CN102704399B CN201210161664.7A CN201210161664A CN102704399B CN 102704399 B CN102704399 B CN 102704399B CN 201210161664 A CN201210161664 A CN 201210161664A CN 102704399 B CN102704399 B CN 102704399B
Authority
CN
China
Prior art keywords
operating room
pier shaft
reinforcing bar
built
bar binding
Prior art date
Application number
CN201210161664.7A
Other languages
Chinese (zh)
Other versions
CN102704399A (en
Inventor
王立忠
邱琼海
余本俊
庄小刚
章尤柱
陈汉初
耿增现
陈卫成
张建红
郗玉兵
徐身志
姜江华
李斐
周加思
刘楠靖
Original Assignee
中铁大桥局集团第二工程有限公司
中铁大桥局集团有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中铁大桥局集团第二工程有限公司, 中铁大桥局集团有限公司 filed Critical 中铁大桥局集团第二工程有限公司
Priority to CN201210161664.7A priority Critical patent/CN102704399B/en
Publication of CN102704399A publication Critical patent/CN102704399A/en
Application granted granted Critical
Publication of CN102704399B publication Critical patent/CN102704399B/en

Links

Abstract

The invention relates to a reinforcement binding and jointing operating room. The operating room is a cubic structure formed by welding lower, middle and upper layer section steels; the bottom of the operating room is open; steel pipes are uniformly inserted in both the lower layer section steel and the middle layer section steel of the operating room to respectively form a lower layer operating platform and a middle layer operating platform; and a safety protective net is fixed on the outer periphery of the operating room. The invention also relates to a reinforcement binding and jointing method which comprises the following steps of: firstly, independently making the operating room; using an inner die of which a pier body is completed as a support and assembling an inner die of which a pier body is not poured; then temporarily fixing the operating room and the inner die; and assembling a detachable operating platform to carry out reinforcement construction, assembling an outer die after checking that the construction is qualified, and finally carrying out concreting. The reinforcement binding and jointing operating room and the reinforcement binding and jointing method are simple and convenient to operate; the construction safety is improved; and the reinforcement binding and jointing operating room and the reinforcement binding and jointing method can also be applied to the reinforcement binding and jointing construction of other inclined and curved structures and the like.

Description

Reinforcing bar binding connects high operating room and reinforcing bar binding connects high method
Technical field
The present invention relates to technical field of bridge construction, particularly relate to a kind of reinforcing bar binding and connect high operating room and reinforcing bar binding connects high method.
Background technology
In existing bridge construction, for the colligation of bridge pier shaft reinforcing bar, what routine adopted is the auxiliary construction method setting up scaffolding platform, need set up the scaffolding platform of corresponding height, but connect height for the colligation of large hollow pier reinforcing bar during construction, owing to being subject to the thickness of hollow pier wall and highly affecting, instability factor becomes many, makes reinforcing bar binding connect high construction and can become relative complex, difficulty, if constructed according to a conventional method, both cannot ensure construction safety, and can construction speed be delayed again.
Summary of the invention
The technical problem to be solved in the present invention is, provide a kind of reinforcement construction process of hollow pier shaft can be made to become safe, convenient and efficiently reinforcing bar binding connect high operating room and reinforcing bar binding connects high method.
In order to solve the problems of the technologies described above, the invention provides a kind of reinforcing bar binding and connect high operating room, described operating room is the cube structure be welded by lower floor, middle level and upper strata three stratotype steel, the bottom opening of described operating room, lower floor's shaped steel and the middle level shaped steel of described operating room are all evenly equipped with steel pipe, and forming lower floor and middle level operating platform respectively, the periphery of described operating room is fixed with safety guard net.
Further, the Internal periphery size of described operating room is identical with the outer profile size of pier shaft to be built.
Further, described operating room is temporarily fixed on the internal mold of pier shaft to be built.
Further, described steel pipe is detachable steel tube, and described detachable steel tube forms the detachable operating platform of the detachable operating platform of lower floor and middle level respectively.
The present invention also provides a kind of reinforcing bar binding to connect high method,
Step one, smooth place is produced reinforcing bar binding and connects high operating room;
Step 2, utilizes the internal mold of having built hollow pier shaft to support, assembled go out the internal mold of pier shaft to be built;
Step 3, utilizes the internal mold of pier shaft to be built to support, and the reinforcing bar binding made is connect high operating room entirety and withholds on pier shaft to be built, and fix with the internal mold temporary weld of pier shaft to be built;
Step 4, connects in high operating room at reinforcing bar binding and wears detachable steel tube, assembled go out detachable operating platform;
Step 5, constructor carries out colligation to the reinforcing bar of pier shaft to be cast and connects height, after passed examination, reinforcing bar binding operating room entirety is hung pier shaft;
Step 6, installs the external mold of pier shaft to be cast, pours into a mould pier shaft concrete after passed examination.
The present invention is stressed clearly, structure is simple, easily manufactured, with low cost, constructing operation is easy, improves working security, and the present invention is through suitably improving, and the reinforcing bar binding that also can be applicable to the structure such as other inclination, curve connects high construction.
Accompanying drawing explanation
Fig. 1 is that reinforcing bar binding connects high construction schematic diagram;
Fig. 2 is the structural facades figure that reinforcing bar binding of the present invention connects high operating room one embodiment;
Fig. 3 is structural plan figure embodiment illustrated in fig. 2.
In figure, 1. build pier shaft, 2. pier shaft to be cast, 3. operating room, 4. detachable steel tube, 5. the internal mold of pier shaft to be cast.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the invention will be further described, can better understand the present invention and can be implemented, but illustrated embodiment is not as a limitation of the invention to make those skilled in the art.
As shown in Figure 1, Figure 2 and Figure 3, for reinforcing bar binding of the present invention connects an embodiment of high operating room 3, described operating room 3 is the cube structures be welded by lower floor, middle level and upper strata three stratotype steel, the bottom opening of described operating room 3, global shape is the cover of a bottom opening, lower floor's shaped steel and the middle level shaped steel of described operating room 3 are all evenly equipped with steel pipe, and form lower level operations platform and middle level operating platform respectively, the periphery of described operating room 3 is fixed with safety guard net, as the safeguard structure of work high above the ground.
Described steel pipe is detachable steel tube 4, described detachable steel tube 4 places plank or walkway board, form the detachable operating platform of lower floor and the detachable operating platform in middle level respectively, the detachable operating platform of the detachable operating platform of described lower floor and middle level uses as the operating platform of construction passage and constructor.
The Internal periphery size of described operating room 3 is identical with the outer profile size of pier shaft 2 to be built, and described operating room 3 is temporarily fixed on the internal mold 5 of pier shaft to be built.
A kind of reinforcing bar binding connects high method, first, goes out reinforcing bar binding connect high operating room 3 at smooth place integral manufacturing; Secondly, utilize the internal mold of having built pier shaft 1 to support, assembled go out the internal mold 5 of pier shaft to be built; Then, then utilize the internal mold 5 of pier shaft to be built to support, the reinforcing bar binding made is connect high operating room 3 entirety and withhold with it pier 2 to be built, and fix with internal mold 5 temporary weld of pier shaft to be built; Then, connect in high operating room 3 at reinforcing bar binding and wear corresponding detachable steel tube 4, detachable steel tube 4 is placed plank or walkway board assembled go out detachable operating platform; Then, the reinforcing bar of constructor to pier shaft 2 to be cast carries out colligation and connects height, after passed examination, reinforcing bar binding is connect high operating room 3 and hangs pier shaft; Finally, the external mold of pier shaft 2 to be cast is installed, after passed examination, pours into a mould pier shaft concrete.
The present invention is through suitably improving, and the reinforcing bar binding that also can be applicable to the structure such as other inclination, curve connects high construction.
The above embodiment is only that protection scope of the present invention is not limited thereto in order to absolutely prove the preferred embodiment that the present invention lifts.The equivalent alternative or conversion that those skilled in the art do on basis of the present invention, all within protection scope of the present invention.Protection scope of the present invention is as the criterion with claims.

Claims (3)

1. a reinforcing bar binding connects high operating room, it is characterized in that, described operating room is the cube structure be welded by lower floor, middle level and upper strata three stratotype steel, the bottom opening of described operating room, lower floor's shaped steel and the middle level shaped steel of described operating room are all evenly equipped with steel pipe, and form lower level operations platform and middle level operating platform respectively, the periphery of described operating room is fixed with safety guard net, the Internal periphery size of described operating room is identical with the outer profile size of pier shaft to be built, and described operating room is temporarily fixed on the internal mold of pier shaft to be built.
2. reinforcing bar binding according to claim 1 connects high operating room, it is characterized in that, described steel pipe is detachable steel tube, and described detachable steel tube forms the detachable operating platform of the detachable operating platform of lower floor and middle level respectively.
3. reinforcing bar binding connects a high method, it is characterized in that,
Step one, smooth place is produced reinforcing bar binding and connects high operating room, described operating room is the cube structure be welded by lower floor, middle level and upper strata three stratotype steel, the bottom opening of described operating room, and the Internal periphery size of described operating room is identical with the outer profile size of pier shaft to be built;
Step 2, utilizes the internal mold of having built hollow pier shaft to support, assembled go out the internal mold of pier shaft to be built;
Step 3, utilizes the internal mold of pier shaft to be built to support, and the reinforcing bar binding made is connect high operating room entirety and withholds on pier shaft to be built, and fix with the internal mold temporary weld of pier shaft to be built;
Step 4, connects in high operating room at reinforcing bar binding and wears detachable steel tube, assembled go out detachable operating platform;
Step 5, constructor carries out colligation to the reinforcing bar of pier shaft to be cast and connects height, after passed examination, reinforcing bar binding operating room entirety is hung pier shaft;
Step 6, installs the external mold of pier shaft to be cast, pours into a mould pier shaft concrete after passed examination.
CN201210161664.7A 2012-05-23 2012-05-23 Reinforcement binding and jointing operating room and reinforcement binding and jointing method CN102704399B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210161664.7A CN102704399B (en) 2012-05-23 2012-05-23 Reinforcement binding and jointing operating room and reinforcement binding and jointing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210161664.7A CN102704399B (en) 2012-05-23 2012-05-23 Reinforcement binding and jointing operating room and reinforcement binding and jointing method

Publications (2)

Publication Number Publication Date
CN102704399A CN102704399A (en) 2012-10-03
CN102704399B true CN102704399B (en) 2015-02-11

Family

ID=46897431

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210161664.7A CN102704399B (en) 2012-05-23 2012-05-23 Reinforcement binding and jointing operating room and reinforcement binding and jointing method

Country Status (1)

Country Link
CN (1) CN102704399B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3127429B2 (en) * 1995-04-30 2001-01-22 新日本製鐵株式会社 Moving scaffold
CN101173499A (en) * 2007-11-22 2008-05-07 广西壮族自治区公路桥梁工程总公司 Method and device for subaqueous construction of bridge pier
CN201232353Y (en) * 2008-07-21 2009-05-06 云南路桥股份有限公司 High pier lifting type turnover formwork platform hanger
CN101481944A (en) * 2009-01-06 2009-07-15 四川公路桥梁建设集团有限公司 Method for mounting high pier, tower over-form construction reinforced bar and movable support thereof
CN201972095U (en) * 2011-03-14 2011-09-14 中铁五局(集团)有限公司 Chain block lifting platform for thin-walled hollow piers of bridges
CN202164546U (en) * 2011-07-28 2012-03-14 中铁一局集团有限公司 High pier bridge construction platform

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3127429B2 (en) * 1995-04-30 2001-01-22 新日本製鐵株式会社 Moving scaffold
CN101173499A (en) * 2007-11-22 2008-05-07 广西壮族自治区公路桥梁工程总公司 Method and device for subaqueous construction of bridge pier
CN201232353Y (en) * 2008-07-21 2009-05-06 云南路桥股份有限公司 High pier lifting type turnover formwork platform hanger
CN101481944A (en) * 2009-01-06 2009-07-15 四川公路桥梁建设集团有限公司 Method for mounting high pier, tower over-form construction reinforced bar and movable support thereof
CN201972095U (en) * 2011-03-14 2011-09-14 中铁五局(集团)有限公司 Chain block lifting platform for thin-walled hollow piers of bridges
CN202164546U (en) * 2011-07-28 2012-03-14 中铁一局集团有限公司 High pier bridge construction platform

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
公铁两用大桥复杂高大墩身施工技术;王立忠;《江苏科技信息 》;20130425(第04期);全文 *
高大空心墩身模板脚手一体化施工技术;王立忠;《公路》;20130225(第02期);全文 *

Also Published As

Publication number Publication date
CN102704399A (en) 2012-10-03

Similar Documents

Publication Publication Date Title
CN106869172B (en) In-situ deposited prefabricated split-mounting type subway underground station construction method
CN103924711B (en) The construction technology of assembling grillage shear wall structural system
CN104088397B (en) A kind of prefabricated post and precast construction method thereof
KR100951097B1 (en) Slab and subgrade external wall structure and method for constructing underground slab and subgrade external wall, bracket
CN103741811B (en) Sleeper formula precast reinforced concrete structure node
CN100476142C (en) Construction method for combined V-shape steel pipe concrete pile
CN103758031B (en) A kind of method utilizing Steel Fiber Reinforced Self-compacting Concrete to prepare assembling bridge pier stud
CN204435673U (en) Integrated frame column template structure
CN104746422B (en) A kind of hollow pier stud delay-pour joint structure of bridge prefabrication and construction method
CN106223360A (en) Use the open cut cast in place and precast construction subway station construction method of stake supporting system
CN103526929B (en) A kind of super high-rise steel pipe column interior concrete pouring construction method
CN102493603B (en) Prefabricated column of reserved concealed column channel, concealed column type complete assembled earthquake-resistant building and its method
CN105715068B (en) Existing brick mix structure shock isolating pedestal underpinning structure and its construction method
CN103410317A (en) Construction method for site assembly and casting integral wall body by adopting wall body prefabricated part
CN105780935B (en) Prefabricated assembled steel tube confinement energy consumption connecting node and construction method
CN205000256U (en) Cast -in -place case roof beam of high mound of bridge construction support system
CN102979304A (en) Construction method of double shear wall formworks at deformation joint of high-rise building
JP5012355B2 (en) Underwater structure reinforcement method, underwater structure
CN102900024B (en) Using method for overturning die plate for large-scale concrete structure and
CN205242706U (en) Cast -in -place constructional column of infilled wall and wall body synchronous construction structure between high -rise outer eaves window
KR20180072968A (en) Permanent form for pier and construction method using the same
KR101458434B1 (en) Half precast concrete column manufacturing method using prefabricated PC panels and constructing method using the same
CN103758348B (en) Profile steel framework structure concrete floor slab suspension mould pouring construction method
CN106192730A (en) A kind of steel bushing precast splice type bridge pier of band WELDING STUDS
CN106592440B (en) A kind of construction method of prefabricated subsection type bridge pier

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
GR01 Patent grant
C14 Grant of patent or utility model