CN209852529U - Offshore mobile platform crude oil export high holding power anchor and double-cable mooring system - Google Patents

Offshore mobile platform crude oil export high holding power anchor and double-cable mooring system Download PDF

Info

Publication number
CN209852529U
CN209852529U CN201920354563.9U CN201920354563U CN209852529U CN 209852529 U CN209852529 U CN 209852529U CN 201920354563 U CN201920354563 U CN 201920354563U CN 209852529 U CN209852529 U CN 209852529U
Authority
CN
China
Prior art keywords
cable
mooring
mobile platform
double
holding power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920354563.9U
Other languages
Chinese (zh)
Inventor
石建荣
庄继泽
穆胜军
高连烨
王聚锋
杨秘
马兆峰
陈诚
陈瑞宝
孟庆鹏
郑路
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNOOC Energy Technology and Services Ltd
Oil Production Services Branch of CNOOC Energy Technology and Services Ltd
Caofeidian Operating Co of CNOOC China Ltd
Original Assignee
CNOOC Energy Technology and Services Ltd
Oil Production Services Branch of CNOOC Energy Technology and Services Ltd
Caofeidian Operating Co of CNOOC China Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNOOC Energy Technology and Services Ltd, Oil Production Services Branch of CNOOC Energy Technology and Services Ltd, Caofeidian Operating Co of CNOOC China Ltd filed Critical CNOOC Energy Technology and Services Ltd
Priority to CN201920354563.9U priority Critical patent/CN209852529U/en
Application granted granted Critical
Publication of CN209852529U publication Critical patent/CN209852529U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

The utility model belongs to the technical field of offshore mobile platform outward transportation systems, and discloses a crude oil outward transportation high holding power anchor and double-cable mooring system for an offshore mobile platform, wherein the head part of an oil tanker is fixed by the high holding power anchor, and the tail part of the oil tanker is connected to the offshore mobile platform by adopting double-cable mooring, thereby forming single-point double-cable mooring; the high holding power anchor is sequentially connected with an anchor chain, a steel cable, an interception shackle, a floating cable and a positioning anchor float and then fixed on a cable pile at the head of the oil tanker; and the tail part of the oil tanker is moored on a mooring cable pile of the offshore mobile platform by adopting double cables. The utility model discloses a big holding power anchor carries out defeated operation outward with the mooring method of two cables, has safe and reliable, and the mooring is simple, and the installation is swift, does not receive the influence of weather sea condition, and engineering cost is low, but advantages such as reuse.

Description

Offshore mobile platform crude oil export high holding power anchor and double-cable mooring system
Technical Field
The utility model belongs to the technical field of marine mobile platform defeated system outward, specific theory relates to a marine mobile platform crude oil defeated big holding power anchor adds two cable mooring system outward.
Background
The export operation of the offshore platform is one of large-scale offshore operations, and the export operation of the mobile offshore platform is firstly tried in the Bohai sea area, so that the selection of a mooring mode is very important. Considering that the export area is generally near the platform, submarine pipelines and sea cables in the area are distributed densely, the fewer the anchor points are, the better the export mooring operation of the offshore oil mobile platform is required to be met, and the export mooring operation can also be used for the export requirement of fixed production facilities.
Most of the existing fixed offshore platforms adopt a two-point mooring mode, but the two-point mooring mode has the defects of easy influence of stormy weather, complex mooring cable and low speed. Since the environmental conditions and sea conditions of the mobile offshore platform change, a mooring mode with convenient installation and high output efficiency is required. In addition, the two-point mooring mode of the offshore fixed platform has relatively high construction cost, can not be recycled, and is not suitable for offshore mobile platforms.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that novel portable offshore platform defeated operation moored provides a marine mobile platform crude oil defeated outward big holding power anchor and two cable mooring systems, adopts the mooring method of big holding power anchor and two cables to carry out defeated operation outward, has safe and reliable, and the mooring is simple, and the installation is swift, does not receive the influence of climatic sea condition, and engineering cost is low, but advantages such as reuse.
In order to solve the technical problem, the utility model discloses a following technical scheme realizes:
a crude oil export high holding power anchor and double-cable mooring system for an offshore mobile platform comprises an oil tanker, wherein the head part of the oil tanker is fixed through the high holding power anchor, and the tail part of the oil tanker is connected to the offshore mobile platform through double-cable mooring, so that single-point double-cable mooring is formed.
Furthermore, the high holding power anchor is sequentially connected with an anchor chain, a steel cable, an interception shackle, a floating cable and a positioning anchor float and then fixed on the mooring bollard at the head of the oil tanker.
Further, the tail part of the oil tanker is moored on a mooring cable pile of the offshore mobile platform by adopting a double cable.
The utility model has the advantages that:
the utility model adopts a mooring mode of a high-holding-power anchor and a double cable, the high-holding-power anchor connected with the bow has strong ground-holding capacity, and the steel cable has strong force-unloading capacity, can be thoroughly and firmly attached to the sea bottom and is firmly attached to the surface of the sea bottom; the double cables moored at the stern are moored on the quick unhooking of the platform, so that the oil lifting wheel can be quickly separated from the platform in emergency to prevent collision, and the safety is good;
the utility model adopts a mooring mode of a high holding power anchor and a double cable, the high holding power anchor and the steel wire cable rope can be recycled, no waste is generated, no pollution is caused to the environment, and no operating cost is increased for environmental protection treatment;
the utility model adopts a mooring mode of a high holding power anchor and a double cable, so that the high holding power anchor is convenient to embed and recover, the construction difficulty is small, and the construction period is short; the mobile platform is very suitable for a mobile platform with an unfixed operation area and short sea time; therefore, the utility model has lower construction cost and lower comprehensive cost than the traditional double-point mooring mode of the suction anchor;
(IV) the utility model discloses it floats to add on the floating hawser of high holding power anchor and establish floating anchor, obvious on the sea, easily assist the tow boat discovery to the cooperation tow boat is conveniently dragged for.
Drawings
Fig. 1 is a schematic structural diagram of a crude oil export high holding power anchor and double-cable mooring system of an offshore mobile platform provided by the present invention;
in the figure: 1: a high holding power anchor; 2: an anchor chain; 3: a wire rope; 4: intercepting and shackle; 5: a floating cable; 6: positioning the anchor float; 7: an oil tanker; 8: a bollard; 9: provided is an offshore mobile platform.
Detailed Description
For further understanding of the contents, features and effects of the present invention, the following embodiments will be exemplified in conjunction with the accompanying drawings as follows:
as shown in fig. 1, the embodiment provides a system for transporting a large holding power anchor and a double-cable mooring for crude oil export of an offshore mobile platform, which includes an oil tanker 7, wherein the head of the oil tanker 7 is fixed by the large holding power anchor 1, and the tail of the oil tanker 7 is connected to an offshore mobile platform 9 by adopting the double-cable mooring, so that the fore and the aft of the oil tanker are moored to form a single-point double-cable mooring.
Specifically, the high-holding-power anchor 1 is connected with an anchor chain 2 with a connecting shackle, the anchor chain 2 is connected with a steel cable 3 with the length of 800 meters, the steel cable 3 is connected with a floating cable 5 with the high strength of 50 meters through an interception shackle 4, and the floating cable 5 is connected with a positioning anchor float 6 and then is connected with a mooring pile 8 at the head of a tanker 7. The high-holding-power anchor 1 has strong holding power and strong steel cable force-unloading capability, can be completely and firmly attached to the seabed and can be firmly attached to the surface of the seabed.
The oil tanker 7 is moored on the mooring bollard 8 of the offshore mobile platform 9 by double cables at the tail part, and the oil tanker 7 and the offshore mobile platform 9 can be separated quickly to prevent collision under emergency conditions.
The mooring bollards 8 of the oil tanker 7 and the mooring bollards 8 of the offshore mobile platform 9 are both provided with quick unhooking devices, and the quick unhooking devices are provided with field tension meters and are used for export mooring operation for the first time. The design of the rapid unhooking device of the embodiment has the rated pressure of 0.7MPa, the rated traction force of 30KN, the rated power of 8KW and the maximum rope speed of 10 m/min.
Although the preferred embodiments of the present invention have been described with reference to the accompanying drawings, the present invention is not limited to the above embodiments, which are only illustrative and not restrictive, and those skilled in the art can make various changes without departing from the spirit and the scope of the invention as claimed.

Claims (3)

1. The system is characterized by comprising an oil tanker, wherein the head part of the oil tanker is fixed by a high-holding-power anchor, and the tail part of the oil tanker is connected to the offshore mobile platform by adopting double-cable mooring, so that single-point double-cable mooring is formed.
2. The system of claim 1, wherein the high holding power anchor is sequentially connected with a chain, a wire rope, a holding shackle, a floating cable and a positioning anchor, and then fixed on a mooring pile at the head of the tanker.
3. The system of claim 1, wherein the tanker is moored to a bollard of the offshore mobile platform by double lines.
CN201920354563.9U 2019-03-19 2019-03-19 Offshore mobile platform crude oil export high holding power anchor and double-cable mooring system Active CN209852529U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920354563.9U CN209852529U (en) 2019-03-19 2019-03-19 Offshore mobile platform crude oil export high holding power anchor and double-cable mooring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920354563.9U CN209852529U (en) 2019-03-19 2019-03-19 Offshore mobile platform crude oil export high holding power anchor and double-cable mooring system

Publications (1)

Publication Number Publication Date
CN209852529U true CN209852529U (en) 2019-12-27

Family

ID=68934376

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920354563.9U Active CN209852529U (en) 2019-03-19 2019-03-19 Offshore mobile platform crude oil export high holding power anchor and double-cable mooring system

Country Status (1)

Country Link
CN (1) CN209852529U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113955016A (en) * 2021-09-29 2022-01-21 山东海洋现代渔业有限公司 Offshore platform positioning method and positioning system
CN113968311A (en) * 2021-12-08 2022-01-25 中国船舶科学研究中心 High-holding-power combined anchor suitable for offshore platform mooring system and operation method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113955016A (en) * 2021-09-29 2022-01-21 山东海洋现代渔业有限公司 Offshore platform positioning method and positioning system
CN113955016B (en) * 2021-09-29 2022-08-12 山东海洋现代渔业有限公司 Offshore platform positioning method and positioning system
CN113968311A (en) * 2021-12-08 2022-01-25 中国船舶科学研究中心 High-holding-power combined anchor suitable for offshore platform mooring system and operation method

Similar Documents

Publication Publication Date Title
CN102079363B (en) Anchoring ocean observation and research buoy laying system and method based on small-sized ship
CN201334105Y (en) Moorage positioning draw-off equipment of marine device
CN201140778Y (en) Flexible connection mooring apparatus for oil transportation on the sea
CN101492140A (en) Sling apparatus for aluminum alloy catamaran and whole-boat set afloat process
CN103738477A (en) Method for replacing upper anchor cable of mooring anchor legs
CN104590497A (en) FPSO (Float Production Storage and Offloading) ship
CN209852529U (en) Offshore mobile platform crude oil export high holding power anchor and double-cable mooring system
CN103482037A (en) Small-sized tugboat
CN202614498U (en) Acoustic experiment suspension device of underwater navigation body model
CN201834178U (en) Anchoring-type buoy laying apparatus based on small-sized ship
CN103754325B (en) Rubber tyre formula push wheel-tug-barge coupling arrangement
CN216269827U (en) Offshore single point mooring replacement maintenance equipment
CN102219047A (en) Device and method of salvaging underwater mooring system in muddy seabed
CN103407548A (en) Quick release method and device of anchor chain for permanently mooring on-water floating type platform
CN113772044B (en) Offshore single point mooring replacement maintenance method
CN101838980B (en) Inflatable oil containment boom capable of diving and being dedicated storage
CN116592182A (en) Method for dragging and laying submarine large-span pipeline
CN103754328B (en) A kind of method of underwater sensor chain Quick distributor
CN201437399U (en) Annular releasable floating type ocean platform
CN203094380U (en) Floating production storage offloading (FPSO) temporary mooring device
Dymarski et al. Technology concept of TLP platform towing and installation in waters with depth of 60 m
CN210529503U (en) Positioning device for beam-transporting ship of suspension bridge
CN113968311A (en) High-holding-power combined anchor suitable for offshore platform mooring system and operation method
CN201704679U (en) Inflatable oil containment boom for submersible positioning storage
CN207730562U (en) Mooring rope load can be monitored and the mooring cage ear device of life prediction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant