CN210341954U - Ecological bank protection of cross - Google Patents

Ecological bank protection of cross Download PDF

Info

Publication number
CN210341954U
CN210341954U CN201921289965.1U CN201921289965U CN210341954U CN 210341954 U CN210341954 U CN 210341954U CN 201921289965 U CN201921289965 U CN 201921289965U CN 210341954 U CN210341954 U CN 210341954U
Authority
CN
China
Prior art keywords
cross
bank protection
main part
prefabricated
arch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921289965.1U
Other languages
Chinese (zh)
Inventor
管正兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Zhengmao New Material Technology Co ltd
Original Assignee
Hubei Zhengmao New Material Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Zhengmao New Material Technology Co ltd filed Critical Hubei Zhengmao New Material Technology Co ltd
Priority to CN201921289965.1U priority Critical patent/CN210341954U/en
Application granted granted Critical
Publication of CN210341954U publication Critical patent/CN210341954U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an ecological bank protection of cross, including last arch, the prefabricated bank protection main part of cross, right bell and spigot, left arch and lower bell and spigot, the upper end of the prefabricated bank protection main part of cross is equipped with the arch, and the left end of the prefabricated bank protection main part of cross is equipped with left arch, and the inside of the prefabricated bank protection main part right-hand member of cross is equipped with right bell and spigot, and the inside of the prefabricated bank protection main part bottom of cross is equipped with down the bell and spigot, and the central point department of the prefabricated bank protection main part of cross is equipped with the preformed hole, has placed the rivet in. The utility model discloses a set up casing, explosion-proof layer, first mounting panel, second mounting panel, MPPT conversion structure that charges, solar cell panel, battery, solved prefabricated bank protection main part of cross, left arch, go up arch, rivet, right bell and spigot structure down, solved traditional bank protection and adopted unable quick assembly fixed, the low and traditional bank protection of efficiency of construction all adopt the on-the-spot problem of pouring shaping, complex process, adaptability low.

Description

Ecological bank protection of cross
Technical Field
The utility model relates to an ecological bank protection technical field specifically is an ecological bank protection of cross.
Background
In recent years, with the increasing construction of water conservancy and hydropower engineering and highway water transportation traffic engineering in China, the slope protection management is developed towards the directions of comprehensive functions, beautiful environment and various shapes, and the structural form of the slope protection plays an important role in ecological protection, environmental management, smooth water transportation and the like along the line. The ecological slope protection is a slope protection technology for supporting slopes or side slopes by basic knowledge of subjects such as comprehensive engineering mechanics, soil science, ecology, phytology and the like to form a comprehensive slope protection system consisting of plants or engineering and plants. After the excavation side slope is formed, the surface layer of the side slope is protected and reinforced by planting plants and utilizing the interaction (root anchoring effect) of the plants, rocks and soil bodies, so that the requirement on the stability of the surface layer of the side slope can be met, the slope protection mode of the damaged natural ecological environment can be recovered, and the method is an effective slope protection and slope fixing means.
However, the prior art has the following defects:
1. the traditional slope protection is inconvenient to construct quickly, is fixed quickly, cannot be assembled quickly, and is too complicated in installation mode;
2. traditional bank protection all adopts cast in situ, and cast-in-place engineering technology is loaded down with trivial details, and the construction environment is poor, and the prefabricated bank protection of bulky is from great, and adaptability is relatively poor.
Disclosure of Invention
Technical problem to be solved
Not enough to prior art, the utility model provides an ecological bank protection of cross has solved traditional bank protection and has adopted unable quick assembly fixed, the low and traditional bank protection of efficiency of construction all to adopt the problem that cast-in-place shaping, complex process, adaptability are low.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an ecological bank protection of cross, includes protruding, the prefabricated bank protection main part of cross, right bell and spigot, left arch and lower bell and spigot, the upper end of the prefabricated bank protection main part of cross is equipped with the arch, the left end of the prefabricated bank protection main part of cross is equipped with left arch, the inside of the prefabricated bank protection main part right-hand member of cross is equipped with right bell and spigot, the inside of the prefabricated bank protection main part bottom of cross is equipped with down the bell and spigot, the central point department of the prefabricated bank protection main part of cross is equipped with the preformed hole, the rivet has been placed in the preformed hole.
Preferably, go up prefabricated slope protection main part up end of cross between arch and the left side arch and be equipped with the second arc arch, the prefabricated slope protection main part up end of cross on the bell and spigot of the right side is equipped with first arc arch, the prefabricated slope protection main part up end of cross on the bell and spigot of the lower bell and spigot is equipped with the third arc arch.
Preferably, prefabricated bank protection main part of cross, go up arch, left side arch, first arc arch, second arc arch and third arc arch are the prefabricated shaping of concrete integral type.
Preferably, the left bulge and the upper bulge are the same in size, the right socket and the lower socket are the same in size, and the sizes of the right socket and the lower socket are both larger than those of the left bulge and the upper bulge.
Preferably, prefabricated bank protection main part center department of cross passes preformed hole and ground fixed connection through the rivet.
(III) advantageous effects
The utility model provides an ecological bank protection of cross possesses following beneficial effect:
(1) the utility model can be assembled and constructed better by arranging the cross-shaped prefabricated slope protection main body, the left bulge, the upper bulge, the rivet, the right socket and the lower socket, has simple structure, is suitable for water conservancy and hydropower engineering and slope protection engineering, has simple fixing mode, wide applicability, convenient site construction, flexible and rapid installation and neat and beautiful installation effect, thereby effectively solving the problems of the traditional slope protection that the traditional slope protection can not be assembled and fixed rapidly and the construction efficiency is low, when the quick assembly and the fixation of the utility model are carried out, a group of cross-shaped prefabricated slope protection main bodies are firstly placed on the ground stably, the rivet passes through the preformed hole at the center of the cross-shaped prefabricated slope protection main body to be fixed with the ground, then a group of cross-shaped prefabricated slope protection main bodies is placed on one side, the left bulge at the left end of the rivet is fixed with the right socket joint of the right, fix with ground through the rivet afterwards, so relapse, realize horizontal fixed mounting, take the prefabricated bank protection main part of a set of new cross afterwards, place the below at the prefabricated bank protection main part of first set of cross, it is fixed with the lower bell and spigot joint of the prefabricated bank protection main part lower extreme of first set of cross with the last arch of its upper end, fix with ground through the rivet equally, realize vertical installation, carry out horizontal joint installation on the prefabricated bank protection main part right side of newly-increased cross again afterwards, form the structure of assembling as shown in the figure, so relapse, accomplish user's needs of assembling.
(2) The utility model has the advantages of high product standardization, high production efficiency, small volume, light dead weight, convenient transportation and construction, thereby effectively solving the problems of the traditional revetment that the cast-in-place molding is adopted, the process is complicated and the adaptability is low, prefabricated bank protection main part of cross, go up arch, left side arch, first arc arch, the protruding prefabricated shaping of concrete integral type that is of second arc, first arc arch in the prefabricated bank protection main part of cross, the protruding design of pleasing to the eye degree of increasing of second arc and third arc, holistic slope protection structure adopts integration concrete placement shaping, and the structure is small and exquisite, and the shape is pleasing to the eye, and the concatenation is effectual, and the practicality can increase, need not to adopt traditional cast in the spot mode to lay.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
fig. 2 is a schematic top view of the present invention;
FIG. 3 is a schematic view of the assembly structure of the present invention;
fig. 4 is a schematic view of the front view cross-sectional structure of the present invention.
The reference numbers in the figures are:
1. an upper bulge; 2. prefabricating a slope protection main body in a cross shape; 3. a first arc-shaped protrusion; 4. a right bell and spigot; 5. riveting; 6. a second arc-shaped protrusion; 7. a left bulge; 8. reserving a hole; 9. a third arc-shaped bulge; 10. a lower bell and spigot; 11. and (4) the ground.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1-4, the utility model provides a technical solution: the utility model provides an ecological bank protection of cross, including last arch 1, prefabricated bank protection main part 2 of cross, right bell and spigot 4, left side arch 7 and lower bell and spigot 10, the upper end of prefabricated bank protection main part 2 of cross is equipped with arch 1, the left end of prefabricated bank protection main part 2 of cross is equipped with left arch 7, the inside of the prefabricated bank protection main part 2 right-hand member of cross is equipped with right bell and spigot 4, the inside of the prefabricated bank protection main part 2 bottom of cross is equipped with down bell and spigot 10, the prefabricated bank protection main part 2 up end of cross between last arch 1 and the left arch 7 of going up is equipped with second arc arch 6, the prefabricated bank protection main part 2 up end of cross on the right bell and spigot 4 is equipped with first arc arch 3, the prefabricated bank protection main part 2 up end of cross on the lower bell and spigot 10 is equipped with third arc arch 9, the utility model discloses in, prefabricated bank protection main part 2 of cross, the second arc-shaped bulge 6 and the third arc-shaped bulge 9 are integrally precast and formed by concrete, the first arc-shaped bulge 3, the second arc-shaped bulge 6 and the third arc-shaped bulge 9 on the cross-shaped precast slope protection main body 2 are designed for increasing the aesthetic degree, the integral slope protection structure is formed by integral concrete pouring without adopting the traditional cast-in-place mode, the cross-shaped precast slope protection main body 2, the upper bulge 1, the left bulge 7, the first arc-shaped bulge 3, the second arc-shaped bulge 6 and the third arc-shaped bulge 9 are integrally precast and formed by concrete, the left bulge 7 and the upper bulge 1 have the same size, the right bell socket 4 and the lower bell socket 10 have the size larger than the left bulge 7 and the upper bulge 1, a preformed hole 8 is arranged at the central point of the cross-shaped precast slope protection main body 2, a rivet 5 is arranged in the preformed hole 8, when the utility model is used for fast assembling and fixing, a group of cross-shaped prefabricated slope protection main bodies 2 are stably placed on the ground 11, the rivets 5 are fixed with the ground 11 by passing through the preformed holes 8 at the centers of the cross-shaped prefabricated slope protection main bodies 2, then a group of cross-shaped prefabricated slope protection main bodies 2 are placed aside, the left bulge 7 at the left end is fixedly connected with the right bell socket 4 at the right end of the upper group of cross-shaped prefabricated slope protection main bodies 2, and then the rivet 5 is fixed with the ground 11, the transverse fixing and the installation are repeated, then a group of new cross-shaped prefabricated slope protection main bodies 2 are taken and placed below the first group of cross-shaped prefabricated slope protection main bodies 2, the upper bulge 1 at the upper end is fixedly connected with the lower bell socket 10 at the lower end of the first group of cross-shaped prefabricated slope protection main bodies 2, fix through rivet 5 and ground 11 equally, realize vertical installation, carry out horizontal joint installation again on prefabricated bank protection main part 2 right sides of newly-increased cross afterwards, form the structure of assembling as shown in fig. 2, so relapse, accomplish user's needs of assembling.
The working principle is as follows: in the utility model, the cross-shaped prefabricated slope protection main body 2, the upper bulge 1, the left bulge 7, the first arc bulge 3, the second arc bulge 6 and the third arc bulge 9 are integrally prefabricated and formed by concrete, the first arc bulge 3, the second arc bulge 6 and the third arc bulge 9 on the cross-shaped prefabricated slope protection main body 2 are designed for increasing the aesthetic degree, the integral slope protection structure is formed by integral concrete pouring, the splicing effect is good, the traditional on-site pouring mode is not needed for laying, when the utility model is rapidly spliced and fixed, a group of cross-shaped prefabricated slope protection main bodies 2 are firstly stably placed on the ground 11, the rivet 5 passes through the preformed hole 8 at the center of the cross-shaped prefabricated slope protection main body 2 to be fixed with the ground 11, then a group of cross-shaped prefabricated slope protection main bodies 2 is placed aside, the left bulge 7 at the left end of the rivet is fixedly connected with the right bell socket 4 at the right end of the upper group of the cross-shaped prefabricated, fix with ground 11 through rivet 5 afterwards, so relapse, realize horizontal fixed mounting, take a set of new prefabricated bank protection main part of cross 2 afterwards, place in the below of the prefabricated bank protection main part of first set of cross 2, it is fixed with the lower bell and spigot 10 joint of the prefabricated bank protection main part of first set of cross 2 lower extreme of the upper arch 1 of its end, fix with ground 11 through rivet 5 equally, realize vertical installation, carry out horizontal joint installation on the prefabricated bank protection main part of cross 2 right sides that increase again afterwards, form the structure of assembling as shown in fig. 3, so relapse, until assembling and accomplish required bank protection area.
To sum up can, the utility model discloses a set up prefabricated bank protection main part of cross 2, left arch 7, go up arch 1, rivet 5, right bell and spigot 4, lower bell and spigot 10 structure, solved traditional bank protection and adopted unable quick assembly fixed, the low and traditional bank protection of efficiency of construction all to adopt the on-the-spot problem of pouring shaping, complex process, adaptability low.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides an ecological bank protection of cross, includes protruding (1), the prefabricated bank protection main part of cross (2), right bell and spigot (4), left arch (7) and lower bell and spigot (10), its characterized in that: the upper end of prefabricated bank protection main part of cross (2) is equipped with arch (1), the left end of prefabricated bank protection main part of cross (2) is equipped with left arch (7), the inside of prefabricated bank protection main part of cross (2) right-hand member is equipped with right bell and spigot (4), the inside of prefabricated bank protection main part of cross (2) bottom is equipped with down bell and spigot (10), the centre point department of the prefabricated bank protection main part of cross (2) is equipped with preformed hole (8), rivet (5) have been placed in preformed hole (8).
2. The ecological bank protection of cross of claim 1, characterized in that: go up prefabricated slope protection main part of cross (2) up end between arch (1) and the left side arch (7) and be equipped with the arch of second arc (6), prefabricated slope protection main part of cross (2) up end on right side socket joint (4) is equipped with first arc arch (3), prefabricated slope protection main part of cross (2) up end on lower socket joint (10) is equipped with the arch of third arc (9).
3. The ecological bank protection of cross of claim 2, characterized in that: prefabricated bank protection main part of cross (2), go up arch (1), left arch (7), first arc arch (3), second arc arch (6) and the protruding (9) of third arc are the prefabricated shaping of concrete integral type.
4. The ecological bank protection of cross of claim 1, characterized in that: the size of the left bulge (7) is consistent with that of the upper bulge (1), the size of the right bell socket (4) is consistent with that of the lower bell socket (10), and the sizes of the right bell socket (4) and the lower bell socket (10) are both larger than those of the left bulge (7) and the upper bulge (1).
5. The ecological bank protection of cross of claim 1, characterized in that: prefabricated bank protection main part of cross (2) center department passes preformed hole (8) and ground (11) fixed connection through rivet (5).
CN201921289965.1U 2019-08-10 2019-08-10 Ecological bank protection of cross Active CN210341954U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921289965.1U CN210341954U (en) 2019-08-10 2019-08-10 Ecological bank protection of cross

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921289965.1U CN210341954U (en) 2019-08-10 2019-08-10 Ecological bank protection of cross

Publications (1)

Publication Number Publication Date
CN210341954U true CN210341954U (en) 2020-04-17

Family

ID=70174765

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921289965.1U Active CN210341954U (en) 2019-08-10 2019-08-10 Ecological bank protection of cross

Country Status (1)

Country Link
CN (1) CN210341954U (en)

Similar Documents

Publication Publication Date Title
CN201332608Y (en) Combination module for greening
CN103590646B (en) A kind of triangular fracture surface angle steel tower for power transmission line
CN105091378A (en) Solar energy support structure
CN102839634B (en) Construction method for life-saving water bank ecological vegetation box
CN206481251U (en) A kind of photovoltaic bracket device of use truss string structure beam
CN205385435U (en) Photovoltaic system on water
CN210341954U (en) Ecological bank protection of cross
CN209388578U (en) A kind of civil engineering class colleges and universities sponge city teaching mode and architectural teaching model
CN213187302U (en) Green building's afforestation curtain
CN201263337Y (en) Novel greenhouse keel frame and mold special for manufacturing the keel
CN213427230U (en) Modularized ecological green wall system
CN210239243U (en) Assembled resource collection corridor frame
CN208363388U (en) A kind of single-pitch type photovoltaic power generation and rain collector
CN208386226U (en) Solar panel road
CN109736264A (en) River regulation ecological slope protection structure
CN201883617U (en) Comprehensive utilization system for building energy
CN110080568A (en) Assembled resource collects corridor
KR101200845B1 (en) High-rise buildung structure
CN217734051U (en) Combined ecological slope protection vegetation block
CN213784378U (en) Landscaping protection slope
CN110259200A (en) A kind of umbrella pavilion corridor and integrated module type gluing Wood construction
CN215122439U (en) Vegetation restoration structure of high and steep slag body side slope
CN211597318U (en) Green energy-saving roof
CN203795514U (en) Rainwater collecting modules and buried-type rainwater collecting device
CN212176350U (en) Green environment-friendly energy-saving building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant