Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520028370.6U
Other languages
Chinese (zh)
Inventor
王志龙
李洪
李富荣
刘建刚
周俊
宋孟琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGXI SECOND CONSTRUCTION Co Ltd
Original Assignee
JIANGXI SECOND CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGXI SECOND CONSTRUCTION Co Ltd filed Critical JIANGXI SECOND CONSTRUCTION Co Ltd
Priority to CN201520028370.6U priority Critical patent/CN204418784U/en
Application granted granted Critical
Publication of CN204418784U publication Critical patent/CN204418784U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention is specifically related to inner steel cylinder of chimney hydraulic pressure lift construction equipment.This construction equipment comprises device basic and is arranged in the column on device basic, flexible guide rail is connected with between column top and chimney urceolus top, side towards steel inner cylinder on column is vertically provided with rigid guideway, column top is provided with hydraulic jack, the steel strand being anchored in hydraulic jack penetrate rigid guideway downwards, and be anchored in the hanger welded with steel inner cylinder, hanger is provided with roller, hydraulic jack traction steel strand move up and draw high hanger and rise steel inner cylinder to hang, steel inner cylinder rises along flexible guide rail higher than the part of column, steel inner cylinder is risen along rigid guideway by hanger lower than the part of column, hanger moves on being slided in rigid guideway by the roller on it.This inner steel cylinder of chimney hydraulic pressure lift construction equipment easy construction, high-quality and high-efficiency, safe and reliable, effectively improve the safety of construction, convenience, simultaneously reduction of erection time, cost-saving.

Description

Inner steel cylinder of chimney hydraulic pressure lift construction equipment
Technical field
The invention relates to steel stack technical field of construction, is specifically related to inner steel cylinder of chimney hydraulic pressure lift construction equipment.
Background technology
Along with the development of economic society, country's improving constantly environmental requirement, all coal-burning power plants must carry out desulphurization denitration process to the flue gas of discharge.Flue gas after process is wet flue gas, temperature is 45 ~ 50 DEG C, in acid, flue gas corrosion is stronger, old chimney can not meet safe handling requirement, in order to more effectively solve the etching problem of wet flue gas to existing chimney, improve application life of chimney, chimney transformation is typically employed in existing concrete chimney reinstalls a self-supporting titanium steel composite board steel inner cylinder and solves chimney anticorrosion requirement.
The installation of inner steel cylinder of chimney adopts pneumatic jacking or these two kinds of construction methods of hydraulic lifting usually.The construction method of pneumatic jacking is the base by the airtight similar piston of making one in steel inner cylinder inner base, the top mouth of steel inner cylinder is closed simultaneously, it is made to form a variable closed container, by supplying compressed air to closed container, make steel inner cylinder moves, then the weld all around spreading section by section in bottom, completes the installation of whole steel inner cylinder.Hydraulic lifting method is then by setting up multiple column on basis, and hydraulic jack is set on column, climbing thus by steel inner cylinder jack-up, then welding spreading section by section in its underpart, until complete the installation of whole steel inner cylinder on column is withstood on by hydraulic jack.For the mounting method of pneumatic jacking, the risk factor of its construction is higher, a lot of security incident has been appeared in the construction of domestic employing the method, in order to ensure construction safety, reduce construction risk as much as possible, need accurately to control air pressure, operation requirements is strict, and all have higher requirement to air compressing and pipeline, seal, guide rail, and adopt the mounting method of pneumatic jacking, base piston steel quantity consumption is larger.For the mounting method of hydraulic lifting, owing to being employing hydraulic jack direct rigidity jacking steel inner cylinder, it has higher performance requirement to the column for installing hydraulic jack, cause column processing technology complicated, and in the jacking process of steel inner cylinder, higher to the control overflow of the displacement of hydraulic jack, jacking position node is complicated, finally directly cause whole operating procedure complexity loaded down with trivial details, practicality is poor.
Summary of the invention
The object of the invention is avoid above-mentioned weak point of the prior art and provide a kind of easy construction, high-quality and high-efficiency, safe and reliable inner steel cylinder of chimney hydraulic pressure lift construction equipment, to improve safety, the convenience of construction, simultaneously reduction of erection time, cost-saving.
The object of the invention is achieved through the following technical solutions:
Provide inner steel cylinder of chimney hydraulic pressure lift construction equipment, the axle center comprising device basic and some winding apparatus bases is arranged in the column on device basic, also comprise flexible guide rail, flexible guide rail is connected between column top and chimney urceolus top, the periphery of flexible guide rail encloses cover along axle center have multiple ringwise clip, connected by horizontal ring beam between adjacent column, column is provided with the support bar be connected with the inside wall of chimney urceolus, side towards steel inner cylinder on column is vertically provided with rigid guideway, column top is provided with hydraulic jack, the steel strand being anchored in hydraulic jack penetrate downwards in rigid guideway, and be anchored on the hanger that welds with steel inner cylinder, hanger is provided with roller, hydraulic jack traction steel strand move up and draw high hanger and rise steel inner cylinder to hang, steel inner cylinder rises along flexible guide rail higher than the part of column, steel inner cylinder is risen along rigid guideway by hanger lower than the part of column, hanger moves on being slided in rigid guideway by the roller on it.
Wherein, described column has circumferentially been evenly arranged four to the six roots of sensation.
Wherein, the height of described column is 9 ~ 13m.
Wherein, every root post is provided with two support bars be in same level, and two support bars are that the Eight characters opens support and connection in the inside wall of chimney urceolus from column.
Wherein, each hanger is provided with three groups of rollers, and described three groups of rollers are separately positioned on the both sides of hanger and middle and relative with column.
Wherein, described device basic adopts steel concrete to be along the circumferential direction cast in the outside on steel inner cylinder basis.
The beneficial effect of the invention:
The inner steel cylinder of chimney hydraulic pressure lift construction equipment of the invention, hanging the process rising steel inner cylinder, it is stressed is passed to device basic along hanger, steel strand, hydraulic jack, column, flexibly connected by steel strand between hydraulic jack and steel inner cylinder, stressed good, less demanding to the journey error of hydraulic jack, be conducive to simplifying construction, improve efficiency of construction, and achieve installed load and be separated with chimney urceolus, therefore this construction equipment is particularly useful for the transformation that the initial design stage does not consider the old chimney of extra installed load.In addition, by tensioning steel strand tension steel inner cylinder, be also conducive to making steel inner cylinder keep positive circular, to improve the final installation quality of steel inner cylinder.
Connected by horizontal ring beam between adjacent column, and column is also provided with the support bar be connected with the inside wall of chimney urceolus, comprehensive reinforcing column strength, guarantees that construction safety is reliable.
Steel inner cylinder is at lifting process, rises along flexible guide rail in its top, is then led by welding hanger thereon in its underpart, rigid guideway along column rises, adopt two Guide Rail Design, ensure the rising accurate stable of steel inner cylinder, guarantee that the steel inner cylinder installed is reliably high-quality.Especially, hanger is provided with roller, hanger, in the process risen along rigid guideway, moves on being slided by roller in rigid guideway, increases fluency when steel inner cylinder rises, is conducive to the convenience of constructing.
Hydraulic jack is installed on column top, is completed the rising of steel inner cylinder by reasonable conversion hanger, effectively optimize the height of column, make column be unlikely to Tai Gao and increase material cost, also can ensure efficiency of construction simultaneously.
Accompanying drawing explanation
Accompanying drawing is utilized to be described further innovation and creation, but the embodiment in accompanying drawing does not form any restriction to the invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to the following drawings.
Fig. 1 is the structural representation of the inner steel cylinder of chimney hydraulic pressure lift construction equipment of the invention.
Fig. 2 is the top cross-sectional view of the inner steel cylinder of chimney hydraulic pressure lift construction equipment of the invention.
Fig. 3 is the zoomed-in view at the A place of Fig. 2.
Reference numeral:
1-device basic,
2-column, 21-rigid guideway,
3-hydraulic jack,
4-support bar,
The horizontal ring beam of 5-,
6-flexible guide rail, 61-clip,
7-hanger, 71-roller,
8-steel strand,
9-steel inner cylinder basis,
10-steel inner cylinder,
11-chimney urceolus.
Detailed description of the invention
With the following Examples the invention is further described.
The inner steel cylinder of chimney hydraulic pressure lift construction equipment of the invention, as shown in Figure 1 to Figure 3, steel concrete is adopted along the circumferential direction to be cast with device basic 1 in the outside on steel inner cylinder basis 9, device basic 1 is furnished with column 2, namely hydraulic jack 3 is arranged on the top of column 2, and hydraulic jack 3 selects 50 ~ 250 tons of hydraulic feed-through jacks do not waited according to the weight of the steel inner cylinder 8 of required installation.
Column 2 is steel post, and column 2 is circumferentially evenly arranged, the quantity of column 2 according to practice of construction demand adopt 4 ~ 6 comparatively suitable, with under the prerequisite providing enough lifting force, save material cost as much as possible.Column 2 can determine an economic height as required, too highly can increase sectional dimension of members, uneconomical, and too short meeting causes conversion times too many, and welding capacity and threading are often, namely loaded down with trivial details also uneconomical, and it is comparatively applicable that the height of column 2 is preferably 9 ~ 13m.
Connected by horizontal ring beam 5 between adjacent column 2, make structure between each column 2 in aggregates, thus improve the intensity of column 2, as shown in Figure 2.Column 2 is also provided with the support bar 4 be connected with the inside wall of chimney urceolus 11, by burying embedded part underground at the inside wall of chimney urceolus 11 and connecting support bar 4, realize the connection of support bar 4 and chimney urceolus 11, for column 2 extension supporting bar 4, column 2 and chimney urceolus 11 are coupled together, improves the security reliability of column 2 further.Preferably, every root post 2 is provided with two support bars 4, this two support bars 4 be connected in the horizontal Eight characters chimney urceolus 11 inside wall, support column 2.
This construction equipment adopts two Guide Rail Design, at column 2, the side of steel inner cylinder 10 is provided with vertical rigid guideway 21, as shown in Figures 2 and 3, rigid guideway 21 is for guiding steel inner cylinder 10 lower than the part of column 2, particularly by guiding the hanger 7 welded with steel inner cylinder 10 to realize, hanger 7 is welded in the bottom of steel inner cylinder 10, hung in the process of liter at steel inner cylinder 10, hanger 7 moves on sliding in rigid guideway 21, more smooth and easy for making it slide, hanger 7 also can install roller 71, move on being slided in rigid guideway 21 by roller 71, not only be beneficial to guiding and can make to move faster smooth and easy, thus raise the efficiency, preferably, each hanger 7 is provided with three groups of rollers 71, described three groups of rollers 71 are separately positioned on both sides and the centre of hanger 7, be arranged at middle roller 71 relative with column 2, hanger 7 utilizes roller 71 in rigid guideway 21, carry out the guiding in three directions, ensure that guiding is stable.A flexible guide rail 6 is also provided with in addition between column 2 top and chimney urceolus 11 top, flexible guide rail 6 is for guiding steel inner cylinder 10 higher than the part of column 2, with avoid the top of steel inner cylinder 10 hang in the process of liter offset excessive, impact construction, for strengthening the lateral stiffness of flexible rail 6 further, enclose along its axis direction the clip 61 that cover has multiple annular, as shown in Figure 1 in the periphery of flexible guide rail 6.
This construction equipment adopts flexible steel strand 8 to hang and draws steel inner cylinder 10, can effectively optimization device is stressed, steel strand 8 be anchored in hydraulic jack 3 backward under penetrate rigid guideway 21, and then be anchored in hanger 7.
The using method concrete in work progress of this construction equipment is as follows:
A. first in chimney urceolus 11, described construction equipment is arranged, but, first flexible guide rail 6 is not installed;
B. the lower weld hanger 7 of steel inner cylinder is saved at head;
C. one end of steel strand 8 is anchored in hydraulic jack 3, the other end of steel strand 8 penetrates rigid guideway 21 downwards from hydraulic jack 3 and is anchored in the hanger 7 that welds in stepb;
D. after arranging A, B, C above completing, now can between the top of column 2 and the top of chimney urceolus 11 placement of flexible guide rail 6;
E., before running, entirety is carried out to the construction equipment arranged and checks and accepts;
F. check and accept by rear, run hydraulic jack 3 to start to promote, hydraulic jack 3 is drawn steel strand 8 and is moved up and draw high hanger 7 and rise steel inner cylinder 8 to hang, steel inner cylinder 8 rises along flexible guide rail 6 higher than the part of column 2, steel inner cylinder 8 is risen along rigid guideway 21 by hanger 7 lower than the part of column 2, hanger 7 moves on being slided in rigid guideway 21 by the roller 71 on it, after steel inner cylinder 8 up being raised the height of a joint steel inner cylinder, hydraulic jack 3 out of service, then a new joint steel inner cylinder 8 is welded on ground, and this new joint steel inner cylinder 8 is carried out docking continuing with by the steel inner cylinder 8 being hung liter,
G. by repeating above-mentioned steps F, until hanger 7 is increased to the lower end of hydraulic jack 3;
H. remove the hanger 7 being increased to the lower end of hydraulic jack 3, again at the lower weld hanger 7 of steel inner cylinder 10, after welding is good, steel strand 8 connects hydraulic jack 3 and hanger 7 again;
I. by the welding repeating above-mentioned steps F, G, H complete more piece steel inner cylinder 10, it is made to reach required height;
J. last, a bottom joint steel inner cylinder 10 is welded on construction and installation steel inner cylinder basis 9 completing steel inner cylinder 10.
In the present embodiment, the height of a joint steel inner cylinder 8 is 2 meters.
Finally should be noted that; above embodiment is only in order to illustrate the technical scheme of the invention; but not the restriction to the invention protection domain; although done to explain to the invention with reference to preferred embodiment; those of ordinary skill in the art is to be understood that; can modify to the technical scheme of the invention or equivalent replacement, and not depart from essence and the scope of the invention technical scheme.

Claims (6)

1. inner steel cylinder of chimney hydraulic pressure lift construction equipment, the axle center comprising device basic and some winding apparatus bases is arranged in the column on device basic, it is characterized in that: also comprise flexible guide rail, flexible guide rail is connected between column top and chimney urceolus top, the periphery of flexible guide rail encloses cover along axle center have multiple ringwise clip, connected by horizontal ring beam between adjacent column, column is provided with the support bar be connected with the inside wall of chimney urceolus, side towards steel inner cylinder on column is vertically provided with rigid guideway, column top is provided with hydraulic jack, the steel strand being anchored in hydraulic jack penetrate downwards in rigid guideway, and be anchored on the hanger that welds with steel inner cylinder, hanger is provided with roller, hydraulic jack traction steel strand move up and draw high hanger and rise steel inner cylinder to hang, steel inner cylinder rises along flexible guide rail higher than the part of column, steel inner cylinder is risen along rigid guideway by hanger lower than the part of column, hanger moves on being slided in rigid guideway by the roller on it.
2. inner steel cylinder of chimney hydraulic pressure lift construction equipment according to claim 1, is characterized in that: the axle center on described column winding apparatus basis has been evenly arranged four to the six roots of sensation.
3. inner steel cylinder of chimney hydraulic pressure lift construction equipment according to claim 1, is characterized in that: the height of described column is 9 ~ 13m.
4. inner steel cylinder of chimney hydraulic pressure lift construction equipment according to claim 1, is characterized in that: every root post is provided with two support bars be in same level, and two support bars are that the Eight characters opens support and connection in the inside wall of chimney urceolus from column.
5. inner steel cylinder of chimney hydraulic pressure lift construction equipment according to claim 1, is characterized in that: each hanger is provided with three groups of rollers, and described three groups of rollers are separately positioned on the both sides of hanger and middle and relative with column.
6. inner steel cylinder of chimney hydraulic pressure lift construction equipment according to claim 1, is characterized in that: described device basic adopts steel concrete to be along the circumferential direction cast in the outside on steel inner cylinder basis.
CN201520028370.6U 2015-01-16 2015-01-16 Inner steel cylinder of chimney hydraulic pressure lift construction equipment Expired - Fee Related CN204418784U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520028370.6U CN204418784U (en) 2015-01-16 2015-01-16 Inner steel cylinder of chimney hydraulic pressure lift construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520028370.6U CN204418784U (en) 2015-01-16 2015-01-16 Inner steel cylinder of chimney hydraulic pressure lift construction equipment

Publications (1)

Publication Number Publication Date
CN204418784U true CN204418784U (en) 2015-06-24

Family

ID=53469167

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520028370.6U Expired - Fee Related CN204418784U (en) 2015-01-16 2015-01-16 Inner steel cylinder of chimney hydraulic pressure lift construction equipment

Country Status (1)

Country Link
CN (1) CN204418784U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104563590A (en) * 2015-01-16 2015-04-29 江西建工第二建筑有限责任公司 Hydraulic lifting construction device and method for inner steel barrel of chimney
CN110217734A (en) * 2019-06-18 2019-09-10 五冶集团上海有限公司 Hydraulic pressure lift construction technology
CN110255437A (en) * 2019-06-18 2019-09-20 五冶集团上海有限公司 Hydraulic lifting apparatus
CN110306864A (en) * 2019-06-19 2019-10-08 河南省工建集团有限责任公司 One kind being based on hyperbatic chimney titanium steel steel inner tube hydraulic lifting apparatus and method
CN113187252A (en) * 2021-04-25 2021-07-30 华能秦煤瑞金发电有限责任公司 Fixed strutting arrangement of reducing tower construction

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104563590A (en) * 2015-01-16 2015-04-29 江西建工第二建筑有限责任公司 Hydraulic lifting construction device and method for inner steel barrel of chimney
CN104563590B (en) * 2015-01-16 2017-01-04 江西建工第二建筑有限责任公司 Inner steel cylinder of chimney hydraulic pressure lift constructing device and method thereof
CN110217734A (en) * 2019-06-18 2019-09-10 五冶集团上海有限公司 Hydraulic pressure lift construction technology
CN110255437A (en) * 2019-06-18 2019-09-20 五冶集团上海有限公司 Hydraulic lifting apparatus
CN110306864A (en) * 2019-06-19 2019-10-08 河南省工建集团有限责任公司 One kind being based on hyperbatic chimney titanium steel steel inner tube hydraulic lifting apparatus and method
CN113187252A (en) * 2021-04-25 2021-07-30 华能秦煤瑞金发电有限责任公司 Fixed strutting arrangement of reducing tower construction

Similar Documents

Publication Publication Date Title
CN204418784U (en) Inner steel cylinder of chimney hydraulic pressure lift construction equipment
CN104477788B (en) Spanning self-climbing type translational crane of wind power generation tower
CN104563590B (en) Inner steel cylinder of chimney hydraulic pressure lift constructing device and method thereof
CN109184189A (en) A kind of diameter Silo conical shell silo roof construction method
CN110004965A (en) A kind of steady stake stage apparatus of piling for the replacement of single-pile foundation flange
CN105952228A (en) Construction method for double layer storage tank with flat suspended roof as inner tank roof
CN202299574U (en) Plug-in type communication base station lifting tower
CN208501732U (en) A kind of piping lane cast-in-place construction integral movable type mould bases
CN101660660B (en) Novel installing method of gas cabinet
CN106284989A (en) The sliding form bracing system of double track and complete construction method
CN109487912A (en) A kind of construction method of super-span truss-string-structure
CN203199913U (en) Assembling and disassembling type hoisting truss
CN201873949U (en) Bride prestress stretch-draw trolley
CN212599995U (en) Welding installation equipment for hot-melt welded pipe
CN204281116U (en) Wind power generation stepped leap self-crawling type translation loop wheel machine
CN210766431U (en) Steel arch rib pushing system
CN210134442U (en) Steel cofferdam system of transferring in succession
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN202644416U (en) A simple lifting device for dismounting a bailey beam
CN110924723A (en) Construction method and hoisting device for earth-covered oil tank and using method
CN110904861A (en) Cable-stayed bridge girder erection crane and construction method thereof
CN206753087U (en) A kind of lighting roof operating platform structure
CN205472319U (en) Between maintenance of combination mobile formula
CN205046848U (en) Gate -type steel sheet mould holder

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150624

Termination date: 20170116