CN213979026U CN202022488279.6U CN202022488279U CN213979026U CN 213979026 U CN213979026 U CN 213979026U CN 202022488279 U CN202022488279 U CN 202022488279U CN 213979026 U CN213979026 U CN 213979026U
Authority
CN
China
Prior art keywords
layer
foundation
base
tower crane
building site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022488279.6U
Other languages
Chinese (zh)
Inventor
费超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Ankuai Intelligent Technology Co ltd
Original Assignee
Jiangsu Ankuai Intelligent Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Ankuai Intelligent Technology Co ltd filed Critical Jiangsu Ankuai Intelligent Technology Co ltd
Priority to CN202022488279.6U priority Critical patent/CN213979026U/en
Application granted granted Critical
Publication of CN213979026U publication Critical patent/CN213979026U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a reinforcing structure of wisdom building site tower crane foundation, the foundation ditch comprises a foundation ditch, the inner wall of foundation ditch is provided with the basic bed course, the last fixed surface of basic bed course is connected with basic side wall, the upper surface of basic bed course is provided with waterproofing membrane, waterproofing membrane's last fixed surface is connected with lower floor's reinforcing bar layer, the upper surface on lower floor's reinforcing bar layer is provided with the base, the side fixedly connected with connecting rod of base, the last fixed surface of base is connected with the set screw. This reinforced structure of wisdom building site tower crane foundation through setting up the connecting rod, the stability between the base of being convenient for, through setting up the base, the placing of the fixed stabilizer blade of being convenient for, through setting up the fixed screw, the fixed stabilizer blade of being convenient for is fixed with the base, through setting up lower floor's reinforcing bar layer, swash plate and reinforced concrete layer, can make base and fixed stabilizer blade firm in the foundation ditch to reach the tower crane foundation reinforcement and reduce the emergence of the accident of collapsing of tower crane.

Description

Reinforcing structure of wisdom building site tower crane basis
Technical Field
The utility model relates to a construction technical field specifically is a reinforced structure of wisdom building site tower crane foundation.
Background
The tower crane is important equipment for hoisting and transporting operation in the building industry, and vertical transportation of most building materials is completed by the tower crane. In order to ensure the smooth operation of the tower crane, the tower crane is installed on a tower crane foundation, and the tower crane foundation must meet two requirements: firstly, the load on the upper part of the tower crane is uniformly transferred to the foundation and the ground endurance cannot be exceeded; secondly, the tower crane can keep integral stability and cannot tip over under various unfavorable working conditions. Thus, tower foundations are typically constructed from larger sized concrete caps.
The tower crane construction needs high-altitude operation, often meets the strong wind weather, and some tower crane foundations are not made, meets the accident that the strong wind weather easily leads to the tower crane to collapse.
Therefore, we provide the reinforced structure of wisdom building site tower crane basis.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a reinforced structure on wisdom building site tower crane basis to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a reinforcing structure of a tower crane foundation of an intelligent construction site comprises a foundation pit, wherein a foundation cushion layer is arranged on the inner wall of the foundation pit, the upper surface of the foundation cushion layer is fixedly connected with a foundation side wall, the upper surface of the foundation cushion layer is provided with a waterproof coiled material, the upper surface of the waterproof roll is fixedly connected with a lower layer reinforcing steel bar layer, the upper surface of the lower layer reinforcing steel bar layer is provided with a base, the side surface of the base is fixedly connected with a connecting rod, the upper surface of the base is fixedly connected with a fixing screw, the upper surface of the base is provided with fixed support legs, the side surfaces of the fixed support legs are fixedly connected with a supporting inclined plate, the side surface of the foundation side wall is provided with a concrete filling layer, the upper surface of the concrete filling layer is provided with a raft cushion layer, the upper surface on lower floor's reinforcing bar layer is provided with reinforced concrete layer, reinforced concrete layer's upper surface fixedly connected with raft board concrete.
Preferably, the number of the foundation side walls is four, and the four foundation side walls are fixedly connected to the upper surface of the foundation cushion layer in a shape like a Chinese character 'kou'.
Preferably, the number of the waterproof rolls is five, and the five waterproof rolls are respectively arranged on the upper surface of the foundation cushion layer and the side surface of the foundation side wall.
Preferably, lower floor's reinforcing bar layer is the crisscross form and lays at waterproofing membrane's upper surface, the quantity of base is four, four the base evenly sets up the upper surface on lower floor's reinforcing bar layer.
Preferably, the lower surface of the fixed supporting leg is provided with a through hole matched with the fixed screw, the number of the fixed supporting legs is four, and the fixed supporting legs are fixedly connected with the base through the fixed screws.
Preferably, the upper surface of the raft bed course is provided with a waterproof layer.
Advantageous effects
The utility model provides a reinforced structure of wisdom building site tower crane basis possesses following beneficial effect:
1. this reinforced structure of wisdom building site tower crane foundation through setting up the connecting rod, the stability between the base of being convenient for, through setting up the base, the placing of the fixed stabilizer blade of being convenient for, through setting up the fixed screw, the fixed stabilizer blade of being convenient for is fixed with the base, through setting up lower floor's reinforcing bar layer, swash plate and reinforced concrete layer, can make base and fixed stabilizer blade firm in the foundation ditch to reach the tower crane foundation reinforcement and reduce the emergence of the accident of collapsing of tower crane.
2. This reinforced structure of wisdom building site tower crane foundation through setting up the foundation ditch, is convenient for lay the basic bed course, prepares for the tower crane foundation, through setting up the basic side wall, can consolidate the foundation ditch, through setting up waterproofing membrane, can prevent that the rainwater from permeating to the foundation ditch inside, through setting up concrete filling layer, raft bed course and raft board concrete, can consolidate inside and the surface of foundation ditch.
Drawings
FIG. 1 is a schematic view of a front cross-sectional structure of the present invention;
FIG. 2 is an enlarged schematic view of the structure at A of FIG. 1 according to the present invention;
fig. 3 is an enlarged schematic structural diagram of the point B in fig. 1 according to the present invention.
In the figure: 1 foundation ditch, 2 foundation bed course, 3 foundation side walls, 4 waterproofing membrane, 5 lower floor's steel reinforcement layers, 6 bases, 7 connecting rods, 8 fixed screws, 9 fixed stabilizer blades, 10 support swash plates, 11 concrete filling layers, 12 raft bed courses, 13 reinforced concrete layers, 14 raft board concretes.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a reinforcing structure of wisdom building site tower crane basis, including foundation ditch 1, foundation ditch 1's inner wall is provided with basic bed course 2, through setting up foundation ditch 1, be convenient for lay basic bed course 2, prepare for the tower crane basis, basic bed course 2's last fixed surface is connected with basic side wall 3, basic side wall 3's quantity is four, four basic side wall 3 are the upper surface of mouth style of calligraphy fixed connection at basic bed course 2, through setting up basic side wall 3, can consolidate foundation ditch 1, basic bed course 2's upper surface is provided with waterproofing membrane 4, waterproofing membrane 4's quantity is five, five waterproofing membrane 4 set up the side at basic bed course 2's upper surface and basic side wall 3 respectively, through setting up waterproofing membrane 4, can prevent that the rainwater from permeating to foundation ditch 1 inside.
