CN210563284U CN201921082066.4U CN201921082066U CN210563284U CN 210563284 U CN210563284 U CN 210563284U CN 201921082066 U CN201921082066 U CN 201921082066U CN 210563284 U CN210563284 U CN 210563284U
Authority
CN
China
Prior art keywords
connecting plate
seted
building safety
plate
mounting groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921082066.4U
Other languages
Chinese (zh)
Inventor
李强
郭刚
哈智瀚
柴大智
刘怡天
左亚斌
杨阳
王周斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Xinrui Urban Construction Co ltd
Original Assignee
Gansu Road And Bridge Hongsheng House Building Installation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Road And Bridge Hongsheng House Building Installation Co ltd filed Critical Gansu Road And Bridge Hongsheng House Building Installation Co ltd
Priority to CN201921082066.4U priority Critical patent/CN210563284U/en
Application granted granted Critical
Publication of CN210563284U publication Critical patent/CN210563284U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a building safety pre-installation adapted packway, including backup pad, connecting plate and walking board, the top fixed mounting of connecting plate has two fixing bases, two the slot has all been seted up to the inside of fixing base, two the screw thread through-hole has all been seted up at the both ends at fixing base top, fastening bolt is installed to the inside screw thread of screw thread through-hole, the thread groove has all been seted up to four apex angle seats of walking board, just the both ends of walking board all are located the inside of slot, the both ends of walking board are divided and are passed through fastening bolt fixed mounting is two the inside of fixing base, the installation head has been preset at the top of backup pad, the mounting groove has been preset in the intermediate position department of the inside bottom of connecting plate, the backup pad passes through the installation head with connecting plate fixed connection. The utility model discloses a set up a series of structures and make this device have stable in structure and convenient to install and dismantle's characteristics.

Description

Building safety preassembles adapted packway
Technical Field
The utility model relates to a building engineering technical field specifically is a building safety pre-installation adapted packway.
Background
The building engineering refers to an engineering entity formed by the construction of various building constructions and their auxiliary facilities and the installation of lines, pipelines and equipment matched with them. The house building is characterized by comprising a top cover, a beam column, a wall, a foundation and a project which can form an internal space and meet the requirements of people on production, living, study and public activities.
In the construction, when cast-in-place slab concrete placement, constructor tramples to the negative muscle of floor, can cause negative muscle offset and subside, simultaneously in order to prevent that cast-in-place slab upper portion is out of shape, it is not hard up, constructor can not trample the reinforcing bar usually, generally need set up interim packway, so that constructor walks on it, current packway is in order to guarantee its stability and security, often be in the same place each structure welded fastening, thereby make the packway become undetachable after the one-time use, or dismantle the difficulty, thereby increased the construction difficulty degree and reduced the efficiency of construction, therefore, we have proposed a construction safety adapted and preassembled packway solution problem in order to solve this a series of problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building safety pre-installation adapted packway to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building safety pre-installation adapted packway, includes backup pad, connecting plate and running plate, the top fixed mounting of connecting plate has two fixing bases, two the slot has all been seted up to the inside of fixing base, two the screw thread through-hole has all been seted up at the both ends at fixing base top, fastening bolt is installed to the inside screw thread of screw thread through-hole, the four-end apex angle seats of running plate have all seted up the thread groove, just the both ends of running plate all are located the inside of slot.
Preferably, the two ends of the walking plate are fixedly installed inside the two fixing seats through the fastening bolts.
Preferably, the mounting head is preset at the top of the support plate, the mounting groove is preset at the middle position of the bottom end inside the connecting plate, and the support plate is fixedly connected with the connecting plate through the mounting head and the mounting groove.
Preferably, the mounting head and the mounting groove are both T-shaped structures, and the mounting groove is of a bottom opening structure.
Preferably, the two fixing seats and the connecting plate are fixed through welding.
Preferably, the number of the connecting plates is not less than two, and the number of the supporting plates is not less than two.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model has the advantages of scientific and reasonable structure, safe and convenient use, the two ends of the walking board are fixedly arranged inside the two fixing seats through the fastening bolts, thereby the walking board of the device is firmly installed and is convenient to disassemble, when the device is not needed to be used, the walking board can be taken out of the slot through loosening the fastening bolts, thereby the walking board is taken out, the supporting board is fixedly connected with the connecting board through the installing head and the installing groove, the supporting board and the connecting board are clamped and fixed in a clamping way, the device is convenient to install and disassemble, thereby the device is convenient to install and connect when in need of use, when the device is not needed to be used, the device can be disassembled into different individuals, the transportation and the secondary use at the later stage are convenient, and the number of the structural components of the device is not less than two, the number of the structural components of the device can be increased according to different needs, thereby, is convenient for people to use.
Drawings
Fig. 1 is a schematic structural view of the whole of the present invention;
FIG. 2 is a side view of the connection plate of the present invention;
fig. 3 is a schematic structural view of the support plate of the present invention;
fig. 4 is a top view of the connection plate of the present invention;
fig. 5 is a plan view of the running board of the present invention.
In the figure: 1. a support plate; 2. a connecting plate; 3. a walking board; 4. a fixed seat; 5. fastening a bolt; 6. mounting grooves; 7. a threaded through hole; 8. a slot; 9. a thread groove; 10. and (5) mounting the head.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: the utility model provides a building safety pre-installation adapted packway technical scheme, includes backup pad 1, connecting plate 2 and running plate 3, and the top fixed mounting of connecting plate 2 has two fixing bases 4, and slot 8 has all been seted up to the inside of two fixing bases 4, and threaded through hole 7 has all been seted up at the both ends at two fixing bases 4 tops, and fastening bolt 5 is installed to the internal thread of threaded through hole 7, and threaded groove 9 has all been seted up to the four-end apex angle seat of running plate 3, and the both ends of running plate 3 all are located the inside of slot 8.
Preferably, the both ends of walking board 3 divide through the inside of fastening bolt 5 fixed mounting at two fixing bases 4 to make this device walking board 3 installation firm, and convenient to detach, when need not using, through unscrewing fastening bolt 5, can take out slot 8 with walking board 3 inside, thereby get down walking board 3.
Preferably, installation head 10 has been preset at the top of backup pad 1, and mounting groove 6 has been preset in the intermediate position department of the inside bottom of connecting plate 2, and backup pad 1 is fixed with 2 fixed connection of connecting plate through installation head 10 and mounting groove 6, mode through the joint with backup pad 1 and 2 joints of connecting plate, be convenient for installation and split to make this device when needs use, be convenient for erection joint, when need not use, can split into different individualities.
Preferably, installation head 10 and mounting groove 6 are T type structure, and mounting groove 6 is bottom open structure, and the backup pad 1 joint of being convenient for is gone into inside connecting plate 2.
Preferably, all through welded fastening between two fixing bases 4 and the connecting plate 2 for connecting plate 2 is more firm in the connection process, and the security is high.
Preferably, two are no less than to the number of connecting plate 2, and two are no less than to the number of backup pad 1, can increase the number of each structure of this device according to the needs of difference to the length to the packway is prolonged, and the aspect people use.
The working principle is as follows: the utility model is characterized in that the two ends of the running board 3 are fixedly arranged inside the two fixing seats 4 through the fastening bolts 5, thereby the running board 3 of the device is firmly installed and is convenient to disassemble, when the device is not needed to be used, the running board 3 can be taken out of the slot 8 by unscrewing the fastening bolts 5, thereby the running board 3 is taken out, the supporting board 1 is fixedly connected with the connecting board 2 through the installing head 10 and the installing slot 6, the supporting board 1 and the connecting board 2 are fixed in a clamping way, thereby the device is convenient to install and disassemble, when the device is needed to be used, the device is convenient to install and connect, when the device is not needed to be used, the device can be disassembled into different individuals, the transportation and the secondary use in the later period are convenient, and the number of the structural components of the device is not less than two, the number of the structural components of the device can be increased according to different needs, thereby the length of, is convenient for people to use.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a building safety pre-installation adapted packway, includes backup pad (1), connecting plate (2) and running plate (3), its characterized in that: the top fixed mounting of connecting plate (2) has two fixing bases (4), two slot (8), two have all been seted up to the inside of fixing base (4) the both ends at fixing base (4) top have all been seted up screw thread through-hole (7), fastening bolt (5) are installed to the internal thread of screw thread through-hole (7), thread groove (9) have all been seted up to the four-end apex angle seat of carriage apron (3), just the both ends of carriage apron (3) all are located the inside of slot (8).
2. The pre-assembled horse way for building safety according to claim 1, wherein: the two ends of the walking plate (3) are fixedly arranged in the two fixed seats (4) through the fastening bolts (5).
3. The pre-assembled horse way for building safety according to claim 1, wherein: an installing head (10) is arranged at the top of the supporting plate (1) in advance, a mounting groove (6) is arranged in the middle of the bottom end in the connecting plate (2) in advance, and the supporting plate (1) is fixedly connected with the connecting plate (2) through the installing head (10) and the mounting groove (6).
4. A construction safety preassembly horseway as claimed in claim 3, wherein: the mounting head (10) and the mounting groove (6) are both T-shaped structures, and the mounting groove (6) is of a bottom opening structure.
5. The pre-assembled horse way for building safety according to claim 1, wherein: the two fixing seats (4) and the connecting plate (2) are fixed through welding.
6. The pre-assembled horse way for building safety according to claim 1, wherein: the number of the connecting plates (2) is not less than two, and the number of the supporting plates (1) is not less than two.
CN201921082066.4U 2019-07-11 2019-07-11 Building safety preassembles adapted packway Active CN210563284U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921082066.4U CN210563284U (en) 2019-07-11 2019-07-11 Building safety preassembles adapted packway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921082066.4U CN210563284U (en) 2019-07-11 2019-07-11 Building safety preassembles adapted packway

Publications (1)

Publication Number Publication Date
CN210563284U true CN210563284U (en) 2020-05-19

Family

ID=70630934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921082066.4U Active CN210563284U (en) 2019-07-11 2019-07-11 Building safety preassembles adapted packway

Country Status (1)

Country Link
CN (1) CN210563284U (en)

Similar Documents

Publication Publication Date Title
CN102359180B (en) Truss combined beam and upper and layer connected light steel structure and construction method thereof
CN207079724U (en) A kind of steel construction primary and secondary beam connecting node
CN204097882U (en) For the assembling combined steel pipe mounting system of bridge engineering
CN210563284U (en) Building safety preassembles adapted packway
CN209780318U (en) prefabricated component installation bearing structure
CN202899303U (en) Building combined hanging piece and building structure
CN213062891U (en) Fastener for walkway plate
CN214169870U (en) A scaffold installation equipment that encorbelments for housing construction
CN212742921U (en) Assembled building element based on BIM
CN208733817U (en) A kind of assembling type steel structure building Special-Shaped Column
CN204691235U (en) Aluminium wood earth system
CN209129226U (en) A kind of novel corner fastener structure
CN112922359A (en) Prefabricated superposed shear wall mounting system and mounting method
CN112681718B (en) A novel pre-buried expansion bolts even wall spare for fixing overhanging type scaffold
CN214034308U (en) Assembled steel construction building ceiling
CN220351519U (en) Annular rail device for assembly type curtain wall hoisting
CN213114977U (en) Shaped column for building steel structure
CN219653947U (en) Girder steel and concrete PC roof beam connection structure
CN218091928U (en) Novel diagonal cantilever beam
CN214272422U (en) Connection node of assembled steel structure stand and precast concrete roof beam
CN210887566U (en) Cladding steel structure beam column
CN217924839U (en) Temporary support system
CN213805847U (en) Steel tool for prefabricated part of fabricated building
CN210976673U (en) Anti-falling device for steel structure engineering construction
CN106571775A (en) Combiner box support and combiner box

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 730000 No. 226, Minzhu West Road, Chengguan District, Lanzhou City, Gansu Province (21st floor, xibeihong building)

Patentee after: Gansu Xinrui Urban Construction Co.,Ltd.

Address before: 730030 no.226, Minzhu West Road, Chengguan District, Lanzhou City, Gansu Province (21st floor, xibeihong building)

Patentee before: GANSU ROAD AND BRIDGE HONGSHENG HOUSE BUILDING INSTALLATION CO.,LTD.