CN210395453U - Basement exposes tubular pile protection architecture - Google Patents

Basement exposes tubular pile protection architecture Download PDF

Info

Publication number
CN210395453U
CN210395453U CN201921146608.XU CN201921146608U CN210395453U CN 210395453 U CN210395453 U CN 210395453U CN 201921146608 U CN201921146608 U CN 201921146608U CN 210395453 U CN210395453 U CN 210395453U
Authority
CN
China
Prior art keywords
protective layer
basement
bottom plate
tubular pile
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921146608.XU
Other languages
Chinese (zh)
Inventor
林继炫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhonghui Changyuan Engineering Design Group Co Ltd
Original Assignee
Zhonghui Changyuan Engineering Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhonghui Changyuan Engineering Design Group Co Ltd filed Critical Zhonghui Changyuan Engineering Design Group Co Ltd
Priority to CN201921146608.XU priority Critical patent/CN210395453U/en
Application granted granted Critical
Publication of CN210395453U publication Critical patent/CN210395453U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a basement exposes tubular pile protection architecture. The pipe pile penetrates through the basement bottom plate, a bearing platform positioned above the basement bottom plate is arranged at the top of the pipe pile, a section of the pipe pile from the bearing platform to the basement bottom plate is an exposed section, and the exposed section of the pipe pile is coated with a protective layer; this protective layer and basement bottom plate are reinforced concrete structure, and the reinforcing bar overlap joint in the reinforcing bar in the protective layer and the basement bottom plate. The utility model discloses a set up the section that exposes of protective layer cladding tubular pile and protect in order to protect the section that exposes of this tubular pile, avoid causing the harm to the section that exposes of tubular pile in the basement construction, and accomplish at the basement and build the back, also can play collision avoidance's effect. Through the reinforcing bar overlap joint with the reinforcing bar in the protective layer and the basement bottom plate in order to improve the structural strength of protective layer to improve the protective effect of protective layer.

Description

Basement exposes tubular pile protection architecture
Technical Field
The utility model relates to a basement exposes tubular pile protection architecture.
Background
The existing construction scheme of two adjacent building units is often met, wherein one building unit has no basement and is already built, and the other building unit has a basement design and is in a state to be built. When a building monomer to be built needs to be excavated into a basement, the adjacent tubular piles of the built building monomer are exposed. The exposed pipe piles are easily damaged in the construction process of the basement.
Disclosure of Invention
The purpose of the utility model is to provide a basement exposes tubular pile protection architecture, the tubular pile passes through the basement bottom plate, and the top of the tubular pile is provided with a bearing platform located above the basement bottom plate, one section of the tubular pile from the bearing platform to the basement bottom plate is an exposed section, the exposed section of the tubular pile is covered with a protective layer; this protective layer and basement bottom plate are reinforced concrete structure, and the reinforcing bar overlap joint in the reinforcing bar in the protective layer and the basement bottom plate.
The utility model discloses a set up the section that exposes of protective layer cladding tubular pile and protect in order to protect the section that exposes of this tubular pile, avoid causing the harm to the section that exposes of tubular pile in the basement construction, and accomplish at the basement and build the back, also can play collision avoidance's effect. Through the reinforcing bar overlap joint with the reinforcing bar in the protective layer and the basement bottom plate in order to improve the structural strength of protective layer to improve the protective effect of protective layer.
Drawings
Fig. 1 shows a schematic structural view of the present invention;
fig. 2 shows a cross-sectional view of the tubular pile and the exposed section coated with the tubular pile;
fig. 3 shows the schematic diagram of the present invention after the first concrete pouring is performed.
Reference numerals:
10, pipe pile;
20, 201, reinforcing steel bars in the basement bottom plate;
30, supporting;
40 protective layer, 401 protective layer of steel reinforcement, 402 bar-embedded steel reinforcement, 403 protective layer of a first portion of concrete, 404 lower interface.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
As shown in fig. 1 to 3, in the structure for protecting the exposed pipe pile of the basement, the pipe pile 10 penetrates through the basement bottom plate 20, a bearing platform 30 is arranged on the top of the pipe pile 10 and located above the basement bottom plate 20, a section of the pipe pile 10 from the bearing platform 30 to the basement bottom plate 20 is an exposed section, and the exposed section of the pipe pile 10 is covered with a protective layer 40; the protective layer 40 and the basement bottom plate 20 are both of reinforced concrete structures, and the reinforcing steel bars 401 in the protective layer are overlapped with the reinforcing steel bars 201 in the basement bottom plate.
This technical scheme is through setting up the section that exposes of protective layer cladding tubular pile in order to protect the section that exposes of this tubular pile, avoids causing the harm to the section that exposes of tubular pile in the basement construction, and accomplishes the back at the basement, also can play collision avoidance's effect. Through the reinforcing bar overlap joint with the reinforcing bar in the protective layer and the basement bottom plate in order to improve the structural strength of protective layer to improve the protective effect of protective layer.
The rebar in the protective layer 40 includes rebar 402 embedded within the cap.
According to the technical scheme, the firmness of the bonding of the protective layer and the bearing platform can be improved by adopting the bar planting scheme. To further improve the protective effect of the protective layer.
The length of the embedded steel bar 402 embedded in the bearing platform 30 is not less than 15d, wherein d is the diameter of the embedded steel bar 402.
This technical scheme reasonable in design through suitably selecting the length that bar planting reinforcing bar implanted in the cushion cap in order to improve the fastness of protective layer and cushion cap drawing and fixing combination effectively.
As shown in fig. 2, the protective layer 40 has a tubular shape with an inner and outer circular cross section. The technical scheme can increase the section area of the protective layer, improve the bearing capacity of the protective layer and improve the protection effect of the protective layer.
The concrete belonging to the protective layer is divided into a first part 403 and a second part, wherein the first part 403 of the concrete of the protective layer extends downwards from the bearing platform, the upper interface of the first part of the concrete of the protective layer is connected with the bearing platform 30, the lower interface 404 of the first part of the concrete of the protective layer is at a certain distance h from the basement floor to be built, and the second part of the concrete of the protective layer is integrated with the concrete belonging to the basement floor.
In this embodiment, the following may be referred to in the construction process:
before the basement bottom plate is poured, the outer wall of the tubular pile and the bottom wall of the existing bearing platform are cleaned, air-dried and brushed twice by cement paste on the surface. Firstly, building a tubular pile reinforcement cage which covers the exposed section of the tubular pile on the periphery of the exposed section of the tubular pile, wherein the bar-embedded steel bars of the tubular pile reinforcement cage are embedded into a bearing platform, then performing first concrete pouring, and making the concrete part which belongs to the protective layer and is formed by the first concrete pouring be called a first part 403 of the concrete of the protective layer, and as shown in fig. 3, making the lower interface of the first part of the concrete of the protective layer have a certain distance with the bottom plate of the basement to be built so as to expose the tubular pile reinforcement cage part. And then, building a bottom plate reinforcement cage of the basement bottom plate, overlapping the bottom plate reinforcement cage and the tubular pile reinforcement cage in the process of building the bottom plate reinforcement cage, then performing secondary pouring, pouring the bottom plate reinforcement cage and the exposed tubular pile reinforcement cage into a whole, and pouring the concrete part belonging to the protective layer formed by the secondary pouring into a second part of the concrete called the protective layer. The pipe pile reinforcement cage is the reinforcement in the protective layer, and the bottom plate reinforcement cage is the reinforcement in the basement bottom plate.
It is worth noting that the vibrating rods are prevented from impacting the pipe pile during the first pouring vibration and the second pouring vibration.
In this embodiment, the concrete belonging to the protective layer is divided into a first part to be poured first and a second part to be poured later, so as to facilitate the overlapping construction of the tubular pile reinforcement cage and the bottom plate reinforcement cage. And the second part of the concrete belonging to the protective layer and the concrete belonging to the basement bottom plate are cast into a whole, thereby being beneficial to seamless connection and strength.

Claims (5)

1. The utility model provides a basement exposes tubular pile protection architecture, tubular pile pass basement bottom plate, and the top of tubular pile is equipped with the cushion cap that is located basement bottom plate's top, and this tubular pile is from one section of cushion cap to basement bottom plate for exposing section, its characterized in that: the exposed section of the pipe pile is coated with a protective layer; this protective layer and basement bottom plate are reinforced concrete structure, and the reinforcing bar overlap joint in the reinforcing bar in the protective layer and the basement bottom plate.
2. The structure of claim 1, wherein the basement is provided with an exposed tubular pile, the structure comprising: the steel bars in the protective layer comprise bar-embedded steel bars implanted in the bearing platform.
3. The structure of claim 2, wherein the basement is provided with an exposed tubular pile, the structure is characterized in that: the length of the embedded steel bar embedded in the bearing platform is not less than 15d, wherein d is the diameter of the embedded steel bar.
4. The structure of any one of claims 1 to 3, wherein the structure comprises: the protective layer is tubular with the section being inner circle and outer square.
5. The structure of claim 4, wherein the basement is provided with an exposed tubular pile, the structure is characterized in that: the concrete belonging to the protective layer is divided into a first part and a second part, the upper interface of the first part of the concrete of the protective layer is connected with the bearing platform, the lower interface of the first part of the concrete of the protective layer is away from the bottom plate of the basement to be built by a certain distance, and the second part of the concrete of the protective layer is integrated with the concrete belonging to the bottom plate of the basement.
CN201921146608.XU 2019-07-20 2019-07-20 Basement exposes tubular pile protection architecture Active CN210395453U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921146608.XU CN210395453U (en) 2019-07-20 2019-07-20 Basement exposes tubular pile protection architecture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921146608.XU CN210395453U (en) 2019-07-20 2019-07-20 Basement exposes tubular pile protection architecture

Publications (1)

Publication Number Publication Date
CN210395453U true CN210395453U (en) 2020-04-24

Family

ID=70355499

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921146608.XU Active CN210395453U (en) 2019-07-20 2019-07-20 Basement exposes tubular pile protection architecture

Country Status (1)

Country Link
CN (1) CN210395453U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111827335A (en) * 2020-07-31 2020-10-27 中铁第四勘察设计院集团有限公司 Connection structure of composite steel pipe pile and bearing platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111827335A (en) * 2020-07-31 2020-10-27 中铁第四勘察设计院集团有限公司 Connection structure of composite steel pipe pile and bearing platform

Similar Documents

Publication Publication Date Title
CN111042185B (en) Construction method of basement raft foundation with tower crane foundation
CN104594361B (en) A kind of I shape fender post and building enclosure also serve as the construction method of agent structure
CN105178358B (en) Vertical supporting system for reverse construction method and construction method of vertical supporting system
CN103628571B (en) Beam-column joint for reverse construction method and construction method
CN210395453U (en) Basement exposes tubular pile protection architecture
CN100513704C (en) Superposition pile for engineering reconstruction and pile forming method
CN111764578B (en) Reverse construction pile column structure and construction method thereof
JP7386095B2 (en) Underground structure construction method
CN108385693A (en) A kind of waiting for anchor rod support method and support system for basement supporting by stages
CN105971196A (en) Method for constructing masonry structure embedded square concrete filled steel tube ring beam-constructional column
CN203905036U (en) Stiff filling core structure of pre-stressed concrete pipe pile
CN206529881U (en) The constructing device of cushion cap and ground girder construction
CN108277817A (en) High Pile Cap for Tower Crane Foundation ruggedized construction and its construction method
CN216194766U (en) Cylindrical foundation pit structure
CN108104135A (en) The construction method of pattern foundation pit supporting structure lattice column
CN102704399B (en) Reinforcement binding and jointing operating room and reinforcement binding and jointing method
CN107806252B (en) Upper pier structure for seismic isolation and reinforcement of existing building and construction method thereof
CN208328940U (en) A kind of support system
CN111456323A (en) Structure column of early and later construction structure, basement structure column and construction method of basement structure column
CN106192767A (en) A kind of device that can improve bottom concrete bearing capacity and construction method
JP3959509B2 (en) Knotted pile and method for manufacturing knotted pile
CN219011192U (en) Foundation trench maintenance filling pile structure
CN212671008U (en) Pile column structure for reverse construction method construction
CN221167889U (en) Anti-scour pier pile foundation structure
CN214783988U (en) Prestressed pipe pile reinforcement cushion layer combined foundation pit supporting system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant