CN208328940U - A kind of support system - Google Patents

A kind of support system Download PDF

Info

Publication number
CN208328940U
CN208328940U CN201820274353.4U CN201820274353U CN208328940U CN 208328940 U CN208328940 U CN 208328940U CN 201820274353 U CN201820274353 U CN 201820274353U CN 208328940 U CN208328940 U CN 208328940U
Authority
CN
China
Prior art keywords
basement
support
pile
anchor
anchor pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820274353.4U
Other languages
Chinese (zh)
Inventor
张文超
薛炜
杨泪朵
于方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU CHEMICAL GROUTING ENGINEERING Co Ltd CHINESE ACADEMY OF SCIENCES
Guangdong Communications Polytechnic
Original Assignee
GUANGZHOU CHEMICAL GROUTING ENGINEERING Co Ltd CHINESE ACADEMY OF SCIENCES
Guangdong Communications Polytechnic
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU CHEMICAL GROUTING ENGINEERING Co Ltd CHINESE ACADEMY OF SCIENCES, Guangdong Communications Polytechnic filed Critical GUANGZHOU CHEMICAL GROUTING ENGINEERING Co Ltd CHINESE ACADEMY OF SCIENCES
Priority to CN201820274353.4U priority Critical patent/CN208328940U/en
Application granted granted Critical
Publication of CN208328940U publication Critical patent/CN208328940U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a kind of support systems, including proposed basement (6) and existing basement (5), reserved space is equipped between the proposed basement (6) and the existing basement (5), support pile (1) is equipped in the reserved space, the top of the support pile (1) is equipped with crown beam (2), the crown beam (2) anchors into be equipped with and wait for anchor pole (3), and the equal other end for anchor pole (3) is welded and fixed with existing basement (5) by getting rid of muscle (4).Tubular pole, cast-in-place concrete pile or steel-pipe pile may be selected in the support pile (1), and the edge of the support pile (1) builds brick wall (7), and construction is equipped with waterproof layer on the outside of the brick wall (7).The original piled anchor of the utility model, stake support support system on the basis of, using already present basement structure, using etc. for anchor pole by the way of, new method for protecting support and support system are provided.

Description

A kind of support system
Technical field
The utility model relates to the technical fields of pattern foundation pit supporting structure at basement height difference in Construction of Basement by stages, refer in particular to A kind of support system.
Background technique
With China's rapid economic development, real estate development of the city project is increasing.Since development of real estate is related to Pang Big capital chain, real estate sale prospect are difficult to predict, it is however generally that, development of real estate construction carries out by stages according to architectural design Exploitation, and development progress is adjusted according to market sale situation.From the angle of Base foundation design, when there are different layers for architectural design When several basements, theoretically should first construct the deeper part of embedded depth of foundation, and corresponding basement foundation ditch also should first construct Deep foundation pit, then shallow foundation pit of constructing.It is general first when real estate project is developed but based on the considerations of aforementioned fund and market It constructs shallower basement, the deep basement of rear construction.The sequence of this exploitation is high for the basement in different development phases Foundation Pit Support Design at difference proposes challenge.On the one hand, construction space is limited at basement height difference by stages, Design of Main Structure A series of problems, such as need to considering intensity, the construction joint setting, waterproof of new-old concrete handover, if the position of seam is design of foundation pit increasing Big difficulty;On the other hand, built basement structure part needs strict control foundation pit deformation during excavation of foundation pit, Prevent a series of engineering problems such as structure safety, base plate leakage caused by coming to nothing because of bottom plate.It is practical new at this especially in soft soil area Before type, in order to solve above-mentioned two problems, the general support system for using stake support or piled anchor.Stake support body system cost height, work Phase is long, and pile-anchor system in the construction process easily disturbs the life of substrate local products, when Soft Soil Layer is thicker, in order to meet the anti-of design Bearing capacity is pulled out, anchoring section need to penetrate Soft Soil Layer, thus cause biggish environmental risk in terms of pattern foundation pit supporting structure and cause very big Waste.
Utility model content
The purpose of this utility model is to utilize already present basement on the basis of the support system that original piled anchor, stake are supportted Structure, using etc. for anchor pole by the way of, a kind of the equal for anchor rod support method and support system of basement supporting by stages is provided.
Technical solution adopted by the utility model: a kind of support system, including proposed basement (6) and existing basement (5), it is equipped with reserved space between the proposed basement (6) and the existing basement (5), is equipped with branch in the reserved space The top of fender pile (1), the support pile (1) is equipped with crown beam (2), and the crown beam (2) anchors into be equipped with and wait for anchor pole (3), described etc. It is welded and fixed with existing basement (5) by getting rid of muscle (4) for the other end of anchor pole (3).
Preferably, tubular pole, cast-in-place concrete pile or steel-pipe pile may be selected in the support pile (1).
Preferably, the edge of the support pile (1) builds brick wall (7).
Preferably, construction is equipped with waterproof layer on the outside of the brick wall (7).
Preferably, described wait is made for anchor pole (3) of bar material.
Preferably, the distance of the reserved space is the thickness of brick wall (7) and the sum of the radius of support pile (1).
Compared with prior art, the utility model has the beneficial effects that (1), compared with existing stake support body system, this is practical It is novel with etc. for anchor pole substitute support provide support pile need fulcrum power, save a large amount of backing materials, cost can be greatly reduced, The process for removing support is also saved simultaneously;Under no supporting condition, the difficulty of earth excavation can be reduced, is shortened the construction period;(2) this reality The fulcrum power that support pile needs is transferred to for anchor pole with novel use etc. and is provided by existing basement, anchor cable construction process is reduced In to the emptying of existing basement substrate soil, disturb, reduce the risk of existing structure sedimentation and deformation, avoid sinking to leading because of substrate soil Cause the risk of basement bottom board cracking, leakage;Using etc. for anchor pole compared with anchor cable, eliminate anchor cable and need time for conserving, It can effectively shorten the duration;In soft clay area, the anchor cable of overlength can be saved, project cost is effectively reduced;(3) the utility model combines Outer wall of basement uses the construction technology of unilateral formwork, and in the present invention, the occupied space of support system is small, waits for anchor In the concrete structure that bar can be embedded to when pouring basement side wall and floorslab concrete, main structure post-cast strip may be disposed at hat Back portion, thus the quantity of structural joint can be effectively reduced, improve the globality of concrete structure.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of support system of the utility model.
Specific embodiment
The technical solution of the utility model is further illustrated combined with specific embodiments below.
In conjunction with Fig. 1, a kind of waiting for anchor rod support method for supporting of basement by stages includes the following steps:
S1: pre- between proposed basement (6) and existing basement (5) according to the exterior wall sideline of proposed basement (6) Spacing carries out bit line positioning blow-down;
S2: it is constructed in reserved space according to position line and obtains support pile (1);
S3: in proposed basement (6) the higher slice excavation section by section earthwork to support pile (1), at the bottom at the top of support pile (1) Absolute altitude constructs to obtain crown beam (2), and when constructing crown beam (2), by etc. for one end of anchor pole (3), to anchor into crown beam (2) internal, will wait It is welded and fixed with existing basement (5) by getting rid of muscle (4) for the other end of anchor pole (3);
S4: continue layer and section earth excavation to the foundation pit bottom of proposed basement (6) on proposed basement (6) and design mark Height pours the bottom plate foot mat of proposed basement (6).
S5: the face absolute altitude of brick wall (7) to crown beam (2) is built along the edge of support pile (1).
S6: the external wall waterproof layer for proposed basement (6) of constructing.
S7: the bottom plate for proposed basement (6) of constructing, and with the side wall of the proposed basement of the construction technology of unilateral formwork (6), Complete the construction of basement structure.
In step S1, the distance of the reserved space is the thickness of brick wall (7) and the sum of the radius of support pile (1).
Tubular pole, cast-in-place concrete pile or steel-pipe pile may be selected in the support pile (1).
In step S3, by assembling reinforcement, formwork supporting plate and concrete construction obtains crown beam (2);General etc. is for anchor pole (3) The other end be welded and fixed with existing basement (5) by getting rid of muscle (4) two sides.
A kind of equal support system manufactured for anchor rod support method of the supporting of basement by stages, including proposed basement (6) With existing basement (5), reserved space is equipped between the proposed basement (6) and the existing basement (5), it is described reserved It is equipped with support pile (1) in space, the top of the support pile (1) is equipped with crown beam (2), and the crown beam (2) anchors into be equipped with and wait for anchor Bar (3), the equal other end for anchor pole (3) are welded and fixed with existing basement (5) by getting rid of muscle (4).
Tubular pole, cast-in-place concrete pile or steel-pipe pile may be selected in the support pile (1);It builds at the edge of the support pile (1) It builds brick wall (7), construction is equipped with waterproof layer on the outside of the brick wall (7), and described wait is made for anchor pole (3) of bar material.
Embodiment one
As shown in Figure 1, a kind of for the equal for suspension roof support system, including proposed basement (6) of basement supporting by stages With existing basement (5), reserved space is equipped between the proposed basement (6) and the existing basement (5), if further including The dry support pile (1) being set at proposed basement (6) reserved space boundary line, the support pile (1) can use tubular pole, concrete The parameters such as the materials such as bored concrete pile or steel-pipe pile are made, and selection stake diameter, stake are long are selected according to Foundation Pit Support Design calculated result.
Support pile (1) top is provided with crown beam (2), support pile (1) is linked to be entirety, crown beam (2) is armored concrete knot Structure, the parameters such as cross-sectional sizes, arrangement of reinforcement are calculated according to continuous beam computation model and are determined.Crown beam (2) beam face absolute altitude and existing underground Room (5) bottom cushion bottom absolute altitude is identical.
Crown beam (2) are anchored into Deng for anchor pole (3) one end, the structure of the other end and existing basement (5) gets rid of muscle (4) welding, shape At equal structure for anchor pole (3) anchorage pile top.It is reinforcing bar Deng the material for anchor pole (3), the diameter and grade of reinforcing bar are not higher than Existing basement (5) gets rid of the specification of muscle (4).(2) 35 times of bar diameters of crown beam are anchored into Deng reinforcing bar one end for anchor pole (3), it is another Muscle (4) welding, two-sided welding 15d are got rid of with existing basement (5) in end.Support pile (1) is located at earth excavation side, support pile (1) stake side and proposed basement (6) exterior wall spacing 240mm.After proposed basement (6) excavation of foundation pit to hole bottom, along support pile (1) side builds 240 thick brick walls (7) and is used as screed-coat, is used for levelling and construction waterproof layer.Construction waterproof layer on the outside of brick wall (7), institute State technique when outer wall of basement is constructed using unilateral formwork.
The utility model is waited for anchor pole (3) support system after foundation for basement supporting by stages, support pile (1) The soil pressure in outside is reached etc. for anchor pole (3) by the mass action of support pile (1) apical cap beam (2), is finally passed soil pressure It is handed to getting rid of on muscle (4) for the existing basement (5), is undertaken by the existing basement (5), so that realizing stake top has anchor drawing Support form.Its design-calculated theoretical model can be using the piled anchor computation model that perhaps stake is supportted again by piled anchor or stake The reaction of supports required for supportting is scaled the evenly load along crown beam (2) distribution, and by equal for anchor pole (3) transmitting.Support pile (1) It is used as screed-coat positioned at the thick brick wall (7) of excavation of foundation pit side setting 240, facilitates construction tanking, eventually by unilateral branch The mode of mould pours proposed basement (6) exterior wall concrete.The occupied space of supporting construction can be so minimized, on the one hand The quantity of structural joint by stages is reduced, earth excavation is on the other hand reduced, reduces cost, can also avoid causing because backfill consolidates The risk that substrate soil comes to nothing under bottom plate.
A kind of waiting for anchor rod support method for basement supporting by stages described in the utility model, as follows:
Existing basement (5) after the completion of, in Develop by stages basement, proposed basement (6) excavation face was lower than both There is structure basement, need to basement height difference supporting, comprising the following steps:
S1, according to proposed basement (6) exterior wall sideline, carry out unwrapping wire to existing structure basement side offset certain distance Positioning, deviation distance are the sum of brick wall thickness and support pile (1) radius;
S2, according to position line construction supporting stake (1), tubular pole, cast-in-place concrete pile or steel pipe may be selected in support pile (1) Stake;
S3, layer and section earth excavation to stake top crown beam (2) bottom absolute altitude;Assembling reinforcement, formwork supporting plate and casting concrete;It ties up When wire-tiing, waits and anchor into 35 times of bar diameters of crown beam (2) range for anchor pole (3) one end;Will etc. for anchor pole (3) the other end with both There is basement (5) to get rid of muscle welding, welding by both sides 15d;
S4, continue layer and section earth excavation on proposed basement (6) to the foundation pit bottom of proposed basement (6) design mark Height pours the bottom plate foot mat of proposed basement (6);
S5: the face absolute altitude of brick wall (7) to crown beam (2) is built along the edge of support pile (1).
S6: the external wall waterproof layer for proposed basement (6) of constructing.
S7: the bottom plate for proposed basement (6) of constructing, and with the side wall of the proposed basement of the construction technology of unilateral formwork (6), Complete the construction of basement structure.
Embodiment two
As shown in Figure 1, the support pile (1) can be tubular pole, cast-in-place concrete pile or steel-pipe pile, with proposed basement (6) exterior wall outer edge deviates the thickness an of brick wall (7) and the sum of the radius of support pile (1) outward, carries out unwrapping wire positioning.Institute The crown beam (2) stated is reinforced concrete structure, is located at the top of support pile (1), and the top of support pile (1) is connect with crown beam (2), And support pile (1) is linked to be the whole load for bearing active earth pressure by crown beam (2).Described equal for anchor pole (3), one end is being applied When work crown beam (2), anchors into crown beam (2) and wait for anchor pole bar diameter for 35 times, the other end and the structure of existing basement (5) get rid of muscle (4) it is welded to connect, weld length welding by both sides 15d.The spacing for getting rid of muscle (4) that the equal horizontal space for anchor pole (3) is n times, n Numerical value can be determined according to the obtained evenly load of conversion.Excavation of foundation pit to proposed basement (6) is to foundation pit bottom designed elevation Afterwards, construct brick wall (7), in order to proposed basement (6) exterior wall with the construction technology of unilateral formwork.Support pile (1) is born Active earth pressure be transferred to existing basement (5) for anchor pole (3) by equal, then realize the branch that support pile draws fulcrum with anchor Watch box system guarantees the safety of excavation of foundation pit.
Below it is the construction method of the present embodiment comprising following steps:
S1, according to the exterior wall sideline of proposed basement (6), to existing structure basement (5) side deviate certain distance into The positioning of row unwrapping wire, deviation distance are the thickness of brick wall (7) and the sum of the radius of support pile (1);
S2, according to position line construction supporting stake (1), tubular pole, cast-in-place concrete pile or steel pipe may be selected in support pile (1) Stake;
The bottom absolute altitude of S3, layer and section earth excavation to stake top crown beam (2);Assembling reinforcement, formwork supporting plate and casting concrete; When assembling reinforcement, waits and anchor into 35 times of bar diameters of crown beam (2) range for anchor pole (3) one end, general etc. is for anchor pole (3) other end and both There is basement to get rid of muscle (4) welding, welding by both sides 15d;
S4: continue layer and section earth excavation to the foundation pit bottom of proposed basement (6) on proposed basement (6) and design mark Height pours the bottom plate foot mat of proposed basement (6).
S5: the face absolute altitude of brick wall (7) to crown beam (2) is built along the edge of support pile (1).
S6: the external wall waterproof layer for proposed basement (6) of constructing.
S7: the bottom plate for proposed basement (6) of constructing, and with the side wall of the proposed basement of the construction technology of unilateral formwork (6), Complete the construction of basement structure.
For those skilled in the art, it can make other each according to the above description of the technical scheme and ideas Kind is corresponding to be changed and deforms, and all these change and deform the guarantor that all should belong to the utility model claims Within the scope of shield.

Claims (6)

1. a kind of support system, it is characterised in that: including proposed basement (6) and existing basement (5), the proposed basement (6) it is equipped with reserved space between the existing basement (5), is equipped with support pile (1) in the reserved space, the support pile (1) top is equipped with crown beam (2), the crown beam (2) anchor into be equipped with it is equal for anchor pole (3), the equal other end for anchor pole (3) with Existing basement (5) is welded and fixed by getting rid of muscle (4).
2. a kind of support system according to claim 1, it is characterised in that: tubular pole, coagulation may be selected in the support pile (1) Native bored concrete pile or steel-pipe pile.
3. a kind of support system according to claim 1, it is characterised in that: the edge of the support pile (1) builds brick wall (7)。
4. a kind of support system according to claim 3, it is characterised in that: construction is equipped with waterproof on the outside of the brick wall (7) Layer.
5. a kind of support system according to claim 1, it is characterised in that: described wait for anchor pole (3) is bar material system At.
6. a kind of support system according to claim 4, it is characterised in that: the distance of the reserved space is brick wall (7) the sum of the radius of thickness and support pile (1).
CN201820274353.4U 2018-02-27 2018-02-27 A kind of support system Active CN208328940U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820274353.4U CN208328940U (en) 2018-02-27 2018-02-27 A kind of support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820274353.4U CN208328940U (en) 2018-02-27 2018-02-27 A kind of support system

Publications (1)

Publication Number Publication Date
CN208328940U true CN208328940U (en) 2019-01-04

Family

ID=64782542

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820274353.4U Active CN208328940U (en) 2018-02-27 2018-02-27 A kind of support system

Country Status (1)

Country Link
CN (1) CN208328940U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113235613A (en) * 2021-05-24 2021-08-10 中国铁路设计集团有限公司 Newly-built foundation pit excavation supporting method using adjacent existing fender post

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113235613A (en) * 2021-05-24 2021-08-10 中国铁路设计集团有限公司 Newly-built foundation pit excavation supporting method using adjacent existing fender post
CN113235613B (en) * 2021-05-24 2024-04-05 中国铁路设计集团有限公司 Method for excavating and supporting newly-built foundation pit by utilizing adjacent existing guard piles

Similar Documents

Publication Publication Date Title
CN106869172B (en) In-situ deposited prefabricated split-mounting type subway underground station construction method
CN205742213U (en) Foundation pit supporting construction
CN107142856B (en) Abutment reconstruction method, abutment reconstruction pier and jacking reconstruction bridge
CN104594361B (en) A kind of I shape fender post and building enclosure also serve as the construction method of agent structure
CN107012871B (en) A kind of suspension type goes along with sb. to guard him the deep reversed construction method for greatly enhancing foundation pit fabricated construction
CN108385693A (en) A kind of waiting for anchor rod support method and support system for basement supporting by stages
CN110144936A (en) One kind adjoining the unilateral formwork of support pile outer wall of basement and construction method
CN208328940U (en) A kind of support system
CN101117801A (en) Superposition pile for engineering reconstruction and pile forming method
CN109440781B (en) Active inclined double-row pile foundation pit supporting method
CN109610516B (en) Basement exterior wall post-cast strip retaining wall construction method
JP2002364006A (en) Construction method for underwater foundation
CN207727603U (en) Big cushion cap deep basal pit formwork supporting system
RU2371547C1 (en) Method for strengthening of slopes and slot maker for its realisation
CN102605801A (en) Suspension semi-reverse-construction method for underground circular water tank
CN109024657A (en) The construction method of Super High Core Walls Structure dell side complex conditions tower crane
CN105297758B (en) Prestress square pile and the integrated column of steel lattice column
CN211006701U (en) Foundation pit supporting structure integrating pile and wall
CN105804086A (en) Construction method for support change joints in foundation trench reverse building method construction
CN109440779B (en) Active type X-shaped double-row pile foundation pit supporting method
CN109440778B (en) Active bidirectional inclined row pile foundation pit supporting method
CN208309592U (en) Foundation pit supporting structure
CN103114594B (en) Supporting structure of adjacent two foundation trenches and construction method thereof
CN106088762A (en) The prefabricated assembled circular underground granary of a kind of insertion slot type encased steel plate
CN105604099B (en) A kind of waterproof roll basic unit