CN110219458A - A kind of waterproof integrated equipment room floor construction method of sound insulation and noise reducing - Google Patents

A kind of waterproof integrated equipment room floor construction method of sound insulation and noise reducing Download PDF

Info

Publication number
CN110219458A
CN110219458A CN201910529056.9A CN201910529056A CN110219458A CN 110219458 A CN110219458 A CN 110219458A CN 201910529056 A CN201910529056 A CN 201910529056A CN 110219458 A CN110219458 A CN 110219458A
Authority
CN
China
Prior art keywords
equipment room
waterproof
sound insulation
noise reducing
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910529056.9A
Other languages
Chinese (zh)
Inventor
王伟民
方超
游崇灏
邓路华
吴水林
郑铿锐
游崇杰
彭焕坚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Lianfu Construction Engineering Co Ltd
SHANTOU BUILDING ENGINEERING CO LTD
Original Assignee
Guangdong Lianfu Construction Engineering Co Ltd
SHANTOU BUILDING ENGINEERING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Lianfu Construction Engineering Co Ltd, SHANTOU BUILDING ENGINEERING CO LTD filed Critical Guangdong Lianfu Construction Engineering Co Ltd
Priority to CN201910529056.9A priority Critical patent/CN110219458A/en
Publication of CN110219458A publication Critical patent/CN110219458A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/82Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to sound only
    • E04B1/84Sound-absorbing elements
    • E04B1/86Sound-absorbing elements slab-shaped
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/98Protection against other undesired influences or dangers against vibrations or shocks; against mechanical destruction, e.g. by air-raids
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/48Special adaptations of floors for incorporating ducts, e.g. for heating or ventilating
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Abstract

The invention discloses a kind of waterproof integrated equipment room floor construction methods of sound insulation and noise reducing, comprising the following steps: step 1, floor is levelling, processing of laying bricks;Step 2 arranges damping block and sound-proof material;Step 3 is laid with steel plate protection;Step 4 arranges waterproof coil paper, assembling reinforcement;Step 5, casting concrete, peripheral sealing processing;Step 6 buries ditch.The present invention solves the noise of equipment room, vibration problem, floor reduction, the vibration being isolated on building and noise transmission pollution, while pre-buried water pipe solves the problems, such as that construction floor plate thickness deficiency is unfavorable for not draining caused by pre-buried, excavation ditch or the easy ponding of par ditch.The present invention can save construction cost, and lifting construction efficiency brings certain economic benefit, is worthy of popularization.

Description

A kind of waterproof integrated equipment room floor construction method of sound insulation and noise reducing
Technical field
The present invention relates to concrete floor technical field, more particularly a kind of waterproof integrated equipment room building of sound insulation and noise reducing Board construction method.
Background technique
In recent years, along with the quick vigorous growth of construction industry, miscellaneous modernization Super High office building also by Gradually become the mainstream of architectural engineering.During this kind of building continues to bring out, the miscellaneous electromechanics of interior of building is set Standby bring vibration and noise pollution can not be ignored.The equipment room and computer room of office tower be usually built up in roofing or Medial position is built, the following vibration equipment can be passed by the bottom of equipment or pipeline, cable for connecting with equipment etc. It is multicast to building structure, vibrational structure radiates to form air-borne sound to receiving space, recipient is passed to, at the same time, in equipment room Ponding emission problem similarly annoyings the normal life and work of building interior people.
Summary of the invention
It, can be with the main purpose of the present invention is to provide a kind of equipment room floor for integrating sound insulation, noise reduction and waterproof Effectively solve the problems in background technique.
The invention proposes a kind of waterproof integrated equipment room floor construction method of sound insulation and noise reducing, packets to achieve the above object Include following steps:
Step 1, floor is levelling, processing of laying bricks: pouring mortar cover to the flooring of out-of-flatness on structure flooring and makees levelling place Reason sets film waterproof material after mortar cover hardening, surrounding edge wall is built around floor, and paste surrounding edge on wall side Glue;
Step 2 arranges damping block and vibration isolating rubber pad: on mortar cover, predefining vibration damping according to equipment room design requirement The layout points of block, after arranging damping block, arrangement is embedded with the vibration isolating rubber pad of sound control glass cotton;
Installation steel plate protection: step 3 installs steel plate for protecting vibration isolating rubber pad on shock-absorption sound-insulation layer;
Step 4 arranges waterproof coil paper, assembling reinforcement: after the completion of steel plate is welded and fixed, one layer of waterproof coil paper is placed on the steel plate, Then in assembling reinforcement net in waterproof coil paper;
Casting concrete, peripheral sealing processing: step 5 has bound and has set up coaming plate in floor surrounding after steel mesh, in coaming plate model It encloses that interior casting concrete is floating to build platform, after concrete hardening, dismantles coaming plate, seal rubber then is installed in floor surrounding;
Step 6, embedded ditch: drawing lines according to equipment room design requirement on platform in concrete floating build, indicate ditch position, trend, It builds on platform the surrounding edge brick casting concrete with around and carries out levelling concrete is floating, and have certain slope according to setting-out position is embedded Water pipe as gutter.
As a preferred technical solution of the present invention, the concrete mortar that leveling pours in step 1 protects thickness 20mm, the coating waterproofing thickness 2mm.
As a preferred technical solution of the present invention, in step 2, according to the load of equipment room distinct device, determination subtracts It shakes the layout points of block, the mounting distance between the damping block is 50~100mm
As a preferred technical solution of the present invention, in step 2, the vibration isolating rubber pad is equipped with and mutually fits with damping block position The hole answered, the vibration isolating rubber pad stick into damping block, and the vibration isolating rubber pad is pasted on mortar cover by all-purpose adhesive.
As a preferred technical solution of the present invention, in step 3, it is fixedly connected by welding between the steel plate.
As a preferred technical solution of the present invention, in step 4, the waterproof roll thickness of paper 2mm, the waterproof coil paper Between use rubber belt sealing.
As a preferred technical solution of the present invention, in step 5, the seal rubber, which is mounted on, have been dismantled coaming plate and has stayed Under cavity in, the concrete is floating to build platform thickness 150mm.
As a preferred technical solution of the present invention, in step 6, the water pipe uses U-PVC water pipe, the U-PVC Water pipe is connected to the drainpipe of equipment room lower and floor drain.
The prior art is compared, and the present invention provides have following the utility model has the advantages that the innovative point of the invention patent is to solve The noise of equipment room, vibration, ponding problem, floor can reduce to greatest extent, vibration and noise transmission on separating building object Pollution controls noise and level of vibration of the equipment to external radiation in the range of concerned countries standard provides.The floor exists When pouring construction, pre-buried good water pipe realizes gravity drainage as gutter, using the gradient, solves construction floor plate thickness deficiency not The problem of conducive to that can not be drained caused by pre-buried, excavation ditch or the easy ponding of par ditch.It was fitted up compared to the conventional equipment room later period Cheng Zhongwei reaches the workload that vibration isolation, noise reduction and drainage effect are constructed, and the invention patent utilizes less manpower and material Just reach effect, saved construction cost, improve construction efficiency, bring certain economic benefit, be worthy of popularization.
Detailed description of the invention
Fig. 1 is floor construction schematic diagram of the present invention;
Fig. 2 is surrounding edge building wall schematic diagram of the present invention;
Fig. 3 is vibration damping sound insulating layer schematic diagram of the present invention;
Fig. 4 is steel plate scheme of installation of the present invention;
Fig. 5 is steel mesh schematic diagram of the present invention;
Fig. 6, which is that the present invention is floating, to be built platform and pours schematic diagram;
Fig. 7 is drainpipe schematic diagram of the present invention;
Fig. 8 is floor construction sectional view of the present invention;
In figure: 1. surrounding edge walls, 2. surrounding edge glue, 3. mortar covers, 4. film waterproof materials, 5. damping blocks, 6. vibration isolating rubber pads, 7. Steel plate, 8. waterproof coil papers, 9. steel meshes, 10. seal rubbers, 11. floating build platform, 12. water pipes.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated, it should be understood that and the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
Schematic diagram disclosed by the invention is as shown in Fig. 1~8, and a kind of waterproof integrated equipment room floor of sound insulation and noise reducing is by surrounding edge Wall 1, mortar cover 3, film waterproof material 4, damping block 5, build-in have the vibration isolating rubber pad 6 of sound control glass film, waterproof coil paper 8, Concrete is floating to build platform 11 and the composition of water pipe 12.
A kind of waterproof integrated equipment room floor construction method of sound insulation and noise reducing, comprising the following steps:
Step 1, floor is levelling, processing of laying bricks: pouring 20mm thickness 1:2.5 cement bonded sand to the flooring of out-of-flatness on structure flooring It starches protective layer 3 and carries out leveling, and be laid with 2mm thickness film waterproof material 4 in floor range by drawing and make water-proofing treatment, Surrounding edge wall 1 is built around the waterproof integrated floor of sound insulation and noise reducing, and surrounding edge glue 2 is pasted on the wall side laid.
Step 2 arranges damping block 5 and vibration isolating rubber pad 6: on mortar cover 3, according to the position of equipment room equipment placement It sets, determines 5 layout design scheme of damping block, preset the correct position of arrangement damping block 5 on mortar cover 3 using the line of ink marker It sets a little, damping block 8 is installed, the mounting distance between the damping block 5 is 50~100mm, after installing damping block 5, arrangement Vibration isolating rubber pad 6, the vibration isolating rubber pad 6 are equipped with the hole slot being adapted with 5 position of damping block, and the damping block 5 is mounted in vibration isolation In the hole slot of rubber mat 6, the vibration isolating rubber pad 6 is fixed on mortar cover 3 after arranging by all-purpose adhesive, the vibration isolating rubber pad 6 embedded 64K sound control glass cottons.
Step 3, installation steel plate 7 are protected: 2mm thick steel plate 7 be installed on vibration damping sound insulating layer and is used to protect vibration isolating rubber pad 6, because The steel plate 7 permanently uses, and is needing to be welded and fixed between steel plate 7 after the placement of steel plate 7, is guaranteeing that the piece between steel plate 7 is in T Type guarantees the globality of steel plate 7, avoids equipment room equipment investment from being subjected to displacement the integrated floor of influence using rear steel plate 7 and uses.
Step 4 places waterproof coil paper 8, assembling reinforcement: after the completion of steel plate 7 is welded and fixed, one layer is placed on steel plate 7 The waterproof coil paper 8 of 2mm thickness, piece uses rubber belt sealing between the waterproof coil paper 8, for ensuring the waterproof effect of waterproof coil paper 8 Fruit, then according to design requirement in waterproof coil paper 8 in assembling reinforcement net 9;
Casting concrete, peripheral sealing processing: step 5 after having bound steel mesh 9, is set up with coaming plate in floor surrounding, is used for The concrete for pouring 150mm thickness, which floats, builds platform 11, and after floating and building 11 concrete hardening of platform, the coaming plate for floating building 11 surrounding of platform is torn open It removes, seal rubber 10 is installed in having dismantled the cavity that coaming plate leaves, be used for floor vibration reduction and cushioning.
Step 6, embedded ditch: drawing lines on layer according to design requirement concrete floating build is completed, indicate ditch position, Trend and the gradient are carried out levelling with 1 casting concrete of surrounding edge wall, are embedded with according to setting-out position in floating build on platform 11 of concrete The water pipe 12 of certain slope is used as gutter.
Preferably, the water pipe 12 uses U-PVC water pipe 12, the U-PVC on the waterproof integrated floor of sound insulation and noise reducing Water pipe 12 is connected to the drainpipe 12 and floor drain of equipment room lower, using gravity stream principle, carries out central drainage in equipment room, Solve the problems, such as that equipment room should not excavate ditch and ponding around Equipment Foundations is caused to drain.
Preferably, it needs to do the vibration isolating rubber pad 6 of lower section when welding between the steel plate 7 for protecting vibration isolating rubber pad 6 Protection processing prevents from damaging vibration isolating rubber pad 6 when welding.
The invention patent solves the noise in electromechanical equipment room, vibration problem, noise and vibration equipment to external radiation In the range of concerned countries standard regulation, embedded water pipe 12 is used as gutter when concrete floor slab placement is constructed for level control, solves Equipment room should not excavate ditch and cause the problem of ponding drains around Equipment Foundations.Compared in conventional equipment room later period fitment process To reach the workload that vibration isolation, noise reduction and drainage effect are constructed, which has only used a small amount of manpower and material Just reach effect, saved construction cost, improve construction efficiency, bring certain economic benefit.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent thereof.

Claims (8)

1. a kind of waterproof integrated equipment room floor construction method of sound insulation and noise reducing, comprising the following steps:
Step 1, floor is levelling, processing of laying bricks: pouring mortar cover (3) to the flooring of out-of-flatness on structure flooring and looks for Flat processing sets film waterproof material (4) after mortar cover (3) hardening, builds surrounding edge wall (1) in floor surrounding, and in wall Surrounding edge glue (2) are pasted on body side;
Step 2 arranges damping block (5) and vibration isolating rubber pad (6): pre- according to equipment room design requirement on mortar cover (3) The layout points for first determining damping block (5), after arranging damping block (5), arrangement is embedded with the vibration isolating rubber pad (6) of sound control glass cotton;
Installation steel plate (7) protection: step 3 installs steel plate (7) for protecting vibration isolating rubber pad (6) on shock-absorption sound-insulation layer;
Step 4 arranges waterproof coil paper (8), assembling reinforcement: after the completion of steel plate (7) is welded and fixed, one layer is placed on steel plate (7) Waterproof coil paper (8), then in assembling reinforcement net (9) on waterproof coil paper (8);
Casting concrete, peripheral sealing processing: step 5 has bound and has set up coaming plate in floor surrounding after steel mesh (9), in coaming plate Casting concrete is floating in range builds platform (11), after concrete hardening, dismantles coaming plate, then installs seal rubber in floor surrounding (10);
Step 6, embedded ditch: drawing lines on platform (11) according to equipment room design requirement in concrete floating build, indicate ditch position, Trend builds on platform (11) the surrounding edge brick casting concrete with around and carries out levelling concrete is floating, and buries band according to setting-out position There is the water pipe (12) of certain slope as gutter.
2. the waterproof integrated equipment room floor construction method of a kind of sound insulation and noise reducing according to claim 1, it is characterised in that: Concrete mortar protective layer (3) the thickness 20mm, film waterproof material (4) the thickness 2mm that leveling pours in step 1.
3. the waterproof integrated equipment room floor construction method of a kind of sound insulation and noise reducing according to claim 1, it is characterised in that: In step 2, according to the load of equipment room distinct device, the layout points of damping block (5), the peace between the damping block (5) are determined Dress distance is 50~100mm.
4. the waterproof integrated equipment room floor construction method of a kind of sound insulation and noise reducing according to claim 1, it is characterised in that: In step 2, the vibration isolating rubber pad (6) is equipped with the hole slot being adapted with damping block (5) position, the hole of the vibration isolating rubber pad (6) Slot sticks into damping block (5), and the vibration isolating rubber pad (6) is pasted on mortar cover (3) by all-purpose adhesive.
5. the waterproof integrated equipment room floor construction method of a kind of sound insulation and noise reducing according to claim 1, it is characterised in that: In step 3, it is fixedly connected by welding between the steel plate (7).
6. the waterproof integrated equipment room floor construction method of a kind of sound insulation and noise reducing according to claim 1, it is characterised in that: In step 4, waterproof coil paper (8) the thickness 2mm uses rubber belt sealing between the waterproof coil paper (8).
7. the waterproof integrated equipment room floor construction method of a kind of sound insulation and noise reducing according to claim 1, it is characterised in that: In step 5, the seal rubber (10), which is mounted on, has been dismantled in the cavity that coaming plate leaves, and the concrete is floating to build platform (11) thickness 150mm。
8. the waterproof integrated equipment room floor construction method of a kind of sound insulation and noise reducing according to claim 1, it is characterised in that: In step 6, the water pipe (12) uses U-PVC water pipe (12), the draining of U-PVC water pipe (12) and equipment room lower Pipe and floor drain connection.
CN201910529056.9A 2019-06-19 2019-06-19 A kind of waterproof integrated equipment room floor construction method of sound insulation and noise reducing Withdrawn CN110219458A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910529056.9A CN110219458A (en) 2019-06-19 2019-06-19 A kind of waterproof integrated equipment room floor construction method of sound insulation and noise reducing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910529056.9A CN110219458A (en) 2019-06-19 2019-06-19 A kind of waterproof integrated equipment room floor construction method of sound insulation and noise reducing

Publications (1)

Publication Number Publication Date
CN110219458A true CN110219458A (en) 2019-09-10

Family

ID=67817714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910529056.9A Withdrawn CN110219458A (en) 2019-06-19 2019-06-19 A kind of waterproof integrated equipment room floor construction method of sound insulation and noise reducing

Country Status (1)

Country Link
CN (1) CN110219458A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110905092A (en) * 2019-12-05 2020-03-24 怀化沃普环保科技有限公司 Noise-reducing and vibration-damping structure for building
CN111121270A (en) * 2019-12-31 2020-05-08 江苏华晖设备工程有限公司 Floating platform for high-rise building and manufacturing method thereof
CN112031287A (en) * 2020-09-09 2020-12-04 中国建筑一局(集团)有限公司 Outdoor sunken floating building platform roof structure and construction method thereof
CN112096000A (en) * 2019-12-05 2020-12-18 怀化沃普环保科技有限公司 Noise-reducing and vibration-damping structure for building
CN112267643A (en) * 2020-10-14 2021-01-26 中国建筑第八工程局有限公司 Construction process of integrated floating floor slab of equipment room
CN112922022A (en) * 2021-02-01 2021-06-08 中建八局第三建设有限公司 Construction method capable of maintaining assembled floating building equipment foundation

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110905092A (en) * 2019-12-05 2020-03-24 怀化沃普环保科技有限公司 Noise-reducing and vibration-damping structure for building
CN112096000A (en) * 2019-12-05 2020-12-18 怀化沃普环保科技有限公司 Noise-reducing and vibration-damping structure for building
CN111121270A (en) * 2019-12-31 2020-05-08 江苏华晖设备工程有限公司 Floating platform for high-rise building and manufacturing method thereof
CN112031287A (en) * 2020-09-09 2020-12-04 中国建筑一局(集团)有限公司 Outdoor sunken floating building platform roof structure and construction method thereof
CN112267643A (en) * 2020-10-14 2021-01-26 中国建筑第八工程局有限公司 Construction process of integrated floating floor slab of equipment room
CN112922022A (en) * 2021-02-01 2021-06-08 中建八局第三建设有限公司 Construction method capable of maintaining assembled floating building equipment foundation

Similar Documents

Publication Publication Date Title
CN110219458A (en) A kind of waterproof integrated equipment room floor construction method of sound insulation and noise reducing
CN110747899B (en) Basement waterproof construction method
CN202000380U (en) Basement outer wall post-pouring belt backfill protective plate
CN201738479U (en) Roof expansion joint integrated cover plate waterproof structure
CN104404985B (en) The construction method of basement bottom plate rear pouring tape waterproof construction
CN104594387A (en) Improved post-pouring strip advanced water-stopping construction method
CN106284427A (en) A kind of basement post-pouring zone temporary leaking water gear soil construction method
CN107816138A (en) A kind of construction technology of subsided rest room
CN108374566B (en) Repairing process for leakage water on back water surface
CN110439036A (en) A kind of poured band of outer wall of basement advance water stop construction method
CN201943093U (en) Settlement joint water-proof structure for basement with drainage channel
CN106948502A (en) A kind of water-proof top cover and its construction method
CN208685999U (en) Floor tile is floating to build sound insulation flooring
CN112922022A (en) Construction method capable of maintaining assembled floating building equipment foundation
CN210887906U (en) Caisson formula bathroom floor antiseep structure
CN205077753U (en) Waterproof construction at roofing expansion joint
CN210508404U (en) Sound insulation and noise reduction waterproof integrated equipment room floor
CN110439035A (en) A kind of basement bottom plate rear pouring tape Seepage method
CN217679289U (en) Underground structure induced seam system
CN207700424U (en) The regulation silencing shock-reduction device of precast concrete
CN110453884A (en) Complete float builds vibration damping soundproof floor and its construction method
CN210530251U (en) Full floating construction vibration-damping sound-insulating floor
CN212478384U (en) Empty connected node structure of grillage falls entirely of bathroom water saving drainage device
CN108589793A (en) A kind of poured band of outer wall of basement postposition assembled advance water stop construction method
CN212984230U (en) Assembled bathroom threshold waterproof construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20190910

WW01 Invention patent application withdrawn after publication