CN209890068U - Temporary fixing device for hoisting reinforcement cage and placing grouting pipe - Google Patents

Temporary fixing device for hoisting reinforcement cage and placing grouting pipe Download PDF

Info

Publication number
CN209890068U
CN209890068U CN201920343922.0U CN201920343922U CN209890068U CN 209890068 U CN209890068 U CN 209890068U CN 201920343922 U CN201920343922 U CN 201920343922U CN 209890068 U CN209890068 U CN 209890068U
Authority
CN
China
Prior art keywords
lifting
hoisting
wire rope
steel wire
reinforcement cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920343922.0U
Other languages
Chinese (zh)
Inventor
李宝文
代永双
李东
王召飞
张猛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Sixth Group Co Ltd
Beijing Railway Construction Co of China Railway Sixth Group Co Ltd
Original Assignee
China Railway Sixth Group Co Ltd
Beijing Railway Construction Co of China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Sixth Group Co Ltd, Beijing Railway Construction Co of China Railway Sixth Group Co Ltd filed Critical China Railway Sixth Group Co Ltd
Priority to CN201920343922.0U priority Critical patent/CN209890068U/en
Application granted granted Critical
Publication of CN209890068U publication Critical patent/CN209890068U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A temporary fixing device for hoisting a reinforcement cage and placing a grouting pipe. The lifting device comprises a lifting fixing ring, lifting lugs, lifting ribs and a steel wire rope; the circumferential wall of the hoisting fixing ring is symmetrically provided with two steel wire rope connecting holes, and the outer circumferential surface is fixed with a plurality of lifting lugs at intervals; a round hole is formed at the outer side part of each lifting lug; the upper end of each lifting rib is connected in the circular hole of a lifting lug through a U-shaped card, and the lower end of each lifting rib is welded on the steel reinforcement cage; one end of each steel wire rope is fixed in one steel wire rope connecting hole, and the other end of each steel wire rope is connected with a hoisting device. The utility model provides an interim fixing device when steel reinforcement cage hoist and mount and slip casting pipe are laid has simple structure, the operation is swift and can satisfy advantages such as hoist and mount stability.

Description

Temporary fixing device for hoisting reinforcement cage and placing grouting pipe
Technical Field
The utility model belongs to the technical field of the method station construction auxiliary device is dug to the lid, especially relate to a interim fixing device when steel reinforcement cage hoist and mount and slip casting pipe are laid.
Background
When the cover excavation method is adopted for installing the middle steel pipe column in station construction with high precision, because unstable conditions exist in the process of directly hoisting the reinforcement cage and the grouting pipe by using a truck crane, the hoisting, lowering and positioning effects are influenced, and the problem of adopting which positioning tool to ensure the stability of the hoisting process and the precision after positioning is solved, so that the method has higher application value.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, an object of the utility model is to provide a temporary fixing device when steel reinforcement cage hoist and mount and slip casting pipe are laid
In order to achieve the purpose, the temporary fixing device for hoisting the reinforcement cage and placing the grouting pipe provided by the utility model comprises a hoisting fixing ring, a lifting lug, a hoisting rib and a steel wire rope; the circumferential wall of the hoisting fixing ring is symmetrically provided with two steel wire rope connecting holes, and the outer circumferential surface is fixed with a plurality of lifting lugs at intervals; a round hole is formed at the outer side part of each lifting lug; the upper end of each lifting rib is connected in the circular hole of a lifting lug through a U-shaped card, and the lower end of each lifting rib is welded on the steel reinforcement cage; one end of each steel wire rope is fixed in one steel wire rope connecting hole, and the other end of each steel wire rope is connected with a hoisting device.
The lifting lugs are arranged on the hoisting fixing ring at equal intervals.
The utility model provides an interim fixing device when steel reinforcement cage hoist and mount and slip casting pipe are laid has simple structure, the operation is swift and can satisfy advantages such as hoist and mount stability.
Drawings
Fig. 1 is the utility model provides a steel reinforcement cage hoist and mount and interim fixing device spatial structure schematic diagram when slip casting pipe is laid.
Detailed Description
The following detailed description of the embodiments of the present invention is provided with reference to the accompanying drawings and examples. The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention.
As shown in fig. 1, the temporary fixing device for hoisting a reinforcement cage and placing a grouting pipe provided by the utility model comprises a hoisting fixing ring 5, a lifting lug 3, a hoisting rib 1 and a steel wire rope 2; wherein, two steel wire rope connecting holes 4 are symmetrically formed on the circumferential wall of the hoisting fixing ring 5, and a plurality of lifting lugs 3 are fixed on the outer circumferential surface at intervals; a round hole is formed at the outer side part of each lifting lug 3; the upper end of each lifting rib 1 is connected in a round hole of a lifting lug 3 through a U-shaped card, and the lower end is welded on the reinforcement cage; the lifting rib 1 and the lifting lug 3 are connected and fixed through the U-shaped card, so that the disassembly and assembly are convenient; one end of each steel wire rope 2 is fixed in one steel wire rope connecting hole 4, and the other end of each steel wire rope is connected with a hoisting device.
The lifting lugs 3 are arranged on the hoisting fixing ring 5 at equal intervals.
Will now the utility model provides a temporary fixing device application method when steel reinforcement cage hoist and mount and slip casting pipe are laid explains as follows: before putting the steel reinforcement cage down, at first by constructor with the lower extreme welding of hanging muscle 1 on the steel reinforcement cage, then connect wire rope 2's the other end on the truck crane, utilize the truck crane to hang this device through wire rope 2, later on the ligature slip casting pipe on welding hanging muscle 1 on the steel reinforcement cage, will utilize this device to connect into holistic steel reinforcement cage and slip casting pipe to transfer together afterwards.

Claims (2)

1. The utility model provides a interim fixing device when steel reinforcement cage hoist and mount and slip casting pipe are laid, its characterized in that: the temporary fixing device comprises a hoisting fixing ring (5), a lifting lug (3), a lifting rib (1) and a steel wire rope (2); the hoisting fixing ring is characterized in that two steel wire rope connecting holes (4) are symmetrically formed in the circumferential wall of the hoisting fixing ring (5), and a plurality of lifting lugs (3) are fixed on the circumferential wall at intervals; a round hole is formed at the outer side part of each lifting lug (3); the upper end of each lifting rib (1) is connected in a round hole of a lifting lug (3) through a U-shaped card, and the lower end is welded on the reinforcement cage; one end of each steel wire rope (2) is fixed in one steel wire rope connecting hole (4), and the other end of each steel wire rope is connected with a hoisting device.
2. The temporary fixing device for hoisting the reinforcement cage and placing the grouting pipe according to claim 1, which is characterized in that: the lifting lugs (3) are arranged on the hoisting fixing ring (5) at equal intervals.
CN201920343922.0U 2019-03-15 2019-03-15 Temporary fixing device for hoisting reinforcement cage and placing grouting pipe Active CN209890068U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920343922.0U CN209890068U (en) 2019-03-15 2019-03-15 Temporary fixing device for hoisting reinforcement cage and placing grouting pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920343922.0U CN209890068U (en) 2019-03-15 2019-03-15 Temporary fixing device for hoisting reinforcement cage and placing grouting pipe

Publications (1)

Publication Number Publication Date
CN209890068U true CN209890068U (en) 2020-01-03

Family

ID=69017435

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920343922.0U Active CN209890068U (en) 2019-03-15 2019-03-15 Temporary fixing device for hoisting reinforcement cage and placing grouting pipe

Country Status (1)

Country Link
CN (1) CN209890068U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111169832A (en) * 2020-01-13 2020-05-19 哈尔滨锅炉厂有限责任公司 Combined hanging device for double-layer annular header

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111169832A (en) * 2020-01-13 2020-05-19 哈尔滨锅炉厂有限责任公司 Combined hanging device for double-layer annular header

Similar Documents

Publication Publication Date Title
CN104480930B (en) A kind of filling pile cage of reinforcement hangs fixing construction method
CN204418784U (en) Inner steel cylinder of chimney hydraulic pressure lift construction equipment
CN209890068U (en) Temporary fixing device for hoisting reinforcement cage and placing grouting pipe
CN106703042B (en) A kind of bracket and the construction method of deep trench supporting
CN205241086U (en) Template hoist and mount and ann gun carriage of disassembling and using
CN104032944A (en) Suspension frame construction platform device
CN105135054B (en) The pipe jacking construction method of super-long pipeline
CN210457158U (en) Curtain type mounting structure for quickly hoisting square concrete pier column hooping
CN201809029U (en) Lifting lever
CN202012079U (en) Pile anchor for cable crane
CN208054723U (en) A kind of Pipe installing application c-type suspension hook
CN204199271U (en) A kind of filling pile cage of reinforcement hangs fastening devices
CN111042538A (en) Hoisting and mounting method of buckling restrained brace
CN204919555U (en) Concrete pipe pile implantation construction welding auxiliary fixtures
CN205558818U (en) A whole lift -type rig
CN210798968U (en) Shaft concrete unloading pipe installation and disassembly device
CN203922432U (en) A kind of hoisting tooling for large-scale permanent-magnetic wind driven generator
CN103669886A (en) Installation method for annular steel structure
CN215755981U (en) Lifting appliance matched with flange plate equipment
JPS5953993B2 (en) Segment installation method for segment underground tanks
CN204917530U (en) Buffer base
CN208830100U (en) Excavator ramming mechanism
CN218371213U (en) A hoisting structure for concrete pipe section
CN204624982U (en) The vertical overhead hoist of a kind of tubing
CN211421111U (en) Steel bar lifting device for immersed tube filling pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant