CN210368827U CN201921057450.9U CN201921057450U CN210368827U CN 210368827 U CN210368827 U CN 210368827U CN 201921057450 U CN201921057450 U CN 201921057450U CN 210368827 U CN210368827 U CN 210368827U
Authority
CN
China
Prior art keywords
bank slope
block
fixedly connected
bank
river course
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921057450.9U
Other languages
Chinese (zh)
Inventor
樊黎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Mingchuang Xinhai Ecological Technology Co ltd
Original Assignee
Wuhan Mingchuang Xinhai Ecological Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Mingchuang Xinhai Ecological Technology Co ltd filed Critical Wuhan Mingchuang Xinhai Ecological Technology Co ltd
Priority to CN201921057450.9U priority Critical patent/CN210368827U/en
Application granted granted Critical
Publication of CN210368827U publication Critical patent/CN210368827U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to an ecological remediation technical field specifically is a sediment bank slope ecological remediation structure is abandoned in river course, including bank foundation, river course and bank slope, one side fixedly connected with retaining wall that the river course is close to the bank slope, the inside fixedly connected with interlayer board of bank slope, the top fixedly connected with barricade of bank foundation. This sediment bank slope ecological remediation structure is abandoned in river course, on the one hand, through the division board, the limit piece, dog and solid borer are that the concrete is prefabricated into, make this ecological remediation structure can accomplish the construction through assembling, the effectual comparatively complicated drawback of structure construction in the past of having avoided, the effectual labour that has saved, thereby the effectual cost that has reduced, on the other hand is through setting up the barricade, make it can block to abandon in the sediment slips into the river course, and can avoid someone to empty rubbish such as abandoning the sediment toward bank slope again, cause its ecological environment who destroys the bank slope, thereby the effectual protective effect to the river course that has strengthened.

