CN210230141U - Dustproof construction waste treatment device - Google Patents

Dustproof construction waste treatment device Download PDF

Info

Publication number
CN210230141U
CN210230141U CN201920813908.2U CN201920813908U CN210230141U CN 210230141 U CN210230141 U CN 210230141U CN 201920813908 U CN201920813908 U CN 201920813908U CN 210230141 U CN210230141 U CN 210230141U
Authority
CN
China
Prior art keywords
pipeline
water tank
device box
communicated
box body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920813908.2U
Other languages
Chinese (zh)
Inventor
Aiqin Sun
孙爱琴
Binglin Ren
任炳霖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Jianqi Construction Group Co ltd
Original Assignee
Henan Jianqi Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Jianqi Construction Group Co ltd filed Critical Henan Jianqi Construction Group Co ltd
Priority to CN201920813908.2U priority Critical patent/CN210230141U/en
Application granted granted Critical
Publication of CN210230141U publication Critical patent/CN210230141U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The utility model discloses a dustproof construction waste processing apparatus, the on-line screen storage device comprises a base, the base above be equipped with the device box, the fixed bellmouth that is equipped with in upper end of device box, the base above and extend to be equipped with above the bellmouth and take out the dust and filter and put one, the device box in be equipped with rubbish milling device, a side lower extreme department of device box articulated be equipped with the door plant, the door plant around and be located the fixed feed cylinder that is equipped with on the device box side, the below of feed cylinder be equipped with and connect the material dolly, the inside of feed cylinder above articulated be equipped with hydraulic stem one, the other end of hydraulic stem one articulate mutually with the lateral surface of door plant, the lateral surface of feed cylinder on and extend to the inside fixed dust extraction filter equipment two that is equipped with of feed cylinder. The utility model has the advantages that: has the advantages of simple structure, convenient operation, dust removal during crushing operation, dust removal during discharging and the like.

Description

Dustproof construction waste treatment device
Technical Field
The utility model relates to a construction waste handles technical field, specifically indicates a dustproof construction waste handles device.
Background
The construction waste refers to residue soil, waste material, residual mud and other wastes generated in the process of construction, laying or dismantling and repairing of various buildings, structures, pipe networks and the like of construction units or personal teams. The treatment of the relevant crushed stone building garbage basically uses relevant mincing or grinding devices.
The existing construction waste treatment device basically pours construction waste such as crushed stones into a stone crusher or a related crushing device in the open air, a large amount of dust is generated in the process, the atmosphere is polluted, the dust is extremely harmful to the bodies of workers, and related dust removing equipment and structures are not arranged on the existing device.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a solve foretell various problems, provide a simple structure, simple operation, can remove dust when crushing operation, can remove dust when the ejection of compact dustproof construction waste processing apparatus.
In order to solve the technical problem, the utility model provides a technical scheme does: a dustproof construction waste treatment device comprises a base, wherein a device box body is arranged on the base, a funnel opening is fixedly arranged at the upper end of the device box body, a dust extraction filter device I is arranged on the upper surface of the base and extends to the upper surface of the funnel opening, a waste crushing device is arranged in the device box body, a door plate is hinged at the lower end of one side surface of the device box body, a discharge barrel is fixedly arranged around the door plate and positioned on the side surface of the device box body, a material receiving trolley is arranged below the discharge barrel, a hydraulic rod I is hinged on the upper surface inside the discharge barrel, the other end of the hydraulic rod I is hinged with the outer side surface of the door plate, a dust extraction filter device II is fixedly arranged on the outer side surface of the discharge barrel and extends to the inside of the discharge barrel, the dust extraction filter device I comprises a water tank I fixedly arranged on the upper surface of the base and a hydraulic rod II fixedly arranged at the, the other end of the hydraulic rod II is provided with an inverted funnel opening matched with the funnel opening, a first exhaust fan is arranged inside the inverted funnel opening, the other end of the first exhaust fan is communicated with a hose, a first pipeline inserted into the water surface of the first water tank is arranged on the first water tank, the other end of the first pipeline is communicated with the other end of the hose, telescopic plates are arranged between the edges of three sides of the upper surface of the funnel opening and the edges of three sides of the lower surface of the inverted funnel opening correspondingly, a second pipeline is communicated with the opposite side surface of the door panel of the device box body, the other end of the second pipeline is communicated with the side surface of the other end of the first pipeline, a first filter layer is arranged in the end part of the second pipeline communicated with the device box body, a second exhaust fan is arranged in the second pipeline, an air outlet pipe is communicated with the upper surface of the first water tank, and a liquid, and a switch valve is arranged on the liquid outlet pipe.
As the improvement, rubbish crushing device including rotating a plurality of mutual parallels of locating in the device box and be located the coplanar cross axle, the cross axle on all be equipped with a plurality of and grind the tooth, grind the tooth and crisscross the setting each other on two adjacent cross axles, device box lateral surface on and with the fixed casing that is equipped with of cross axle correspondence position department, the casing in all be equipped with the motor, the transmission shaft of motor be connected with the one end of cross axle.
As an improvement, the second dust pumping and filtering device comprises a second water tank fixedly arranged on the outer side surface of the discharge cylinder and a third suction fan arranged on the upper surface of the interior of the discharge cylinder, the other end of the third suction fan is communicated with a third pipeline, the other end of the third pipeline is inserted into the water below the water surface of the interior of the second water tank, and the upper surface of the second water tank is communicated with a second air outlet pipe.
As an improvement, a second filter layer is inserted and arranged on the first pipeline close to the first water tank.
Compared with the prior art, the utility model the advantage lie in: when the garbage crushing device is used, the garbage crushing device can thoroughly crush various construction garbage poured into the box body of the device; the inverted funnel opening and the first suction fan can be used for sucking out dust generated in the device box body when the garbage crushing device moves, the first filter layer and the second suction fan can be used for sucking out dust generated after the garbage crushing device is crushed in the device box body, the dust sucked out by the first suction fan and the second suction fan enters the first water tank for final water filtration after being filtered by the second filter layer, then the gas sucked out is discharged through the gas outlet pipe, and the dust is reduced from all places to the greatest extent in the whole process; the first hydraulic rod is arranged to control the opening and closing of the door panel; the second dust-pumping filter device can perform the last dust-pumping filtration operation during material placing of the utility model, so that less dust is generated during material placing; the whole arrangement of the utility model can produce little dust, which is more beneficial to the health of human body.
Drawings
Fig. 1 is the utility model relates to a dustproof construction waste treatment device's elevation structure sketch map.
Fig. 2 is a schematic view of the garbage crushing device of the dustproof construction garbage disposal device of the present invention.
As shown in the figure: 1. a base; 2. a device case; 3. a funnel opening; 4. a door panel; 5. a discharging barrel; 6. a first hydraulic rod; 7. a first water tank; 8. a second hydraulic rod; 9. inverting the funnel mouth; 10. a first exhaust fan; 11. a hose; 12. a first pipeline; 13. a retractable plate; 14. a second pipeline; 15. a first filter layer; 16. a second exhaust fan; 17. an air outlet pipe; 18. a liquid outlet pipe; 19. an on-off valve; 20. a horizontal axis; 21. grinding the teeth; 22. a housing; 23. a motor; 24. a second water tank; 25. a third exhaust fan; 26. a third pipeline; 27. a second air outlet pipe; 28. a material receiving trolley; 29. and a second filter layer.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
With reference to the attached drawings 1 and 2, the dustproof construction waste treatment device comprises a base 1, a device box body 2 is arranged on the base 1, a funnel opening 3 is fixedly arranged at the upper end of the device box body 2, a first dust extraction filter device is arranged on the base 1 and extends to the upper surface of the funnel opening 3, a waste crushing device is arranged in the device box body 2, a door plate 4 is hinged to the lower end of one side surface of the device box body 2, a discharge barrel 5 is fixedly arranged on the periphery of the door plate 4 and on the side surface of the device box body 2, a receiving trolley 28 is arranged below the discharge barrel 5, a first hydraulic rod 6 is hinged to the upper surface inside the discharge barrel 5, the other end of the first hydraulic rod 6 is hinged to the outer side surface of the door plate 4, a second dust extraction filter device is fixedly arranged on the outer side surface of the discharge barrel 5 and extends to the inside of the discharge barrel 5, the dust extraction and filtration device comprises a first water tank 7 fixedly arranged on a base 1 and a second hydraulic rod 8 fixedly arranged at the four corners of the upper surface of a funnel opening 3, an inverted funnel opening 9 matched with the funnel opening 3 is arranged at the other end of the second hydraulic rod 8, a first exhaust fan 10 is arranged inside the upper surface of the inverted funnel opening 9, a hose 11 is communicated with the other end of the first exhaust fan 10, a first pipeline 12 inserted into the lower surface of water in the first water tank 7 is arranged on the upper surface of the first water tank 7, the other end of the first pipeline 12 is communicated with the other end of the hose 11, telescopic plates 13 are arranged between the three edges of the upper surface of the funnel opening 3 and the corresponding three edges of the lower surface of the inverted funnel opening 9, a second pipeline 14 is communicated with the opposite side surface of the side surface of a door panel 4 of the device box body 2, and the other end of the second pipeline 14 is communicated with the side surface, a first filter layer 15 is arranged in the end part of the second pipeline 14 communicated with the device box body 2, a second exhaust fan 16 is arranged in the second pipeline 14, an air outlet pipe 17 is communicated with the upper surface of the first water tank 7, a liquid outlet pipe 18 is communicated with the lower end of the side surface of the first water tank 7, and a switch valve 19 is arranged on the liquid outlet pipe 18.
The rubbish crushing device locate a plurality of mutual parallels and lie in the coplanar cross axle 20 in device box 2 including rotating, cross axle 20 on all be equipped with a plurality of and grind tooth 21, grind tooth 21 on two adjacent cross axles 20 and set up crisscross each other, device box 2 lateral surface on and with cross axle 20 correspond the fixed casing 22 that is equipped with of position department, casing 22 in all be equipped with motor 23, motor 23's transmission shaft be connected with cross axle 20's one end.
The second dust extraction and filtration device comprises a second water tank 24 fixedly arranged on the outer side surface of the discharge barrel 5 and a third exhaust fan 25 arranged on the upper surface inside the discharge barrel 5, the other end of the third exhaust fan 25 is communicated with a third pipeline 26, the other end of the third pipeline 26 is inserted below the water surface inside the second water tank 24, and a second air outlet pipe 27 is communicated with the upper surface of the second water tank 24.
A second filter layer 29 is inserted in the position, close to the upper surface of the first water tank 7, of the first pipeline 12.
The utility model discloses a concrete implementation mode: when the utility model is used, the inverted funnel mouth 9 can be lifted through the extension of the second hydraulic rod 8, then the construction waste to be treated is poured into the device box body 2 from a side surface which is not provided with the expansion plate 13, then the grinding teeth 21 are driven to rotate through the rotation of the motor 23, thereby the construction waste is ground, meanwhile, the dust generated by the grinding operation is extracted out of the device box body 2 through the rotation of the first suction fan 10, the dust is filtered through the hose 11, the first pipeline 12 and the second filter layer 29 and enters the first water tank 7, the dust is mixed when meeting water, the final filtration is finished, and finally, the gas is discharged through the gas outlet pipe 17; performing dust extraction and filtration operation below the crushing device through a second suction fan 16, wherein dust finally enters a first water tank 7; when needs blowing, accessible hydraulic stem one 6 shortens to pull open door plant 4, thereby make the rubbish after grinding fall to connecing the material dolly 28 in through ejection of compact section of thick bamboo 5, simultaneously through the motion of extraction fan three 25, take out the dust that produces during the ejection of compact to carry out water filtration in the second 24 water tanks, after the completion, its gas will be discharged through second 27 outlet pipes.
The present invention and the embodiments thereof have been described above, but the description is not limited thereto, and the embodiment shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should understand that they should not be limited to the embodiments described above, and that they can design the similar structure and embodiments without departing from the spirit of the invention.

Claims (4)

1. The utility model provides a dustproof construction waste treatment device, includes base (1), base (1) above be equipped with device box (2), its characterized in that: the device is characterized in that a funnel opening (3) is fixedly arranged at the upper end of a device box body (2), a dust pumping filter device is arranged on a base (1) and extends to the upper side of the funnel opening (3), a garbage crushing device is arranged in the device box body (2), a door plate (4) is hinged to the lower end of one side face of the device box body (2), a discharge barrel (5) is fixedly arranged on the periphery of the door plate (4) and positioned on the side face of the device box body (2), a material receiving trolley (28) is arranged below the discharge barrel (5), a hydraulic rod I (6) is hinged to the upper side of the inside of the discharge barrel (5), the other end of the hydraulic rod I (6) is hinged to the outer side face of the door plate (4), a dust pumping filter device II is fixedly arranged on the outer side face of the discharge barrel (5) and extends to the inner portion of the discharge barrel (5), and the dust pumping filter device I comprises a water tank I (7) fixedly arranged on the base (1) and a fixedly (3) A second hydraulic rod (8) at the four corners of the upper surface, a first pumping fan (10) is arranged inside the upper surface of the inverted funnel opening (9), the other end of the first pumping fan (10) is communicated with a hose (11), a first pipeline (12) inserted into the water surface of the first water tank (7) is arranged on the upper surface of the first water tank (7), the other end of the first pipeline (12) is communicated with the other end of the hose (11), telescopic plates (13) are arranged between the edges of the three sides of the upper surface of the funnel opening (3) and the edges of the lower surface of the inverted funnel opening (9) correspondingly, a second pipeline (14) is communicated with the opposite side surface of the door panel (4) of the device box body (2), and the other end of the second pipeline (14) is communicated with the side surface of the other end of the first pipeline (12), the device is characterized in that a first filter layer (15) is arranged in the end part, communicated with the device box body (2), of the second pipeline (14), a second exhaust fan (16) is arranged in the second pipeline (14), an air outlet pipe (17) is communicated with the upper surface of the first water tank (7), a liquid outlet pipe (18) is communicated with the lower end of the side surface of the first water tank (7), and a switch valve (19) is arranged on the liquid outlet pipe (18).
2. The dustproof construction waste disposal device according to claim 1, wherein: rubbish crushing device locate a plurality of mutual parallels in device box (2) and lie in coplanar's cross axle (20) including rotating, cross axle (20) on all be equipped with a plurality of and grind tooth (21), grind tooth (21) on two adjacent cross axles (20) and set up crisscross each other, device box (2) lateral surface on and correspond position department with cross axle (20) and fix and be equipped with casing (22), casing (22) in all be equipped with motor (23), the transmission shaft of motor (23) be connected with the one end of cross axle (20).
3. The dustproof construction waste disposal device according to claim 1, wherein: the second dust extraction and filtration device comprises a second water tank (24) fixedly arranged on the outer side surface of the discharge barrel (5) and a third exhaust fan (25) arranged on the inner upper surface of the discharge barrel (5), the other end of the third exhaust fan (25) is communicated with a third pipeline (26), the other end of the third pipeline (26) is inserted into the water surface of the inner part of the second water tank (24), and a second air outlet pipe (27) is communicated with the upper surface of the second water tank (24).
4. The dustproof construction waste disposal device according to claim 1, wherein: a second filter layer (29) is inserted and arranged on the first pipeline (12) close to the upper surface of the first water tank (7).
CN201920813908.2U 2019-05-31 2019-05-31 Dustproof construction waste treatment device Expired - Fee Related CN210230141U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920813908.2U CN210230141U (en) 2019-05-31 2019-05-31 Dustproof construction waste treatment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920813908.2U CN210230141U (en) 2019-05-31 2019-05-31 Dustproof construction waste treatment device

Publications (1)

Publication Number Publication Date
CN210230141U true CN210230141U (en) 2020-04-03

Family

ID=69973175

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920813908.2U Expired - Fee Related CN210230141U (en) 2019-05-31 2019-05-31 Dustproof construction waste treatment device

Country Status (1)

Country Link
CN (1) CN210230141U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113680511A (en) * 2021-10-26 2021-11-23 徐州永力达工程机械制造有限公司 Engineering handling device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113680511A (en) * 2021-10-26 2021-11-23 徐州永力达工程机械制造有限公司 Engineering handling device

Similar Documents

Publication Publication Date Title
CN108160184A (en) A kind of environment-friendly type building solid waste processing equipment
CN211473493U (en) Can collect formula interior decoration and shovel except that device with wall skin
CN210230141U (en) Dustproof construction waste treatment device
CN108940493A (en) A kind of solid waste high-effective classifying processing equipment
CN112169977A (en) Municipal building waste circulating crushing device and using method thereof
CN110893359A (en) Civil engineering construction waste treatment device
CN206800613U (en) A kind of combined suction sewage truck
CN211246722U (en) Novel construction waste treatment device
CN108940465A (en) A kind of environment-friendly type building refuse disposal installation
CN209816770U (en) Side suction working device of railway sewage suction truck
CN212549748U (en) Garbage collection device for building
CN213014104U (en) Dust collector for highway construction
CN208275562U (en) A kind of civil construction project construction waste material environment-friendly processing unit
CN208407169U (en) A kind of bulk cholesterol grinding device
CN112403654A (en) Building rubbish reducing mechanism for building
CN218981878U (en) Building materials processing equipment that building materials processing was used
CN221276466U (en) Construction waste residue cleaning equipment
CN219252731U (en) Solid waste treatment equipment
CN218554255U (en) Mine fills curing agent powder ball-milling device
CN217796593U (en) Remove convenient garbage collection device
CN214716990U (en) Building waste processing apparatus for civil engineering
CN210935309U (en) Civil engineering construction waste treatment device
CN214054650U (en) Wall grinds paper-back edition and puts for construction
CN215694320U (en) Waste recovery device for constructional engineering construction
CN212145996U (en) Low-pollution building garbage treatment device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200403

CF01 Termination of patent right due to non-payment of annual fee