CN210766409U - Break joint partition plate template of protective wall - Google Patents

Break joint partition plate template of protective wall Download PDF

Info

Publication number
CN210766409U
CN210766409U CN201921172682.9U CN201921172682U CN210766409U CN 210766409 U CN210766409 U CN 210766409U CN 201921172682 U CN201921172682 U CN 201921172682U CN 210766409 U CN210766409 U CN 210766409U
Authority
CN
China
Prior art keywords
side steel
steel sheet
steel plate
protective wall
broken joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921172682.9U
Other languages
Chinese (zh)
Inventor
黄小华
陈以昭
张静波
柴波
张素芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Huahua Bridge Equipments Co ltd
Original Assignee
Anhui Huahua Bridge Equipments Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Huahua Bridge Equipments Co ltd filed Critical Anhui Huahua Bridge Equipments Co ltd
Priority to CN201921172682.9U priority Critical patent/CN210766409U/en
Application granted granted Critical
Publication of CN210766409U publication Critical patent/CN210766409U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a protective wall broken joint baffle template, the protective wall broken joint is located between two adjacent protective walls, the baffle template is arranged in the protective wall broken joint and is used for forming the protective wall broken joint when the protective wall is poured, the baffle template comprises a middle steel plate and side steel plates respectively arranged at two sides of the middle steel plate, and the side of the side steel plate far away from the middle steel plate is provided with an isolation film; the utility model discloses a protection wall breaking joint baffle template, simple structure, the installation and the dismantlement of being convenient for, after the protection wall shaping, the protection wall concrete of pouring does not contact, not adhere to the side of concrete and side steel sheet because the isolation effect of barrier film, when the side steel sheet is dismantled, does not need the offside steel sheet to strike, avoids having the side steel sheet to warp, prolongs side steel sheet life, saves the cost.

Description

Break joint partition plate template of protective wall
Technical Field
The utility model belongs to bridge protection wall breaking joint shaping field, more specifically the utility model relates to a protection wall breaking joint baffle template that says so.
Background
The bridge protection wall is mostly provided with broken joints for weakening the generation of cracks of transverse members, the width of the broken joints is generally set to be about 1 cm, and the existing commonly used protection wall broken joint template materials comprise wood boards, foam boards, steel plates and the like, but all have the defects of different degrees, such as poor forming, insufficient rigidity, incapability of turnover and reuse, difficulty in dismantling, template changeability and the like.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a protection wall breaking joint baffle template, template non-deformable can long-time cyclic utilization, saves the cost, and convenient to detach improves and dismantles efficiency and demolishs working strength.
The utility model provides a protection wall broken joint baffle template, the protection wall both sides are fixed with the side form respectively, and the protection wall broken joint is located between the double-phase adjacent protection wall, and the baffle template sets up in the protection wall broken joint for form the protection wall broken joint when the protection wall is pour, and the baffle template sets up at the side form tip, and the baffle template includes middle steel sheet and sets up the side steel sheet in middle steel sheet both sides respectively, and the side steel sheet is provided with the barrier film on keeping away from the side of middle steel sheet.
Preferably, two mounting holes are formed in one end face of the side steel plate, flexible magnetic strips are fixed to the mounting holes through screws, and the length of each flexible magnetic strip is not smaller than the height of the side steel plate.
Preferably, the flexible magnetic strip comprises a non-woven fabric strip and permanent magnet sheets fixed on the non-woven fabric strip at intervals.
Preferably, the sum of the thicknesses of the middle steel plate and the two side steel plates is adaptive to the width of the broken joint of the protective wall.
Preferably, one end of the middle steel plate is provided with a lifting head, and the lifting head is provided with a lifting hole.
Preferably, the release film is a plastic film or a nonwoven fabric.
The utility model discloses technical scheme's beneficial effect is:
the utility model discloses technical scheme's a protection wall breaking joint baffle template, simple structure, the installation and dismantlement of being convenient for, after the protection wall shaping, the protection wall concrete of pouring does not contact, not conglutinate because the isolation of barrier film, concrete and side steel sheet side, when the side steel sheet is dismantled, does not need the side steel sheet to strike, avoids having the side steel sheet to warp, prolongs side steel sheet life, saves the cost.
Drawings
FIG. 1 is a top view of a partition plate template for protecting wall fracture according to the technical solution of the present invention,
FIG. 2 is a front view of a baffle plate template for protecting wall fracture in the technical scheme of the utility model,
figure 3 is a schematic view of an intermediate steel plate,
figure 4 is a schematic view of a side steel plate,
FIG. 5 is a schematic view of the installation of the isolation diaphragm on the side steel plate.
Detailed Description
In order to facilitate the understanding of the technical solutions of the present invention by those skilled in the art, the technical solutions of the present invention will now be further described with reference to the drawings attached to the specification.
As shown in figures 1 to 5, the side formworks 1 are fixed on two sides of a protective wall 2 respectively, the protective wall broken joint is located between two adjacent protective walls 2, the partition formwork is arranged in the protective wall broken joint and used for forming the protective wall broken joint when the protective wall is poured, the partition formwork is arranged at the end portions of the side formworks 1 and comprises a middle steel plate 3 and side steel plates 4 respectively arranged on two sides of the middle steel plate 3, and isolation films 6 are arranged on the side faces, far away from the middle steel plate 3, of the side steel plates 4.
Based on the technical scheme, when the protection wall fracture partition plate template is installed, the isolation films 6 are respectively fixed on the side surfaces of the side steel plates 4, then the two side steel plates 4 and the middle steel plate 3 are installed at the position of the fracture of the protection wall, namely, the side plates of the side steel plates 1 are installed and fixed at the end parts of the side steel plates, the side plates of the two side steel plates 4 provided with the isolation films 6 are respectively tightly propped against the side steel plates 1 close to the side steel plates, then the protection wall 2 is cast, after the casting is finished, the partition plate template is removed after the cast concrete is dried, firstly, the middle steel plate 3 is lifted and pulled out by a lifting machine, after the middle steel plate 3 is pulled out, the two side steel plates 4 lose the middle supporting force and extrusion force, and the isolation films 6 isolate the side steel plates 4 from the protection wall 2, so that the concrete cast by the protection wall 2 cannot be bonded with the steel plates of the side steel plates 4, side steel sheet 4 can drop automatically, or break away from protecting wall 2 automatically, the operator directly take out the side steel sheet can, in this step is dismantled, need not strike the concrete that makes it break away from protecting wall 2 to side steel sheet 4, the effectual deformation of avoiding side steel sheet 4 has prolonged side steel sheet 4's life, has also reduced side steel sheet 4 simultaneously and has demolishd the working strength of operation, has improved the speed and the work efficiency that side steel sheet 4 demolishd.
As shown in fig. 4 and 5, two mounting holes are formed in one end surface of the side steel plate 4, a flexible magnetic strip 11 is fixed to the mounting holes through screws 8, the length of the flexible magnetic strip 11 is not less than the height of the side steel plate 4, and the flexible magnetic strip 11 comprises a non-woven fabric strip 9 and permanent magnet pieces 10 fixed to the non-woven fabric strip 9 at intervals; according to the structure design, the flexible magnetic strip 11 is utilized to press the isolation film 6 and suck the side steel plate, so that the isolation film 6 is fixed on the side surface of the side steel plate 4, the operation is convenient and rapid, and the isolation film is convenient to mount and separate from the side steel plate 4; when the flexible magnetic strip is installed, the end part of the isolation film 6 needs to be extended to the narrow side face of the side steel plate 4, and then the flexible magnetic strip 11 presses the end part of the isolation film 6 on the narrow side face of the side steel plate 4, so that the tight connection between the side steel plate 4 and the 2 side templates 1 of the protective wall is not influenced, and the pouring of the protective wall 2 is not influenced.
As shown in fig. 1 and 2, the sum of the thicknesses of the middle steel plate 3 and the two side steel plates 4 is adapted to the width of the broken seam of the protective wall; the width of the broken joint of the protective wall is about 1 cm generally, the sum of the thicknesses of the middle steel plate 3 and the two side steel plates 4 is equal to the thickness of the broken joint of the protective wall, and the thicknesses of the middle steel plate 3 and the two side steel plates 4 are balanced when the middle steel plate 3 and the two side steel plates 4 are selected, so that the middle steel plate 3 and one of the two side steel plates 4 are prevented from being thin and easily deformed when the protective wall is used.
As shown in fig. 3, a lifting head 5 is provided at one end of the middle steel plate 3, and a lifting hole 7 is provided on the lifting head 5.
As shown in fig. 1, the isolation film 6 is a plastic film or a non-woven fabric or other film bodies capable of isolating, the isolation film 6 needs to be cut to be slightly larger than the side surface area of the side steel plate 4, so that the isolation film is convenient to fix on the side steel plate 4, the main function of the isolation film is to isolate the side steel plate 4 from the concrete-poured protection wall 2, the protection wall 2 is prevented from being bonded and adhered with the side steel plate 4 during pouring, after the concrete of the conventional protection wall 2 is bonded with the side steel plate 4, the side steel plate 4 needs to be knocked when being disassembled, on one hand, labor during disassembling is reduced, and on the other hand, the side steel plate 4 is prevented from being deformed through multiple knocking.
The technical solution of the present invention is to provide an improved method for manufacturing a semiconductor device, which is characterized in that the method is not limited by the above-mentioned method, and the method is not substantially improved by the method and the device, or the method and the device are directly applied to other occasions without improvement, all within the protection scope of the present invention.

Claims (6)

1. The utility model provides a guard wall broken joint baffle template, guard wall broken joint is located between the double-phase adjacent guard wall, and the baffle template sets up in the guard wall broken joint for form the guard wall broken joint when the guard wall is pour, its characterized in that, the baffle template includes middle steel sheet and sets up the side steel sheet in middle steel sheet both sides respectively, the side steel sheet is provided with the barrier film on keeping away from the side of middle steel sheet.
2. A protective wall broken joint clapboard template according to claim 1, wherein two mounting holes are arranged on one end face of the side steel plate, flexible magnetic strips are fixed on the mounting holes through screws, and the length of the flexible magnetic strips is not less than the height of the side steel plate.
3. A partition panel form for a protective wall slit according to claim 2, wherein said flexible magnetic strip comprises a non-woven fabric strip and permanent magnet pieces fixed to said non-woven fabric strip at intervals.
4. A diaphragm plate form for protecting wall gap according to claim 1, wherein the sum of the thicknesses of the middle steel plate and the two side steel plates is adapted to the width of the gap of the protecting wall.
5. A protective wall broken joint partition plate template according to claim 1, wherein one end of the middle steel plate is provided with a lifting head, and the lifting head is provided with lifting holes.
6. A partition form for a protective wall slit according to claim 1, wherein the separation film is a plastic film or a nonwoven fabric.
CN201921172682.9U 2019-07-24 2019-07-24 Break joint partition plate template of protective wall Active CN210766409U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921172682.9U CN210766409U (en) 2019-07-24 2019-07-24 Break joint partition plate template of protective wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921172682.9U CN210766409U (en) 2019-07-24 2019-07-24 Break joint partition plate template of protective wall

Publications (1)

Publication Number Publication Date
CN210766409U true CN210766409U (en) 2020-06-16

Family

ID=71061180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921172682.9U Active CN210766409U (en) 2019-07-24 2019-07-24 Break joint partition plate template of protective wall

Country Status (1)

Country Link
CN (1) CN210766409U (en)

Similar Documents

Publication Publication Date Title
CN202467176U (en) Post-cast strip isolation template
CN210766409U (en) Break joint partition plate template of protective wall
CN105952154A (en) Concrete pouring template support
CN108930403B (en) Device for preventing slurry leakage at root of concrete aluminum template and using method thereof
CN103452319A (en) Chiseling-free device for concrete splicing interface and construction method for chiseling-free device
CN202831624U (en) Template for deformation joint of shear wall
CN204609293U (en) Portablely locate buttress casting mold
CN111005562A (en) Method for sealing and processing opening of window of assembled laminated plate wall
CN201232352Y (en) L-shaped corner formwork
CN215564414U (en) Construction template applied to ribbed floor
CN104652673A (en) Assembled integrated type prefabricated concrete floor slab and connection method thereof
CN212715921U (en) Two-sided coincide wallboard door and window entrance to a cave formwork structure
CN213681757U (en) Wet seam construction equipment of bridge
CN217501028U (en) Aluminum die structure for forming outer wall of bay window of building
CN212670938U (en) Prefabricated two-sided coincide wallboard of metal sheet banding formula that punches a hole
CN205276548U (en) Mounting structure of wallboard and time stand
CN205875724U (en) Concrete placement formwork support
CN206581602U (en) A kind of civil engineering bridge construction template link
CN212562485U (en) Detachable bridge frame reserved hole die
CN111733893A (en) Post-cast strip plugging structure and construction method thereof
CN216810945U (en) Novel high-speed railway station dysmorphism post steel formwork system
CN204326528U (en) Combined type hole reservation mould
CN220100669U (en) Old template leakage-proof easy-to-disassemble template patch board
CN216042588U (en) Aluminum film quick-release structure in narrow space
CN212478546U (en) Stair stubble-jointing pick-free chiseling device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant