CN210704757U - Rack is used in production of high density concrete pile - Google Patents

Rack is used in production of high density concrete pile Download PDF

Info

Publication number
CN210704757U
CN210704757U CN201921271164.2U CN201921271164U CN210704757U CN 210704757 U CN210704757 U CN 210704757U CN 201921271164 U CN201921271164 U CN 201921271164U CN 210704757 U CN210704757 U CN 210704757U
Authority
CN
China
Prior art keywords
pile
layer
square
frame
placing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921271164.2U
Other languages
Chinese (zh)
Inventor
孙根明
孙晴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Xiongyu Concrete Component Co Ltd
Original Assignee
Zhejiang Xiongyu Concrete Component Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Xiongyu Concrete Component Co Ltd filed Critical Zhejiang Xiongyu Concrete Component Co Ltd
Priority to CN201921271164.2U priority Critical patent/CN210704757U/en
Application granted granted Critical
Publication of CN210704757U publication Critical patent/CN210704757U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model discloses a rack is used in production of high density concrete pile belongs to the concrete and deposits technical field, rack is used in production of high density concrete pile includes the frame and shelters from the covering or awning on a car, boat, etc. parcel is at the frame surface, the frame comprises upper cover, left branch fagging, right branch fagging and bottom plate jointly, bottom plate fixed connection is in left branch fagging and right branch fagging bottom, the clearance is connected with stiffener A between left branch fagging and the right branch fagging, stiffener A can dismantle through first fastening bolt and be connected with the bracing piece, the bracing piece wholly runs through to place the layer and the intraductal portion is placed to the tubular pile in the square pile, the layer is placed to. The utility model discloses an increase and have the square pile to place the layer and the layer is placed to the tubular pile, can place the concrete pile of multiple different shapes, can effectively deposit multiple concrete pile, be fit for being extensively promoted and used.

Description

Rack is used in production of high density concrete pile
Technical Field
The utility model relates to a technical field is deposited to the concrete, especially relates to a rack is used in production of high density concrete pile.
Background
The concrete pile refers to a pile made of concrete including general reinforced concrete and prestressed concrete. The composite material has the advantages of wood and steel saving, durability, low manufacturing cost and the like, is widely used in foundation engineering of hydraulic buildings, industrial buildings, civil buildings and bridges, and is also commonly used for anti-sliding or water-resisting of side slopes and foundation pit supporting.
In the prior art, concrete piles lack a device for storing and placing after casting molding, are mostly directly stacked in the open air, and are exposed to the sun and rain, so that the quality of the concrete piles is influenced to a certain extent.
SUMMERY OF THE UTILITY MODEL
The utility model provides a rack is used in production of high density concrete pile has the square pile to place the layer and the layer is placed to the tubular pile through the increase, can place the concrete pile of multiple different shapes, can effectively deposit multiple concrete pile, can effectively solve the problem in the background art.
The utility model provides a specific technical scheme as follows:
the utility model provides a rack for producing high-density concrete piles, which comprises a frame and a shielding tent, the shielding tent is wrapped on the outer surface of the frame, the frame consists of an upper cover, a left supporting plate, a right supporting plate and a bottom plate, the bottom plate is fixedly connected with the bottoms of the left support plate and the right support plate, a reinforcing rod A is connected between the left support plate and the right support plate in a clearance way, the reinforcing rod A is detachably connected with a supporting rod through a first fastening bolt, the supporting rod integrally penetrates through the square pile placing layer and the tubular pile placing layer, two sides of the square pile placing layer and the tubular pile placing layer are connected with the inner side wall of the frame in a linking manner, and the layer is placed with the tubular pile in proper order in turn to the layer is placed to the square stake, square groove has been seted up on the layer is placed to the square stake, the arc wall has been seted up on the layer is placed to the tubular pile, fixedly connected with centrum on the bottom plate.
Optionally, the upper cover is of a triangular structure and is fixedly connected to the top ends of the left support plate and the right support plate.
Optionally, the top end of the supporting rod and the square pile placing layer are detachably connected through a vertical connecting elbow, and a third fastening bolt is connected to the vertical connecting elbow in a threaded manner.
Optionally, the square pile placing layer and the tubular pile placing layer are fixedly connected with lifting rings.
Optionally, the vertebral body is detachably connected with a reinforcing rod B through a second fastening bolt.
The utility model has the advantages as follows:
1. the utility model discloses it is practical, convenient operation and excellent in use effect, the during operation, the staff will use the instrument earlier to insert the centrum ground, use stiffener B and second fastening bolt to carry out the fixed between the centrum afterwards, through increasing the centrum for whole concrete pile rack can be placed in any place, no matter be level and smooth ground or unevenness, and make its bottom be difficult to receive the corruption, has improved the device's practicality and durability greatly.
The utility model discloses in, after adorning the centrum, assemble the upper portion branch of rack again, main content is that place the layer with the square pile and the layer is placed to the tubular pile in the frame inside and the bracing piece and stiffener A carries out cross fixation, sheathes in the periphery of whole frame at last and shelter from the covering or awning on a car, boat, etc. through increasing, can avoid the concrete pile to receive the erosion of rainwater and sun to shine, has ensured that the concrete pile can not receive external environment and has influenced.
The utility model discloses in, accomplish whole equipment back, with the concrete pile place in corresponding recess can, because the appearance of the final pouring of concrete pile is not fixed one, consider multiple appearance, so the utility model discloses in increase to have the square pile to place the layer and the layer is placed to the tubular pile, can place to different appearance concrete piles, greatly increased the device's application scope.
The utility model discloses an use stiffener A and stiffener B to use corresponding fastening bolt to fasten, make whole rack firm more and sturdy, the stability of placing the thing is stronger.
The utility model discloses an increase rings, when needs get the material transportation to the concrete pile, can use the lifting hook on the crane to hook rings, and then carry out whole the hoisting with the concrete pile, convenient transportation for the device's functionality is more complete.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the description of the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
Fig. 1 is a schematic overall structure diagram of a high-density concrete pile production rack according to an embodiment of the present invention;
fig. 2 is a schematic perspective view of a high-density concrete pile production rack according to an embodiment of the present invention;
fig. 3 is an enlarged schematic structural view of a place a of the placing rack for producing high-density concrete piles according to the embodiment of the present invention;
in the figure: 1. a frame; 101. an upper cover; 102. a left support plate; 103. a right support plate; 104. a base plate; 2. a shelter canopy; 3. a square pile placement layer; 4. a square groove; 5. a tubular pile placing layer; 6. an arc-shaped slot; 7. a support bar; 8. a first fastening bolt; 9. a reinforcing rod A; 10. a second fastening bolt; 11. a vertebral body; 12. a reinforcing rod B; 13. vertically connecting the elbows; 14. a third fastening bolt; 15. and lifting the ring.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention clearer, the present invention will be described in further detail with reference to the accompanying drawings, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
The following will explain in detail a high-density concrete pile production rack according to an embodiment of the present invention with reference to fig. 1 to 3.
As shown in fig. 1-3, a high-density concrete pile production rack comprises a frame 1 and a shielding canopy 2, the shielding canopy 2 is wrapped on the outer surface of the frame 1, the frame 1 is composed of an upper cover 101, a left support plate 102, a right support plate 103 and a bottom plate 104, the bottom plate 104 is fixedly connected to the bottoms of the left support plate 102 and the right support plate 103, a reinforcing rod a9 is connected between the left support plate 102 and the right support plate 103 in a clearance manner, the reinforcing rod a9 is detachably connected with a support rod 7 through a first fastening bolt 8, the support rod 7 integrally penetrates through the square pile placing layer 3 and the tubular pile placing layer 5, the two sides of the square pile placing layer 3 and the tubular pile placing layer 5 are connected to the inner side wall of the frame 1, the square pile placing layer 3 and the tubular pile placing layer 5 are sequentially and alternately distributed, a square groove 4 is formed in the square pile placing layer 3, the tubular pile placing layer 5 is provided with an arc-shaped groove 6, and the bottom plate 104 is fixedly connected with a cone 11.
In the embodiment, as shown in fig. 1 and 2, the shielding awning 2 is additionally arranged, so that the concrete pile can be prevented from being corroded by rainwater and scorched by the sun, and the concrete pile is prevented from being influenced by the external environment; after the whole assembly is completed, concrete piles are placed in the corresponding grooves, and because the shape of the concrete pile which is finally poured is not fixed, and various shapes are considered, the square pile placing layer 3 and the tubular pile placing layer 5 are added in the utility model, concrete piles with different shapes can be placed, and the application range of the device is greatly increased; through using stiffener A9 and stiffener B12 to use corresponding fastening bolt to fasten, make whole rack firm more and sturdy, the stability of placing the thing is stronger.
The upper cover 101 is of a triangular structure, and the upper cover 101 is fixedly connected to the top ends of the left support plate 102 and the right support plate 103.
In this embodiment, as shown in fig. 1, by arranging the upper cover 101 in a triangular structure, when it is exposed to rain weather, rain water will not accumulate on the shielding canopy 2, but will slide down along the two side edges of the upper cover 101.
Wherein the vertebral body 11 is detachably connected with a reinforcing bar B12 through a second fastening bolt 10.
In the embodiment, as shown in fig. 1, by adding the vertebral body 11, the whole concrete pile placing frame can be placed anywhere, whether on a flat ground or an uneven ground, and the bottom of the concrete pile placing frame is not easy to corrode, so that the practicability and the durability of the concrete pile placing frame are greatly improved.
Wherein, equal fixedly connected with rings 15 on layer 3 is placed to the square pile and the layer 5 is placed to the tubular pile.
In this embodiment, as shown in fig. 1, by adding the lifting ring 15, when the concrete pile needs to be taken and transported, the lifting ring 15 can be hooked by using a lifting hook on a lifting machine, so that the concrete pile is lifted integrally, transportation is facilitated, and the functionality of the device is more complete.
The top end of the support rod 7 is detachably connected with the square pile placing layer 3 through a vertical connecting elbow 13, and a third fastening bolt 14 is connected to the vertical connecting elbow 13 in a threaded mode.
In this embodiment, as shown in fig. 3, the vertical connecting elbow 13 can better help the support rod 7 to be connected and fixed with the square pile placing layer 3, and the third fastening bolt 14 can strengthen and fix the support rod.
It should be noted that, the utility model relates to a rack is used in production of high density concrete pile, during operation, the staff will insert centrum 11 into the ground with the instrument earlier, use stiffener B12 and second fastening bolt 10 to carry out the fixed between the centrum afterwards, through increasing centrum 11, make the whole concrete pile rack can be placed in any place, no matter be level or uneven ground, and make its bottom be difficult to receive the corruption, have greatly improved practicality and durability of the device; after the cone 11 is installed, the upper part of the placing frame is assembled, the main content is that the square pile placing layer 3 and the tubular pile placing layer 5 are fixed in the frame 1 in a crossed mode through the supporting rods 7 and the reinforcing rods A9, and finally the shielding awning 2 is sleeved on the periphery of the whole frame 1, so that the concrete pile can be prevented from being corroded by rainwater and burnt by the sun by the aid of the shielding awning 2, and the concrete pile is prevented from being influenced by the external environment; after the whole assembly is completed, concrete piles are placed in the corresponding grooves, and because the shape of the concrete pile which is finally poured is not fixed, and various shapes are considered, the square pile placing layer 3 and the tubular pile placing layer 5 are added in the utility model, concrete piles with different shapes can be placed, and the application range of the device is greatly increased; the reinforcing rod A9 and the reinforcing rod B12 are used, and corresponding fastening bolts are used for fastening, so that the whole placing frame is more stable and solid, and the stability of placing objects is stronger; through increasing rings 15, when needs get the material transportation to the concrete pile, can use the lifting hook on the lifting machine to hook rings 15, and then carry out whole the lifting with the concrete pile, convenient transportation for the device's functionality is more complete.
The utility model discloses a frame 1; an upper cover 101; a left support plate 102; a right support plate 103; a base plate 104; a shielding canopy 2; a square pile placement layer 3; a square groove 4; a tubular pile placing layer 5; an arc-shaped groove 6; a support bar 7; a first fastening bolt 8; stiffener a 9; a second fastening bolt 10; a vertebral body 11; a reinforcing bar B12; a vertical connecting elbow 13; the third fastening bolt 14; the lifting ring 15 components are all standard or known to those skilled in the art, and their structure and principle are known to those skilled in the art through technical manuals or through routine experimentation.
It is apparent that those skilled in the art can make various changes and modifications to the embodiments of the present invention without departing from the spirit and scope of the embodiments of the present invention. Thus, if such modifications and variations of the embodiments of the present invention fall within the scope of the claims and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (5)

1. The placing rack for producing the high-density concrete piles is characterized by comprising a frame (1) and a shielding awning (2), wherein the shielding awning (2) is wrapped on the outer surface of the frame (1), the frame (1) is composed of an upper cover (101), a left supporting plate (102), a right supporting plate (103) and a bottom plate (104) together, the bottom plate (104) is fixedly connected to the bottoms of the left supporting plate (102) and the right supporting plate (103), a reinforcing rod A (9) is connected between the left supporting plate (102) and the right supporting plate (103) in a clearance connection mode, the reinforcing rod A (9) is detachably connected with a supporting rod (7) through a first fastening bolt (8), the supporting rod (7) integrally penetrates through the square pile placing layer (3) and the tubular pile placing layer (5), two sides of the square pile placing layer (3) and the tubular pile placing layer (5) are connected to the inner side wall of the frame (1), and layer (3) is placed with the tubular pile to square stake and layer (5) is in proper order alternate distribution, square groove (4) have been seted up on layer (3) is placed to square stake, arc wall (6) have been seted up on layer (5) is placed to the tubular pile, fixedly connected with centrum (11) on bottom plate (104).
2. The placing frame for the production of the high-density concrete pile according to claim 1, wherein the upper cover (101) is of a triangular structure, and the upper cover (101) is fixedly connected to the top ends of the left support plate (102) and the right support plate (103).
3. A placing rack for high-density concrete pile production according to claim 1, wherein a reinforcing rod B (12) is detachably connected to the cone body (11) through a second fastening bolt (10).
4. The placing rack for the production of the high-density concrete piles according to claim 1, wherein lifting rings (15) are fixedly connected to the square pile placing layer (3) and the pipe pile placing layer (5).
5. The placing rack for the production of the high-density concrete pile according to claim 1, wherein the top end of the supporting rod (7) is detachably connected with the square pile placing layer (3) through a vertical connecting elbow (13), and a third fastening bolt (14) is in threaded connection with the vertical connecting elbow (13).
CN201921271164.2U 2019-08-07 2019-08-07 Rack is used in production of high density concrete pile Expired - Fee Related CN210704757U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921271164.2U CN210704757U (en) 2019-08-07 2019-08-07 Rack is used in production of high density concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921271164.2U CN210704757U (en) 2019-08-07 2019-08-07 Rack is used in production of high density concrete pile

Publications (1)

Publication Number Publication Date
CN210704757U true CN210704757U (en) 2020-06-09

Family

ID=70960456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921271164.2U Expired - Fee Related CN210704757U (en) 2019-08-07 2019-08-07 Rack is used in production of high density concrete pile

Country Status (1)

Country Link
CN (1) CN210704757U (en)

Similar Documents

Publication Publication Date Title
CN203961998U (en) A kind of shallow tunnel combined type preliminary bracing structure
CN204435975U (en) A kind of Modular spliced pond
CN108589767B (en) Turnbuckle single-sided vertical die inclined throwing and supporting device and construction method thereof
CN106836463A (en) The constructing device and construction method of cushion cap and ground girder construction
CN103741970A (en) Assembled machining shed for building construction and manufacture and installation method thereof
CN210704757U (en) Rack is used in production of high density concrete pile
CN106193776A (en) Chimney and the combinative structure of water tower and construction method thereof
CN205875708U (en) Basement outer wall single -side supporting formwork construction structures based on steel pipe truss
CN208023601U (en) A kind of prefabricated pile foundation support table side form of mutual buckle type
CN206529881U (en) The constructing device of cushion cap and ground girder construction
CN207714358U (en) A kind of transmission line of electricity composite structure assembled cushion cap anchor rod foundation
CN206829624U (en) A kind of regularization formwork reinforcement system
CN201649291U (en) Box house
CN213682085U (en) Steel-pipe pile foundation reinforcing apparatus
CN213979026U (en) Reinforcing structure of wisdom building site tower crane basis
CN212376139U (en) Tree-shaped three-fork steel pipe column for supporting outdoor concrete platform
CN210370121U (en) Reinforced single-tube communication tower
CN206317048U (en) Support for storing reinforcing steel bars
CN218373320U (en) Continuous sealed water-proof and drainage system for railway bridge
CN205976695U (en) Integrated configuration of chimney and water tower
CN206529937U (en) For the prefabricated constructional column at wall external corner and rammed earth wall construction
CN213329087U (en) Pipeline support assembled pile foundation structure
CN208072582U (en) A kind of stainless steel gutter of reinforced concrete structure
CN219753431U (en) Corrugated steel evaporation pond
CN212405166U (en) Double-row pile and inclined strut combined soft soil deep foundation pit supporting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200609

Termination date: 20210807