CN210798378U - Light-duty ready-package removes toilet - Google Patents
Light-duty ready-package removes toilet Download PDFInfo
- Publication number
- CN210798378U CN210798378U CN201920401561.0U CN201920401561U CN210798378U CN 210798378 U CN210798378 U CN 210798378U CN 201920401561 U CN201920401561 U CN 201920401561U CN 210798378 U CN210798378 U CN 210798378U
- Authority
- CN
- China
- Prior art keywords
- upright post
- clean room
- wallboard
- light
- shaped keel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a light-duty fast-assembling type movable clean room, an outer wallboard upright post, an inner wallboard upright post, a top plate crossbeam and a T-shaped keel, wherein the outer wallboard upright post and the top plate crossbeam form a three-dimensional outer frame, the inner wallboard upright post and the T-shaped keel form a three-dimensional inner frame, the inner frame is arranged inside the outer frame, the outer frame and the inner frame respectively form the clean room by metal wall plates, a static pressure space is formed between the upper end of the T-shaped keel and the top plate crossbeam, a return air channel is formed between the outer wallboard upright post and the inner wallboard upright post, a return air shutter is arranged on the inner wallboard formed on the inner wallboard upright post, a plurality of FFU filtering units are arranged on the T-shaped keel, the air supply of the FFU filtering units sequentially passes through the clean room and returns to the FFU for circulating filtration through the return air channel, prevent pollution caused by uncontrollable airflow in the factory building.
Description
Technical Field
The utility model belongs to the filtration equipment field especially relates to a light-duty ready-package removes toilet.
Background
At present, the simple and quick clean space building method mainly adopts a clean shed, the clean shed mainly comprises a frame and a fan filtering unit, the clean area is not tightly sealed, and the diffusion of dust moved by production equipment and personnel is difficult to control.
In the application number: CN201521113574.6, having the filing date of 20151229 names: in the patent of the installation structure of the fresh air filtering device for the clean room, the installation structure of the fresh air filtering device for the clean room is disclosed, which comprises a fresh air filter box body, a fresh air inlet pipe, a fresh air outlet pipe and a detachable filter; the fresh air filter box body is provided with a mounting opening which is communicated with the inside of the fresh air filter box body, and the fresh air inlet pipe and the fresh air outlet pipe are respectively connected and mounted with the air inlet and the air outlet of the fresh air filter box body; this detachable filter is installed on the fresh air filter box, and detachable filter is including the framework and set up filter screen and the handle in the framework, and the filter screen stretches into the inside of fresh air filter box through aforementioned installing port, and this handle is located outside the fresh air filter box.
Disclosure of Invention
The utility model aims at providing a light-duty ready-package removes toilet in order to overcome the defect that above-mentioned prior art exists.
The purpose of the utility model can be realized through the following technical scheme:
a light fast-assembling movable clean room comprises an outer wall plate upright post 8, an inner wall plate upright post 5, a top plate crossbeam 3 and a T-shaped keel 9, the outer wallboard upright post 8 and the top plate crossbeam 3 form a three-dimensional outer frame, the inner wallboard upright post 5 and the T-shaped keel 9 form a three-dimensional inner frame, the inner frame is arranged in the outer frame, the outer frame and the inner frame respectively form a clean room by metal wall plates, a static pressure space is formed between the upper end of the T-shaped keel 9 and the top plate cross beam 3, a return air channel is formed between the outer wallboard upright post 8 and the inner wallboard upright post 5, a return air shutter 6 is arranged on the inner wallboard formed on the inner wallboard upright post 5, a plurality of FFU filtering units 10 are installed on the T-shaped keel 9, and air supplied by the FFU filtering units 10 sequentially passes through a clean room and returns to the FFU filtering units through an air return passage from the air return shutter 6 for circulating filtration.
Preferably, an air conditioning system is arranged on a top plate formed by the top plate cross beam 3.
Preferably, the T-shaped keel 9 is provided with a lighting lamp 8.
Preferably, an observation window 82 is arranged on an external wall panel 86 formed by the external wall panel upright posts 8, an upper metal wall panel 81 and a lower metal wall panel 83 are respectively arranged on the upper side and the lower side of the observation window 82, and the external wall panel 86 is fixedly connected with an external frame through an upper rail 84 and a lower rail 85.
Preferably, the contact position of the T-shaped keel 9 and the external wall panel 86 is fixedly connected with the external wall panel 86 through a ceiling edge-closing section 87.
Preferably, the clean room is further provided with an equipment power distribution device, and the equipment power distribution device comprises an electric threading pipe 12 and an electric junction box 11.
Preferably, the equipment power distribution device is arranged in the outer wall panel upright post 8 or the inner wall panel upright post 5, and the outer wall panel upright post 8 and the inner wall panel upright post 5 are of hollow structures.
The utility model has the advantages that:
the clean room has the advantages of light and stable structure, small occupied space, easy expansion, tight sealing and prevention of pollution caused by uncontrollable airflow in a factory building.
Drawings
Fig. 1 is a schematic structural diagram of a light-weight, fast-assembly, mobile clean room.
Fig. 2 is a schematic view of an installation structure of the metal wall panel.
Fig. 3 is a schematic structural view of a combination of metal wall panels, a ceiling panel and a drop ceiling.
Figure 4 is a wall panel column integrated power distribution.
Fig. 5 is a three-dimensional structure view of a light-weight, fast-assembly and movable clean room.
Detailed Description
The technical scheme of the utility model is further described with the attached drawings:
a light fast-assembling movable clean room comprises an outer wall plate upright post 8, an inner wall plate upright post 5, a top plate crossbeam 3 and a T-shaped keel 9, the outer wallboard upright post 8 and the top plate crossbeam 3 form a three-dimensional outer frame, the inner wallboard upright post 5 and the T-shaped keel 9 form a three-dimensional inner frame, the inner frame is arranged in the outer frame, the outer frame and the inner frame respectively form a clean room by metal wall plates, a static pressure space is formed between the upper end of the T-shaped keel 9 and the top plate cross beam 3, a return air channel is formed between the outer wallboard upright post 8 and the inner wallboard upright post 5, a return air shutter 6 is arranged on the inner wallboard formed on the inner wallboard upright post 5, a plurality of FFU filtering units 10 are installed on the T-shaped keel 9, and air supplied by the FFU filtering units 10 sequentially passes through a clean room and returns to the FFU filtering units through an air return passage from the air return shutter 6 for circulating filtration.
In this embodiment, preferably, an air conditioning system is disposed on a top plate formed by the top plate cross beam 3.
In this embodiment, preferably, the T-shaped keel 9 is provided with a lighting fixture 8.
In this embodiment, preferably, the external wall panel 86 formed by the external wall panel columns 8 is provided with an observation window 82, the upper and lower sides of the observation window 82 are respectively provided with an upper window metal wall panel 81 and a lower window metal wall panel 83, and the upper and lower sides of the external wall panel 86 are respectively fixedly connected with the external frame through an upper rail 84 and a lower rail 85.
In this embodiment, preferably, the contact position between the T-shaped keel 9 and the external wall panel 86 is fixedly connected with the external wall panel 86 through a ceiling edge-closing profile 87.
In this embodiment, preferably, the clean room is further provided with an equipment power distribution device, and the equipment power distribution device includes an electrical conduit 12 and an electrical junction box 11.
In this embodiment, preferably, the equipment power distribution device is disposed in the outer wall panel column 8 or the inner wall panel column 5, and the outer wall panel column 8 and the inner wall panel column 5 are hollow structures.
The upper portion confined space of light-duty ready-package toilet forms the static pressure space, stabilizes the air current, reduces the dynamic pressure, also can with the better mixture of air conditioning system air supply, the upper portion roof forms confined space with the wall body that falls to the ground, prevents the pollution that uncontrollable air current brought in the factory building. The high-strength wallboard section bar enables the clean room not to be attached to a building structure to form a system, and the structure is light, handy and stable, small in occupied space, easy to expand and tight in sealing.
The light fast-assembling clean room is not only provided with the fan filtering unit FFU and the lighting lamp, but also can integrate production equipment power distribution, clean room air return and local air exhaust. The air conditioner can be connected to the air supply of the air conditioner in the factory, and a special air conditioning system can be configured.
Finally, it should be noted that:
the skilled person can, with reference to the present disclosure, carry out the method and carry out its application, it being expressly noted that all similar substitutes and modifications apparent to the skilled person are deemed to be included within the present invention. The method and application of the present invention have been described in terms of preferred embodiments, and it will be apparent to those skilled in the art that the techniques of the present invention may be practiced and used without departing from the spirit and scope of the present invention by modifying or otherwise appropriately changing or combining the various methods and applications of the present invention.
Claims (7)
1. The utility model provides a light-duty ready-package removes toilet which characterized in that: comprises an outer wall plate upright post (8), an inner wall plate upright post (5), a top plate cross beam (3) and a T-shaped keel (9), the outer wallboard upright post (8) and the top plate cross beam (3) form a three-dimensional outer frame, the inner wallboard upright post (5) and the T-shaped keel (9) form a three-dimensional inner frame, the inner frame is arranged in the outer frame, the outer frame and the inner frame respectively form a clean room by metal wallboards, a static pressure space is formed between the upper end of the T-shaped keel (9) and the top plate cross beam (3), an air return channel is formed between the outer wallboard upright post (8) and the inner wallboard upright post (5), an air return shutter (6) is arranged on an inner wall plate formed on the inner wall plate upright post (5), a plurality of FFU filtering units (10) are arranged on the T-shaped keel (9), the air supplied by the FFU filtering unit (10) passes through the clean room in sequence and returns to the FFU filtering unit from the return air shutter (6) through the return air channel for circulating filtration.
2. A light-weight, ready-to-load, mobile clean room according to claim 1, characterized in that: and an air conditioning system is arranged on a top plate formed by the top plate cross beam (3).
3. A light-weight, ready-to-load, mobile clean room according to claim 1, characterized in that: and the T-shaped keel (9) is provided with a lighting lamp 8.
4. A light-weight, ready-to-load, mobile clean room according to claim 1, characterized in that: be equipped with observation window (82) on side fascia (86) that side fascia stand (8) formed, metal wallboard (81) and under window metal wallboard (83) are equipped with respectively from top to bottom on observation window (82), side fascia (86) are respectively through upper rail (84) and lower rail (85) fixed connection and outer frame from top to bottom.
5. A light-weight, ready-to-load, mobile clean room according to claim 1, characterized in that: the T-shaped keel (9) is fixedly connected with the outer wall panel (86) through the ceiling edge-folding section bar (87).
6. A light-weight, ready-to-load, mobile clean room according to claim 1, characterized in that: the clean room is also provided with an equipment power distribution device, and the equipment power distribution device comprises an electric threading pipe (12) and an electric junction box (11).
7. A light-weight, ready-to-load, mobile clean room according to claim 6, characterized in that: the equipment power distribution device is arranged in an outer wallboard upright post (8) or an inner wallboard upright post (5), and the outer wallboard upright post (8) and the inner wallboard upright post (5) are of hollow structures.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920401561.0U CN210798378U (en) | 2019-03-27 | 2019-03-27 | Light-duty ready-package removes toilet |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920401561.0U CN210798378U (en) | 2019-03-27 | 2019-03-27 | Light-duty ready-package removes toilet |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210798378U true CN210798378U (en) | 2020-06-19 |
Family
ID=71231016
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920401561.0U Expired - Fee Related CN210798378U (en) | 2019-03-27 | 2019-03-27 | Light-duty ready-package removes toilet |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210798378U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112344487A (en) * | 2020-10-26 | 2021-02-09 | 中铁建工集团建筑安装有限公司 | Air filter and clean room temperature and humidity debugging method |
KR102334741B1 (en) * | 2020-11-17 | 2021-12-02 | 한경대학교 산학협력단 | Bus stop shelter with improved user convenience and air purification efficiency |
CN115288490A (en) * | 2022-09-28 | 2022-11-04 | 沧州佳宜洁环保科技有限公司 | Resource type low-carbon ecological toilet |
-
2019
- 2019-03-27 CN CN201920401561.0U patent/CN210798378U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112344487A (en) * | 2020-10-26 | 2021-02-09 | 中铁建工集团建筑安装有限公司 | Air filter and clean room temperature and humidity debugging method |
KR102334741B1 (en) * | 2020-11-17 | 2021-12-02 | 한경대학교 산학협력단 | Bus stop shelter with improved user convenience and air purification efficiency |
CN115288490A (en) * | 2022-09-28 | 2022-11-04 | 沧州佳宜洁环保科技有限公司 | Resource type low-carbon ecological toilet |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210798378U (en) | Light-duty ready-package removes toilet | |
CN104775522B (en) | A kind of detachable house box | |
CN217870608U (en) | Piping lane structure | |
CN217431120U (en) | Air intake device for combustion engine | |
CN108306209B (en) | Mobile intelligent GIS device dustproof device | |
CN207405851U (en) | grid ceiling structure | |
CN206815528U (en) | A kind of assembling type mobile room | |
CN213979514U (en) | Suspended ceiling | |
CN210569010U (en) | Double-layer filtering air inlet chamber structure of process air conditioner | |
CN106639380A (en) | Integrated machine room | |
CN209976639U (en) | Air prefilter quick replacement system | |
CN109296230B (en) | Assembled transformer substation complete machine structure | |
CN207113167U (en) | Air purification filter system | |
CN102211088B (en) | Roof natural-ventilation deduster | |
JP3164750U (en) | Unit house air conditioner integrated panel | |
CN206346312U (en) | A kind of steel-structure box room | |
CN110529957B (en) | Double-layer filtering air inlet chamber structure of process air conditioner | |
CN206071106U (en) | Dismounting Combined multifunctional energy-conservation tea booth | |
CN103821394A (en) | Sand blast house with movable roof and construction method thereof | |
CN113216526B (en) | Energy-saving environment-friendly roof system of green building | |
CN218148897U (en) | Quickly-installed box type house with corridor | |
CN115045421B (en) | Outdoor glass curtain wall structure and construction method | |
CN218993575U (en) | High-efficiency ventilation device | |
CN212053304U (en) | From quick pin-connected panel sound-proof booth of taking silencer | |
CN216866210U (en) | Military high-voltage tent |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200619 Termination date: 20210327 |