CN210124143U - Device suitable for overpass plant climbing - Google Patents

Device suitable for overpass plant climbing Download PDF

Info

Publication number
CN210124143U
CN210124143U CN201920620996.4U CN201920620996U CN210124143U CN 210124143 U CN210124143 U CN 210124143U CN 201920620996 U CN201920620996 U CN 201920620996U CN 210124143 U CN210124143 U CN 210124143U
Authority
CN
China
Prior art keywords
wire mesh
viaduct
steel wire
climbing
planting area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920620996.4U
Other languages
Chinese (zh)
Inventor
牟猛
樊瑞华
窦金法
马伯可
吴海亮
张筱鹍
杨海威
陈秀婷
杨丰鲛
任寅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Municipal Engineering Design and Research Institute Group Co Ltd
Original Assignee
Jinan Municipal Engineering Design and Research Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Municipal Engineering Design and Research Institute Group Co Ltd filed Critical Jinan Municipal Engineering Design and Research Institute Group Co Ltd
Priority to CN201920620996.4U priority Critical patent/CN210124143U/en
Application granted granted Critical
Publication of CN210124143U publication Critical patent/CN210124143U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cultivation Of Plants (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a device suitable for climbing viaduct plants, which comprises a steel wire mesh, wherein the steel wire mesh is used for coating the outer side surface of an elevated pier stud, the height of the steel wire mesh is the same as that of the elevated pier stud, and the steel wire mesh is bound by an iron wire after coating the elevated pier stud; the steel wire mesh is fixedly connected with one ends of the nylon ropes, the other ends of the nylon ropes are fixedly connected with the balance weight, the balance weight is arranged in the planting area, and the nylon ropes are obliquely and upwards arranged; the planting area is arranged on the ground. The planting area is arranged around the elevated pier stud, and plants are planted in the planting area. The watering pipe sets up between overhead pier stud and wire net, the watering pipe is used for receiving the ponding at overhead bridge top, the bottom of watering pipe is sealed, the side equipartition of watering pipe is equipped with a plurality of holes of watering. The utility model discloses can realize that the climbing of greening plant along the overpass, the climbing adhesive force of plant is strong, has promoted the overpass greening view effect.

Description

Device suitable for overpass plant climbing
Technical Field
The utility model belongs to the technical field of the municipal administration environmental protection, concretely relates to device suitable for overpass plant climbing.
Background
With the increasing emphasis on urban greening construction in China, urban land, especially land used in large and medium cities, is short, and the greening coverage rate standard specified by the state cannot be achieved by means of traditional ground greening, and the greening requirement of urban ecological system balance cannot be met. Therefore, the development of urban three-dimensional greening becomes the necessity of urban greening construction, and the three-dimensional greening under the viaduct is also an important component of an urban three-dimensional greening system, so that the urban three-dimensional greening system can help to retain dust in the city, intercept part of rainwater, reduce noise, absorb part of automobile exhaust and waste gas in the air, relieve urban heat island effect, improve urban greening rate and beautify environment, and also play a role in improving urban brand image.
The inventor thinks that the following problems are exposed in the existing viaduct three-dimensional greening engineering:
the elevated pier is smooth, the climbing property of the plant adhesive force is not strong, and the plant growth vigor is weak.
SUMMERY OF THE UTILITY MODEL
The utility model aims at overcoming the not enough of above-mentioned prior art, provide a device suitable for overpass plant climbing, can realize that greening plants follows the climbing of overpass, the climbing adhesive force of plant is strong, has promoted the greening view effect of overpass.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a device suitable for overpass plant climbing, includes the wire net, the wire net is used for cladding overhead pier stud lateral surface, the height of wire net is the same with the height of overhead pier stud, through the iron wire ligature behind the wire net cladding overhead pier stud.
Adopt the cladding of wire net structure at overhead pier stud lateral surface, the wire net has certain pliability, and the wire net after the cladding is accomplished can closely combine with overhead pier stud, also can reserve the clearance as required between overhead pier stud and wire net. Compared with a completely flexible nylon wire mesh, the condition that the steel wire mesh falls down due to plant tension and gravity can not occur; compared with a completely rigid reinforcement cage, the steel reinforcement cage can adapt to elevated piers of different specifications and sizes.
The steel wire mesh is fixedly connected with one ends of the nylon ropes, the other ends of the nylon ropes are fixedly connected with the balance weight, the balance weight is arranged in the planting area, and the nylon ropes are obliquely and upwards arranged; the planting area is arranged on the ground.
The utility model has the advantages that:
the utility model discloses combine the way that the viaduct mound combines the wire net, can effectively solve because of the viaduct mound is comparatively smooth, problem that the plant climbing adhesive force is not strong has improved under the viaduct afforestation view quality.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, illustrate embodiments of the application and, together with the description, serve to explain the application and are not intended to limit the application.
Fig. 1 is a front view of the overall structure in embodiment 1 of the present invention;
fig. 2 is a front view of the overall structure in embodiment 2 of the present invention;
figure 3 is the utility model discloses a top view of device suitable for overpass plant climbing.
In the figure: 1. standing stones; 2. steel wire mesh; 3. a nylon cord; 4. elevated pier studs; 5. watering pipes; 6. a plant; 7. and (4) driving a roadway.
Detailed Description
It should be noted that the following detailed description is exemplary and is intended to provide further explanation of the disclosure. Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs.
It is noted that the terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of example embodiments according to the present application. As used herein, the singular is intended to include the plural unless the context clearly dictates otherwise, and it should be understood that the terms "comprises" and/or "comprising," when used in this specification, specify the presence of the stated features; a step of; operating; a device; components, and/or combinations thereof.
The utility model provides a device suitable for overpass plant climbing, including the wire net, the wire net is used for cladding the overhead pier stud lateral surface, the height of wire net is the same with the height of overhead pier stud, through the iron wire ligature behind the wire net cladding overhead pier stud;
the steel wire mesh is fixedly connected with one ends of the nylon ropes, the other ends of the nylon ropes are fixedly connected with the balance weight, the balance weight is arranged in the planting area, and the nylon ropes are obliquely and upwards arranged; the planting area is arranged on the ground.
Further, the planting area is arranged around the elevated pier stud, and plants are planted in the planting area.
Further, still include watering pipe, watering pipe sets up between overhead pier stud and wire net, watering pipe is used for receiving the ponding at overhead bridge top, watering pipe's bottom is sealed, watering pipe's side equipartition is equipped with a plurality of holes of watering.
Further, plant the district including a plurality of planting casees, the upper surface of planting the case is parallel and level with the upper surface of roadway, it has the plant to plant in the case to plant.
Furthermore, a vertical edge stone is arranged between the planting area and the roadway.
Embodiment 1, as shown in fig. 1, a afforestation equipment suitable for overpass plant 6 scrambles, includes wire net 2, wire net 2 is used for cladding 4 lateral surfaces of overhead pier stud, wire net 2's height is the same with overhead pier stud 4's height, wire net 2 passes through the iron wire ligature behind the cladding overhead pier stud 4.
Specifically, the both ends of wire net 2 are through the iron wire ligature, but the ligature part is not only limited to the iron wire, can also adopt parts such as nylon rope, steel wire, can be set up by oneself by technical staff in the field.
In particular, a preferred structure of the wire mesh is a galvanized wire mesh, and in other embodiments, the wire mesh may be coated or uncoated.
In some embodiments, the wire mesh size is 2.5cm by 2.5cm, with a wire mesh height of 4 meters.
The steel wire mesh 2 is fixedly connected with one ends of a plurality of nylon ropes 3, the other ends of the nylon ropes 3 are fixedly connected with a balance weight, the balance weight is arranged in a plant 6 planting area, and the nylon ropes 3 are arranged obliquely upwards; the plant 6 planting area is arranged on the ground.
Specifically, the balancing weight can adopt the stone, and the balancing weight is very straight with the nylon rope, can make things convenient for the plant to scramble.
Further, the plant 6 planting area is arranged around the elevated pier stud 4, and the plants 6 are planted in the plant 6 planting area. The planting adopts a mode of planting the parthenocissus tricuspidata and the hedera helix alternately (planting the hedera helix in the second year), and the planting density is 4 plants/meter, so as to ensure the greening landscape effect in winter.
Further, still include watering pipe 5, watering pipe sets up between overhead pier stud 4 and wire net 2, watering pipe 5 is used for receiving the ponding at overhead bridge top, watering pipe 5's bottom is sealed, watering pipe 5's side equipartition is equipped with a plurality of holes of watering.
Furthermore, the planting area is 50-100cm wide and the soil layer is more than 50cm thick, and the roots of the plants are about 25cm away from the wall when the plants are planted. Under the condition of being not suitable for field planting, adopting a planting box or a downward digging and earthing planting mode, planting the field planting with the earthing depth not less than 60cm and the width not less than 50cm,
furthermore, a vertical edge stone 1 is arranged between the planting area and the roadway 7.
The working principle is as follows: when using this device, plant 6 in 6 plant areas of plant, the plant 6 that is close to wire net 2 directly climbs to overhead pier stud 4 through wire net 2, and the plant 6 of keeping away from wire net 2 climbs along wire net 2 after the drawing of nylon rope 3.
When precipitation, partial rainwater on the viaduct is poured from the watering pipe 5, because the bottom end of the watering pipe 5 is sealed, the rainwater in the watering pipe 5 can be sprayed out of the watering hole, the rainwater sprayed out of the watering hole can realize watering of 6 leaf surfaces of the plant, dust on the 6 leaf surfaces of the plant can be removed, and the phenomenon that the excessive dust affects the growth of the plant 6 is avoided.
Embodiment 2, as shown in fig. 2 and 3, a greening device suitable for climbing viaduct plants 6 is the same as the basic structure of embodiment 1, except that the embodiment provides a greening device with a double-elevated pier column 4 structure used side by side, and a greening device suitable for climbing viaduct plants 6 is arranged on each elevated pier column 4. Although the present invention has been described with reference to the accompanying drawings, it is not intended to limit the scope of the present invention, and those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art without inventive work are still within the scope of the present invention.

Claims (5)

1. The device is suitable for climbing viaduct plants and is characterized by comprising a steel wire mesh, wherein the steel wire mesh is used for coating the outer side surface of an viaduct pier stud, the height of the steel wire mesh is the same as that of the viaduct pier stud, and the steel wire mesh is bound by an iron wire after coating the viaduct pier stud;
the steel wire mesh is fixedly connected with one ends of the nylon ropes, the other ends of the nylon ropes are fixedly connected with the balance weight, the balance weight is arranged in the planting area, and the nylon ropes are obliquely and upwards arranged; the planting area is arranged on the ground.
2. The apparatus for climbing viaduct plants of claim 1, wherein the planting area is arranged around the viaduct pier, and plants are planted in the planting area.
3. The device suitable for climbing viaduct plants according to claim 1, further comprising a watering pipe, wherein the watering pipe is arranged between the viaduct pier column and the steel wire mesh, the watering pipe is used for receiving accumulated water at the top of the viaduct, the bottom of the watering pipe is closed, and a plurality of watering holes are uniformly distributed on the side surface of the watering pipe.
4. The apparatus for viaduct plant climbing according to claim 2, wherein the planting area comprises a plurality of planting boxes, the upper surfaces of the planting boxes are flush with the upper surface of the roadway, and plants are planted in the planting boxes.
5. The apparatus for climbing viaduct plants according to claim 1, wherein a vertical stone is arranged between the planting area and the roadway.
CN201920620996.4U 2019-04-29 2019-04-29 Device suitable for overpass plant climbing Active CN210124143U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920620996.4U CN210124143U (en) 2019-04-29 2019-04-29 Device suitable for overpass plant climbing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920620996.4U CN210124143U (en) 2019-04-29 2019-04-29 Device suitable for overpass plant climbing

Publications (1)

Publication Number Publication Date
CN210124143U true CN210124143U (en) 2020-03-06

Family

ID=69662059

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920620996.4U Active CN210124143U (en) 2019-04-29 2019-04-29 Device suitable for overpass plant climbing

Country Status (1)

Country Link
CN (1) CN210124143U (en)

Similar Documents

Publication Publication Date Title
CN105625443A (en) High-steep soil nail grass planting slope protection structure system and construction method thereof
CN108360516A (en) Mountain restoration system based on sponge ecosystem and construction method
CN206736931U (en) Highway Lithological Slope liana ecological safeguard structure
CN105340614A (en) Novel hard slope lattice ecological afforestation structure and method
CN210151758U (en) Side slope ecological protection structure with water storage and supply system
CN111593748A (en) Ecological protection structure of broken rock abrupt slope and construction method thereof
CN107152029A (en) Honeycomb fashion protective slope structure and its construction method
CN210124143U (en) Device suitable for overpass plant climbing
CN112900361B (en) Slope protection structure for preventing water and soil loss
CN112442996A (en) Slope protection structure and method applied to hilly area
CN102071696B (en) Steep slope protective soft frame and construction method thereof
CN211080261U (en) Highway side slope protective structure
CN110453646B (en) Hydraulic engineering protects bearing structure with ecological bank protection
CN205591233U (en) High -steep soil nail grass planting slope protection structure system
CN208618428U (en) A kind of green plant protective slope structure of concrete cast-in-situ type
CN206564951U (en) A kind of drainage system of strawberry greenhouse
CN108867691A (en) Grass planting ditch rain-water drainage piping lane system and construction method
CN110777820B (en) Construction method for performing ecological protection on stone slope by adopting composite vegetation concrete
CN210263090U (en) Side slope protection and ecological green covering combined symbiotic universal constraint structure
CN109853596B (en) Highway slope protection greening structure and construction process thereof
CN207537964U (en) A kind of hydraulic engineering ecological protection slope
CN205935482U (en) Wall
CN113789795A (en) Highway slope protection structure and construction method thereof
CN205755796U (en) A kind of slope greening planting unit
RU84400U1 (en) PROTECTIVE COVERING OF UNDERWATER PIPELINES FROM FLUSHING

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant