- CN210508404U CN210508404U CN201920919038.7U CN201920919038U CN210508404U CN 210508404 U CN210508404 U CN 210508404U CN 201920919038 U CN201920919038 U CN 201920919038U CN 210508404 U CN210508404 U CN 210508404U
- Authority
- CN
- China
- Prior art keywords
- vibration
- floor slab
- equipment room
- floor
- sound insulation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Floor Finish (AREA)
- Building Environments (AREA)
Abstract
The utility model relates to a waterproof integration equipment room floor of making an uproar falls in sound insulation, including the floor main part, its characterized in that: surrounding wall bodies for limiting the size of the floor slab are arranged on the periphery of the floor slab, a vibration-damping sound-insulating layer is arranged inside the floor slab, and a steel plate for protecting the vibration-damping sound-insulating layer is arranged on the upper side of the vibration-damping sound-insulating layer; the concrete floating construction platform is arranged on the upper portion of the floor slab and used for bearing equipment, a drain pipe used for floor slab drainage is pre-buried in the floating construction platform, and sealing rubber is arranged between the floating construction platform and the surrounding wall body. The utility model provides a noise, the vibration problem of equipment room, the floor reduces, has kept apart vibration and noise propagation pollution on the building, and pre-buried water pipe has solved the thick not enough unable problem of drainage that is unfavorable for pre-buried, excavation ditch or the easy ponding of horizontal ditch caused of building floor board simultaneously. The utility model discloses can practice thrift construction cost, promote the efficiency of construction, bring certain economic benefits, be worth popularizing and applying.
Description
Technical Field
The utility model relates to a concrete floor field, more specifically are waterproof integration equipment room floor of making an uproar falls in sound insulation.
Background
In recent years, with the rapid and vigorous development of the construction industry, various modern super high-rise office buildings have become the mainstream of the construction engineering. In the process of the continuous emergence of such buildings, vibration and noise pollution caused by a wide variety of electromechanical devices inside the buildings cannot be ignored. The equipment room and the machine room of a high-rise office building are usually arranged on the roof or in the middle position of the building, the equipment vibration can be transmitted to the building structure through the bottom of the equipment or a pipeline, a cable and the like connected with the equipment, the vibration structure radiates to a receiving space to form air sound, and the air sound is transmitted to a receiver, and meanwhile, the problem of water accumulation and discharge in the equipment room also troubles the normal life and work of people in the building.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a collect the sound insulation, fall make an uproar and waterproof in equipment room floor of an organic whole, can effectively solve the problem in the background art.
In order to realize the above-mentioned purpose the utility model provides a waterproof integration equipment room floor of making an uproar falls in sound insulation, including the floor main part, its characterized in that: the periphery of the floor is provided with surrounding wall bodies for limiting the size of the floor, a vibration-damping sound-insulating layer is arranged inside the floor, the lower side of the vibration-damping sound-insulating layer is a mortar protective layer for leveling treatment, the upper side of the vibration-damping sound-insulating layer is provided with a steel plate for protecting the vibration-damping sound-insulating layer, and waterproof roll paper is laid on the steel plate; the concrete floating construction platform is arranged at the top of the floor and used for bearing equipment, a drain pipe used for floor drainage is pre-buried in the floating construction platform, and sealing rubber is arranged between the floating construction platform and the surrounding wall body.
As the utility model discloses a preferred technical scheme, the floor is established on the floor of equipment room, pour the mortar protective layer to equipment room floor and do the processing of making level before the floor is pour the construction.
As a preferred technical scheme of the utility model, the damping puigging includes damping piece and vibration isolation cushion, the vibration isolation cushion is equipped with the hole groove that suits with the damping piece, the damping piece inlays in the vibration isolation cushion.
As an optimized technical scheme of the utility model, the vibration isolation rubber mat is inlayed with sound insulation glass cotton.
As an optimized technical scheme of the utility model, the inside ligature of floating building platform has the reinforcing bar net.
As an optimal technical scheme of the utility model, be used for through welded fastening between the steel sheet of protection damping puigging to piece between the steel sheet is T shape.
As an optimized technical scheme of the utility model, the pre-buried drain pipe of floating building platform communicates the drain pipe or the floor drain department of the lower department of equipment room.
As an optimized technical proposal of the utility model, the drain pipe is made of U-PVC material.
Compared with the prior art, the utility model provides a possess following beneficial effect: the utility model discloses an innovation point lies in having solved noise, vibration, the ponding problem in electromechanical device room, and the floor can vibration and noise propagation pollution on furthest reduction, the isolation building, and the noise and the vibration level control of equipment external radiation are in the within range of relevant national standard regulation. When the floor slab is in pouring construction, the drainage pipe is pre-buried in advance, gravity drainage is realized by utilizing the gradient, and the problem that the building floor slab is not thick enough and is not beneficial to pre-burying, excavating a ditch or leveling a ditch and is easy to accumulate water to cause water drainage can be solved. Compare the work load that ordinary equipment room later stage fitment in-process was under construction for reaching the vibration isolation, making an uproar and drainage effect, the utility model discloses an utilize less manpower and material just to reach the effect, practiced thrift construction cost, improved the efficiency of construction, brought certain economic benefits, be worth popularizing and applying.
Drawings
FIG. 1 is a schematic view of the floor structure of the present invention;
FIG. 2 is a schematic view of the wall body of the utility model;
FIG. 3 is a schematic view of the floating platform pouring of the present invention;
FIG. 4 is a sectional view of the floor structure of the present invention;
in the figure: 1. the wall comprises a surrounding wall body, 2 surrounding glue, 3 a mortar protective layer, 4 a film-coated waterproof layer, 5 a vibration damping block, 6 a vibration isolation rubber mat, 7 a steel plate, 8 waterproof roll paper, 9 a steel bar net, 10 sealing rubber, 11 a floating platform and 12 a drain pipe.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments, it is to be understood that the specific embodiments described herein are only used for explaining the present invention, and are not used for limiting the present invention.
The utility model discloses a schematic diagram is shown in fig. 1 ~ 4, a waterproof integration equipment room floor of making an uproar falls in sound insulation, including the floor main part, its characterized in that: the floor is equipped with mortar protective layer 3, the waterproof layer 4 of filming, damping piece 5, vibration isolation cushion 6, steel sheet 7, waterproof stock form 8, floats building platform 11 and drain pipe 12 from bottom to top, be equipped with all around of floor and be used for injecing the surrounding wall body 1 of floor size, it is equipped with sealing rubber 10 to float between building platform 11 and the surrounding wall body 1.
The floor is arranged on the floor of the equipment room, a 20mm thick 1:2.5 concrete mortar protective layer 3 is poured on the structural floor with unevenness of the equipment room before the floor is poured for leveling treatment, and a 2mm thick coating waterproof layer 4 is arranged on the mortar protective layer 3 and is used for waterproof treatment of the floor. And building the surrounding wall body 1 within the range of the poured mortar protective layer 3 according to the designed size of the floor slab, so as to facilitate the pouring construction of the floor slab, wherein the surrounding glue 2 is arranged on the inner side edge of the surrounding wall body 1.
The interior of floor is equipped with the damping puigging, the damping puigging is established above the mortar protective layer 3 of floor bottommost department. The vibration reduction and sound insulation layer comprises vibration reduction blocks 5 and vibration isolation rubber mats 6, the vibration reduction blocks 5 are installed according to the design requirements of an equipment room, the installation distance between the vibration reduction blocks 5 is 50-100 mm, the vibration isolation rubber mats 6 are provided with hole grooves corresponding to the vibration reduction blocks 5 in position, the hole grooves in the vibration isolation rubber mats 6 are matched with the vibration reduction blocks 5 in size, and the vibration reduction blocks 5 are embedded in the hole grooves of the vibration isolation rubber mats 6. The vibration isolation rubber mat 6 is embedded with sound insulation glass wool, and the vibration isolation rubber mat 6 is pasted on the mortar protective layer through universal glue.
The steel sheet 7 that 2mm is thick is installed to the top of damping puigging and is used for protecting the damping puigging, through welded fastening between the steel sheet 7, and the piece between the steel sheet 7 is the T shape, guarantees steel sheet 7's wholeness, avoids equipment room equipment to come into operation back steel sheet 7 to take place the displacement and influence the floor and use.
Concrete floating platform 11 is arranged above steel plate 7, waterproof roll paper 8 is paved on steel plate 7, and the waterproof roll paper is used for preventing slurry leakage during concrete pouring of floating platform 11 and is used for floor waterproof treatment. And before the floating platform 11 is poured, reinforcing meshes 9 are bound above the steel plates 7 to ensure the rigidity of the floating platform 11, and a template is erected on the inner side edge of the surrounding wall body 1 to serve as a surrounding plate of the floating platform 11 and used for concrete pouring construction of the floating platform 11. After the concrete of the floating building platform 11 is hardened, the surrounding plates around the floating building platform 11 are dismantled, sealing rubber 10 is installed in a cavity reserved by the dismantled surrounding plates and used for separating the floating building platform 11 from the surrounding wall body 1, the sealing rubber 10 can reduce the vibration of the floating building platform 11, reduce noise propagation and achieve the effects of sound insulation and noise reduction.
The floating platform 11 is pre-buried with a drain pipe 12 for floor drainage, the drain pipe 12 is buried when leveling is performed between the floating platform 11 and the surrounding wall body 1, the drain pipe 12 is buried according to the design requirements of the equipment room, the installation position of the equipment room is avoided, and the drain pipe 12 is communicated with the drain pipe 12 or a floor drain at the lower part of the equipment room by a certain gradient when pre-buried.
Preferably, when the steel plates 7 for protecting the vibration-damping and sound-insulating layer are welded, the vibration-damping and sound-insulating layer below needs to be protected, so that the vibration-isolating rubber mat 6 is prevented from being damaged during welding.
A construction method of a sound insulation, noise reduction and waterproof integrated equipment room floor slab comprises the following steps: firstly, floor leveling and bricklaying treatment: the method comprises the following steps of pouring a mortar protective layer 3 on the uneven floor of the equipment room structure, leveling, arranging a coating waterproof layer 4 after the mortar protective layer 3 is hardened, building a surrounding wall body 1 around a floor slab, and sticking surrounding glue 2 on the edge of the wall body; step two, arranging a vibration reduction block 5 and a vibration isolation rubber cushion 6: on the mortar protective layer 3, the arrangement points of the vibration reduction blocks 5 are predetermined according to the design requirements of the equipment room, and after the vibration reduction blocks 5 are arranged, vibration isolation rubber pads 6 embedded with sound insulation glass wool are arranged; step three, protecting the installation steel plate 7: a steel plate 7 is arranged on the vibration-damping and sound-insulating layer and used for protecting a vibration-isolating rubber mat 6; step four, arranging waterproof roll paper 8 and binding steel bars: after the steel plate 7 is welded and fixed, a layer of waterproof roll paper 8 is placed on the steel plate 7, and then a reinforcing mesh 9 is bound on the waterproof roll paper 8; step five, pouring concrete and performing peripheral sealing treatment: after the reinforcing mesh 9 is bound, erecting a coaming plate on the periphery of the floor slab, pouring a concrete floating platform 11 in the scope of the coaming plate, detaching the coaming plate after the concrete is hardened, and then installing sealing rubber 10 on the periphery of the floor slab; step six, burying a ditch: drawing lines on the concrete floating platform 11 according to the design requirements of the equipment room, marking the position and the trend of the water pipe, leveling the concrete on the concrete floating platform 11 and the surrounding wall body 1, and burying the water pipe 12 with a certain gradient according to the position of the drawn lines.
The utility model provides a noise, vibration, the ponding problem of electromechanical device room, the floor can furthest reduce, keep apart vibration and noise propagation pollution on the building, to the noise of equipment external radiation and vibration level control in the within range of relevant national standard regulation. When the floor slab is in pouring construction, the water return pipe 12 is pre-buried in advance, gravity drainage is realized by utilizing the gradient, and the problem that the building floor slab is not thick enough and is not beneficial to pre-burying, digging a ditch or leveling the ditch and is easy to accumulate water to cause water drainage can be solved.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (8)
1. The utility model provides a waterproof integration equipment room floor of making an uproar falls in sound insulation, includes floor main part, its characterized in that: surrounding wall bodies (1) used for limiting the size of the floor slab are arranged on the periphery of the floor slab, a vibration-damping sound-insulating layer is arranged inside the floor slab, a mortar protective layer (3) for leveling treatment is arranged on the lower side of the vibration-damping sound-insulating layer, a steel plate (7) used for protecting the vibration-damping sound-insulating layer is arranged on the upper side of the vibration-damping sound-insulating layer, and waterproof roll paper (8) is laid on the steel plate (7); the concrete floating construction platform is characterized in that a concrete floating construction platform (11) used for bearing equipment is arranged on the upper portion of the floor slab, a drain pipe (12) used for floor slab drainage is pre-buried in the floating construction platform (11), and sealing rubber (10) is arranged between the floating construction platform (11) and the surrounding wall body (1).
2. The sound insulation, noise reduction and waterproof integrated equipment room floor slab of claim 1 is characterized in that: the floor slab is arranged on the floor of the equipment room, and the leveling treatment is carried out on the equipment room floor pouring mortar protective layer (3) before the floor slab pouring construction.
3. The sound insulation, noise reduction and waterproof integrated equipment room floor slab of claim 1 is characterized in that: the vibration-damping and sound-insulating layer comprises a vibration-damping block (5) and a vibration-isolating rubber mat (6), the vibration-isolating rubber mat (6) is provided with a hole groove matched with the vibration-damping block (5), and the vibration-damping block (5) is embedded in the vibration-isolating rubber mat (6).
4. The sound insulation, noise reduction and waterproof integrated equipment room floor slab of claim 3 is characterized in that: the vibration isolation rubber mat (6) is embedded with sound insulation glass wool.
5. The sound insulation, noise reduction and waterproof integrated equipment room floor slab of claim 1 is characterized in that: and a reinforcing mesh (9) is bound inside the floating building platform (11).
6. The sound insulation, noise reduction and waterproof integrated equipment room floor slab of claim 1 is characterized in that: the steel plates (7) for protecting the vibration-damping and sound-insulating layers are fixed by welding, and the abutted seams among the steel plates (7) are T-shaped.
7. The sound insulation, noise reduction and waterproof integrated equipment room floor slab of claim 1 is characterized in that: the drainage pipe (12) pre-buried in the floating platform (11) is communicated with a drainage pipe (12) or a floor drain at the lower part of the equipment room.
8. The sound insulation, noise reduction and waterproof integrated equipment room floor slab of claim 1 is characterized in that: the drain pipe (12) is made of a U-PVC material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920919038.7U CN210508404U (en) | 2019-06-19 | 2019-06-19 | Sound insulation and noise reduction waterproof integrated equipment room floor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920919038.7U CN210508404U (en) | 2019-06-19 | 2019-06-19 | Sound insulation and noise reduction waterproof integrated equipment room floor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210508404U true CN210508404U (en) | 2020-05-12 |
Family
ID=70578938
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920919038.7U Expired - Fee Related CN210508404U (en) | 2019-06-19 | 2019-06-19 | Sound insulation and noise reduction waterproof integrated equipment room floor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210508404U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113404174A (en) * | 2021-07-06 | 2021-09-17 | 江苏世科环境发展有限公司 | Sound insulation vibration attenuation panel and flexible connection spare |
-
2019
- 2019-06-19 CN CN201920919038.7U patent/CN210508404U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113404174A (en) * | 2021-07-06 | 2021-09-17 | 江苏世科环境发展有限公司 | Sound insulation vibration attenuation panel and flexible connection spare |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110747899B (en) | Basement waterproof construction method | |
CN104652830B (en) | The construction method that a kind of Prefabricated construction panel and prefabricated panel are built | |
CN201865127U (en) | Reinforced waterproof late poured band of basement bottom plate | |
CN110219458A (en) | A kind of waterproof integrated equipment room floor construction method of sound insulation and noise reducing | |
CN100473790C (en) | Tower crane foundation for construction and manufacturing method thereof | |
CN105862873A (en) | Construction method of underground water prevention and exterior wall structures of narrow space of deep foundation pit | |
CN104420480B (en) | The method for arranging of Collapsible Loess District comprehensive pipe network and structure | |
CN206298900U (en) | A kind of diaphram wall built-in type steel encloses purlin plug system | |
CN103572964B (en) | Building engineering structure construction stage prefabricated air channel mounting method | |
CN113309353A (en) | Underground chamber roof post-cast strip advanced sealing structure and construction method | |
CN210508404U (en) | Sound insulation and noise reduction waterproof integrated equipment room floor | |
CN112343091A (en) | Subside post-cast strip structure sealed in advance | |
CN106948502A (en) | A kind of water-proof top cover and its construction method | |
CN112922022A (en) | Construction method capable of maintaining assembled floating building equipment foundation | |
CN210117716U (en) | Trapezoidal foundation ditch lateral wall concrete typical forms of elevartor shaft | |
CN204645093U (en) | Basement outer wall post-cast strip advanced treatment structure | |
CN114321494B (en) | Municipal pipeline protection structure and construction method thereof | |
CN112610022B (en) | Old building translation construction method near deep foundation pit | |
CN206205166U (en) | It is a kind of can synchronous crossed construction outer wall of basement waterproofing protection structure | |
CN210530251U (en) | Full floating construction vibration-damping sound-insulating floor | |
CN107419811A (en) | The method and its structure of basement bottom board support pile and spilled water hole waterproofing and leakage-stopping | |
CN210216499U (en) | A bottom plate and side wall handing-over department waterproof construction for piping lane | |
CN210031922U (en) | Basement waterproof structure | |
CN112095665A (en) | Water buoyancy balance construction method applied to subway upper cover | |
CN218758493U (en) | Basin type integral prefabricated toilet chassis structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200512 Termination date: 20210619 |