CN110965766A - Template for construction of deformation joint of shear wall structure, construction structure and construction method - Google Patents

Template for construction of deformation joint of shear wall structure, construction structure and construction method Download PDF

Info

Publication number
CN110965766A
CN110965766A CN201911331373.6A CN201911331373A CN110965766A CN 110965766 A CN110965766 A CN 110965766A CN 201911331373 A CN201911331373 A CN 201911331373A CN 110965766 A CN110965766 A CN 110965766A
Authority
CN
China
Prior art keywords
template
construction
nut
shear wall
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911331373.6A
Other languages
Chinese (zh)
Inventor
郭蓉
李慧林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan Hongyu Century Construction Engineering Co Ltd
Original Assignee
Dongguan Hongyu Century Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Hongyu Century Construction Engineering Co Ltd filed Critical Dongguan Hongyu Century Construction Engineering Co Ltd
Priority to CN201911331373.6A priority Critical patent/CN110965766A/en
Publication of CN110965766A publication Critical patent/CN110965766A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
    • E04G11/085End form panels for walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
    • E04G11/12Forms, which are completely dismantled after setting of the concrete and re-built for next pouring of elements and beams which are mounted during erection of the shuttering to brace or couple the elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
    • E04G17/0651One-piece elements
    • E04G17/0652One-piece elements fully recoverable

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a construction method of a deformation joint of a shear wall structure, which relates to the technical field of shear wall construction, and the technical scheme has the following key points: including interior template and exterior sheathing, wherein be connected with two piece at least main joist, two piece at least secondary joist on the interior template, secondary joist vertical fixation is on the main joist, and at least two are parallel to each other between with the main joist, parallel to each other between two piece at least secondary joist, fixedly connected with nut on the interior template, the position that corresponds the nut on the interior template is opened there is the through-hole. The invention solves the technical problem that the template in the deformation joint is inconvenient to remove, and has the advantage of being convenient to remove the template in the deformation joint.

Description

Template for construction of deformation joint of shear wall structure, construction structure and construction method
Technical Field
The invention relates to the technical field of shear wall construction, in particular to a template for construction of a deformation joint of a shear wall structure, a construction structure and a construction method.
Background
The shear wall has three types, namely an expansion joint, a settlement joint and a shockproof joint.
The construction method of the shear wall comprises the following steps: template manufacturing and installation, steel bar binding, shear wall pouring and template dismantling.
In the prior art, because the width of the deformation joint is limited, the installation, adjustment and removal of the template and the support are required to be completed in a narrow place, and the removal process in the prior art is difficult.
Disclosure of Invention
Aiming at the defects in the prior art, the invention aims to: the construction method for the deformation joint of the shear wall structure has the advantage of convenience in template removal.
Above-mentioned technical purpose is realized through following technical scheme, a template is used in construction of shear wall structure movement joint, including inner formword and exterior sheathing, wherein be connected with two piece at least main joist, two piece at least secondary joist on the inner formword, secondary joist vertical fixation is on the main joist, and at least two are parallel to each other between with the main joist, be parallel to each other between two piece at least secondary joist, fixedly connected with nut on the inner formword, the position that corresponds the nut on the inner formword is opened there is the through-hole.
Through above-mentioned technical scheme, fix at nut and centre form, can conveniently demolish the in-process, the external mold department is demolishd, reduces owing to the inconvenient problem of operation that leads to in the movement joint space is narrow and small.
Further, the inner formwork and/or the outer formwork are steel plates.
Through the technical scheme, the steel plate has high hardness, and is not easy to deform due to the expansion of concrete in the concrete pouring process.
Furthermore, the top of the inner template and/or the outer template is fixedly connected with a hanging ring.
Through the technical scheme, the hoisting device is hung on the hoisting ring through the hoisting ring, so that the hoisting is more convenient.
The utility model provides a shear force wall construction structures which characterized in that: the split type nut forming die comprises an inner die plate and an outer die plate, a split bolt is connected between the inner die plate and the outer die plate, a nut is fixedly connected onto the inner die plate, a through hole is formed in the position, corresponding to the nut, on the inner die plate, and the split bolt penetrates through the nut, fixed to the inner die, of the outer die plate in a threaded connection mode.
Through the technical scheme, the split bolts are connected to the nuts of the inner formwork in a threaded mode, concrete is poured between the inner formwork and the outer formwork, pouring of the shear wall is completed, when the formwork is detached, the split bolts are detached from the position of the outer template, one side of the inner formwork in a relative field is spacious, and operation is more convenient.
Furthermore, a connecting groove is formed in one side of each steel formwork, and a connecting edge which is matched and spliced with the connecting groove in the adjacent steel formwork is formed in the other side of each steel formwork.
Through above-mentioned technical scheme, the steel sheet can be realized the concatenation with the cooperation setting between the stupefied in spread groove and connection, and it is more convenient in the hoist and mount process, adapts to the wall body of equidimension not simultaneously.
Furthermore, the top of the connecting groove is provided with a flared part, and the bottom of the connecting edge is provided with a necking part.
Through above-mentioned technical scheme, through the setting of flaring portion and throat portion, can aim at more easily when hoist and mount, let simultaneously can let the spread groove with be connected stupefied and realize interference fit, when connecting stupefied and the spread groove between the clearance less, through the setting of flaring portion and throat portion, it is more convenient to connect.
Furthermore, the split bolt is coated with a wall penetrating pipe.
Through the technical scheme, through the setting of wall pipe, keep apart bolt and concrete, reduce the damage to the wall body when demolising the bolt, can prolong concreting and demolish the interval time between the template simultaneously, still can demolish the split bolt after the concrete solidifies completely, it delays to produce the time limit in the period to appear weather or other special cases among the prior art, cause solidification of concrete to be difficult for demolising the split bolt, through the setting of wall pipe, still can demolish the split bolt under this kind of condition.
A construction method of a shear wall construction structure according to any one of claims 4 to 7, comprising the steps of, in a first step, machining a formwork; secondly, fixing the inner die and the outer die at preset positions; thirdly, fixing the outer die and the inner die through split bolts; fourthly, pouring concrete; and fifthly, removing the template, wherein in the process of fixing the template, a nut is fixed on the inner mold, a split bolt penetrates through the outer mold and is connected to the nut fixed on the inner mold in a threaded manner, and the template is lifted out of the deformation joint in the process of removing the template by selecting a hoisting manner.
Through above-mentioned technical scheme, fix the nut on the centre form, demolish the template, demolish in the outer mould department, can avoid because demolish the inconvenient factor of template in narrow and small movement joint, demolish the template through the mode of hoist and mount, it is easier to be under construction.
In conclusion, the invention has the following technical effects:
1. the large steel template can be prefabricated, the tower crane is convenient to integrally hoist and mount, the rigidity is high, the turnover construction can be realized, and the large steel template can be used for template construction at a deformation joint position.
2. The screw cap is welded on the steel die in advance by utilizing the weldability of the screw cap, so that workers can reinforce and remove the die plate on the other side (in a floor) of the shear wall steel large die plate.
3. The method for fixing the bolts in the steel mould panel by using the bolt holes formed at the joint of the two steel moulds and the channel steel by using the characteristic that the steel moulds can be combined and assembled is utilized, and epoxy resin is used for sealing the joints of the steel mould panel at the joint of the steel panel, so that the construction requirements of different layer heights and wall lengths are met.
Drawings
FIG. 1 is a flowchart of the method of example 1;
FIG. 2 is a schematic view of the structure of a template in example 1;
fig. 3 is a schematic diagram of the splicing of two template units in example 1.
Reference numerals: 1. an inner template; 10. a template unit; 100. connecting grooves; 101. connecting edges; 102. a flared part; 103. a necking part; 2. an outer template; 3. oppositely pulling the bolts; 4. a nut; 5. a wall body; 50. a hoisting ring; 6. a through-wall pipe.
Detailed Description
The embodiment discloses a construction method of a deformation joint of a shear wall structure.
Referring to fig. 1, the method includes the following steps: firstly, processing a template. And secondly, placing the inner mold. And thirdly, placing an outer die. And fourthly, erecting an inner die and penetrating a bolt for reinforcement. And fifthly, pouring concrete. And sixthly, hoisting and detaching the template.
The template processing method comprises the following steps:
firstly, preparing materials, wherein the materials to be prepared comprise: 14 mm's steel form, 90 mm's secondary joist and 3 mm's steel pipe are as main joist, a plurality of screws, and 3, 14mm steel pipes are as fixed pipe to the split bolt.
With reference to fig. 2, two main joists are taken, are vertically placed at intervals of 450mm, and are vertically fixed on the main joists, and the distance between two adjacent main joists is 240mm, the main joists and the steel formwork are fixed through bolts, the distance between the bolts close to one row of the ground and the ground is not more than 200mm, and the distance between the bolts close to one row of the ground and the ground is 220mm in the embodiment.
The fixing pipe is welded between the keels, so that the whole stress of the template is uniform, the nut 4 is welded on the fixing pipe every 500mm, and the template is provided with a through hole for the screw rod of the split bolt 3 to pass through.
Through welding nut 4 on the template, the dismouting is more convenient, makes the workman can carry out the reinforcement of template and demolish work in the opposite side (in the floor) of template.
The space in the movement joint is narrow and small, and the work of dismantling through inside the floor is more convenient.
And after the template is processed, fixing the inner film at a preset position, fixing the outer die at a preset position, and fixing the inner film and the outer die.
The split bolt 3 penetrates through the outer die to be in threaded connection with a nut 4 fixed on the inner die, and the side, far away from the inner die, of the outer die is fixed through the bolt.
In order to facilitate the removal of the formwork, in this embodiment, the bolt is sleeved with a through-wall pipe 6, so as to isolate the screw of the split bolt 3 from the wall body 5.
And pouring concrete between the inner mold and the outer mold to form the shear wall, and removing the template after the concrete is initially set.
The concrete mode of template demolition is:
and (4) disassembling from the outer die, rotating the bolt, and disassembling the bolt from the nut 4 of the inner die because the nut 4 is fixed on the template of the inner die.
The centre form is taken off the template through the mode of hoist and mount, because the position of movement joint is narrower and small, can't enter into the inside work of dismantling of movement joint, fixes through nut 4 and template, dismantles from the external mold department, and it is easier to dismantle.
In this embodiment, the inner mold and the outer mold are made of steel plates.
A steel formwork, with reference to FIG. 3, includes a plurality of formwork units 10, wherein one side of the formwork unit 10 is opened with a connecting groove 100, and the other side is extended with a connecting ridge 101.
Connecting stupefied 101 is the T style of calligraphy, and connecting groove 100 is the same with connecting stupefied 101 shape, and in order to make things convenient for the assembly of template, the connecting groove 100 top is provided with flared portion 102, connects stupefied 101 bottom and is provided with throat portion 103.
After the throat 103 is inserted from the flared portion 102, the two steel templates can be connected together.
For the convenience of hoisting, a hoisting ring 50 is fixedly connected to the top of the steel plate.
Concrete implementation process fixes interior template 1 and exterior sheathing 2, keeps away from external mold one side fixation nut 4 at the inner membrane, will carry out pouring of concrete after 3 are fixed to the stay bolt, forms the shear force wall, after the shear force wall initial set, carries out the template and demolishs, carries out demolishs the template in exterior sheathing department, takes off the interior mould through the waterproof of hoist and mount after taking off the stay bolt, because the space of movement joint is narrow and small, through demolishing the template in exterior sheathing department, it is more convenient.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications of the present embodiment without inventive contribution as needed after reading the present specification, but all of them are protected by patent law within the scope of the claims of the present invention.

Claims (8)

1. The utility model provides a template is used in construction of shear wall structure movement joint which characterized in that: including interior template (1) and exterior sheathing (2), wherein be connected with two piece at least main joist, two piece at least secondary joist on interior template (1), secondary joist vertical fixation is on the main joist, and at least two are parallel to each other between with the main joist, parallel to each other between two piece at least secondary joist, fixedly connected with nut (4) on interior template (1), the position that corresponds nut (4) on interior template (1) is opened there is the through-hole.
2. The formwork for construction of the deformation joint of the shear wall structure according to claim 1, wherein: the inner template (1) and/or the outer template (2) are steel plates.
3. The formwork for construction of the deformation joint of the shear wall structure according to claim 1 or 2, wherein: the top of the inner template (1) and/or the top of the outer template (2) are fixedly connected with a hanging ring (50).
4. The utility model provides a shear force wall construction structures which characterized in that: including inner formword (1) and exterior sheathing (2), be connected with between inner formword (1) and exterior sheathing (2) split bolt (3), fixedly connected with nut (4) on inner formword (1), the through-hole has been seted up to the position that corresponds nut (4) on inner formword (1), and split bolt (3) pass exterior sheathing (2) threaded connection on fixed nut (4) on the centre form.
5. A shear wall construction structure according to claim 4, wherein: one side of the steel formwork is provided with a connecting groove (100), and the other side of the steel formwork is provided with a connecting edge (101) which is matched and spliced with the connecting groove (100) on the adjacent steel formwork.
6. A shear wall construction structure according to claim 5, wherein: flared parts (102) are arranged at the tops of the connecting grooves (100), and necking parts (103) are arranged at the bottoms of the connecting ribs (101).
7. A shear wall construction structure according to any one of claims 4 to 6, wherein: the split bolt (3) is coated with a wall penetrating pipe (6).
8. A construction method of a shear wall construction structure according to any one of claims 4 to 7, comprising the steps of, in a first step, machining a formwork; secondly, fixing the inner die and the outer die at preset positions; thirdly, fixing the outer die and the inner die through split bolts (3); fourthly, pouring concrete; and fifthly, removing the template, wherein in the process of fixing the template, the nut (4) is fixed on the inner mold, the split bolt (3) penetrates through the outer mold and is connected to the nut (4) fixed on the inner mold in a threaded manner, and the template is lifted out of the deformation joint in the process of removing the template by using a lifting manner.
CN201911331373.6A 2019-12-21 2019-12-21 Template for construction of deformation joint of shear wall structure, construction structure and construction method Pending CN110965766A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911331373.6A CN110965766A (en) 2019-12-21 2019-12-21 Template for construction of deformation joint of shear wall structure, construction structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911331373.6A CN110965766A (en) 2019-12-21 2019-12-21 Template for construction of deformation joint of shear wall structure, construction structure and construction method

Publications (1)

Publication Number Publication Date
CN110965766A true CN110965766A (en) 2020-04-07

Family

ID=70035598

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911331373.6A Pending CN110965766A (en) 2019-12-21 2019-12-21 Template for construction of deformation joint of shear wall structure, construction structure and construction method

Country Status (1)

Country Link
CN (1) CN110965766A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112459467A (en) * 2020-10-26 2021-03-09 中铁建设集团有限公司 Deformation joint wall formwork and cast-in-place shear wall construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4454702A (en) * 1981-03-24 1984-06-19 Bonilla Lugo Juan Building construction and method of constructing same
CN201437639U (en) * 2009-06-10 2010-04-14 中建三局建设工程股份有限公司 Integral type deformation joint steel moulding plate
CN202810200U (en) * 2012-09-14 2013-03-20 中建一局集团第五建筑有限公司 Double-walled large steel formwork at deformation joint
CN203129578U (en) * 2013-02-22 2013-08-14 毛成 Building template
CN108385980A (en) * 2018-02-28 2018-08-10 五冶集团上海有限公司 Deformation joint shear wall set shaped steel formwork installs unidirectional fastening screw construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4454702A (en) * 1981-03-24 1984-06-19 Bonilla Lugo Juan Building construction and method of constructing same
CN201437639U (en) * 2009-06-10 2010-04-14 中建三局建设工程股份有限公司 Integral type deformation joint steel moulding plate
CN202810200U (en) * 2012-09-14 2013-03-20 中建一局集团第五建筑有限公司 Double-walled large steel formwork at deformation joint
CN203129578U (en) * 2013-02-22 2013-08-14 毛成 Building template
CN108385980A (en) * 2018-02-28 2018-08-10 五冶集团上海有限公司 Deformation joint shear wall set shaped steel formwork installs unidirectional fastening screw construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112459467A (en) * 2020-10-26 2021-03-09 中铁建设集团有限公司 Deformation joint wall formwork and cast-in-place shear wall construction method

Similar Documents

Publication Publication Date Title
CN104895318A (en) Aluminum alloy template system and construction method of same
CN111946050A (en) Aluminum alloy formwork construction method applied to assembly type engineering
CN109208790B (en) Single-side formwork erecting construction method for arc shear wall
CN104196231A (en) Concrete floor aluminum alloy template and construction method thereof
CN111395754B (en) Method for implementing formwork supporting system
CN209874483U (en) Detachable fixing die for reserved air conditioner hole of shear wall
CN215760469U (en) Building structure movement joint position shear force wall aluminum mould board location reinforcement device
CN214531887U (en) Template reinforcing system for arc-shaped wall
CN110863644A (en) Novel turnover tool type beam side connecting wall piece fixing device and method
CN110965766A (en) Template for construction of deformation joint of shear wall structure, construction structure and construction method
CN212784485U (en) Inner supporting device of distribution box
CN204059940U (en) A kind of concrete floor aluminum alloy mould plate
CN215254581U (en) Tool type beam column joint angle mould
CN105804396A (en) Precast stair flight manufactured by non-established and circularly-used template system and construction method
CN113090025B (en) Aluminum mold matching overhanging outer frame construction method of full concrete outer wall structure
CN210685368U (en) Convenient reinforcing complete die set for concrete wall formworks on two sides of deformation joint
CN209907936U (en) Integrated template system of cast-in-situ overhanging window board with secondary structure
CN110118014B (en) Exterior wall template system free of exterior scaffold and construction method thereof
CN109914571B (en) Basement drainage ditch formwork system, pouring system and construction method
CN103216087B (en) A kind of two-way self-bearing type construction formwork system
CN112627570A (en) Repairing tool for repairing large gap of door opening and construction method thereof
CN111002432A (en) Prefabricated constructional column template and using method thereof
CN111472541A (en) Expansion joint template and construction method thereof
CN111535578A (en) Mounting process of template of cast-in-place structure
CN205822768U (en) A kind of detachable die mould Steel Thin-Wall template

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200407

RJ01 Rejection of invention patent application after publication