CN100513704C - Superposition pile for engineering reconstruction and pile forming method - Google Patents

Superposition pile for engineering reconstruction and pile forming method Download PDF

Info

Publication number
CN100513704C
CN100513704C CNB2007100727482A CN200710072748A CN100513704C CN 100513704 C CN100513704 C CN 100513704C CN B2007100727482 A CNB2007100727482 A CN B2007100727482A CN 200710072748 A CN200710072748 A CN 200710072748A CN 100513704 C CN100513704 C CN 100513704C
Authority
CN
China
Prior art keywords
pile
stake
former
original
around
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2007100727482A
Other languages
Chinese (zh)
Other versions
CN101117801A (en
Inventor
郑文忠
侯晓萌
王英
周威
解恒燕
谭军
张辉
王宏伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Institute of Technology
Original Assignee
Harbin Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Institute of Technology filed Critical Harbin Institute of Technology
Priority to CNB2007100727482A priority Critical patent/CN100513704C/en
Publication of CN101117801A publication Critical patent/CN101117801A/en
Application granted granted Critical
Publication of CN100513704C publication Critical patent/CN100513704C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

A coincidence pile used for modification of projects and a method for the file forming relate to a modified reinforcing pile for projects and a method for the file forming, the method removes the difficulties of reinforcing the original pile by increasing piles and adding loading platforms with poor performance. A longitudinal reinforced steel bar (3), a peripheral loop stirrup (4) and a peripheral loop concrete (2) are arranged around the external surface of an original pile (1) along the length of the original pile (1) to form the coincidence pile. The procedures are described as follows: first, the original pile is unloaded; second, the soil body is removed around the unloaded pile (1), and hole expansion is carried out around the original pile (1); third, the longitudinal reinforced bar (3) and the loop stirrup (4) are arranged in the holes around the original pile (1) along the length of the original pile (1); fourth, concrete (2) is poured into the holes, and the coincidence pile is formed. The present invention is applicable for the reinforcement and the modification of each pile for the pile foundation of added floors of each column. The present invention is simple, with increased efficiency, and has load bearing of the pile.

Description

Engineered piling method with congruent pile
Technical field
The present invention relates to the piling method of the armored concrete stake of field of civil engineering, the especially engineered piling method of reinforcing stake.
Background technology
At present, for the original structure of a pillar corresponding to a pile, when the load of the structure of the former stake of needs increases (when original building is increased layer), the drag deficiency of existing pile foundation plinth, not only need to reinforce the superstructure of original building, and existing reinforcing will increase a number and set up cushion cap former pile foundation is reinforced, this method construction is loaded down with trivial details, raw material increase, and overall performance is poor.
Summary of the invention
The present invention reinforces former pile foundation for the existing reinforcement means of solution will increase a number and set up cushion cap, it is loaded down with trivial details to construct, and raw material increase, the problem of overall performance difference, proposed a kind of engineered piling method with congruent pile, the concrete technical scheme that addresses the above problem is as follows:
The present invention is made of former stake, peripheral annular concrete, vertical muscle and peripheral annular stirrup, vertical muscle, peripheral annular stirrup and peripheral annular concrete along former pile length direction be located at former stake external surface around, constitute congruent pile.
The step of piling method of the present invention is as follows:
Step 1, between adjacent two posts, the bar base is set,, makes the Load Transfer of former pile load give the bar base at bar base top-pour (block) walling body;
Step 2, according to the design size of congruent pile, the soil body of the former stake periphery after the unloading is removed, to carrying out reaming around the former stake, the reaming degree of depth is the degree of depth of former stake then, and the stake bottom is enlarged size; Superimposed ring thickness is determined according to the load of improvement project needs around enlarged footing size and the stake;
Step 3, in superimposed ring cavity around the former stake after reaming, along former pile length direction will indulge muscle and ring-shaped stirrup be arranged on former stake around, form the overlapping layers cage of reinforcement;
Step 4, synform become around the former stake of overlapping layers cage of reinforcement concreting in the superimposed ring cavity, promptly form congruent pile of the present invention.
The present invention is applicable to that the original building to the corresponding pile of every post directly adds the strengthening reconstruction of the pile foundation of layer.Method of the present invention is easy, can improve work efficiency, saves raw material, and the overall performance of stake is good.The present invention is widely used in engineered pile foundation reinforcement engineering.
Description of drawings
Fig. 1 is the superimposed part and former stake 1 foundation length direction structure schematic diagram on congruent pile of the present invention basis, and Fig. 2 is the A-A cross-sectional view of Fig. 1.5 for widening the place in former stake 1 basis among the figure, and 6 is former pile foundation bottom, and 7 is the congruent pile basal part, and 8 is the hole that former basis is expanded.
The specific embodiment
The specific embodiment one: describe present embodiment in conjunction with Fig. 1, Fig. 2, present embodiment is made of former stake 1, peripheral annular concrete 2, vertical muscle 3 and peripheral annular stirrup 4, vertical muscle 3, peripheral annular stirrup 4 and peripheral annular concrete 2 along former stake 1 length direction be located at former stake 1 external surface around, constitute congruent pile.
The specific embodiment two: the step of present embodiment method is as follows:
Step 1, between adjacent two posts, the bar base is set,, makes the Load Transfer of former pile load give the bar base at bar base top-pour (block) walling body;
Step 2, according to the design size of congruent pile, the soil body of former stake 1 periphery after the unloading is removed, to carrying out reaming around the former stake 1, the reaming degree of depth is the degree of depth of former stake 1 then, and the stake bottom is enlarged size; Superimposed ring thickness is determined according to the load of improvement project needs around enlarged footing size and the stake;
Step 3, in superimposed ring cavity around the former stake after reaming 1, along former stake 1 length direction will indulge muscle 3 and ring-shaped stirrup 4 be arranged on former stake 1 around, form the overlapping layers cage of reinforcement;
Step 4, synform become around the former stake 1 of overlapping layers cage of reinforcement concreting 2 in the superimposed ring cavity, promptly form congruent pile of the present invention.
After congruent pile can effectively carry, water the body of wall that (block) built after removing adjacent center-to-center, make the congruent pile recovering bearing after the reinforcing.

Claims (1)

1, engineered piling method with congruent pile is characterized in that the step of this method is as follows:
Step 1, between adjacent two posts, the bar base is set,, makes the Load Transfer of former pile load give the bar base at bar base top-pour walling body;
Step 2, according to the design size of congruent pile, the soil body of former stake (1) periphery after the unloading is removed, then reaming is carried out in former stake (1) on every side, the reaming degree of depth is the degree of depth of former stake (1), and the stake bottom is enlarged size;
Step 3, in former stake (1) the superimposed on every side ring cavity after reaming, along former stake (1) length direction will indulge muscle (3) and ring-shaped stirrup (4) be arranged on former stake (1) around, formation overlapping layers cage of reinforcement;
Step 4, synform become the interior fluid concrete (2) of former stake (1) superimposed ring cavity of overlapping layers cage of reinforcement on every side, promptly form congruent pile of the present invention.
CNB2007100727482A 2007-09-05 2007-09-05 Superposition pile for engineering reconstruction and pile forming method Expired - Fee Related CN100513704C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2007100727482A CN100513704C (en) 2007-09-05 2007-09-05 Superposition pile for engineering reconstruction and pile forming method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2007100727482A CN100513704C (en) 2007-09-05 2007-09-05 Superposition pile for engineering reconstruction and pile forming method

Publications (2)

Publication Number Publication Date
CN101117801A CN101117801A (en) 2008-02-06
CN100513704C true CN100513704C (en) 2009-07-15

Family

ID=39054053

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2007100727482A Expired - Fee Related CN100513704C (en) 2007-09-05 2007-09-05 Superposition pile for engineering reconstruction and pile forming method

Country Status (1)

Country Link
CN (1) CN100513704C (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101550705B (en) * 2008-03-31 2012-12-05 贵阳铝镁设计研究院有限公司 Reinforcement processing method of pile foundation
CN101806040B (en) * 2010-03-25 2012-05-30 徐国彬 Underpinning device and method for bridge and building
CN103174163A (en) * 2011-12-26 2013-06-26 贵阳铝镁设计研究院有限公司 Heightening method and heightening structure of opening of prefabricated column foundation
CN103669901A (en) * 2013-12-04 2014-03-26 岩土科技股份有限公司 Method used for reforming pile in underground space into pillar
CN105113387A (en) * 2015-08-27 2015-12-02 苏州同尚工程设计咨询有限公司 Reconstruction structure and construction method of bridge bearing platform
CN110670579A (en) * 2019-04-17 2020-01-10 柳红滨 Hoop pile for pile foundation engineering and foundation treatment and construction process thereof

Also Published As

Publication number Publication date
CN101117801A (en) 2008-02-06

Similar Documents

Publication Publication Date Title
CN102767189B (en) Set bearing platform foundations and construction method thereof
CN100513704C (en) Superposition pile for engineering reconstruction and pile forming method
CN105926802A (en) Reinforcement structure of 3D printed reinforced masonry shear wall structure
CN105220697A (en) Shaped steel and prestressed reinforced concrete combining structure support and construction method
CN101560766B (en) Grid-like underground continuous wall plate and production method thereof
CN100535264C (en) Steel boxed cofferdam and recovery method thereof
CN110777806B (en) Multi-connecting-rod plane frame permanent supporting structure and construction process thereof
CN203160254U (en) Pit support structure
CN105113715A (en) Prefabricated column for reverse construction method and underground structure reverse construction method
CN106013834A (en) Device and method for storey addition of basement
CN103911989B (en) A kind of underwater casting base type foundation with retaining wall and construction method thereof
CN108385693A (en) A kind of waiting for anchor rod support method and support system for basement supporting by stages
CN204940700U (en) Reverse construction prefabricated post and underground structure
CN107237342A (en) New low pile cap foundation structure and its construction method
CN106400814A (en) Foundation pit supporting method
CN102116024B (en) Static pressure multilayer radial enlarging grouting pile and construction method thereof
CN211816333U (en) Circular parallelly connected friction pile
CN103061334A (en) I-section prestressed reinforced concrete support pile by centrifugal pouring
CN209941687U (en) Heavy-duty equipment hoisting device based on proximity deep foundation pit construction environment
CN208328940U (en) A kind of support system
CN103911990B (en) A kind of underwater casting formula tubing string with retaining wall and construction method thereof
CN203129133U (en) Centrifugal poured prestressed steel bar concrete H-shaped section support pile
CN105908738A (en) Large-dimension steel and concrete combined hollow anti-slide pile and construction method thereof
CN207109839U (en) New low pile cap foundation structure
CN1037286C (en) Multi-layer integrate working pile supporting system and working method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: The Guangdong No. 3 Water Conservancy and Hydro-Electric Engineering Board

Assignor: Harbin Institute of Technology

Contract record no.: 2011440000572

Denomination of invention: Superposition pile for engineering reconstruction and pile forming method

Granted publication date: 20090715

License type: Exclusive License

Open date: 20080206

Record date: 20110628

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090715

Termination date: 20200905

CF01 Termination of patent right due to non-payment of annual fee