CN210738049U - Can sun-proof rain-proof building engineering scaffold frame - Google Patents

Can sun-proof rain-proof building engineering scaffold frame Download PDF

Info

Publication number
CN210738049U
CN210738049U CN201921510479.8U CN201921510479U CN210738049U CN 210738049 U CN210738049 U CN 210738049U CN 201921510479 U CN201921510479 U CN 201921510479U CN 210738049 U CN210738049 U CN 210738049U
Authority
CN
China
Prior art keywords
ceiling
scaffold
sun
rain
support frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921510479.8U
Other languages
Chinese (zh)
Inventor
买中傲
高红艳
张娜
张莉萍
买嗣备
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Energy Institute
Original Assignee
Shaanxi Energy Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Energy Institute filed Critical Shaanxi Energy Institute
Priority to CN201921510479.8U priority Critical patent/CN210738049U/en
Application granted granted Critical
Publication of CN210738049U publication Critical patent/CN210738049U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a building engineering scaffold capable of sun-screening and rain-proofing, which comprises a scaffold main body and a ceiling, wherein the ceiling is detachably connected at the top of the scaffold main body, the ceiling support comprises four C-shaped support frames, every two support frames are fixedly connected through a folding connecting piece, folding and unfolding between the support frames are realized through the rotation opening and closing of the folding connecting piece, and the ceiling is covered with a piece of sun-shading cloth made of waterproof materials, so that the scaffold can be sun-screening and rain-proofing; scaffold frame main part includes base, montant and workstation, still is equipped with the stiffener of all directions between the montant, is equipped with the staircase between ground and the workstation, and the scaffold frame bottom is equipped with the universal wheel, makes things convenient for the removal of scaffold frame, and the while carries out dual fixed, safe firm through locking buckle on the universal wheel and the clamping screw on the base to scaffold frame position. The utility model has the advantages of reasonable design, can be used to sun-proof rain-proof, the ceiling is dismantled conveniently, can also fold, is convenient for accomodate and stores.

Description

Can sun-proof rain-proof building engineering scaffold frame
Technical Field
The utility model relates to a scaffold frame field especially relates to a can sun-proof rainproof building engineering scaffold frame.
Background
The scaffold is various supports which are erected for workers to operate and solve vertical and horizontal transportation on a construction site, is a necessary work product which can facilitate building construction, masonry of brick walls, pouring of concrete, plastering, decoration and painting of wall surfaces, installation of structural members and the like, and the scaffold is required to be erected nearby so as to perform construction operation and stack construction materials on the scaffold, and the position of the scaffold is often required to be moved in a short distance on a small construction site. However, the traditional scaffold is not provided with a ceiling, so that a constructor needs to construct the scaffold in rainy days or under the insolation of the sun frequently, the damage to the body is large, and particularly sudden diseases such as heatstroke and the like easily occur under the condition of high temperature in summer.
Disclosure of Invention
To the problem that exists, the utility model aims at providing a scaffold frame has rain-proof function, and the ceiling is dismantled foldingly all very conveniently.
In order to achieve the above object, the utility model adopts the following technical scheme:
the utility model provides a can sun-proof rain-proof building engineering scaffold frame which characterized in that: the scaffold comprises a scaffold main body and a ceiling, wherein the ceiling comprises a ceiling bracket and sunshade cloth; the ceiling support is detachably connected to the top of the scaffold main body, and the sunshade cloth is fixedly covered on the ceiling support;
the ceiling support comprises two C-shaped first support frames and two C-shaped second support frames, wherein one first support frame and the corresponding second support frame are arranged in opposite directions and connected through a first folding piece, and the two first support frames are connected through a second folding piece.
Furthermore, a plurality of limiting holes are formed in the first support frame and the second support frame, and a ceiling fixing rod is arranged at the upper end of the scaffold main body; the ceiling fixing rod can be inserted into the limiting hole to fix the ceiling support.
Furthermore, the first support frame and the second support frame are identical in size and shape.
Furthermore, the scaffold main body comprises a base and a workbench, four vertical rods are fixed at four corners of the base, a reinforcing vertical rod is arranged between two vertical rods on the long side of the base, a reinforcing cross rod is arranged between each two adjacent vertical rods, a reinforcing connecting rod is arranged between each two vertical rods on the diagonal, and the two reinforcing connecting rods are crossed to form an X shape; an escalator is further arranged on one side of the base, and a plurality of transverse escalator supports are arranged between the escalator and the vertical rod; the top of the escalator is connected with the workbench.
Furthermore, four universal wheels are arranged on the base, and each universal wheel is provided with a locking buckle.
Furthermore, a plurality of fixing screw rods are arranged on the base.
Furthermore, the staircase includes two parallel longitudinal support rods for the staircase, and a plurality of pedals are arranged between the two longitudinal support rods for the staircase, and each pedal is provided with a non-slip mat.
The utility model has the advantages that: compared with the prior art, the utility model has the improvement that,
1. the engineering scaffold of the utility model is provided with a ceiling which can be used for sun protection and rain protection;
2. the ceiling of the engineering scaffold of the utility model can be detachably connected with the top of the scaffold, is convenient to detach, can be folded and is convenient to store;
3. the utility model discloses an engineering scaffold puts up the convenience, and is safe firm, generally is applicable to various engineering projects.
Drawings
Fig. 1 is the utility model discloses engineering scaffold's front view.
Figure 2 is the side view of the utility model discloses engineering scaffold staircase one side.
Fig. 3 is a side view of the side of the scaffold without the ladder of the present invention.
Fig. 4 is a schematic structural view of the ceiling bracket of the present invention.
Fig. 5 is an enlarged view of the structure of the folding connector of the present invention.
Fig. 6 is a schematic structural diagram of the first support frame of the present invention.
Wherein: 11-ceiling support, 111-first support frame, 112-second support frame, 113-folding connecting piece, 1131-fixing piece, 1132-connecting shaft, 114-limiting hole, 12-sunshade cloth, 21-base, 22-vertical rod, 23-reinforcing vertical rod, 24-reinforcing transverse rod, 25-reinforcing connecting rod, 26-universal wheel, 261-locking buckle, 27-fixing screw, 28-staircase, 281-staircase support, 282-staircase longitudinal support rod, 283-pedal, 284-non-slip mat, 29-workbench and 3-ceiling fixing rod.
Detailed Description
In order to make those skilled in the art better understand the technical solution of the present invention, the following describes the technical solution of the present invention with reference to the accompanying drawings and embodiments.
The first embodiment is as follows:
referring to fig. 1-6, a sun-proof and rain-proof scaffolding for construction engineering includes a scaffolding body and a ceiling;
further, the scaffold main body comprises a base 21 and a workbench 29, the base 21 is a rectangular metal block with a certain thickness, four fixing grooves are formed in four corners of the base 21, the fixing grooves are connected with four vertical rods 22 through screw rods and nuts, a reinforcing vertical rod 23 is further arranged between each two vertical rods 22 on the long side of the base 21, the height of each reinforcing vertical rod 23 is higher than that of each vertical rod 22, a reinforcing cross rod 24 is arranged between each two adjacent vertical rods 22 and each reinforcing vertical rod 23, a reinforcing cross rod 24 is also arranged between each two adjacent vertical rods 22, a reinforcing connecting rod 25 is arranged between each two vertical rods 22 on the diagonal line, and the two reinforcing connecting rods 25 are crossed to form an X shape; the reinforcing cross bar 24 and the reinforcing connecting rod 25 are fixedly connected with the vertical bar 22 and the reinforcing vertical bar 22 through connecting fasteners; the workbench 29 is positioned above the reinforcing cross bar 24 and the reinforcing connecting rod 25, and four corners and four edges of the workbench 29 are fixed with the vertical bars 22 and the reinforcing vertical bars 22 through connecting fasteners;
one side of base 21 still is equipped with staircase 28, staircase 28 includes the vertical bracing piece 282 of the staircase of two parallels, two be equipped with a plurality of footboards 283 between the vertical bracing piece 282 of staircase, all be stained with slipmat 284 on every footboard 283, prevent that constructor from slipping when the cat ladder and falling the injury, two the vertical bracing piece 282 of staircase with be fixed with a plurality of horizontal staircase supports 281 with connecting fastener between the montant 22 for it is together fixed with staircase and scaffold main part, the top and the workstation 29 of staircase 28 link to each other.
The ceiling comprises a ceiling bracket 11 and a sunshade cloth 12; the ceiling support 11 is detachably connected to the top of the scaffold main body through a screw and a nut, and the sunshade cloth 12 is fixedly covered on the ceiling support 11 through a screw;
the ceiling support 11 comprises two C-shaped first support frames 111 and two C-shaped second support frames 112, wherein one first support frame 111 and one second support frame 112 are respectively taken and arranged oppositely, the end parts of the first support frame and the second support frame are spliced together, and the upper parts of the first support frame and the second support frame are connected by a first folding connecting piece; the two first supporting frames 111 are connected through a second folding connecting piece, and the folding and the storage of the ceiling support 11 are realized under the connecting action of the first folding piece and the second folding piece.
Further, the first folding connector and the second folding connector are the same folding connector 113.
Further, folding connector 113 includes two stationary blades 1131 and a connecting axle 1132, and two stationary blades 1131 carry out 90 degrees rotations to connecting axle 1132 direction, and two stationary blades 1131 are fixed on two support frames with the screw respectively, open and shut the folding and the opening that drive the support frame through the rotation of stationary blade 1131.
The sun-shading cloth 12 is made of waterproof materials, and achieves a rainproof function.
Further, a plurality of limiting holes 114 are formed in the first support frame 111 and the second support frame 112, and ceiling fixing rods 3 are respectively arranged at the upper ends of the vertical rods 22 and the reinforcing vertical rods 23; the ceiling fixing rod 3 is connected with the vertical rod 22 and the reinforcing vertical rod 23 through universal shafts and can rotate up and down, left and right, and the ceiling fixing rod 3 is inserted into the limiting hole 114 to further fix the ceiling support 11.
Preferably, the first support bracket 111 and the second support bracket 112 are the same in size and shape.
Further, four universal wheels 26 are arranged at the lower part of the base 21, and each universal wheel 26 is provided with a locking buckle 261.
Further, a plurality of fixing screws 27 are disposed on the base 21.
The utility model discloses a concrete implementation way does:
the utility model provides a can sun-proof rainproof building engineering scaffold, when using, builds the scaffold main part through connecting the fastener, removes the scaffold to the workplace through universal wheel 26, will lock buckle 261 and lock and die, simultaneously, rotatory clamping screw 27 makes the toper pointed end of clamping screw 27 bottom insert ground to fix the position of scaffold, prevent to take place to slide at the in-process of engineering construction. The operator climbs the work bench 29 via the escalator 28; and then, fixedly connecting the installed ceiling with the vertical rods 22 and the reinforcing vertical rods 23 through screw nuts, inserting the ceiling fixing rod 3 into the corresponding limiting hole 114 as required, and fixing the ceiling on the top of the scaffold.
When the ceiling is not needed in autumn and winter, the ceiling fixing rod 3 is pulled out of the limiting hole 114, the screw and the nut on the ceiling are screwed off, the ceiling is taken down, and the ceiling is folded into 1/4 size through the three folding connecting pieces 113 to be stored; the scaffold main body can be detached and transported to other places conveniently.
Along with the progress of engineering, when the height of scaffold main part needs to be increased, the ceiling is firstly detached, then the workbench is detached, one or more steel pipes are respectively and correspondingly connected to the top ends of the vertical rods 22, the reinforcing rods 23 and the escalator 28 through connecting fasteners, the heights of the vertical rods 22, the reinforcing rods 23 and the escalator 28 are prolonged, then the workbench 29 and the ceiling are assembled, and the lifting of the height of the scaffold is realized.
In this embodiment, a plurality of stages of the work table 29 may be built, and the ceiling may be provided on the top of the uppermost stage of the work table 29.
Example two:
referring to fig. 1-6, a sun-proof and rain-proof scaffolding for construction engineering includes a scaffolding body and a ceiling;
further, the scaffold main body comprises a base 21 and a workbench 29, the base 21 is a rectangular metal block with a certain thickness, four vertical rods 22 are welded above four corners of the base 21, a reinforcing vertical rod 23 is arranged between each two vertical rods 22 on the long side of the base 21, the height of each reinforcing vertical rod 23 is higher than that of each vertical rod 22, a reinforcing cross rod 24 is arranged between each two adjacent vertical rods 22 and each reinforcing vertical rod 23, a reinforcing cross rod 24 is also arranged between each two adjacent vertical rods 22, a reinforcing connecting rod 25 is arranged between each two vertical rods 22 on the diagonal, and the two reinforcing connecting rods 25 are crossed to form an X shape; the reinforcing cross bar 24 and the reinforcing connecting rod 25 are welded on the vertical bar 22 and the reinforcing vertical bar 22; the workbench 29 is positioned above the reinforcing cross bar 24 and the reinforcing connecting rod 25, and the workbench 29 is fixed with the vertical bar 22 and the reinforcing vertical bar 22 through welding;
one side of base 21 still is equipped with staircase 28, staircase 28 includes the vertical bracing piece 282 of the staircase of two parallels, two be equipped with a plurality of footboards 283 between the vertical bracing piece 282 of staircase, all be stained with slipmat 284 on every footboard 283, prevent that constructor from slipping when the cat ladder and falling and hindering, two the vertical bracing piece 282 of staircase with it has a plurality of horizontal staircase supports 281 to weld between the montant 22 for it is together fixed with the scaffold main part to be used for staircase, the top of staircase 28 links to each other with workstation 29.
The ceiling comprises a ceiling bracket 11 and a sunshade cloth 12; the ceiling support 11 is detachably connected to the top of the scaffold main body by bolts and nuts, and the sunshade cloth 12 is fixedly covered on the ceiling support 11 by bolts;
the ceiling support 11 comprises two C-shaped first support frames 111 and two C-shaped second support frames 112, wherein one first support frame 111 and one second support frame 112 are respectively taken and arranged oppositely, the end parts of the first support frame and the second support frame are spliced together, and the upper parts of the first support frame and the second support frame are connected by a first folding connecting piece; the two first supporting frames 111 are connected through a second folding connecting piece, and the folding and the storage of the ceiling support 11 are realized under the connecting action of the first folding piece and the second folding piece.
Further, the first folding connector and the second folding connector are the same folding connector 113.
Further, folding connector 113 includes two stationary blades 1131 and a connecting axle 1132, and two stationary blades 1131 carry out 90 degrees rotations to connecting axle 1132 direction, and two stationary blades 1131 are fixed on two support frames with the screw respectively, open and shut the folding and the opening that drive the support frame through the rotation of stationary blade 1131.
The sun-shading cloth 12 is made of waterproof materials, and achieves a rainproof function.
Further, a plurality of limiting holes 114 are formed in the first support frame 111 and the second support frame 112, and ceiling fixing rods 3 are respectively arranged at the upper ends of the vertical rods 22 and the reinforcing vertical rods 23; the ceiling fixing rod 3 is connected with the vertical rod 22 and the reinforcing vertical rod 23 through universal shafts and can rotate up and down, left and right, and the ceiling fixing rod 3 is inserted into the limiting hole 114 to further fix the ceiling support 11.
Preferably, the first support bracket 111 and the second support bracket 112 are the same in size and shape.
Further, four universal wheels 26 are arranged at the lower part of the base 21, and each universal wheel 26 is provided with a locking buckle 261.
Further, a plurality of fixing screws 27 are disposed on the base 21.
The utility model discloses a concrete implementation way does:
the utility model provides a can sun-proof rainproof building engineering scaffold, when using, removes the scaffold to the workplace through universal wheel 26, will lock buckle 261 dead, simultaneously, rotatory clamping screw 27 makes the toper pointed end of clamping screw 27 bottom insert ground to fix the position of scaffold, prevent to take place to slide at the in-process of engineering construction. The operator climbs the work bench 29 via the escalator 28; and then, fixedly connecting the mounted ceiling with the vertical rods 22 and the reinforcing vertical rods 23 through screws and nuts, inserting the ceiling fixing rod 3 into the corresponding limiting hole 114 as required, and fixing the ceiling on the top of the scaffold.
When the ceiling is not needed in autumn and winter, the ceiling fixing rod 3 is firstly pulled out from the limiting hole 114, then the screw nuts on the ceiling are screwed off, the ceiling is taken down, and the ceiling is folded into 1/4 size through the three folding connecting pieces 113 to be stored.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (7)

1. The utility model provides a can sun-proof rain-proof building engineering scaffold frame which characterized in that: the scaffold comprises a scaffold main body and a ceiling, wherein the ceiling comprises a ceiling bracket (11) and sunshade cloth (12); the ceiling support (11) is detachably connected to the top of the scaffold main body, and the sunshade cloth (12) is fixedly covered on the ceiling support (11);
ceiling support (11) include first support frame (111) of two C types and second support frame (112) of two C types, one first support frame (111) sets up rather than second support frame (112) that correspond in opposite directions, and connects through first folded piece between the two, two connect through second folded piece between first support frame (111), under the linkage effect of first folded piece and second folded piece, realize folding the accomodating of ceiling support (11).
2. A sun and rain sheltering construction scaffold according to claim 1, characterized by that: a plurality of limiting holes (114) are formed in the first supporting frame (111) and the second supporting frame (112), and a ceiling fixing rod (3) is arranged at the upper end of the scaffold main body; the ceiling fixing rod (3) can be inserted into the limiting hole (114) to fix the ceiling support (11).
3. A sun and rain sheltering construction scaffold according to claim 2, characterized in that: the first support frame (111) and the second support frame (112) are identical in size and shape.
4. A sun and rain sheltering construction scaffold according to claim 1, characterized by that: the scaffold main body comprises a base (21) and a workbench (29), four vertical rods (22) are fixed at four corners of the base (21), a reinforcing vertical rod (23) is arranged between each two vertical rods (22) on the long side of the base (21), a reinforcing cross rod (24) is arranged between each two adjacent vertical rods (22) and each reinforcing vertical rod (23), a reinforcing cross rod (24) is also arranged between each two adjacent vertical rods (22), a reinforcing connecting rod (25) is arranged between each two vertical rods (22) on the diagonal line, and the two reinforcing connecting rods (25) are crossed to form an X shape; an escalator (28) is further arranged on one side of the base (21), and a plurality of transverse escalator supports (281) are arranged between the escalator (28) and the vertical rod (22); the top of the staircase (28) is connected with a working platform (29).
5. A sun and rain protection construction scaffold according to claim 4, wherein: four universal wheels (26) are arranged on the base (21), and each universal wheel (26) is provided with a locking buckle (261).
6. A sun and rain protection construction scaffold according to claim 4, wherein: the base (21) is provided with a plurality of fixing screw rods (27).
7. A sun and rain protection construction scaffold according to claim 4, wherein: the escalator (28) comprises two parallel escalator longitudinal supporting rods (282), a plurality of pedals (283) are arranged between the two escalator longitudinal supporting rods (282), and each pedal (283) is provided with a non-slip mat (284).
CN201921510479.8U 2019-09-11 2019-09-11 Can sun-proof rain-proof building engineering scaffold frame Expired - Fee Related CN210738049U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921510479.8U CN210738049U (en) 2019-09-11 2019-09-11 Can sun-proof rain-proof building engineering scaffold frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921510479.8U CN210738049U (en) 2019-09-11 2019-09-11 Can sun-proof rain-proof building engineering scaffold frame

Publications (1)

Publication Number Publication Date
CN210738049U true CN210738049U (en) 2020-06-12

Family

ID=71006798

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921510479.8U Expired - Fee Related CN210738049U (en) 2019-09-11 2019-09-11 Can sun-proof rain-proof building engineering scaffold frame

Country Status (1)

Country Link
CN (1) CN210738049U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112160570A (en) * 2020-09-16 2021-01-01 徐团团 Green building supporting platform convenient to quick construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112160570A (en) * 2020-09-16 2021-01-01 徐团团 Green building supporting platform convenient to quick construction

Similar Documents

Publication Publication Date Title
CN210738049U (en) Can sun-proof rain-proof building engineering scaffold frame
CN211285297U (en) Bridge engineering is with folding construction support of safe type
CN113735029A (en) Auxiliary lifting device for mounting multifunctional overhead pipeline
CN111946047A (en) A protection adjustable shelter covering or awning on a car, boat, etc. for building scaffold
CN212105028U (en) Safe type scaffold frame for construction
CN210239090U (en) Movable operating platform
CN216616780U (en) Anti-falling device for building scaffold
CN212743445U (en) Movable telescopic folding shed frame
CN112144892B (en) Steel frame construction equipment for building engineering
CN211369454U (en) Scaffold for building engineering
CN218522164U (en) Scaffold for building engineering
CN216406084U (en) Scaffold convenient to remove
CN214833481U (en) Quick-mounting folding barracks
CN112252785B (en) Splicing type automatic telescopic environment-friendly storehouse
JPH0348247Y2 (en)
CN215254418U (en) A assembled building equipment platform for construction
CN214785796U (en) Safe type scaffold frame for construction
CN2748565Y (en) Electric lifting platform support for exterior wall operation
CN212406014U (en) Multifunctional scaffold for road and bridge construction
CN214497876U (en) Quick-mounting folding barracks and supporting consignment vehicle assembly thereof
CN211873744U (en) Adjustable supporting vehicle for construction engineering construction
CN214834583U (en) Scaffold for building engineering
CN214739730U (en) Frame type upright column scaffold device
CN219863920U (en) Building construction platform convenient to remove
CN221073413U (en) Foldable movable scaffold for engineering construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200612

Termination date: 20210911

CF01 Termination of patent right due to non-payment of annual fee