The upper surface of the waterproof roll 4 is fixedly connected with a lower reinforcing steel bar layer 5, the lower reinforcing steel bar layer 5 is paved on the upper surface of the waterproof roll 4 in a cross shape, the upper surface of the lower reinforcing steel bar layer 5 is provided with four bases 6, the four bases 6 are uniformly arranged on the upper surface of the lower reinforcing steel bar layer 5, the side surface of the base 6 is fixedly connected with a connecting rod 7, the connection rod 7 is arranged to facilitate the stability between the bases 6, the fixing screws 8 are fixedly connected to the upper surface of the base 6, the fixing support legs 9 are arranged on the upper surface of the base 6, through holes matched with the fixing screws 8 are formed in the lower surfaces of the fixing support legs 9, the number of the fixing support legs 9 is four, the four fixing support legs 9 are fixedly connected with the base 6 through the fixing screws 8, through setting up base 6, the placing of the fixed stabilizer blade 9 of being convenient for, through setting up set screw 8, the fixed stabilizer blade 9 of being convenient for is fixed with base 6.
Side fixedly connected with support swash plate 10 of stationary foot 9, the side of foundation side wall 3 is provided with concrete filling layer 11, the upper surface of concrete filling layer 11 is provided with raft bed course 12, the upper surface of raft bed course 12 is provided with the waterproof layer, the upper surface of lower floor's steel bar layer 5 is provided with reinforced concrete layer 13, through setting up lower floor's steel bar layer 5, support swash plate 10 and reinforced concrete layer 13, can make base 6 and stationary foot 9 firm in foundation ditch 1, thereby reach the emergence of consolidating and reducing the tower crane collapse accident to the tower crane basis, reinforced concrete layer 13's upper surface fixedly connected with raft slab concrete 14, through setting up concrete filling layer 11, raft bed course 12 and raft slab concrete 14, can consolidate 1 inside and surface of foundation ditch.
The working principle is as follows: when the reinforcing structure of the smart building site tower crane foundation is used, firstly, a foundation pit 1 is dug, the foundation pit 1 is compacted and leveled, then a foundation mat layer 2 is poured on the foundation pit 1, a foundation side wall 3 is built on the upper surface of the foundation mat layer 2, waterproof coiled materials 4 are arranged on the surfaces of the foundation side wall 3 and the foundation mat layer 2, then a template is arranged on the waterproof coiled materials 4 according to the foundation size, a lower reinforcing steel bar layer 5 is arranged in the template, a base 6 is arranged on the lower reinforcing steel bar layer 5 to be fixed, then fixing support legs 9 are arranged on the upper surface of the base 6 and fixed through fixing screws 8, after the horizontal angle is adjusted, upper reinforcing steel bars and vertical bars are arranged in the template, then concrete is cast to form a reinforced concrete layer 13, after the template is removed, a concrete filling layer height 11 is poured on the inner wall of the foundation pit 1, a raft bed 12 is cast on the concrete filling layer 11 to prevent water, and finally, a layer of raft concrete 14 is cast, thereby reach the effect of consolidating the tower crane foundation.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a reinforced structure on wisdom building site tower crane basis, includes foundation ditch (1), its characterized in that: the inner wall of the foundation pit (1) is provided with a foundation bed layer (2), the upper surface of the foundation bed layer (2) is fixedly connected with a foundation side wall (3), the upper surface of the foundation bed layer (2) is provided with a waterproof coiled material (4), the upper surface of the waterproof coiled material (4) is fixedly connected with a lower layer steel bar layer (5), the upper surface of the lower layer steel bar layer (5) is provided with a base (6), the side surface of the base (6) is fixedly connected with a connecting rod (7), the upper surface of the base (6) is fixedly connected with a fixing screw (8), the upper surface of the base (6) is provided with a fixing support leg (9), the side surface of the fixing support leg (9) is fixedly connected with a support inclined plate (10), the side surface of the foundation side wall (3) is provided with a concrete filling layer (11), the upper surface of the concrete filling layer (11) is provided with a raft cushion layer (12), the upper surface of lower floor's reinforcing bar layer (5) is provided with reinforced concrete layer (13), the upper surface fixed connection of reinforced concrete layer (13) has raft board concrete (14).
2. The reinforcing structure of wisdom building site tower crane basis of claim 1, its characterized in that: the number of the foundation side walls (3) is four, and the four foundation side walls (3) are fixedly connected to the upper surface of the foundation cushion layer (2) in a shape like a Chinese character 'kou'.
3. The reinforcing structure of wisdom building site tower crane basis of claim 1, its characterized in that: the waterproof roll is characterized in that the number of the waterproof rolls (4) is five, and the waterproof rolls (4) are respectively arranged on the upper surface of the foundation mat layer (2) and the side surface of the foundation side wall (3).
4. The reinforcing structure of wisdom building site tower crane basis of claim 1, its characterized in that: lower floor's reinforcing bar layer (5) are the crisscross form and lay at the upper surface of waterproofing membrane (4), the quantity of base (6) is four, four base (6) evenly sets up the upper surface of lower floor's reinforcing bar layer (5).
5. The reinforcing structure of wisdom building site tower crane basis of claim 1, its characterized in that: the lower surface of the fixed support leg (9) is provided with through holes matched with the fixed screws (8), the number of the fixed support legs (9) is four, and the fixed support legs (9) are fixedly connected with the base (6) through the fixed screws (8).
6. The reinforcing structure of wisdom building site tower crane basis of claim 1, its characterized in that: the upper surface of the raft cushion layer (12) is provided with a waterproof layer.
CN202022488279.6U 2020-11-02 2020-11-02 Reinforcing structure of wisdom building site tower crane basis Active CN213979026U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022488279.6U CN213979026U (en) 2020-11-02 2020-11-02 Reinforcing structure of wisdom building site tower crane basis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022488279.6U CN213979026U (en) 2020-11-02 2020-11-02 Reinforcing structure of wisdom building site tower crane basis

Publications (1)

Publication Number Publication Date
CN213979026U true CN213979026U (en) 2021-08-17

Family

ID=77259955

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022488279.6U Active CN213979026U (en) 2020-11-02 2020-11-02 Reinforcing structure of wisdom building site tower crane basis

Country Status (1)

Country Link
CN (1) CN213979026U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114622590A (en) * 2022-03-18 2022-06-14 中铁广州工程局集团深圳工程有限公司 High-steep slope circular pier column in-situ single-pile upper tower crane foundation structure and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114622590A (en) * 2022-03-18 2022-06-14 中铁广州工程局集团深圳工程有限公司 High-steep slope circular pier column in-situ single-pile upper tower crane foundation structure and construction method
CN114622590B (en) * 2022-03-18 2024-01-30 中铁广州工程局集团深圳工程有限公司 High-steep slope circular pier column in-situ single pile tower crane foundation structure and construction method

Similar Documents

Publication Publication Date Title
CN210766804U (en) Silt foundation strutting arrangement is used in civil engineering construction
CN106836463A (en) The constructing device and construction method of cushion cap and ground girder construction
CN104120736A (en) Construction method of reinforced concrete retaining wall
CN213979026U (en) Reinforcing structure of wisdom building site tower crane basis
CN106988319A (en) A kind of rapid constructing method of large deep foundation pit agent structure side wall
CN102094524B (en) Construction method of high-altitude large-span beam-slab template steel support system
CN106193776A (en) Chimney and the combinative structure of water tower and construction method thereof
CN202644543U (en) Combined recyclable foundation pit supporting inner supporting upright column
CN106906836A (en) A kind of CFG pile composite foundations and its construction method for ferruginous laterite area
CN113235645B (en) Tower crane foundation reserved joint bar assembly type forming die construction method
CN203113515U (en) Slip form jacking integrated device
CN206529881U (en) The constructing device of cushion cap and ground girder construction
CN215367371U (en) Fast supporting structure of prefabricated tire template
CN205742249U (en) A kind of prestressed concrete back cover cushion cap template
CN214993788U (en) Assembled cement soil composite pile
CN204676591U (en) Trough rim construction elevator basis
CN205976695U (en) Integrated configuration of chimney and water tower
CN217106184U (en) Inclined supporting device of concrete side form
CN101550690B (en) Triangular concrete thin-wall folded plate pile and preparation method thereof
CN201411684Y (en) Triangular concrete thin-walled folded sheet pile
CN205742960U (en) A kind of vertical scaffold reinforcement assembly across Bars In Poured Concrete Slab
CN217651842U (en) Foundation foundation structure
CN211547799U (en) Basement tower crane and frame column cushion cap foundation
CN204456181U (en) Truss-like retaining wall