Description

Ecological restoration structure of sediment bank slope is abandoned in river course
Technical Field
The utility model relates to an ecological remediation technical field specifically is a sediment bank slope ecological remediation structure is abandoned in river course.
Background
On the river course of suburb and mountain river, often appear and pile up a large amount of engineering waste slag, building waste or domestic waste phenomenon such as waste material at will on the ramp of river course both sides, these waste materials are not only occupying a lot of land very extensively, cause the influence to the surrounding environment, the existing ecological restoration method, usually to the pollution and rubbish on the surface of river course bank slope, through removing the waste slag on the bank slope of river course, the method such as the firm soil plant such as the masson pine of horse etc. is planted directly on the bank slope, carry on ecological restoration, but when the soil of river course both sides is few, or soil structure bad situation appears, the ecological restoration plant is difficult to survive directly too often, or grow slowly, the existing method can't play the role of restoring the ecology, preventing soil erosion, protecting the environment.
The existing ecological restoration structure of the riverway waste slag bank slope is complex, difficult to implement and incapable of preventing waste slag from sliding into the riverway, so that improvement is needed.
The riverway waste slag bank slope ecological restoration structure disclosed in the Chinese utility model patent application publication specification CN208346749U can ensure the stability of the soil body on the bank slope by laying a solid soil layer and using the solid soil layer as the base layer of the restoration structure, thereby preventing landslide, water and soil loss, influence on the ecological restoration effect of the bank slope and the like caused by loosening the original soil body; through set up the concrete dyke wall on the toe wall, utilize the waterproof special type of concrete, prevent the washing away of the soil body river course rivers of bottom bank slope, cause the soil erosion and water loss, through set up green layer of planting and the solid water layer in upper portion on the concrete dyke wall, can play and guarantee soil fertility, afforest the environment and stabilize the effect of water and soil, and then effectively strengthen and guarantee the afforestation effect, however, this river course is abandoned sediment bank slope ecological remediation structure, in the work progress, it still has the structure comparatively loaded down with trivial details, the implementation shortcoming such as comparatively trouble.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a sediment bank slope ecological remediation structure is abandoned in river course uses through the cooperation that sets up retaining wall, interlayer board, barricade and greening plants, has solved the problem that proposes among the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a riverway waste slag bank slope ecological restoration structure comprises a riverway foundation, a riverway and a bank slope, wherein one side of the riverway close to the bank slope is fixedly connected with a retaining wall, a partition plate is fixedly connected inside the bank slope, and the top of the riverway foundation is fixedly connected with a retaining wall;
the retaining wall comprises a side block and a stop block, the bottoms of the side block and the stop block are fixedly connected with transverse plates, the bottoms of the transverse plates are fixedly connected with vertical plates, fixing holes are formed in the transverse plates, and fixing drill rods are inserted into the fixing holes;
one side fixedly connected with fixture block of dog, limit piece and the adjacent one side of dog set up the draw-in groove with fixture block looks adaptation, the dog is kept away from one side of fixture block and is seted up the groove of assembling with fixture block looks adaptation.
Optionally, the river course is close to the equal fixedly connected with in both sides of bank slope, just the material of retaining wall is the concrete.
Optionally, the bank slope is outstanding to the one end of interlayer board, and set up in the inside of interlayer board in the bank slope is seen and is equipped with the infiltration hole, just the quantity in infiltration hole is a plurality of.
Optionally, the number of limit piece is two, and two the limit piece sets up respectively in the both ends of barricade, the quantity of dog is a plurality of, and a plurality of joint between the dog.
Optionally, the interlayer plate, the edge block, the stop block and the fixing drill are all prefabricated by concrete.
Optionally, the number of the fixing drill rods is several, and the side blocks and the stop blocks are fixedly connected with the river bank foundation through the fixing drill rods.
Optionally, the stop dog is connected with the clamping groove formed in the side block through a clamping block arranged at one end of the stop dog in a clamping manner, and the stop dog is connected with the adjacent stop dog through the splicing groove formed in the stop dog in a clamping manner.
Optionally, greening plants are planted on the bank slope.
(III) advantageous effects
The utility model provides a sediment bank slope ecological remediation structure is abandoned in river course possesses following beneficial effect:
(1) this sediment bank slope ecological remediation structure is abandoned in river course, on the one hand through setting up the barricade, make it stop to abandon the sediment and slide into in the river course, and can avoid someone to empty rubbish such as abandoning the sediment toward bank slope once more, cause its ecological environment who destroys the bank slope, thereby the effectual protection effect to the river course that has strengthened, on the other hand passes through the barricade and designs for assembling the construction that forms, make the barricade simple construction, the effectual labour that has saved constructor, thereby the effectual cost that has reduced, secondly through setting up fixed borer, the effectual steadiness between limit piece and dog and the river bank foundation that has strengthened, thereby the effectual fastness of barricade has been strengthened.
(2) The ecological restoration structure of the riverway waste slag bank slope can well keep the soil on the bank slope by arranging the greening plants, and plays the roles of greening the environment and stabilizing water and soil, thereby effectively reducing the water and soil loss of the bank slope, on the other hand, the ecological restoration structure can be constructed by assembling the interlayer plates, the edge blocks, the stop blocks and the fixing brazes which are all prefabricated by concrete, effectively avoiding the defect of complicated structure construction in the past, effectively saving labor force, thereby effectively reducing cost, secondly, the arrangement of the interlayer plate effectively enhances the protection effect on the bank slope, thereby effectively reducing the phenomenon of water and soil loss of the bank slope, the water seepage holes are formed in the partition plate, so that rainwater can go deep into the ground along the water seepage holes, and more rainwater is effectively prevented from causing damage to green plants.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural diagram of the edge block of the present invention;
FIG. 3 is a schematic structural view of the stopper of the present invention;
fig. 4 is a schematic top view of the retaining wall of the present invention.
In the figure: the method comprises the following steps of 1-river bank foundation, 2-river channel, 3-bank slope, 4-retaining wall, 5-interlayer plate, 6-retaining wall, 7-edge block, 8-stop block, 9-transverse plate, 10-vertical plate, 11-fixing hole, 12-fixing drill rod, 13-clamping block, 14-clamping groove and 15-splicing groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, the present invention provides a technical solution: a riverway waste slag bank slope ecological restoration structure comprises a riverway foundation 1, a riverway 2 and a bank slope 3, wherein one side of the riverway 2 close to the bank slope 3 is fixedly connected with a retaining wall 4, the interior of the bank slope 3 is fixedly connected with a partition plate 5, and the top of the riverway foundation 1 is fixedly connected with a retaining wall 6;
the retaining wall 6 comprises a side block 7 and a stop block 8, the bottoms of the side block 7 and the stop block 8 are fixedly connected with a transverse plate 9, the bottom of the transverse plate 9 is fixedly connected with a vertical plate 10, a fixing hole 11 is formed in the transverse plate 9, and a fixing drill rod 12 is inserted in the fixing hole 11;
one side fixedly connected with fixture block 13 of dog 8, limit piece 7 and the adjacent draw-in groove 14 of dog 13 looks adaptation are seted up to one side of dog 8, and dog 8 keeps away from one side of fixture block 13 and sets up the groove 15 of assembling with fixture block 13 looks adaptation.
As an optional technical solution of the utility model:
the two sides of the river channel 2 close to the bank slope 3 are fixedly connected, and the retaining wall 4 is made of concrete
As an optional technical solution of the utility model:
the outstanding bank slope 3 of interlayer board 5's one end, and set up the inside of interlayer board 5 in bank slope 3 and see out and be equipped with the infiltration hole, and the quantity in infiltration hole is a plurality of, through setting up interlayer board 5, the effectual protection effect to bank slope 3 that has strengthened to the effectual phenomenon that alleviates 3 soil erosion and water losses in bank slope, the infiltration hole of seting up through interlayer board 5's inside, make the rainwater can be along the infiltration hole deep underground, the effectual more rainwater of having avoided causes harm to the afforestation plant.
As an optional technical solution of the utility model:
the quantity of limit piece 7 is two, and two limit pieces 7 set up respectively in the both ends of barricade 6, and the quantity of dog 8 is a plurality of, and the joint between a plurality of dog 8, through setting up barricade 6, makes it can block to abandon in the sediment slips into river course 2 to can avoid someone to fall again toward bank slope 3 and abandon rubbish such as sediment, cause its ecological environment who destroys bank slope 3, thereby effectual reinforcing is to the protective effect of river course 2.
As an optional technical solution of the utility model:
division board 5, limit piece 7, dog 8 and fixed borer 12 are the concrete prefabrication, are the concrete prefabrication through division board 5, limit piece 7, dog 8 and fixed borer 12, make this ecological remediation structure can accomplish the construction through assembling, the effectual comparatively complicated drawback of structure construction in the past of having avoided, the effectual labour that has saved to the effectual cost that has reduced.
As an optional technical solution of the utility model:
the quantity of fixed borer 12 is a plurality of, and limit piece 7 and dog 8 all through fixed borer 12 and 1 fixed connection of river bank foundation, through setting up fixed borer 12, the effectual steadiness that has strengthened between limit piece 7 and dog 8 and the river bank foundation 1 to the effectual fastness that has strengthened barricade 6.
As an optional technical solution of the utility model:
the stop block 8 is clamped with a clamping groove 14 formed in the side block 7 through a clamping block 13 arranged at one end of the stop block, and the stop block 8 is clamped with an adjacent stop block 8 through an assembling groove 15 formed in the stop block.
As an optional technical solution of the utility model:
planting has the afforestation plant on the bank slope 3, through setting up the afforestation plant, makes it can be fine keep the soil on the bank slope 3 to the effect of afforestation environment and firm soil and water has been played, thereby the effectual phenomenon that the soil and water loss takes place in bank slope 3 that has alleviateed.
When the user is using, constructor excavates the groove with 5 looks adaptations of division board on bank slope 3, then puts division board 5 in the groove, then backfills soil to install division board 5, then assemble barricade 6 and form, then consolidate barricade 6 through fixed borer 12, plant the afforestation plant on bank slope 3 again at last to protect bank slope 3, place soil erosion and water loss.
In conclusion, when the ecological restoration structure for the riverway waste slag bank slope is used, on one hand, the retaining wall 6 can prevent waste slag from sliding into the riverway 2 and can prevent garbage such as the waste slag from being poured onto the bank slope 3 again by someone from damaging the ecological environment of the bank slope 3, so that the protection effect on the riverway 2 is effectively enhanced, on the other hand, the retaining wall 6 is simple in construction and effectively saves labor force of constructors through the construction design of the retaining wall 6 formed by assembling, so that the cost is effectively reduced, on the other hand, the fixing drill rods 12 are arranged, so that the stability between the side blocks 7 and the stop blocks 8 and the riverbank foundation 1 is effectively enhanced, the firmness of the retaining wall 6 is effectively enhanced, on the one hand, the retaining soil on the bank slope 3 can be well realized through the arrangement of greening plants, and the effects of greening environment and stabilizing water and soil are achieved, thereby the effectual bank slope 3 that has alleviateed takes place the phenomenon of soil erosion and water loss, on the other hand passes through division board 5, side piece 7, dog 8 and fixed borer 12 are the concrete and prefabricate into, make this ecological remediation structure can accomplish the construction through assembling, the effectual comparatively complicated drawback of structure construction in the past of having avoided, the effectual labour that has saved, thereby the effectual cost that has reduced, secondly through setting up division board 5, the effectual protection effect to bank slope 3 that has strengthened, thereby the effectual bank slope 3 soil erosion and water loss's phenomenon that has alleviateed, the infiltration hole of seting up through division board 5's inside, make the rainwater can go deep into the underground along the infiltration hole, the effectual more rainwater of having avoided causes harm to the afforestation plant, this ecological remediation structure, the construction is simple, and can block someone and fall the abandon sediment toward river course 2 inward-dip once more, certain practicality has.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (8)

1. The utility model provides a sediment bank slope ecological remediation structure is abandoned in river course which characterized in that: the river bank foundation comprises a river bank foundation (1), a river channel (2) and a bank slope (3), wherein one side, close to the bank slope (3), of the river channel (2) is fixedly connected with a retaining wall (4), the interior of the bank slope (3) is fixedly connected with a interlayer plate (5), and the top of the river bank foundation (1) is fixedly connected with a retaining wall (6);
the retaining wall (6) comprises a side block (7) and a stop block (8), the bottoms of the side block (7) and the stop block (8) are fixedly connected with a transverse plate (9), the bottom of the transverse plate (9) is fixedly connected with a vertical plate (10), a fixing hole (11) is formed in the transverse plate (9), and a fixing drill rod (12) is inserted in the fixing hole (11);
one side of the stop block (8) is fixedly connected with a clamping block (13), one side of the side block (7) adjacent to the stop block (8) is provided with a clamping groove (14) matched with the clamping block (13), and one side of the stop block (8) far away from the clamping block (13) is provided with an assembling groove (15) matched with the clamping block (13).
2. The ecological restoration structure of the riverway waste residue bank slope according to claim 1, wherein both sides of the riverway (2) close to the bank slope (3) are fixedly connected with each other, and the retaining wall (4) is made of concrete.
3. The ecological restoration structure for the riverway waste slag bank slope according to claim 1, wherein one end of the division plate (5) protrudes out of the bank slope (3), and the division plate (5) arranged in the bank slope (3) is provided with a plurality of water seepage holes when viewed from the inside.
4. The riverway waste slag bank slope ecological restoration structure according to claim 1, wherein the number of the side blocks (7) is two, the two side blocks (7) are respectively arranged at two ends of the retaining wall (6), the number of the stop blocks (8) is several, and the stop blocks (8) are clamped with each other.
5. The ecological restoration structure of the riverway waste slag bank slope according to claim 1, wherein the division plates (5), the edge blocks (7), the stop blocks (8) and the fixing anchor rods (12) are all prefabricated by concrete.
6. The riverway waste slag bank slope ecological restoration structure according to claim 1, wherein the number of the fixing drill rods (12) is several, and the side blocks (7) and the stop blocks (8) are fixedly connected with a riverbank foundation (1) through the fixing drill rods (12).
7. The ecological restoration structure for the riverway waste slag bank slope according to claim 1, wherein the stop block (8) is clamped with a clamping groove (14) formed in the edge block (7) through a clamping block (13) arranged at one end of the stop block, and the stop block (8) is clamped with an adjacent stop block (8) through a splicing groove (15) formed in the stop block.
8. The riverway waste residue bank slope ecological restoration structure is characterized in that greening plants are planted on the bank slope (3).
CN201921057450.9U 2019-07-09 2019-07-09 Ecological restoration structure of sediment bank slope is abandoned in river course Active CN210368827U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921057450.9U CN210368827U (en) 2019-07-09 2019-07-09 Ecological restoration structure of sediment bank slope is abandoned in river course

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921057450.9U CN210368827U (en) 2019-07-09 2019-07-09 Ecological restoration structure of sediment bank slope is abandoned in river course

Publications (1)

Publication Number Publication Date
CN210368827U true CN210368827U (en) 2020-04-21

Family

ID=70269956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921057450.9U Active CN210368827U (en) 2019-07-09 2019-07-09 Ecological restoration structure of sediment bank slope is abandoned in river course

Country Status (1)

Country Link
CN (1) CN210368827U (en)

Similar Documents

Publication Publication Date Title
CN105862887B (en) A kind of ion type rareearth mine ecological slope protection structure
CN106759104B (en) Ecological slope protection structure and construction method
CN104514216A (en) Fill channel anti-frost heaving and anti-seepage structure and construction method
CN108411856B (en) Ecological restoration structure and method for river waste residue bank slope
CN210368827U (en) Ecological restoration structure of sediment bank slope is abandoned in river course
CN205975504U (en) A afforestation building block and bank protection for dredging waterway
CN216973293U (en) Ecological retaining brick with novel structure
CN212316830U (en) Hydraulic engineering is with ecological slope protection brick of concatenation formula
CN212223776U (en) Novel hydraulic engineering side slope construction protection system
CN207376577U (en) A kind of canal comprehensive improvement system
CN112726504A (en) Ecological retaining wall bank protection
KR100709103B1 (en) The mega green block
CN217678882U (en) A multi-functional ecological bank protection structure of standing vertically for city river course
CN218373660U (en) Ecological building block retaining wall structure of channel
CN220486494U (en) Civil engineering slope protection structure
CN219710191U (en) Ecological bank protection
CN218813498U (en) Utilize flat formula slope protection structure of riverway clear silt material
CN213653377U (en) Cast-in-place channel structure
CN217811064U (en) Trimming device for foundation pit displacement bevel edge
CN214883417U (en) River course bank protection afforestation ecological protection structure
CN209975538U (en) Dredged silt sintering-free ceramsite concrete plant-growing building block
CN212896167U (en) Ecological bank protection of water conservancy building
CN214573022U (en) Environment-friendly permeable road
CN220977882U (en) Ecological level ditch slope protection structure
CN212772181U (en) Ecological revetment structure capable of being constructed on water

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant