CN211421111U - Steel bar lifting device for immersed tube filling pile - Google Patents

Steel bar lifting device for immersed tube filling pile Download PDF

Info

Publication number
CN211421111U
CN211421111U CN201920299282.8U CN201920299282U CN211421111U CN 211421111 U CN211421111 U CN 211421111U CN 201920299282 U CN201920299282 U CN 201920299282U CN 211421111 U CN211421111 U CN 211421111U
Authority
CN
China
Prior art keywords
protective layer
lifting
plate
flaring
guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920299282.8U
Other languages
Chinese (zh)
Inventor
王新泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Jiangrun Technology Co Ltd
Original Assignee
Hangzhou Jiangrun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiangrun Technology Co Ltd filed Critical Hangzhou Jiangrun Technology Co Ltd
Priority to CN201920299282.8U priority Critical patent/CN211421111U/en
Application granted granted Critical
Publication of CN211421111U publication Critical patent/CN211421111U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a sinking pipe bored concrete pile reinforcing bar hoisting device, including protective layer space bar, rings, lifting rope, hanger plate, loop wheel machine haulage rope and guide flaring, lifting rope, rings and hanger plate constitute hoisting device, and the hanger plate passes through lifting rope and rings connection steel reinforcement cage, and the hanger plate top is connected with the loop wheel machine haulage rope; the side wall of the immersed tube is provided with a protective layer spacing plate, the upper end of the protective layer spacing plate is connected with a guide flaring, and the flaring is wide at the top and narrow at the bottom; the preformed groove at the bottom of the guide flaring is spliced with the top connecting bulge on the protective layer partition plate and fixed by the fixing nail. The utility model has the advantages that: the protective layer partition plate designed by the utility model can accurately lift the steel reinforcement cage, and prevent the over-small thickness of the concrete protective layer at one side and the influence on the pile forming quality caused by the non-centered lifting position of the steel reinforcement cage; the utility model discloses a transfer that guide flaring can guide steel reinforcement cage fast.

Description

Steel bar lifting device for immersed tube filling pile
Technical Field
The utility model relates to a vibration immersed tube bored concrete pile especially relates to an immersed tube bored concrete pile reinforcing bar lifts device.
Background
The pipe-sinking cast-in-place pile is one of many types of pile foundations in civil engineering and building engineering. The method is characterized in that a steel pipe (namely a sleeve) which is adaptive to the design size of a pile is adopted, a pile tip is sleeved on the end part and then sunk into the soil, a steel bar framework is hung in the sleeve, then the pipe is pulled out by vibration or hammering while concrete is poured, and the vibration during pipe pulling is utilized to tamp the concrete to form the required cast-in-place pile. And because the mouth of pipe of immersed tube is less at the framework of steel reinforcement hoist and mount in-process, can't be smooth hoist the framework of steel reinforcement and put to the immersed tube in, if it is great to hoist and put positional deviation, collide with the immersed tube mouth of pipe, will cause the damage to the immersed tube mouth of pipe, in addition when the framework of steel reinforcement is hoisted and put to the immersed tube in, can't be accurate align framework centroid and immersed tube centroid, make the concrete protection layer thickness in the framework outside inhomogeneous, the less one side of thickness probably can't satisfy the engineering technical requirement, influence the quality of forming a pile.
In summary, it is very important to find a steel bar lifting device for a cast-in-place bored concrete pile, which can accurately lift a steel bar cage and is convenient for lifting.
SUMMERY OF THE UTILITY MODEL
The utility model aims at overcoming the deficiencies in the prior art and providing a immersed tube bored concrete pile reinforcing bar hoisting device.
The steel bar hoisting device for the immersed tube cast-in-place pile comprises a protective layer partition plate, a lifting ring, a lifting rope, a lifting plate, a crane traction rope and a guide flaring, wherein the lifting rope, the lifting ring and the lifting plate form the hoisting device; the side wall of the immersed tube is provided with a protective layer spacing plate, the upper end of the protective layer spacing plate is connected with a guide flaring, and the flaring is wide at the top and narrow at the bottom.
Preferably, the method comprises the following steps: the preformed groove at the bottom of the guide flaring is spliced with the top connecting bulge on the protective layer partition plate and fixed by the fixing nail.
The utility model has the advantages that:
(1) the utility model discloses a protective layer space bar can accurately hang and put the steel reinforcement cage, prevents that the steel reinforcement cage from hanging the position and not having the centre and causing one side concrete protective layer thickness undersize, influences the pile quality of forming.
(2) The utility model discloses a transfer that guide flaring can guide steel reinforcement cage fast.
Drawings
FIG. 1 is a schematic view of a steel bar lifting device of a cast-in-place immersed tube pile;
fig. 2 is a detailed view of the splice at a in fig. 1.
Description of reference numerals: 1-pile tip; 3, sinking the pipe; 9-ground; 15-a feed inlet; 35-protective layer spacing plate; 36-a hoisting ring; 37-lifting rope; 38-hanger plate; 39-crane haulage rope; 40, guiding flaring; 41-a preformed groove; 42-top connecting projection; 43-fixing nail.
Detailed Description
The present invention will be further described with reference to the following examples. The following description of the embodiments is merely provided to aid in understanding the invention. It should be noted that, for those skilled in the art, without departing from the principle of the present invention, the present invention can be further modified and modified, and such modifications and modifications also fall within the protection scope of the appended claims.
The sinking pipe cast-in-place pile steel bar lifting device comprises a protective layer partition plate 35, a lifting ring 36, a lifting rope 37, a lifting plate 38, a crane pulling rope 39 and a guide flaring 40, wherein the lifting rope 37, the lifting ring 36 and the lifting plate 38 form the lifting device, the lifting plate 38 is connected with a steel bar cage through the lifting rope 37 and the lifting ring 36, and the top of the lifting plate 38 is connected with the crane pulling rope 39; the lateral wall of immersed tube 3 sets up protective layer space bar 35, and guide flaring 40 is connected to protective layer space bar 35 upper end, and the flaring is wide from top to bottom narrow, and the lifting of the steel reinforcement cage of being convenient for is put, and protective layer space bar 35 can make the steel reinforcement cage accurately place, and the concrete protective layer thickness of avoiding both sides is inhomogeneous, influences construction quality.
The preformed groove 41 at the bottom of the guiding flaring 40 is spliced with the top connecting protrusion 42 on the protective layer spacing plate 35 and fixed by the fixing nail 43.
The construction method of the immersed tube filling pile steel bar lifting device comprises the following steps:
(1) and (5) setting a sinking pipe. And (4) utilizing the piling hammer to drive the outer immersed tube to the designed depth.
(2) And (5) hoisting the reinforcement cage. Utilize the loop wheel machine to transfer the steel reinforcement cage that the off-site ligature is good to the immersed tube, need place protective layer space bar 35 at the immersed tube inner wall before putting down to connect guide flaring 40 on the protective layer space bar, the transfer that can effectual guide steel reinforcement cage of guide flaring, the protective layer space bar then can ensure the concrete protective layer thickness of stake not to take place the deviation.
(3) And removing the protective layer spacing plate and the guide flaring on the protective layer spacing plate. And after the steel reinforcement cage is placed, dismantling the protective layer spacing plate and the guide flaring on the protective layer spacing plate.

Claims (2)

1. The utility model provides a immersed tube bored concrete pile reinforcing bar lifts device which characterized in that: the protective layer partition plate comprises a protective layer partition plate (35), a lifting ring (36), a lifting rope (37), a lifting plate (38), a crane hauling rope (39) and a guide flaring (40), wherein the lifting rope (37), the lifting ring (36) and the lifting plate (38) form a lifting device, the lifting plate (38) is connected with a reinforcement cage through the lifting rope (37) and the lifting ring (36), and the top of the lifting plate (38) is connected with the crane hauling rope (39); the side wall of the immersed tube (3) is provided with a protective layer spacing plate (35), the upper end of the protective layer spacing plate (35) is connected with a guide flaring (40), and the flaring is wide at the top and narrow at the bottom.
2. The sinking cast-in-place pile reinforcing steel bar lifting device according to claim 1, wherein: the preformed groove (41) at the bottom of the guide flaring (40) is spliced with the top connecting bulge (42) on the protective layer spacing plate (35) and fixed by a fixing nail (43).
CN201920299282.8U 2019-03-08 2019-03-08 Steel bar lifting device for immersed tube filling pile Active CN211421111U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920299282.8U CN211421111U (en) 2019-03-08 2019-03-08 Steel bar lifting device for immersed tube filling pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920299282.8U CN211421111U (en) 2019-03-08 2019-03-08 Steel bar lifting device for immersed tube filling pile

Publications (1)

Publication Number Publication Date
CN211421111U true CN211421111U (en) 2020-09-04

Family

ID=72287377

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920299282.8U Active CN211421111U (en) 2019-03-08 2019-03-08 Steel bar lifting device for immersed tube filling pile

Country Status (1)

Country Link
CN (1) CN211421111U (en)

Similar Documents

Publication Publication Date Title
CN108643192A (en) Brace in Deep Footing Groove supporting ultralong steel tube column pile construction method
CN113981961B (en) Ship-type pile planting method for deepwater bare rock
CN210366620U (en) A hang muscle system for steel reinforcement cage
CN114232628A (en) Cutting hoop for integrally breaking pile head of cast-in-situ bored pile and construction method
CN211421111U (en) Steel bar lifting device for immersed tube filling pile
CN102605800A (en) Underground continuous wall construction method
CN113089654B (en) Construction process of hole digging pile in complex soil layer and steel casing for construction
CN115288184A (en) Shallow-covering-layer offshore wind power single-pile composite foundation construction method and composite foundation thereof
CN213653457U (en) Steel reinforcement cage lifts by crane and mounting structure
CN211646408U (en) Sheet pile and foundation pit support structure
CN210122723U (en) Novel steel reinforcement cage gallows
CN108086309B (en) Mini pile reinforcement cage installation method
WO2020199655A1 (en) Inner-outer sleeve assembly for piling apparatus, and piling apparatus
CN108644471B (en) Pipeline sliding transportation structure system on large-area water area and construction method thereof
CN206970086U (en) A kind of hanging apparatus
CN216807752U (en) Pile foundation steel reinforcement cage hoist and mount auxiliary device
CN110629757A (en) Method for removing pile section steel in SMW construction method
CN218520968U (en) Steel reinforcement cage pulls positioner for building installation
CN216108512U (en) Synchronous hoisting structure for multiple lengthened sounding pipes of foundation pit reverse construction method cast-in-place pile
CN213952232U (en) Reinforcing cage hanging rib replacing device for deep foundation pit cast-in-situ bored pile
CN219078843U (en) Reinforcing cage hoisting auxiliary device
CN213805375U (en) Device convenient for breaking pile head of large-diameter secant pile
CN210066725U (en) Drilled pile reinforcement cage hanging bar capable of being recycled
CN213805377U (en) Pile head breaking structure of occlusive pile
CN219731988U (en) Turnover hanging bar adjusting device under deep hole

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant