CN209636638U - Overhead bridge construction hanging basket - Google Patents
Overhead bridge construction hanging basket Download PDFInfo
- Publication number
- CN209636638U CN209636638U CN201720442026.0U CN201720442026U CN209636638U CN 209636638 U CN209636638 U CN 209636638U CN 201720442026 U CN201720442026 U CN 201720442026U CN 209636638 U CN209636638 U CN 209636638U
- Authority
- CN
- China
- Prior art keywords
- steels
- girder steel
- steel
- vertical
- supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Overhead bridge construction hanging basket, including two lateral girder steels, two vertical girder steels and one piece of horizontally disposed bottom plate, the four corners of bottom plate, which are respectively perpendicular, is fixed with a supporting steel, the lower end of supporting steel is equipped with universal wheel, clump weight is placed on bottom plate, wherein a lateral girder steel is fixedly connected on the upper end of two supporting steels of front side, in addition a lateral girder steel is fixedly connected on the upper end of two supporting steels of rear side, the right end of two lateral girder steels flushes, and two vertical girder steels are vertically arranged;In conclusion the utility model structure is simple, design rationally, compared with traditional, is constructed more convenient, safer, and then improves the construction efficiency of construction personnel.
Description
Technical field
The utility model belongs to technical field of building construction, and in particular to a kind of overhead bridge construction hanging basket.
Background technique
Overpass has become more and more in present traffic route, because overpass generally outmatches common ground
On road, some crossroads etc. are avoided, the unobstructed degree of road can be improved, but construct in overpass lateral surface
When, worker usually utilizes the hanger tools such as lifting rope, this kind of tool first itself safety it is not high;In addition lifting rope is used in worker
When being constructed, lifting rope and overpass side wall excessive friction will lead to lifting rope fracture, and consequence is hardly imaginable, in fact this work of lifting rope
Have and be generally strapped in worker's waist, very inconvenient in worker's work progress, an especially construction area completion is transferred to another
More troublesome when a construction area, construction efficiency is low.
Utility model content
The utility model in order to solve shortcoming in the prior art, provide a kind of structure is simple, construction safety is convenient,
It can be improved the overhead bridge construction hanging basket of construction efficiency.
In order to solve the above technical problems, the utility model adopts the following technical solution: overhead bridge construction hanging basket, packet
Two lateral girder steels, two vertical girder steels and one piece of horizontally disposed bottom plate are included, the four corners of bottom plate, which are respectively perpendicular, is fixed with one
Root supporting steel, the lower end of supporting steel are equipped with universal wheel, are placed with clump weight on bottom plate, wherein a lateral girder steel is fixedly connected
In the upper end of two supporting steels of front side, in addition a lateral girder steel is fixedly connected on the upper end of two supporting steels of rear side, and two
The right end of root transverse direction girder steel flushes, and two vertical girder steels are vertically arranged, wherein a vertical upper end for girder steel and the transverse direction of front side
The right end of girder steel is fixedly connected, and in addition the upper end of a vertical girder steel is fixedly connected with the right end of the lateral girder steel of rear side, and two
It is fixedly connected with operation platform sling between the lower end of vertical girder steel, operation platform sling is located at the left side of two vertical girder steels, and operation is hung
It is respectively and fixedly provided between the front side edge of plate and the vertical girder steel of front side, between the back side edge of operation platform sling and the vertical girder steel of rear side tiltedly
Draw girder steel;Wherein ladder is fixed on a vertical girder steel.
The right side of the lower end of two supporting steels on right side is rotatably connected to idler wheel, and the center line of idler wheel is vertically
Setting.
Stiffening plate is fixed between the right part of lateral girder steel and the upper end of vertical girder steel.
The periphery of operation platform sling is equipped with protective fence.
By adopting the above technical scheme, when worker is constructed using the present apparatus, bottom plate is placed in the bridge of overpass by worker
Face, two vertical girder steels reach the outside of overpass, and operation platform sling is located at the downside of overpass bridge floor at this time, and worker can lead to
It crosses ladder to arrive safe and sound on operation platform sling, to construct, be constructed compared to traditional by lifting rope, worker does not have beam
Sense is tied up, and can be moved on operation platform sling, is freely constructed;Wherein, clump weight is placed on bottom plate, clump weight can increase
The stability of bottom plate installs idler wheel additional to improve the safety of integral device on supporting steel, in mobile device, idler wheel energy
Enough support bridge side and the supporting steel of overpass;Reinforcement is fixed between the right part of lateral girder steel and the upper end of vertical girder steel
Plate, stiffening plate can reinforce the bonding strength between the right part of lateral girder steel and the upper end of vertical girder steel, operation platform sling
Periphery is equipped with protective fence, and protective fence can protect the safety of construction personnel on operation platform sling.
In conclusion the utility model structure is simple, design rationally, compared with traditional, constructed more convenient, is more pacified
Entirely, and then the construction efficiency of construction personnel is improved.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Specific embodiment
As shown in Figure 1, the overhead bridge construction hanging basket of the utility model, including two 1, two, lateral girder steels are vertical
Girder steel 2 and bottom plate 3, the four corners of bottom plate 3, which are respectively perpendicular, is fixed with a supporting steel 4, and the lower end of supporting steel 4 is equipped with universal wheel
5, clump weight 6 is placed on bottom plate 3, wherein a lateral girder steel 1 is fixedly connected on the upper end of two supporting steels 4 of front side, separately
Outer one lateral girder steel 1 is fixedly connected on the upper end of two supporting steels 4 of rear side, and the right end of two lateral girder steels 1 flushes, and two
Vertical girder steel 2 is vertically arranged, wherein the upper end of a vertical girder steel 2 is fixedly connected with the right end of the lateral girder steel 1 of front side, in addition
The upper end of a piece vertical girder steel 2 is fixedly connected with the right end of the lateral girder steel 1 of rear side, between the lower end of two vertical girder steels 2
It is fixedly connected with operation platform sling 7, operation platform sling 7 is located at the left side of two vertical girder steels 2, the front side edge of operation platform sling 7 and front side
Vertical girder steel 2 between, between the back side edge of operation platform sling 7 and the vertical girder steel 2 of rear side be respectively and fixedly provided with oblique pull girder steel 8;Wherein
Ladder 9 is fixed on a piece vertical girder steel 2.The right side of the lower end of two supporting steels 4 on right side is rotatably connected to idler wheel 10,
The center line of idler wheel 10 is arranged in vertical.It is fixed with and adds between the right part of lateral girder steel 1 and the upper end of vertical girder steel 2
Strong plate 11.The periphery of operation platform sling 7 is equipped with protective fence 12.
When worker is constructed using the present apparatus, bottom plate 3 is placed in the bridge floor of overpass, two vertical girder steels 2 by worker
The outside of overpass is reached, operation platform sling 7 is located at the downside of overpass bridge floor at this time, two idler wheels 10 rolling on supporting steel 4
The dynamic bridge side for being connected to overpass, worker can be arrived safe and sound on operation platform sling 7 by ladder 9, thus construct, compared to
Traditional is constructed by lifting rope, and worker does not fetter sense, and can move on operation platform sling 7, is freely constructed;When this
When construction area is completed to need to be moved to next construction area after constructing, the worker on the bridge floor of overpass can be pushed
Supporting steel 4, thus top of the movable base plate 3 to region to be onstructed, the worker on operation platform sling can continue the construction area
The construction in domain.
The present embodiment not makes any form of restriction the shape of the utility model, material, structure etc., all foundations
The technical essence of the utility model any simple modification, equivalent change and modification to the above embodiments, belong to this reality
With the protection scope of new technique scheme.
Claims (3)
1. overhead bridge construction hanging basket, it is characterised in that: including two lateral girder steels, two vertical girder steels and one piece of level
The bottom plate of setting, the four corners of bottom plate, which are respectively perpendicular, is fixed with a supporting steel, and the lower end of supporting steel is equipped with universal wheel, bottom plate
On be placed with clump weight, wherein a lateral girder steel is fixedly connected on the upper end of two supporting steels of front side, an other transverse direction
Girder steel is fixedly connected on the upper end of two supporting steels of rear side, and the right end of two lateral girder steels flushes, and two vertical girder steels are vertical
Setting, wherein the upper end of a vertical girder steel is fixedly connected with the right end of the lateral girder steel of front side, other vertical girder steel
Upper end is fixedly connected with the right end of the lateral girder steel of rear side, is fixedly connected with operation between the lower end of two vertical girder steels and is hung
Plate, operation platform sling are located at the left side of two vertical girder steels, and between the front side edge of operation platform sling and the vertical girder steel of front side, operation hangs
Oblique pull girder steel is respectively and fixedly provided between the back side edge of plate and the vertical girder steel of rear side;Wherein ladder is fixed on a vertical girder steel;
The right side of the lower end of two supporting steels on right side is rotatably connected to idler wheel, and the center line of idler wheel is vertically set
It sets.
2. overhead bridge construction hanging basket according to claim 1, it is characterised in that: the right part of lateral girder steel and perpendicular
Stiffening plate is fixed between the upper end of girder steel.
3. overhead bridge construction hanging basket according to claim 1, it is characterised in that: the periphery of operation platform sling is equipped with anti-
Guardrail.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720442026.0U CN209636638U (en) | 2017-04-25 | 2017-04-25 | Overhead bridge construction hanging basket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720442026.0U CN209636638U (en) | 2017-04-25 | 2017-04-25 | Overhead bridge construction hanging basket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209636638U true CN209636638U (en) | 2019-11-15 |
Family
ID=68470691
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720442026.0U Expired - Fee Related CN209636638U (en) | 2017-04-25 | 2017-04-25 | Overhead bridge construction hanging basket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209636638U (en) |
-
2017
- 2017-04-25 CN CN201720442026.0U patent/CN209636638U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208518295U (en) | One kind being used for Super High assembled overhanging apparatus for work | |
CN206233546U (en) | A kind of elevator hoistways workbench | |
CN205822747U (en) | Architectural engineering scaffold | |
CN204626252U (en) | Hanging basket device of movable assembly vehicle for bridge guardrail | |
CN209636638U (en) | Overhead bridge construction hanging basket | |
CN209891681U (en) | Anti-tilting scaffold | |
CN110331845A (en) | A kind of housing construction platform | |
CN205711761U (en) | A kind of Novel hanging basket of convenience and safety | |
CN209397925U (en) | It is a kind of apply to concrete barrier formwork peace tear open packaged type peace tear frame open | |
CN211499700U (en) | Construction protection handling frame | |
CN101768925A (en) | Mounting equipment for anti-falling beam stop block and construction method thereof | |
CN212507525U (en) | Movable protection device for vertical crossing synchronous construction | |
CN212052563U (en) | Scaffold for water conservancy construction | |
CN211369454U (en) | Scaffold for building engineering | |
CN206308994U (en) | A kind of Mobile operating platform for hanging operation | |
CN210369844U (en) | Simple hanging basket | |
CN208844441U (en) | Bridge beam body operation platform | |
CN207904774U (en) | The construction equipment of anticollision barrier casting concrete on a kind of bridge | |
CN207739605U (en) | Elevator shaft three-dimensional construction protection system | |
CN206529699U (en) | Bridge guardrail external hanging type multi-function device | |
CN210828254U (en) | Movable scaffold | |
CN205396963U (en) | Base is put things in good order to whole steel pipe on scaffold | |
CN205638500U (en) | Large -scale steel shotcrete of variant formula installation movable trolley | |
CN218150028U (en) | Novel building outrigger packway structure | |
CN211396511U (en) | Scaffold frame that building engineering used |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191115 Termination date: 20200425 |