CN210597670U - Integrated aluminum mould hanging mould pouring water-stopping concrete ridge structure - Google Patents

Integrated aluminum mould hanging mould pouring water-stopping concrete ridge structure Download PDF

Info

Publication number
CN210597670U
CN210597670U CN201921285631.7U CN201921285631U CN210597670U CN 210597670 U CN210597670 U CN 210597670U CN 201921285631 U CN201921285631 U CN 201921285631U CN 210597670 U CN210597670 U CN 210597670U
Authority
CN
China
Prior art keywords
concrete
fixing plate
mould
fixed
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921285631.7U
Other languages
Chinese (zh)
Inventor
王贺迪
孙纪龙
曾涛
张龙
王雪松
李航
安康
栾奥
姚渊
郭秀玲
陆鑫
张廷佳
付新闯
田蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Railway Investment Construction Group Co Ltd
Original Assignee
China State Railway Investment Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Railway Investment Construction Group Co Ltd filed Critical China State Railway Investment Construction Group Co Ltd
Priority to CN201921285631.7U priority Critical patent/CN210597670U/en
Application granted granted Critical
Publication of CN210597670U publication Critical patent/CN210597670U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an integrated aluminum mould hanging mould pouring water-stop concrete ridge structure, an angle support is arranged on the ground, the upper end of the angle support is connected with a lower fixed plate, and the lower end of the angle support is fixed on a floor slab; the lower fixing plate is fixed with the upper fixing plate through a support plate; side plates at the upper end and the lower end of the aluminum die are respectively connected with an upper fixing plate and a lower fixing plate through bolts; pouring concrete between the upper surface of the whole floor slab and the aluminum molds to ensure that the concrete ridge formed between the aluminum molds and the ground concrete form an integral structure; the angle steel support is buried in ground concrete. By adopting the construction method of the integrated aluminum mould suspended mould casting water-stopping concrete sill table, the construction technical problem that the once forming quality of the water-stopping sill and the floor slab is poor is solved, the integrity of concrete is improved, the water seepage problem is avoided, and the construction difficulty is reduced.

Description

Integrated aluminum mould hanging mould pouring water-stopping concrete ridge structure
Technical Field
The utility model relates to a building technical field, a whole concrete bank structure specifically says so.
Background
In the building construction, a water stop ridge structure is required to be arranged at a place with water. The construction of the water stop bank in the prior art is that the water stop bank is poured again after the ground concrete construction is finished, so that the result is that: the contact position of the lower end of the water stop ridge with the ground is not an integral body, and water leakage is inevitably caused; in addition, with the development and popularization of new technologies in the construction industry, the application of the aluminum alloy template in engineering is more and more extensive. How to deepen the aluminum mould according to the design drawing is convenient for on-site construction, secondary structure construction is reduced, and cost resources are saved, so that the method is the key point of aluminum alloy template construction research.
Disclosure of Invention
In order to solve the above problem, the utility model aims at providing a stagnant water bank is holistic structure with ground, and once the construction is accomplished, and concrete technical scheme is as follows:
the integrated aluminum mould hanging mould pouring water stop concrete ridge structure is characterized in that an angle steel support is arranged on the ground, the upper end of the angle steel support is connected with a lower fixing plate, and the lower end of the angle steel support is fixed on a floor slab; the lower fixing plate is fixed with the upper fixing plate through a support plate; side plates at the upper end and the lower end of the aluminum die are respectively connected with an upper fixing plate and a lower fixing plate through bolts; pouring concrete between the upper surface of the whole floor slab and the aluminum molds to ensure that the concrete ridge formed between the aluminum molds and the ground concrete form an integral structure; the angle steel support is buried in ground concrete.
The section of the support plate is L-shaped, a lower connecting plate is fixed at the lower end of the support plate, and the lower connecting plate and the lower fixing plate are fixed through bolts; an upper connecting plate is fixed at the upper end of the support plate and is fixed with the upper fixing plate through bolts.
The lower end of the angle steel support is fixedly provided with a lower bottom plate, and the lower bottom plate is fixed with the ground through a bolt.
And after the concrete is poured, the height of the ground concrete reaches the lower surface of the lower fixing plate.
The utility model has the advantages that:
by adopting the construction method of the integrated aluminum mould suspended mould casting water-stopping concrete sill table, the construction technical problem that the once forming quality of the water-stopping sill and the floor slab is poor is solved, the integrity of concrete is improved, the water seepage problem is avoided, and the construction difficulty is reduced.
After the concrete reaches the required strength, the bolts are screwed off, and the floor aluminum mold and the ridge table side mold are dismantled, so that the operation is simple and the construction is convenient.
The lower bottom plate is welded at the vertical bottom of the angle steel support, and forms a water stop sheet type with a floor slab, so that water seepage is prevented, and the waterproof construction quality is guaranteed.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a diagram of a water concrete sill structure.
Detailed Description
The utility model is described in detail with reference to the drawings, as shown in the figures, an angle iron support 2 is arranged on the ground 1, the upper end of the angle iron support 2 is connected with a lower fixing plate 34, and the lower end of the angle iron support is fixed on the floor slab 1; the lower fixing plate 34 is fixed with the upper fixing plate 32 through a support plate 33; the side plates at the upper and lower ends of the aluminum die 4 are respectively connected with the upper fixing plate 32 and the lower fixing plate 34 through bolts; pouring concrete between the upper surface of the whole floor slab and the aluminum molds to ensure that the concrete ridge formed between the aluminum molds and the ground concrete form an integral structure; the angle iron support 2 is buried in ground concrete.
The section of the support plate 33 is L-shaped, a lower connecting plate 31 is fixed at the lower end of the support plate, and the lower connecting plate 31 and the lower fixing plate 34 are fixed through bolts; an upper connecting plate is fixed at the upper end of the support plate, and the upper connecting plate and the upper fixing plate 32 are fixed through bolts.
The lower end of the angle steel support is fixedly provided with a lower bottom plate 21, and the lower bottom plate 21 is fixed with the ground 1 through bolts.
And after the concrete is poured, the height of the ground concrete reaches the lower surface of the lower fixing plate.
Construction method
Preparation for construction
1) The tee joint and the tee joint are made to work according to actual conditions on site, and smooth construction is guaranteed.
2) And reasonably arranging a construction site according to site conditions, and determining a construction sequence.
3) And carrying out aluminum mould deepening design on the water-stopping concrete sill table according to design drawings and construction requirements.
4) And (5) organizing the material to enter a field, rechecking the material, and purchasing the vulnerable accessories.
5) The aluminum template and the angle steel support have enough strength and rigidity, are tightly spliced, are flexibly assembled and disassembled, and are convenient to carry.
6) The construction scheme with perfect establishment and complete examination and approval procedures is adopted before construction, and training work of different levels of technology and various types of workers is well done.
Floor aluminum form installation
And (3) sequentially installing wall columns, beams and floor slab aluminum templates, checking the verticality and the flatness of the aluminum templates and checking whether the pins are correctly wedged, and then transferring the binding of roof steel bars.
Angle steel support mounting
And paying off and positioning the angle steel support on the floor aluminum mould, opening a hole on the floor aluminum mould on site according to the position of a bolt hole on the angle steel support, wherein the hole diameter is phi 8, and the hole is tightly fixed by adopting an M6 bolt.
Aluminum die side die installation
The aluminum die side die is fixedly arranged between an upper fixing plate and a lower fixing plate of the angle steel support, the aluminum die side die is tightly fixed by an M12 bolt, the upper part of the aluminum die side die is provided with reinforcing angle steel, the reinforcing angle steel is tightly fixed by pins, and the distance between the reinforcing angle steel and the reinforcing angle steel is not more than 1000 mm.
Pouring of concrete
After the steel bars are bound, the water stop ridge platform and the floor slab concrete are cast together, and the ridge platform concrete is vibrated by the vibrating rod in the casting process, so that the compactness effect of the concrete is ensured.
Removing the aluminum mold
After the strength of the floor slab concrete reaches the strength required by the aluminum mould dismantling, dismantling the M6 bolt, then dismantling the floor slab aluminum mould, dismantling the reinforcing angle steel and the M12 bolt, and dismantling the aluminum mould side mould; and uniformly cutting off the screws exposed out of the concrete surface by using a cutting machine, and plastering by using polymer cement mortar.

Claims (4)

1. Integration aluminium mould hangs mould and pours stagnant water concrete bank structure, its characterized in that: an angle steel support is arranged on the ground, the upper end of the angle steel support is connected with a lower fixing plate, and the lower end of the angle steel support is fixed on a floor slab; the lower fixing plate is fixed with the upper fixing plate through a support plate; side plates at the upper end and the lower end of the aluminum die are respectively connected with an upper fixing plate and a lower fixing plate through bolts; pouring concrete between the upper surface of the whole floor slab and the aluminum molds to ensure that the concrete ridge formed between the aluminum molds and the ground concrete form an integral structure; the angle steel support is buried in ground concrete.
2. The integrated aluminum mould hanging mould pouring water stop concrete sill structure of claim 1, which is characterized in that: the section of the support plate is L-shaped, a lower connecting plate is fixed at the lower end of the support plate, and the lower connecting plate and the lower fixing plate are fixed through bolts; an upper connecting plate is fixed at the upper end of the support plate and is fixed with the upper fixing plate through bolts.
3. The integrated aluminum mould hanging mould pouring water stop concrete sill structure of claim 1, which is characterized in that: the lower end of the angle steel support is fixedly provided with a lower bottom plate, and the lower bottom plate is fixed with the ground through a bolt.
4. The integrated aluminum mould hanging mould pouring water stop concrete sill structure of claim 1, which is characterized in that: and after the concrete is poured, the height of the ground concrete reaches the lower surface of the lower fixing plate.
CN201921285631.7U 2019-08-09 2019-08-09 Integrated aluminum mould hanging mould pouring water-stopping concrete ridge structure Expired - Fee Related CN210597670U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921285631.7U CN210597670U (en) 2019-08-09 2019-08-09 Integrated aluminum mould hanging mould pouring water-stopping concrete ridge structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921285631.7U CN210597670U (en) 2019-08-09 2019-08-09 Integrated aluminum mould hanging mould pouring water-stopping concrete ridge structure

Publications (1)

Publication Number Publication Date
CN210597670U true CN210597670U (en) 2020-05-22

Family

ID=70721594

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921285631.7U Expired - Fee Related CN210597670U (en) 2019-08-09 2019-08-09 Integrated aluminum mould hanging mould pouring water-stopping concrete ridge structure

Country Status (1)

Country Link
CN (1) CN210597670U (en)

Similar Documents

Publication Publication Date Title
CN111946050A (en) Aluminum alloy formwork construction method applied to assembly type engineering
CN106592426A (en) Prefabricated template system for transverse pre-stress overall width reinforced concrete bridge deck and construction method
CN109252662B (en) One-step forming construction method for vertical shaft bridge frame through cast-in-place concrete floor
CN207177286U (en) Add region mould after fabricated shear wall is reserved
CN210263131U (en) Assembled is from stagnant water underground pipe gallery structure
CN112411798A (en) Synchronous construction method for prefabricated guide wall and main structure of toilet
CN112064894A (en) Construction method of large-diameter circular column
CN112458905A (en) Splicing adjustment method for prefabricated capping beam and prefabricated stand column
CN210597670U (en) Integrated aluminum mould hanging mould pouring water-stopping concrete ridge structure
CN116378428A (en) Construction method of longitudinal rib superimposed shear wall structure wall
CN111535482A (en) Aluminum mould construction concrete structure and tool and electromechanical reservation pre-embedding construction method
CN215254581U (en) Tool type beam column joint angle mould
CN209990152U (en) Opening-closing type pouring opening structure
CN210738077U (en) Waterproof reverse-edge aluminum alloy hanging die
CN108335853A (en) A kind of precast splice type box type transformer basis
JP6654918B2 (en) Fixing method and joint structure of joint steel frame in composite structure
CN219710363U (en) Anti-floating supporting die structure of water collecting well
CN112536911A (en) Integral construction method for bridge prefabricated stand column
CN112196185A (en) Construction method of stiff fair-faced concrete column
CN214169157U (en) Prefabricated inspection well template
CN110700574A (en) Post-cast strip supporting structure and construction method thereof
CN206477251U (en) Transverse prestress overall with reinforced concrete bridge deck plate prefab-form system
CN110965766A (en) Template for construction of deformation joint of shear wall structure, construction structure and construction method
CN212895926U (en) Operating platform of hollow bridge tower
CN217840881U (en) Construction device for penetrating roof pipeline sleeve and reinforced concrete member

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200522

Termination date: 20210809