CN221073413U - Foldable movable scaffold for engineering construction - Google Patents

Foldable movable scaffold for engineering construction Download PDF

Info

Publication number
CN221073413U
CN221073413U CN202323110479.8U CN202323110479U CN221073413U CN 221073413 U CN221073413 U CN 221073413U CN 202323110479 U CN202323110479 U CN 202323110479U CN 221073413 U CN221073413 U CN 221073413U
Authority
CN
China
Prior art keywords
rod
support
rods
engineering construction
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323110479.8U
Other languages
Chinese (zh)
Inventor
曹水
张世杰
翟博
江坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Shandong Construction Engineering Co ltd
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Shandong Construction Engineering Co ltd
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Shandong Construction Engineering Co ltd, China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Shandong Construction Engineering Co ltd
Priority to CN202323110479.8U priority Critical patent/CN221073413U/en
Application granted granted Critical
Publication of CN221073413U publication Critical patent/CN221073413U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The foldable movable scaffold for engineering construction comprises support leg pieces arranged on two sides and a working platform arranged between the support leg pieces, wherein the support leg pieces comprise a first support rod, a second support rod and a fixed rod connected between the first support rod and the second support rod, and the working platform is lapped between the fixed rods on the support leg pieces on two sides; the first supporting rods of the supporting leg pieces on two sides and the second supporting rods are connected through movable pieces, each movable piece comprises a middle mounting rod and bearing sleeves respectively sleeved on the upper portion and the lower portion of the middle mounting rod, each middle mounting rod is connected with a first connecting pipe arranged on the first supporting rod or the second supporting rod through a first inclined rod, each bearing sleeve is connected with a second connecting pipe arranged on the first supporting rod or the second supporting rod through a second inclined rod, and fixing nuts used for limiting the bearing sleeves are arranged at the upper end and the lower end of each middle mounting rod. According to the application, through the arrangement of the bearing sleeve, the inclined rod can be rotated to drive the scaffold to fold, so that a user can conveniently and quickly build and detach the scaffold.

Description

Foldable movable scaffold for engineering construction
Technical Field
The application relates to the field of building construction, in particular to a foldable movable scaffold for engineering construction.
Background
The mobile scaffold refers to various supports erected for workers to operate and solve vertical and horizontal transportation at a construction site. The movable scaffold has the characteristics of simple assembly and disassembly, good bearing performance, safe and reliable use and the like, has high development speed, and is the earliest in development and the most in use in various novel scaffolds.
A movable scaffold for seed house construction engineering construction, such as a seed house with the bulletin number of CN213868845U, which belongs to the technical field of scaffolds. The utility model provides a remove scaffold frame that engineering construction was used is built in room, including the roof, roof bottom left side front and back symmetry is equipped with two support column A, support column A left side is equipped with the stopper, rotate between two support column A and be connected with the rotor plate, symmetry rotation is connected with the supporting leg around the rotor plate left side bottom, the supporting leg outside rotates and is connected with the horizontal pole, square groove has been seted up at the rotor plate top, two strip type grooves have been seted up to square groove outer wall bilateral symmetry, strip type inslot rotation is connected with the rack, square inslot is equipped with the material board, material board top oblique angle symmetry is equipped with two pivots, the motor cover has been set firmly at the pivot top, the output of the motor in the motor cover is worn out and is extended to outside and is equipped with the gear. According to the utility model, building materials are placed on the material plate by rotating the rotating plate, and the material plate is conveyed to the top plate by matching the gear and the rack, so that the building materials are conveyed.
However, according to the working principle proposed by the above patent, the applicant believes that although the above device can achieve a certain degree of building material transport, in practical use, the above device does not have a folding function and cannot be quickly set up and dismantled.
Accordingly, a person skilled in the art provides a collapsible mobile scaffold for engineering construction to solve the above mentioned problems of the prior art.
Disclosure of utility model
The utility model aims to provide a foldable movable scaffold for engineering construction, which solves the problems in the background technology.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
The utility model provides a collapsible removal scaffold frame that engineering construction used which characterized in that: the support leg comprises a first support rod, a second support rod and a fixing rod connected between the first support rod and the second support rod, and the working platform is lapped between the fixing rods on the support leg pieces on two sides; the first supporting rods and the second supporting rods of the supporting leg pieces on two sides are connected through movable pieces, each movable piece comprises a middle mounting rod and bearing sleeves respectively sleeved on the upper parts and the lower parts of the middle mounting rods, the middle mounting rods are connected with first connecting pipes arranged on the first supporting rods or the second supporting rods through first inclined rods, the bearing sleeves are connected with second connecting pipes arranged on the first supporting rods or the second supporting rods through second inclined rods, and fixing nuts used for limiting the bearing sleeves are arranged at the upper ends and the lower ends of the middle mounting rods.
Further preferably, the two first diagonal rods are arranged in a splayed shape, the first connecting pipe is sleeved on the first supporting rod or the second supporting rod, and a first fixing hole is formed in the first connecting pipe.
Further, two second inclined rods are arranged on the bearing sleeves at the upper part and the lower part respectively, a second connecting sleeve is sleeved on the first supporting rod or the second supporting rod, and a second fixing hole is formed in the second connecting pipe.
Further, universal wheels are fixedly arranged at the bottoms of the first supporting rod and the second supporting rod.
Further, plugs are arranged at the tops of the first supporting rod and the second supporting rod, and mounting holes are formed in the plugs.
Further, work platform includes bottom support body, bottom plate and baffle, has seted up the ventilation hole on the bottom plate, the dop is installed to bottom support body both sides, the dop overlap joint is on the dead lever, the bottom support body includes the frame and locates the crossbeam in the frame.
In addition, a tool box is fixedly arranged on one side of the top of the working platform, and a tool table is fixedly arranged on the top of the tool box.
More preferably, the inner cavity of the bearing sleeve is movably provided with a rotating ball.
Compared with the prior art, the utility model has the following characteristics and beneficial effects:
The scaffold is convenient for a user to construct, the movable piece and the supporting leg piece are convenient to connect through the arrangement of the first connecting pipe, the stability of the whole scaffold is convenient to increase through the arrangement of the first diagonal rod, the installation strength of the bearing sleeve is convenient to strengthen through the arrangement of the middle installation rod, the diagonal rod can be rotated through the arrangement of the bearing sleeve to drive the scaffold to fold, so that the scaffold is convenient for the user to quickly build and disassemble, the fixing strength of the bearing sleeve is convenient to increase through the arrangement of the fixing nut, and the stability is convenient to increase through the arrangement of the second diagonal rod and the cooperation of the first diagonal rod.
According to the utility model, a stable and safe working environment is provided by a user conveniently through the arrangement of the working platform, a reliable connection point can be provided through the arrangement of the clamping head, so that the working platform is more stable, the unexpected sliding or mistaken stepping of the edge of a worker is prevented through the arrangement of the baffle, the falling risk of the worker is reduced, the user can store a tool conveniently through the arrangement of the tool box, another scaffold can be installed through the arrangement of the plug, the overall height of the scaffold is increased, and the user can conveniently move the scaffold through the arrangement of the universal wheels.
Drawings
FIG. 1 is a schematic view of a collapsible mobile scaffold for engineering construction according to the present application;
FIG. 2 is a schematic structural view of a working platform according to the present application;
Fig. 3 is a schematic structural view of a bearing housing according to the present application.
Detailed Description
The present utility model will be further described below in order to make the technical means, innovative features, achieved objects and effects achieved by the present utility model easy to understand.
The examples described herein are specific embodiments of the present utility model, which are intended to illustrate the inventive concept, are intended to be illustrative and exemplary, and should not be construed as limiting the utility model to the embodiments and scope of the utility model. In addition to the embodiments described herein, those skilled in the art can adopt other obvious solutions based on the disclosure of the claims and specification, including those adopting any obvious substitutions and modifications to the embodiments described herein.
The foldable movable scaffold for engineering construction comprises support leg pieces 1 arranged on two sides and a working platform 2 arranged between the support leg pieces 1, wherein the support leg pieces 1 comprise a first support rod 11, a second support rod 12 and a fixed rod 13 connected between the first support rod 11 and the second support rod 12, and the working platform 2 is lapped between the fixed rods 13 on the support leg pieces 1 on two sides; the first supporting rods 11 and the second supporting rods 12 of the two-side supporting leg pieces 1 are connected through the movable piece 3, the movable piece 3 comprises a middle mounting rod 31 and bearing sleeves 32 respectively sleeved on the upper portion and the lower portion of the middle mounting rod 31, the middle mounting rod 31 is connected with a first connecting pipe 34 arranged on the first supporting rod 11 or the second supporting rod 12 through a first inclined rod 33, the bearing sleeves 32 are connected with a second connecting pipe 36 arranged on the first supporting rod 11 or the second supporting rod 12 through a second inclined rod 35, and fixing nuts 37 used for limiting the bearing sleeves 32 are arranged at the upper end and the lower end of the middle mounting rod 31.
The two first inclined rods 33 are arranged in a splayed shape, the first connecting pipe 34 is sleeved on the first supporting rod 11 or the second supporting rod 12, and the first connecting pipe 34 is provided with a first fixing hole 38.
The two second diagonal rods 35 are arranged in a splayed manner, the two second diagonal rods 35 are respectively arranged on the bearing sleeves 32 at the upper part and the lower part, the second connecting pipe 36 is sleeved on the first supporting rod 11 or the second supporting rod 12, the second connecting pipe 36 is provided with a second fixing hole 39, and the first fixing hole 38 and the second fixing hole 39 are designed to fix the first connecting pipe 34 with the first supporting rod 11 or the second supporting rod 1 through a bolt or an inserting rod when the scaffold needs to be fixed, and fix the second connecting pipe 36 with the first supporting rod 11 or the second supporting rod 1 through the bolt or the inserting rod when the scaffold needs to be folded.
The bottoms of the first supporting rod 11 and the second supporting rod 12 are fixedly provided with universal wheels 4.
The tops of the first supporting rod 11 and the second supporting rod 12 are respectively provided with a plug 5, the plugs 5 are provided with mounting holes 6, the plugs are convenient for the scaffold to be connected up, and the plugs 5 of the first supporting rod 11 and the lower first supporting rod 11 are fixed through bolts after being connected in an inserted mode.
The working platform 2 comprises a bottom frame body 21, a bottom plate 22 and a baffle plate 23, vent holes 24 are formed in the bottom plate 22, clamping heads 25 are arranged on two sides of the bottom frame body 21, the clamping heads 25 are lapped on the fixed rods 13, and the bottom frame body 21 comprises a frame and a cross beam arranged in the frame.
A tool box 26 is fixedly arranged on one side of the top of the working platform 2, a tool table 27 is fixedly arranged on the top of the tool box 26, and a rotating ball 7 is movably arranged in the inner cavity of a bearing sleeve 32.
The working principle of the utility model is as follows: construction operation is carried out through scaffold frame main part convenient to use ware, is convenient for connect the scaffold frame through first connecting pipe, is convenient for increase the stability of scaffold frame through first dwang, is convenient for strengthen the installation intensity of bearing bush through the installation pole, can rotate the dwang through the bearing bush, is convenient for increase the fixed strength of bearing bush through fixation nut, is convenient for cooperate first dwang increase stability through the second dwang, is convenient for connect the scaffold frame through the second connecting pipe, is convenient for fix the connecting pipe on the scaffold frame through the fixed orifices. Through work platform convenient to use person provides a stable and safe operational environment, can provide a reliable tie point through the dop, prevent through the baffle that the staff from unexpected landing or mistake from stepping on the edge, deposit the use tool through toolbox convenient to use person, can install another scaffold frame through the plug, remove the scaffold frame through universal wheel convenient to use person.
The utility model is not related in part to the same as or can be practiced with the prior art.
While the fundamental and principal features of the utility model and advantages of the utility model have been shown and described, it will be apparent to those skilled in the art that the utility model is not limited to the details of the foregoing exemplary embodiments, but may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present disclosure describes embodiments, not every embodiment is provided with a separate embodiment, and that this description is provided for clarity only, and that the disclosure is not limited to the embodiments described in detail below, and that the embodiments described in the examples may be combined as appropriate to form other embodiments that will be apparent to those skilled in the art.

Claims (8)

1. The utility model provides a collapsible removal scaffold frame that engineering construction used which characterized in that: the support leg comprises support leg pieces (1) arranged on two sides and a working platform (2) arranged between the support leg pieces (1), wherein the support leg pieces (1) comprise a first support rod (11), a second support rod (12) and a fixed rod (13) connected between the first support rod (11) and the second support rod (12), and the working platform (2) is lapped between the fixed rods (13) on the support leg pieces (1) on two sides; the two-side support leg is characterized in that the first support rods (11) and the second support rods (12) of the two-side support leg pieces (1) are connected through the movable piece (3), the movable piece (3) comprises a middle mounting rod (31) and bearing sleeves (32) respectively sleeved on the upper portion and the lower portion of the middle mounting rod (31), the middle mounting rod (31) is connected with a first connecting pipe (34) arranged on the first support rods (11) or the second support rods (12) through a first inclined rod (33), the bearing sleeves (32) are connected with a second connecting pipe (36) arranged on the first support rods (11) or the second support rods (12) through a second inclined rod (35), and fixing nuts (37) used for limiting the bearing sleeves (32) are arranged at the upper end and the lower end of the middle mounting rod (31).
2. A collapsible mobile scaffolding for use in engineering construction as claimed in claim 1, wherein: the two first inclined rods (33) are arranged in a splayed shape, the first connecting pipes (34) are sleeved on the first supporting rods (11) or the second supporting rods (12), and the first connecting pipes (34) are provided with first fixing holes (38).
3. A collapsible mobile scaffolding for use in engineering construction as claimed in claim 1, wherein: the two second inclined rods (35) are respectively arranged on the bearing sleeves (32) at the upper part and the lower part, the second connecting pipe (36) is sleeved on the first supporting rod (11) or the second supporting rod (12), and the second connecting pipe (36) is provided with a second fixing hole (39).
4. A collapsible mobile scaffolding for use in engineering construction as claimed in claim 1, wherein: the bottoms of the first supporting rod (11) and the second supporting rod (12) are fixedly provided with universal wheels (4).
5. A collapsible mobile scaffolding for use in engineering construction as claimed in claim 1, wherein: the top of first branch (11) and second branch (12) all is equipped with plug (5), install mounting hole (6) on plug (5).
6. A collapsible mobile scaffolding for use in engineering construction as claimed in claim 1, wherein: work platform (2) are including bottom support body (21), bottom plate (22) and baffle (23), have seted up ventilation hole (24) on bottom plate (22), chuck (25) are installed to bottom support body (21) both sides, chuck (25) overlap joint is on dead lever (13), bottom support body (21) include the frame and locate the crossbeam in the frame.
7. A collapsible mobile scaffolding for use in engineering construction as claimed in claim 6, wherein: one side of work platform (2) top is fixed mounting has toolbox (26), the top of toolbox (26) is fixed mounting has instrument platform (27).
8. The collapsible mobile scaffold for engineering construction according to any one of claims 1-7, wherein: the inner cavity of the bearing sleeve (32) is movably provided with a rotating ball (7).
CN202323110479.8U 2023-11-17 2023-11-17 Foldable movable scaffold for engineering construction Active CN221073413U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323110479.8U CN221073413U (en) 2023-11-17 2023-11-17 Foldable movable scaffold for engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323110479.8U CN221073413U (en) 2023-11-17 2023-11-17 Foldable movable scaffold for engineering construction

Publications (1)

Publication Number Publication Date
CN221073413U true CN221073413U (en) 2024-06-04

Family

ID=91251904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323110479.8U Active CN221073413U (en) 2023-11-17 2023-11-17 Foldable movable scaffold for engineering construction

Country Status (1)

Country Link
CN (1) CN221073413U (en)

Similar Documents

Publication Publication Date Title
CN221073413U (en) Foldable movable scaffold for engineering construction
CN209723602U (en) A kind of architectural engineering reinforced support device
CN210049676U (en) Detachable construction guardrail
CN210067387U (en) Foldable scaffold
CN218437513U (en) Multifunctional movable plank house
CN212642069U (en) Scaffold for bridge and tunnel construction
CN210738049U (en) Can sun-proof rain-proof building engineering scaffold frame
CN219365355U (en) Combined scaffold for constructional engineering
CN221219585U (en) Portal scaffold with supporting structure
CN214615292U (en) Lightweight scaffold
CN219773543U (en) Split lifting scaffold
CN219604806U (en) Portable scaffold for house building
CN219431533U (en) Conveniently folded protection fence
CN221609433U (en) Civil engineering scaffold
CN214402693U (en) Many functions stabilize safe scaffold
CN221546300U (en) Foldable indoor scaffold
CN216360877U (en) Scaffold frame that building engineering was set up with being convenient for fast
CN216551592U (en) Make things convenient for section of dismouting to assemble case roof beam and erect construction equipment
CN219826024U (en) Scaffold structure easy to build
CN219327288U (en) External scaffold for curtain wall
CN214995851U (en) Climb a high strength triangular supports
CN212642074U (en) Foot stool device for building
CN213234206U (en) Scaffold for civil and industrial building construction
CN214090887U (en) Scaffold frame for indoor decoration
CN217053964U (en) Conversion structure for connecting roof truss

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant