CN209652977U - A kind of compound cable piping lane - Google Patents
A kind of compound cable piping lane Download PDFInfo
- Publication number
- CN209652977U CN209652977U CN201920147656.4U CN201920147656U CN209652977U CN 209652977 U CN209652977 U CN 209652977U CN 201920147656 U CN201920147656 U CN 201920147656U CN 209652977 U CN209652977 U CN 209652977U
- Authority
- CN
- China
- Prior art keywords
- cabin
- cable
- piping lane
- inspection shaft
- comprehensive
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Sewage (AREA)
Abstract
The utility model relates to building element technical fields, disclose a kind of compound cable piping lane, including comprehensive cable cabin, the first cabin, the second cabin and the first inspection shaft, the at least side in the comprehensive cable cabin is equipped with first cabin, second cabin and first inspection shaft, first inspection shaft is located at the top in first cabin and is connected to first cabin, second freight space is in the top in first cabin, second cabin is deviated to the direction far from the comprehensive cable cabin at first inspection shaft, to get around first inspection shaft.Compound cable piping lane in the utility model realizes the intensive arrangement of the pipelines such as water supply, rainwater, sewage, electric power, communication below road, road excavation is reduced, even also can be used under relatively narrow road by increasing the first cabin and the second cabin.
Description
Technical field
The utility model relates to building element technical field more particularly to a kind of compound cable piping lanes.
Background technique
Pipe gallery is the comprehensive corridor of underground urban duct, i.e., builds a tunnel space in Urban Underground, by electric power, is led to
Letter, the various utilities pipelines such as combustion gas, heat supply, plumbing are integrated in one, and are equipped with special access hole, hoisting port and monitoring system,
Implement unified planning, Uniting, unified construction and management, is the important infrastructure and " lifeline " for ensureing city operations.
Pipe gallery is divided into main line pipe gallery, branch line pipe gallery and cable piping lane.
In general, main line pipe gallery and branch line pipe gallery are mainly layed on the primary and secondary arterial highway in city.It is small for city
Branch or villages within the city's road, road section is narrow, and to consider the influence in two sides house, makes it that can excavate space smaller.But
It is to be also required to be equipped with the municipal pipelines such as water supply, rainwater, sewage, electric power, communication, combustion gas on these roads.Due to above-mentioned limit
System, the piping lane of these roads generally use cable piping lane.But traditional cable piping lane inner space is smaller, is only used for accommodating electric power
Cable and communication cable, function are more single.Therefore, be badly in need of a kind of intensive arrangement, can be reduced road excavation convenient for small in city
It constructs on branch or villages within the city's road the compound cable piping lane of implementation, to accommodate water supply, rainwater, sewage, electric power, communication simultaneously
Equal pipelines.
Utility model content
For overcome the deficiencies in the prior art, the utility model provides a kind of compound cable piping lane, by cable pipe
Increase the first cabin and the second cabin in corridor, realizes the intensive cloth of the pipelines such as water supply, rainwater, sewage, electric power, communication below road
It sets, road excavation is reduced, even also can be used under relatively narrow road.
The technical scheme adopted by the utility model to solve the technical problem is as follows:
Provide a kind of compound cable piping lane, including comprehensive cable cabin, the first cabin, the second cabin and the first inspection shaft, institute
At least side for stating comprehensive cable cabin is equipped with first cabin, second cabin and first inspection shaft, and described first checks
Well location in first cabin top and be connected to first cabin, second freight space is in the top in first cabin, in institute
It states second cabin at the first inspection shaft to deviate to the direction far from the comprehensive cable cabin, to get around first inspection shaft.
It as an improvement of the above technical solution, further include the second inspection shaft, second inspection shaft is located at second cabin
Top and be connected to second cabin.
As a further improvement of the above technical scheme, the side wall in first cabin is equipped with the first pipe access port, and described the
The side wall in two cabins is equipped with the second pipe access port.
As a further improvement of the above technical scheme, the two sides in the comprehensive cable storehouse are equipped with first cabin, institute
State the second cabin, first inspection shaft and second inspection shaft.
As a further improvement of the above technical scheme, first cabin is bilge tank, and second cabin is rainwater cabin.
As a further improvement of the above technical scheme, first cabin is rainwater cabin, and second cabin is bilge tank.
As a further improvement of the above technical scheme, the inner wall of the bilge tank be equipped with concrete cover and anti-corrosion every
Absciss layer.
As a further improvement of the above technical scheme, the bottom in the comprehensive cable storehouse is equipped with catch basin, and top is fixed
There is dismountable cover plate.
As a further improvement of the above technical scheme, the side wall in the comprehensive cable storehouse is equipped with cable support and pipeline branch
Frame.
As a further improvement of the above technical scheme, the side wall in the comprehensive cable storehouse is exported equipped with cable pipe.
The beneficial effects of the utility model are: realizing road by increasing the first cabin and the second cabin in cable piping lane
The intensive arrangement of the pipelines such as lower section water supply, rainwater, sewage, electric power, communication reduces road excavation, even under relatively narrow road
Also it can be used.
Detailed description of the invention
The present invention will be further described with reference to the accompanying drawings and examples:
Fig. 1 is the floor plan of compound cable piping lane in the utility model one embodiment;
Fig. 2 is in Fig. 1 along the cross-sectional view in the direction A-A;
Fig. 3 is in Fig. 1 along the cross-sectional view in the direction B-B;
Fig. 4 is in Fig. 1 along the cross-sectional view in the direction C-C.
Specific embodiment
It is carried out below with reference to technical effect of the embodiment and attached drawing to the design of the utility model, specific structure and generation
Clear, complete description, to be completely understood by the purpose of this utility model, scheme and effect.It should be noted that not conflicting
In the case where, the features in the embodiments and the embodiments of the present application can be combined with each other.
It should be noted that unless otherwise specified, when a certain feature referred to as " fixation ", " connection " are in another feature,
It can directly fix, be connected to another feature, and can also fix, be connected to another feature indirectly.In addition, this
The descriptions such as up, down, left, right, before and after used in utility model are only relative to each composition portion of the utility model in attached drawing
For the mutual alignment relation divided.
In addition, unless otherwise defined, the technology of all technical and scientific terms used herein and the art
The normally understood meaning of personnel is identical.Term used in the description is intended merely to description specific embodiment herein, without
It is to limit the utility model.Term " and or " used herein includes appointing for one or more relevant listed items
The combination of meaning.
Referring to figs. 1 to Fig. 4, show in the utility model one embodiment the floor plan of compound cable piping lane and
Cross-sectional view along the direction A-A, B-B and C-C.Compound cable piping lane includes comprehensive cable cabin 1, bilge tank 2, rainwater cabin 3, sewage
Inspection shaft 4 and rainwater inspection well 5.The two sides in comprehensive cable cabin 1 be provided with bilge tank 2, rainwater cabin 3, sewage inspection well 4 and
Rainwater inspection well 5 can also be adjusted according to road concrete condition, be only arranged in any side in comprehensive cable cabin 1.
Sewage inspection well 4 is set to the top of bilge tank 2, and be connected to bilge tank 2, bilge tank 2 by sewage inspection well 4 and
Realize vertical connection in ground.Rainwater inspection well 5 is set to the top in rainwater cabin 3, and is connected to rainwater cabin 3, and rainwater cabin 3 passes through rainwater
Vertical connection is realized on inspection shaft 4 and ground.The mode easy access personnel of vertical connection enter sewage inspection well 4 and rainwater inspection
Well 5 overhauls bilge tank 2 and rainwater cabin 3 respectively.
In most of position along road direction of advance, rainwater cabin 3 is located at the surface of bilge tank 2, but in order to avoid dirt
Water inspection shaft 4, at the position of sewage inspection well 4, (direction far from the comprehensive cable cabin 1) offset outward of rainwater cabin 3, with around
Open sewage inspection well 4.After sewage inspection well 4, rainwater cabin 3 returns original position (surface of bilge tank 2).So set
Meter can guarantee that sewage inspection well 4 is located at the top of bilge tank 2, and rainwater inspection well 5 is located at the top in rainwater cabin 3, facilitates inspection
It repairs, and can guarantee that interference will not be generated between each other.And in most of position, bilge tank 2 is stacked with rainwater cabin 3, section
The occupied space on road width direction is saved, it is possible to reduce road excavation range is also suitable under relatively narrow road, is expanded
Use scope.In addition, bilge tank and the position in rainwater cabin can be interchanged, corresponding sewage inspection well and rainwater inspection well also with
Transposition.
It is equipped with sewage pipe access port 21 in the side wall of bilge tank 2, the side wall in rainwater cabin 3 is equipped with rain pipe access port 31, with
Collect the sewage and rainwater of both sides of the road discharge.More corrosive goods are usually contained in life and trade effluent due to discharge
In order to protect bilge tank 2 concrete cover and anti-corrosion separation layer can be arranged in the inner wall of bilge tank 2, to increase sewage in matter
The service life in cabin 2.
It is equipped with support of pipelines or buttress 11 in the bottom in comprehensive cable cabin 1, is placed with the pipelines such as feed pipe 12, bracket thereon
Or height of the buttress 11 apart from bottom not less than 200mm to be advisable.It is several not less than being equipped at 800mm above bracket or buttress
Cable support 13, is placed with various cables 14 on cable support 13, and the quantity that cable 14 is placed is advisable with being no more than 16 times.In
The cable pipe outlet 15 picked out for each cable and pipeline is additionally provided on the two sides side wall in comprehensive cable cabin 1, in general, before road
One cable pipe is set every 50-100m into direction and exports 15.The top in comprehensive cable cabin 1 is equipped with dismountable cover plate 16, with side
Just service personnel enters in comprehensive cable cabin 1 from dismountable cover plate 16 and overhauls, and the position can be used as comprehensive cable cabin 1
Ventilation opening.Distance of the cable pipe outlet 15 apart from dismountable cover plate 16 not less than 300mm to be advisable.In general, before road
One dismountable cover plate 16 is set every 100-200m into direction.It is additionally provided with catch basin in the bottom in comprehensive cable cabin 1, works as synthesis
Gather when having excessive ponding in cable cabin 1, drip pump can be used and drain ponding.In general, along road direction of advance every
A catch basin is arranged in 100-200m.
In general, the width and height in bilge tank 2 and rainwater cabin 3 no more than 800mm to be advisable.The width in comprehensive cable cabin 1
Degree not less than 1400mm to be advisable, highly to be advisable no more than 2300mm.And entire depth of the compound cable piping lane apart from earth's surface
Degree can more closely facilitate construction and subsequent maintenance apart from ground to be advisable no more than 300mm.Specific size can be according to the reality of road
Border situation determines.
Above-mentioned compound cable piping lane realizes water supply, rainwater, dirt below road by increasing rainwater cabin and bilge tank
The intensive arrangement of the pipelines such as water, electric power, communication reduces road excavation, even also can be used under relatively narrow road.
It is illustrating for progress to be implemented to the preferable of the utility model, but the invention is not limited to the reality above
Example is applied, those skilled in the art can also make various equivalent variations without departing from the spirit of the present invention
Or replacement, these equivalent deformations or replacement are all included in the scope defined by the claims of the present application.
Claims (10)
1. a kind of compound cable piping lane, which is characterized in that including integrating cable cabin, the first cabin, the second cabin and the first inspection shaft,
At least side in the comprehensive cable cabin is equipped with first cabin, second cabin and first inspection shaft, first inspection
It looks into well location to be connected in the top in first cabin and with first cabin, second freight space is in the top in first cabin, In
Second cabin is deviated to the direction far from the comprehensive cable cabin at first inspection shaft, is checked with getting around described first
Well.
2. compound cable piping lane according to claim 1, which is characterized in that it further include the second inspection shaft, described second
Inspection shaft is located at the top in second cabin and is connected to second cabin.
3. compound cable piping lane according to claim 1, which is characterized in that the side wall in first cabin is equipped with the first pipe
The side wall of access port, second cabin is equipped with the second pipe access port.
4. compound cable piping lane according to claim 2, which is characterized in that the two sides in the comprehensive cable storehouse are equipped with
First cabin, second cabin, first inspection shaft and second inspection shaft.
5. compound cable piping lane according to claim 1, which is characterized in that first cabin is bilge tank, described the
Two cabins are rainwater cabin.
6. compound cable piping lane according to claim 1, which is characterized in that first cabin is rainwater cabin, described the
Two cabins are bilge tank.
7. compound cable piping lane according to claim 5 or 6, which is characterized in that the inner wall of the bilge tank is equipped with mixed
Solidifying protective soil layer and anti-corrosion separation layer.
8. compound cable piping lane according to claim 1, which is characterized in that the bottom in the comprehensive cable storehouse is equipped with collection
Sink, top are fixed with dismountable cover plate.
9. compound cable piping lane according to claim 1, which is characterized in that the side wall in the comprehensive cable storehouse is equipped with cable
Line bracket and support of pipelines.
10. compound cable piping lane according to claim 1, which is characterized in that the side wall in the comprehensive cable storehouse is equipped with
Cable pipe outlet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920147656.4U CN209652977U (en) | 2019-01-28 | 2019-01-28 | A kind of compound cable piping lane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920147656.4U CN209652977U (en) | 2019-01-28 | 2019-01-28 | A kind of compound cable piping lane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209652977U true CN209652977U (en) | 2019-11-19 |
Family
ID=68523039
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920147656.4U Active CN209652977U (en) | 2019-01-28 | 2019-01-28 | A kind of compound cable piping lane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209652977U (en) |
-
2019
- 2019-01-28 CN CN201920147656.4U patent/CN209652977U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106351254A (en) | Multilayer urban underground comprehensive pipe gallery | |
CN207685859U (en) | A kind of underground pipe gallery | |
CN106638681A (en) | Integrated pipe gallery | |
CN202247950U (en) | Quadrate culvert member | |
CN213597033U (en) | Deep buried comprehensive pipe gallery | |
CN208717954U (en) | A kind of integrated pipe canal applied to city section water power route arrangement | |
CN109944273A (en) | A kind of city tunnel, track traffic regional tunnel and pipe gallery build structure jointly | |
CN205557584U (en) | Steel pipe corridor and large -scale utility tunnel system | |
CN106320370A (en) | Underground comprehensive pipe rack system | |
CN110258632B (en) | Comprehensive pipe rack pipeline branch port of direct buried outgoing line | |
CN202469227U (en) | Prefabricated reinforced concrete fabricated pipe gallery | |
CN209652977U (en) | A kind of compound cable piping lane | |
CN211285694U (en) | Utility tunnel structure | |
CN205296347U (en) | Arrangement structure that utility tunnel internal drain pipe said | |
CN107975065A (en) | A kind of pipe gallery in more cabins | |
CN215442013U (en) | Cross joint structure of comprehensive pipe gallery and drain pipe | |
CN201162227Y (en) | Underground pipe canal | |
CN207646753U (en) | Single single cabin formula of pier support makes somebody a mere figurehead pipe gallery | |
CN206396789U (en) | A kind of comprehensive pipe gallery structure for being easy to sewage collecting to discharge | |
CN102691312A (en) | Precast assembled pipeline combined shaft | |
CN210482369U (en) | Compact utility tunnel of sewage pipe is taken to bottom | |
CN210766884U (en) | Underground cover plate ditch suitable for pipeline collection | |
CN206844150U (en) | A kind of shallow embedding formula pipe gallery | |
CN215165815U (en) | Underground city utility tunnel | |
CN210597373U (en) | Utility tunnel pipeline branch mouth that direct-burried was qualified for next round of competitions |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 10 / F, Jianyi building, 3 Zhenxing Road, Futian District, Shenzhen, Guangdong 518028 Patentee after: Shenzhen Urban Planning and Design Institute Co.,Ltd. Address before: 10 / F, Jianyi building, 3 Zhenxing Road, Futian District, Shenzhen, Guangdong 518028 Patentee before: URBAN PLANNING & DESIGN INSTITUTE OF SHENZHEN (UPDIS) |