CN204435975U - A kind of Modular spliced pond - Google Patents

A kind of Modular spliced pond Download PDF

Info

Publication number
CN204435975U
CN204435975U CN201520037979.XU CN201520037979U CN204435975U CN 204435975 U CN204435975 U CN 204435975U CN 201520037979 U CN201520037979 U CN 201520037979U CN 204435975 U CN204435975 U CN 204435975U
Authority
CN
China
Prior art keywords
cant board
plate
base plate
groove
bracing frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520037979.XU
Other languages
Chinese (zh)
Inventor
侯宝权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520037979.XU priority Critical patent/CN204435975U/en
Application granted granted Critical
Publication of CN204435975U publication Critical patent/CN204435975U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • E04H7/02Containers for fluids or gases; Supports therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H4/00Swimming or splash baths or pools
    • E04H4/0018Easily movable or transportable swimming pools
    • E04H4/0043Easily movable or transportable swimming pools mainly made of panels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H4/00Swimming or splash baths or pools
    • E04H4/0018Easily movable or transportable swimming pools
    • E04H4/0043Easily movable or transportable swimming pools mainly made of panels
    • E04H4/005Easily movable or transportable swimming pools mainly made of panels characterised by the framework for supporting the panels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H4/00Swimming or splash baths or pools
    • E04H4/0018Easily movable or transportable swimming pools
    • E04H2004/0068Easily movable or transportable swimming pools made of plastic shells or plastic elements including at least parts of walls and floors

Abstract

The utility model discloses a kind of Modular spliced pond, be spliced by several base plates, cant board and braced structures frame, cant board is fixed on the top of base plate, base plate and cant board surround the spatial accommodation of storing liquid, braced structures frame is arranged on the outside of described spatial accommodation and for supporting fixing described spatial accommodation, base plate, cant board and braced structures frame are modular construction body.The modular construction body of described liquid storage tank employing non-metallic material is assembled (does not need fastening bolt, hasp type connection; Can quick mold pressing produce in enormous quantities; Can without inner bag film; Large-scale, medium-sized, small-sized), module assembled is quick, and liquid storage tank is built and remove very convenient, can be used as swimming pool, pond, environmental protection pond and liquid cell.

Description

A kind of Modular spliced pond
Technical field
The utility model belongs to technical field of mold, particularly a kind of Modular spliced pond.
Background technology
Swimming pool more common in current life, pond, environmental protection pond etc., and the Liquid storage container such as purifying pond, liquid storage pool in plant area of enterprise can be referred to as liquid storage tank.These liquid storage tanks are all generally fixed forms, how by concreting or brickly to form.In the process of building liquid storage tank, the transport of the materials such as unavoidable sandstone, cement, and the construction of cement, stone, sand and water mix and blend, operation is various, and the construction period is long, manually build by laying bricks or stones and waste time and energy, when pond is removed for some reason, remove difficulty greatly, discarded concrete block and fragment of brick, form building waste, contaminated environment.
The liquid storage tank of metal material, the tank body that such as volume ratio is larger, solidifying soil can be eliminated to a certain extent build or the technological deficiency of brick liquid storage tank, but the liquid storage tank of metal material is in the environment exposed, experience long wind and weather, the metal material of liquid storage tank is perishable aging, has rusty stains, application life obviously shortens, and the working strength of material can not meet the demands.
Utility model content
It is perishable aging that the purpose of this utility model is to overcome existing metal material liquid storage tank, and the technological deficiency of concreting or brick liquid storage tank dismounting difficulty, provides a kind of Modular spliced pond.Described liquid storage tank adopts the modular construction body of non-metallic material assembled, does not need fastening bolt, and hasp type connects; Can quick mold pressing produce in enormous quantities; Can without inner bag film; Large-scale, medium-sized, small-sized.Module assembled is quick, and liquid storage tank is built and remove very convenient, and the airtight performance of pond body is good.
To achieve these goals, the technical scheme that the utility model is taked is:
A kind of Modular spliced pond, be spliced by several base plates, cant board and braced structures frame, cant board is fixed on the top of base plate, base plate and cant board surround the spatial accommodation of storing liquid, braced structures frame is arranged on the outside of described spatial accommodation and for supporting fixing described spatial accommodation, described base plate, cant board and braced structures frame are modular construction body.
Further, the base plate in described Modular spliced pond is square module structure, the floor board comprising several base plate pedestals and be fixed on above base plate pedestal, and wherein, four base plate pedestals are separately positioned on the below at floor board four right angle corner places.
Respectively arrange two bracing frame contiguous blocks in the below of each side of floor board, support frame as described above contiguous block is all arranged on the inner side of the base plate pedestal at right angle corner place, for being connected and fixed braced structures frame.
Two sides that described floor board is wherein relative stretch out, the base plate spill draw-in groove forming opening upwards respectively and the base plate convex fixture block stretched out downwards.
The base plate convex fixture block of another base plate that the base plate spill draw-in groove of base plate splices with its phase is connected, and forms the diapire of described spatial accommodation.
Further, the cant board in described Modular spliced pond is rectangle modular construction body, several cant boards are spliced to form the sidewall of described spatial accommodation mutually, offer opening respectively towards the riser inner face draw-in groove of cant board inner face, opening towards the riser back side draw-in groove at the cant board back side in two short side edge of cant board, the riser back side draw-in groove of another cant board that the riser inner face draw-in groove of cant board splices with its phase is connected.
Arrange two the first horizontal bar plates and the second horizontal bar plate be parallel to each other with the long side of cant board in the middle part of the described cant board back side, the inner side of riser back side draw-in groove arranges a vertical rib plate, and vertical rib plate is parallel with the short side of cant board.
Described second horizontal bar plate is provided with riser briquetting near one end of riser back side draw-in groove, the inside of riser back side draw-in groove is provided with four grafting blocks perpendicular with cant board, wherein two grafting blocks are near the long limit of cant board, and wherein two grafting blocks are separately positioned on the end of the first horizontal bar plate and the second horizontal bar plate.
Described grafting block offers cross through hole, vertical through holes offered by riser briquetting, for being connected and fixed braced structures frame.
Further, the braced structures frame in described Modular spliced pond is the L-shaped modular construction body in longitudinal section, comprise bracing frame upper plate and be arranged on the bracing frame lower plate below bracing frame upper plate, the middle part hollow out of bracing frame upper plate and bracing frame lower plate, the thickness of bracing frame upper plate is less than the thickness of bracing frame lower plate.
The front and rear portions of support frame as described above upper plate and bracing frame lower plate is provided with periphery gusset, bracing frame upper plate and the arranged on left and right sides of bracing frame lower plate near its front portion are symmetrical arranged vertical gusset, vertical gusset and bracing frame upper plate, bracing frame lower plate are perpendicular, under bracing frame upper plate and bracing frame, the interval, side of the periphery gusset of prelaminar part arranges several bracing frame briquettings, and vertical through holes offered by support frame as described above briquetting.
The front central place of support frame as described above lower plate is inlaid with round-meshed L shape steel plate, the below of two base plates that the end of bracing frame lower plate is deeply spliced mutually and being fitting to connection with two bracing frame contiguous blocks of floor board junction.
Preferred as technical scheme, the bracing frame upper plate in described Modular spliced pond is the square module structure of middle part hollow out.
Preferred as technical scheme, the bracing frame upper plate in described Modular spliced pond is the irregular modular construction body of middle part hollow out, its top is provided with the overflow groove that longitudinal section is ∪ shape, the below of overflow groove is provided with overflow groove sewer pipe, and angle bar resettlement groove is offered in the both sides of overflow groove, is provided with angle bar in angle bar resettlement groove, PVC profile is laid in the top of angle bar, block stone material is fixed in the top of PVC profile, sets up grid directly over overflow groove, and the bottom of overflow groove is provided with PVC profile.
Preferred as technical scheme, described base plate is fixedly connected with cant board by ∪ shape jig, the upper surface of floor board is equipped with PVC counterdie, the right angle corner place, inner side that floor board and cant board are formed is provided with PVC water-proof section bar, PVC counterdie and PVC water-proof section bar hot melt are integrated, aluminium alloys waterproof press strip and rubber pad are set between cant board and floor board, the shape of aluminium alloys waterproof press strip and the matching form of cant board long side close, and rubber pad is arranged on the below of aluminium alloys waterproof press strip.
Further, when described two cant boards vertically splice, one of them cant board cuts away riser back side draw-in groove along its vertical rib plate, the one long plate that slips is set in the riser inner face draw-in groove of another cant board, the long plate that slips is screwed in riser inner face draw-in groove, its vertical rib plate is fixedly connected with the long plate that slips by angle bar by the cant board cutting away riser back side draw-in groove, and the junction of two cant boards is provided with rubber cushion.
Further, described cant board abuts against the front portion of braced structures frame, and the grafting block being arranged on draw-in groove inside, the riser back side is fixedly connected with braced structures frame by inserting rod, and riser briquetting and bracing frame briquetting are bolted to connection.
Preferred as technical scheme, described base plate, cant board and braced structures frame are made by nonmetallic composite, the surface of base plate and cant board has plastic coating or pastes mosaic or arrange waterproof inner container film, and the outer rim of the bottom side of base plate arranges several diagonal bars be parallel to each other.
The beneficial effects of the utility model are mainly reflected in:
Form base plate of the present utility model, cant board and braced structures frame all to be formed by standardized mould pressing process manufacture, of the present utility model building adopts Large Steel mould hot press forming technology, assembling construction, convenient and swift.Base plate, cant board and braced structures frame are nonmetallic composite, and batch production speed is fast, lightweight, are convenient to of the present utility modelly manually build and remove, and do not need large-scale lifting handling facilities to assist, reduce construction cost.Meanwhile, the base plate of nonmetal composite, cant board and braced structures frame, durable in use, intensity is high, the situation there will not be corrosion and ageing, having rusty stains, and makes the overall clean aesthetic of the utility model.
The each junction of the utility model and corner coordinate closely, and coordinate 3M clay, airtight performance is good, avoids the situation occurring leakage sepage.User as required, can build the utility model of different volume size, practical flexibly.
Form base plate of the present utility model, cant board and braced structures frame and can be used for the assembled of swimming pool, pond, environmental protection pond, liquid cell, septic tank etc., also be applicable to can assembled fixed spool (on the ground or underground), ice stadium baffle plate, house baffle plate etc., also can be used as watertight shutter of controlling flood.
Accompanying drawing explanation
Fig. 1 is the phantom drawing of base plate.
Fig. 2 is the lateral view of base plate shown in Fig. 1.
Fig. 3 is the elevation of cant board.
Fig. 4 is the top view of cant board shown in Fig. 3.
Fig. 5 is the lateral view of cant board shown in Fig. 3.
Fig. 6 is the annexation schematic diagram of cant board shown in Fig. 3.
Fig. 7 is the partial enlarged drawing at A place in Fig. 6.
Fig. 8 is the annexation schematic diagram of base plate.
Fig. 9 is the phantom drawing of base plate and braced structures frame annexation.
Figure 10 is the partial enlarged drawing at B place in Fig. 9.
Figure 11 is a kind of elevation of braced structures frame.
Figure 12 is the elevation of another kind of braced structures frame.
Figure 13 is that the top structure of the frame of braced structures shown in Figure 12 installs graph of a relation.
Figure 14 is the annexation schematic diagram of base plate and cant board.
Figure 15 is the partial enlarged drawing at C place in Figure 14.
Figure 16 is the annexation schematic diagram of cant board when being spliced into right angle.
Figure 17 is base plate, cant board and braced structures frame annexation schematic diagram.
Figure 18 is cant board and braced structures frame annexation schematic diagram.
Figure 19 is the partial enlarged drawing at D place in Figure 18.
Figure 20 is grafting block and braced structures frame annexation schematic diagram.
Figure 21 is the annexation schematic diagram between the frame of braced structures shown in Figure 12.
Figure 22 is a kind of overall structure schematic diagram of Modular spliced pond.
Description of reference numerals: 1, base plate; 1-1, base plate pedestal; 1-2, floor board; 1-3, bracing frame contiguous block; 1-4, base plate spill draw-in groove; 1-5, base plate convex fixture block; 1-6, diagonal bar;
2, cant board; 2-1, riser inner face draw-in groove; 2-2, riser back side draw-in groove; 2-3, the first horizontal bar plate; 2-4, the second horizontal bar plate; 2-5, vertical rib plate; 2-6, riser briquetting; 2-7, grafting block;
3, braced structures frame; 3-1, bracing frame upper plate; 3-2, bracing frame lower plate; 3-3, periphery gusset; 3-4, vertical gusset; 3-5, bracing frame briquetting; 3-6, L shape steel plate; 3-7, overflow groove; 3-8, overflow groove sewer pipe; 3-9, angle bar resettlement groove; 3-10, angle bar; 3-11, PVC section bar; 3-12, block stone material; 3-13, grid;
4, ∪ shape jig; 5, PVC counterdie; 6, PVC water-proof section bar; 7, aluminium alloys waterproof press strip; 8, rubber pad; 9, the long plate that slips; 10, rubber cushion.
Detailed description of the invention
For the ease of understanding the purpose of this utility model, technical scheme and effect thereof, now will be elaborated further the utility model in conjunction with the embodiments.
The utility model gives a kind of Modular spliced pond, and its overall structure as shown in figure 22, forms the base plate 1 in described Modular spliced pond, cant board 2 and braced structures frame 3 and is modular construction body.User as required, can select the quantity of base plate 1, cant board 2 and braced structures frame 3, the Modular spliced pond varied in size with stitching portion spatial accommodation.Multiple base plates 1 are spliced into the diapire of spatial accommodation, and cant board 2 is spliced into the sidewall of spatial accommodation, braced structures frame 3 be arranged on described spatial accommodation outside and for supporting fixing described spatial accommodation.
The structure of base plate 1 as depicted in figs. 1 and 2.Base plate 1 entirety is square module structure, comprises square floor board 1-2 and is arranged on several base plate pedestals 1-1 below floor board 1-2.Wherein, a base plate pedestal 1-1 is respectively set in the below at floor board 1-2 tetra-right angle corner places.In order to improve the sound construction degree of base plate 1 entirety, between the soffit of floor board 1-2 and each base plate pedestal 1-1, be provided with reinforcing rib.
Especially, respectively arrange two bracing frame contiguous block 1-3 in the below of each side of floor board 1-2, bracing frame contiguous block 1-3 is all arranged on the inner side of the base plate pedestal 1-1 at right angle corner place, and bracing frame contiguous block 1-3 is used for being connected and fixed braced structures frame 3.Further, two sides that described floor board 1-2 is wherein relative stretch out, the base plate spill draw-in groove 1-4 forming the opening upwards respectively and base plate convex fixture block 1-5 stretched out downwards.The outer rim of the bottom side of floor board 1-2 is arranged side by side several diagonal bar 1-6 be parallel to each other, and improves the withstand voltage bearing performance of floor board 1-2.
As shown in Figure 8, connected as one by base plate spill draw-in groove 1-4 and base plate convex fixture block 1-5 between base plate 1, namely the base plate convex fixture block 1-5 of another base plate 1 that the base plate spill draw-in groove 1-4 of base plate 1 splices with its phase is connected, and forms the diapire of described spatial accommodation.
Cant board 2 is also rectangle modular construction body, as shown in Fig. 3, Fig. 4 and Fig. 5.Multiple cant board 2 is spliced to form the sidewall of described spatial accommodation respectively mutually along level and vertical direction.Opening is offered respectively towards the riser inner face draw-in groove 2-1 of cant board 2 inner face, opening towards the riser back side draw-in groove 2-2 at cant board 2 back side in two short side edge of cant board 2.Be interconnected by riser inner face draw-in groove 2-1, riser back side draw-in groove 2-2 between cant board 2, as shown in Figure 6 and Figure 7, the riser back side draw-in groove 2-2 of another cant board 2 that the riser inner face draw-in groove 2-1 of cant board 2 splices with its phase is connected.
In order to strengthen the durability of cant board 2, two the first horizontal bar plate 2-3 and the second horizontal bar plate 2-4 be parallel to each other with the long side of cant board 2 are set in the middle part of cant board 2 back side, arrange a vertical rib plate 2-5 in the inner side of riser back side draw-in groove 2-2, vertical rib plate 2-5 is parallel with the short side of cant board 2.As shown in Figure 3 and Figure 5, second horizontal bar plate 2-4 is provided with riser briquetting 2-6 near one end of riser back side draw-in groove 2-2, the inside of riser back side draw-in groove 2-2 is provided with four grafting block 2-7s perpendicular with cant board 2, wherein two grafting block 2-7 are near the long limit of cant board 2, and wherein two grafting block 2-7 are separately positioned on the end of the first horizontal bar plate 2-3 and the second horizontal bar plate 2-4.It should be noted that, described grafting block 2-7 offers cross through hole, riser briquetting 2-6 offers vertical through holes, for being connected and fixed braced structures frame 3.
When two cant boards 2 vertically splice, when forming a right angle corner, one of them cant board 2 is cut away riser back side draw-in groove 2-2 along its vertical rib plate 2-5.Cant board 2 after treatment long slip plate 9 by one complete cant board 2 is vertical splices with another, as shown in figure 16.The long plate 9 that slips is screwed in the riser inner face draw-in groove 2-1 of complete cant board 2, and its vertical rib plate 2-5 is fixedly connected with the long plate 9 that slips by angle bar 3-10 by cant board 2 after treatment.Especially, the junction of two cant boards 2 is provided with rubber cushion 10, to improve the seal of junction, prevents from being stored in liquid leakage.
Base plate 1 and cant board 2 are connected to one by ∪ shape jig 4, and as shown in FIG. 14 and 15, ∪ shape jig 4 arranges the outside of described spatial accommodation.In order to the situation preventing base plate 1 and cant board 2 junction from occurring liquid leakage, this gives a kind of leakproof leak-stopping processing mode.PVC counterdie 5 is laid at the upper surface of floor board 1-2, the right angle corner place, inner side formed at floor board 1-2 and cant board 2 arranges PVC water-proof section bar 6, PVC counterdie 5 and PVC water-proof section bar 6 hot melt are integrated, aluminium alloys waterproof press strip 7 and rubber pad 8 are set between cant board 2 and floor board 1-2, the shape of aluminium alloys waterproof press strip 7 and the matching form of cant board 2 long side close, and rubber pad 8 is arranged on the below of aluminium alloys waterproof press strip 7.
In order to improve the steadiness of described liquid storage tank, need the arranged outside braced structures frame 3 of the spatial accommodation formed at cant board 2 and base plate 1.The overall structure of braced structures frame 3 is the L-shaped modular construction body in longitudinal section.This gives the braced structures frame 3 of two kinds of structures, as shown in figure 11, a kind of structure of braced structures frame 3 as shown in figure 12 for a kind of structure of braced structures frame 3.The structure of above-mentioned two kinds of braced structures framves 3 is substantially similar, comprises bracing frame upper plate 3-1 and is arranged on the bracing frame lower plate 3-2 below bracing frame upper plate 3-1.In order to alleviate the overall weight of braced structures frame 3, bracing frame upper plate 3-1 and bracing frame lower plate 3-2 is middle part hollow out design, and the thickness of bracing frame upper plate 3-1 is less than the thickness of bracing frame lower plate 3-2.
Braced structures frame 3 is supports of described liquid storage tank, needs enough firm.In order to improve the fastness of braced structures frame 3, all arrange periphery gusset 3-3 in the front and rear portions of bracing frame upper plate 3-1 and bracing frame lower plate 3-2, at bracing frame upper plate 3-1 and bracing frame lower plate 3-2, the arranged on left and right sides near its front portion is symmetrical arranged vertical gusset 3-4.Vertical gusset 3-4 and bracing frame upper plate 3-1, bracing frame lower plate 3-2 perpendicular.Especially, be inlaid with round-meshed L shape steel plate 3-6 at the front central place of support frame as described above lower plate 3-2, the setting of L shape steel plate 3-6, further increases the structural strength of braced structures frame 3.
Braced structures frame 3 is as shown in figure 11 the square module structure of a kind of middle part hollow out.Braced structures frame 3 is as shown in figure 12 the irregular modular construction body of a kind of middle part hollow out, and its top is also provided with water overflowing structure.As shown in Figure 13 and Figure 21, braced structures frame 3 top can arrange the overflow groove 3-7 that longitudinal section is ∪ shape, the below of overflow groove 3-7 is provided with overflow groove sewer pipe 3-8, angle bar resettlement groove 3-9 is offered in the both sides on overflow groove 3-7 top, arrange angle bar 3-10 in angle bar resettlement groove 3-9, block stone material 3-12 is fixed in the top of top laying PVC profile 3-11, the PVC profile 3-11 of angle bar 3-10, set up grid 3-13 directly over overflow groove 3-7, the bottom of overflow groove 3-7 is provided with PVC profile 3-11.
The front portion of braced structures frame 3 is close to the back side of cant board 2.As shown in Figure 17 and Figure 20, the grafting block 2-7 being arranged on draw-in groove 2-2 inside, the riser back side is fixedly connected with braced structures frame 3 by inserting rod.It should be noted that, several bracing frame briquettings 3-5 is set at the interval, side of the periphery gusset 3-3 of bracing frame upper plate 3-1 and bracing frame lower plate 3-2 front portion.Bracing frame briquetting 3-5 all can be arranged on the left side of periphery gusset 3-3.Bracing frame briquetting 3-5 offers vertical through holes.As shown in Figure 18 and Figure 19, the riser briquetting 2-6 of cant board 2 and bracing frame briquetting 3-5 is bolted to connection.As shown in Fig. 9, Figure 10 and Figure 17, the below of two base plates 1 that the end of bracing frame lower plate 3-2 is deeply spliced mutually, and be fitting to connection with two bracing frame contiguous block 1-3 of floor board 1-2 junction.
Described in the present embodiment, base plate 1, cant board 2 and braced structures frame 3 are made by nonmetallic composite, have plastic coating on the surface of base plate 1 and cant board 2 or paste mosaic or arrange waterproof inner container film.
In the present embodiment, Modular spliced pond is square.In other examples, Modular spliced pond can also be circular.
The utility model is done above in conjunction with the embodiments and further described, but the utility model is not limited to above-mentioned embodiment, in the ken that one skilled in the relevant art possesses, can also make a variety of changes under the prerequisite not departing from the utility model aim.

Claims (10)

1. a Modular spliced pond, it is characterized in that, be spliced by several base plates (1), cant board (2) and braced structures frame (3), cant board (2) is fixed on the top of base plate (1), base plate (1) and cant board (2) surround the spatial accommodation of storing liquid, braced structures frame (3) is arranged on the outside of described spatial accommodation and for supporting fixing described spatial accommodation, described base plate (1), cant board (2) and braced structures frame (3) are modular construction body.
2. Modular spliced pond according to claim 1, it is characterized in that, described base plate (1) is square module structure, comprise several base plate pedestals (1-1) and be fixed on the floor board (1-2) of base plate pedestal (1-1) top, wherein, four base plate pedestals (1-1) are separately positioned on the below at floor board (1-2) four right angle corner places;
Respectively arrange two bracing frame contiguous blocks (1-3) in the below of floor board (1-2) each side, support frame as described above contiguous block (1-3) is all arranged on the inner side of the base plate pedestal (1-1) at right angle corner place, for being connected and fixed braced structures frame (3);
Two sides that described floor board (1-2) is wherein relative stretch out, the base plate spill draw-in groove (1-4) forming opening upwards respectively and the base plate convex fixture block (1-5) stretched out downwards;
The base plate convex fixture block (1-5) of another base plate (1) that base plate spill draw-in groove (1-4) and its phase of base plate (1) are spliced is connected, and forms the diapire of described spatial accommodation.
3. Modular spliced pond according to claim 1, it is characterized in that, described cant board (2) is rectangle modular construction body, several cant boards (2) are spliced to form the sidewall of described spatial accommodation mutually, the riser inner face draw-in groove (2-1) of opening towards cant board (2) inner face is offered respectively in two short side edge of cant board (2), opening is towards riser back side draw-in groove (2-2) at cant board (2) back side, riser back side draw-in groove (2-2) of another cant board (2) that riser inner face draw-in groove (2-1) and its phase of cant board (2) are spliced is connected,
Two the first horizontal bar plates (2-3) and the second horizontal bar plate (2-4) be parallel to each other with the long side of cant board (2) are set in the middle part of described cant board (2) back side, the inner side at riser back side draw-in groove (2-2) arranges a vertical rib plate (2-5), and vertical rib plate (2-5) is parallel with the short side of cant board (2);
Described second horizontal bar plate (2-4) is provided with riser briquetting (2-6) near the one end at riser back side draw-in groove (2-2), the inside at riser back side draw-in groove (2-2) is provided with four grafting blocks (2-7) perpendicular with cant board (2), wherein two grafting blocks (2-7) are near the long limit of cant boards (2), and wherein two grafting blocks (2-7) are separately positioned on the end of the first horizontal bar plate (2-3) and the second horizontal bar plate (2-4);
Described grafting block (2-7) offers cross through hole, vertical through holes offered by riser briquetting (2-6), for being connected and fixed braced structures frame (3).
4. the Modular spliced pond according to claim 1 or 2 or 3, it is characterized in that, described braced structures frame (3) is the L-shaped modular construction body in longitudinal section, comprise bracing frame upper plate (3-1) and be arranged on the bracing frame lower plate (3-2) of bracing frame upper plate (3-1) below, the middle part hollow out of bracing frame upper plate (3-1) and bracing frame lower plate (3-2), the thickness of bracing frame upper plate (3-1) is less than the thickness of bracing frame lower plate (3-2);
Before support frame as described above upper plate (3-1) and bracing frame lower plate (3-2), rear portion is provided with periphery gusset (3-3), a left side for bracing frame upper plate (3-1) and bracing frame lower plate (3-2) its front portion close, right bilateral symmetry arranges vertical gusset (3-4), vertical gusset (3-4) and bracing frame upper plate (3-1), bracing frame lower plate (3-2) is perpendicular, at the interval, side of the anterior periphery gusset (3-3) of bracing frame upper plate (3-1) and bracing frame lower plate (3-2), several bracing frame briquettings (3-5) are set, vertical through holes offered by support frame as described above briquetting (3-5),
The front central place of support frame as described above lower plate (3-2) is inlaid with round-meshed L shape steel plate (3-6), the below of two base plates (1) that the end of bracing frame lower plate (3-2) is deeply spliced mutually and being fitting to connection with two bracing frame contiguous blocks (1-3) of floor board (1-2) junction.
5. Modular spliced pond according to claim 4, is characterized in that, the square module structure that support frame as described above upper plate (3-1) is middle part hollow out.
6. Modular spliced pond according to claim 4, it is characterized in that, the irregular modular construction body that support frame as described above upper plate (3-1) is middle part hollow out, its top is provided with the overflow groove (3-7) that longitudinal section is ∪ shape, the below of overflow groove (3-7) is provided with overflow groove sewer pipe (3-8), angle bar resettlement groove (3-9) is offered in the both sides of overflow groove (3-7), angle bar (3-10) is provided with in angle bar resettlement groove (3-9), PVC profile (3-11) is laid in the top of angle bar (3-10), block stone material (3-12) is fixed in the top of PVC profile (3-11), grid (3-13) is set up directly over overflow groove (3-7), the bottom of overflow groove (3-7) is provided with PVC profile (3-11).
7. Modular spliced pond according to claim 2, it is characterized in that, described base plate (1) is fixedly connected with cant board (2) by ∪ shape jig (4), the upper surface of floor board (1-2) is equipped with PVC counterdie (5), the right angle corner place, inner side formed at floor board (1-2) and cant board (2) is provided with PVC water-proof section bar (6), PVC counterdie (5) and PVC water-proof section bar (6) hot melt are integrated, aluminium alloys waterproof press strip (7) and rubber pad (8) are set between cant board (2) and floor board (1-2), the shape of aluminium alloys waterproof press strip (7) and the matching form of cant board (2) long side close, rubber pad (8) is arranged on the below of aluminium alloys waterproof press strip (7).
8. Modular spliced pond according to claim 3, it is characterized in that, when described two cant boards (2) are vertically spliced, one of them cant board (2) cuts away riser back side draw-in groove (2-2) along its vertical rib plate (2-5), the one long plate (9) that slips is set in the riser inner face draw-in groove (2-1) of another cant board (2), the long plate (9) that slips is screwed in riser inner face draw-in groove (2-1), its vertical rib plate (2-5) is fixedly connected with the long plate (9) that slips by angle bar (3-10) by the cant board (2) cutting away riser back side draw-in groove (2-2), the junction of two cant boards (2) is provided with rubber cushion (10).
9. the Modular spliced pond according to claim 3 or 8, it is characterized in that, described cant board (2) abuts against the front portion of braced structures frame (3), be arranged on the inner grafting block (2-7) in riser back side draw-in groove (2-2) to be fixedly connected with braced structures frame (3) by inserting rod, riser briquetting (2-6) and bracing frame briquetting (3-5) are bolted to connection.
10. Modular spliced pond according to claim 1, it is characterized in that, described base plate (1), cant board (2) and braced structures frame (3) are made by nonmetallic composite, the surface of base plate (1) and cant board (2) has plastic coating or pastes mosaic or arrange waterproof inner container film, and the outer rim of the bottom side of base plate (1) arranges several diagonal bars be parallel to each other (1-6).
CN201520037979.XU 2014-12-03 2015-01-20 A kind of Modular spliced pond Withdrawn - After Issue CN204435975U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520037979.XU CN204435975U (en) 2014-12-03 2015-01-20 A kind of Modular spliced pond

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN2014207442889 2014-12-03
CN201420744288 2014-12-03
CN201520037979.XU CN204435975U (en) 2014-12-03 2015-01-20 A kind of Modular spliced pond

Publications (1)

Publication Number Publication Date
CN204435975U true CN204435975U (en) 2015-07-01

Family

ID=53080571

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201520037979.XU Withdrawn - After Issue CN204435975U (en) 2014-12-03 2015-01-20 A kind of Modular spliced pond
CN201510027352.0A Active CN104563573B (en) 2014-12-03 2015-01-20 A kind of Modular spliced pond

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201510027352.0A Active CN104563573B (en) 2014-12-03 2015-01-20 A kind of Modular spliced pond

Country Status (1)

Country Link
CN (2) CN204435975U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104563573A (en) * 2014-12-03 2015-04-29 侯宝权 Modular assembly pool
CN105625787A (en) * 2016-02-05 2016-06-01 中国航空规划设计研究总院有限公司 Pre-stressed steel structure and concrete combined squat silo structure and construction method thereof

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130684B (en) * 2019-04-09 2021-01-12 温州睿鹰建设工程有限公司 Simple swimming pool
CN110042928B (en) * 2019-05-24 2024-02-27 侯宝权 Modularized spliced house and construction method thereof
CN111395818A (en) * 2020-03-25 2020-07-10 中国建筑设计研究院有限公司 Modular component of swimming pool body and installation method
CN114411924B (en) * 2021-12-25 2024-02-20 广东定源项目管理有限公司 Sponge district leans on wall seepage well system
CN217581476U (en) * 2022-01-12 2022-10-14 宜兴市华龙塑木新材料有限公司 Plastic-wood corner frame at top of pool wall for plastic-wood swimming pool

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2888013Y (en) * 2005-08-27 2007-04-11 曲连龙 Combined amusement equipment
GB2441380A (en) * 2006-08-29 2008-03-05 Escar Modular pool
AU2012202995A1 (en) * 2011-05-25 2012-12-13 Glass Pools Pty Ltd A swimming pool
CN203334726U (en) * 2013-07-01 2013-12-11 侯宝权 Internal pressure type assembly-structure swimming pool and multi-functional swimming pool tent
CN204435975U (en) * 2014-12-03 2015-07-01 侯宝权 A kind of Modular spliced pond

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104563573A (en) * 2014-12-03 2015-04-29 侯宝权 Modular assembly pool
CN105625787A (en) * 2016-02-05 2016-06-01 中国航空规划设计研究总院有限公司 Pre-stressed steel structure and concrete combined squat silo structure and construction method thereof

Also Published As

Publication number Publication date
CN104563573B (en) 2017-03-01
CN104563573A (en) 2015-04-29

Similar Documents

Publication Publication Date Title
CN204435975U (en) A kind of Modular spliced pond
CN202850596U (en) Industrialized prefabricated assembly type fence
CN108726348B (en) Horizontal prefabrication, overturning and hoisting method for pipe gallery segments
CN206267522U (en) The buttress template support system of shock isolating pedestal
CN103850439A (en) Modular house construction method
CN207376642U (en) A kind of additional elevator is to a point prefabricated assembled basis
CN203222186U (en) Brick block carrying device
CN213390243U (en) Stainless steel formula stealthy well lid that sinks
CN211752720U (en) Detachable tertiary sedimentation tank
CN205369714U (en) A constructional column structure that be used for at bottom of tie -beam with brick wall or floor
CN104389346B (en) A kind of high-strength light shearing formula assembled building structural system and preparation method thereof
CN204849827U (en) Prefabricated assembled cable worker well
CN205093378U (en) Ecological fish pond structure
CN204040457U (en) Wooden frame plastic formwork system
CN204152280U (en) The water leak preventing structure of pin-connected panel collecting-tank
CN206090713U (en) Glass steel cistern
CN205776400U (en) A kind of for poured band of outer wall of basement structure
CN204491507U (en) A kind of hydraulic engineering template
CN205777582U (en) A kind of concrete pier base moulding bed assembled for large-scale steel structure body
CN205135017U (en) Swimming pool module and swimming pool that founds thereof
CN204825570U (en) Pavement prefabricated plate
CN205348865U (en) Mould pressing baffle sub -assembly and liquid storage tank that founds thereof
CN104018614B (en) The preparation of precast concrete assembled plate and monolithic architecture constructive method
CN210598159U (en) Mortar conveyer for construction
CN219430669U (en) Matte waterproof netherlands component

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20150701

Effective date of abandoning: 20171114