CN209585023U - A kind of dry operation assembled spiral steel pile basis - Google Patents

A kind of dry operation assembled spiral steel pile basis Download PDF

Info

Publication number
CN209585023U
CN209585023U CN201822075446.7U CN201822075446U CN209585023U CN 209585023 U CN209585023 U CN 209585023U CN 201822075446 U CN201822075446 U CN 201822075446U CN 209585023 U CN209585023 U CN 209585023U
Authority
CN
China
Prior art keywords
pile
spiral steel
steel pile
tower
dry operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822075446.7U
Other languages
Chinese (zh)
Inventor
周鲲
陈霖华
徐满华
吴戈
吴广
刘国其
程育林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Jingyan Electric Power Design Co Ltd
State Grid Corp of China SGCC
State Grid Hunan Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Hunan Electric Power Co Ltd
Original Assignee
Hunan Jingyan Electric Power Design Co Ltd
State Grid Corp of China SGCC
State Grid Hunan Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Hunan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Jingyan Electric Power Design Co Ltd, State Grid Corp of China SGCC, State Grid Hunan Electric Power Co Ltd, Economic and Technological Research Institute of State Grid Hunan Electric Power Co Ltd filed Critical Hunan Jingyan Electric Power Design Co Ltd
Priority to CN201822075446.7U priority Critical patent/CN209585023U/en
Application granted granted Critical
Publication of CN209585023U publication Critical patent/CN209585023U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of dry operation assembled spiral steel pile bases, the spiral steel pile being embedded in including spinning in soil layer, the spiral steel pile is formed by steel pipe and around the endless spiral being welded on outer wall of steel pipe, the top and bottom end of the steel pipe, which are respectively welded, is connected with pile crown flange and pile top, has been bolted connection column foot pedestal on the pile crown flange.The stability on entire basis not only can be improved without spoir during spiral steel pile precession in the characteristics of the utility model has process simple, is convenient for constructing operation, but also can reduce soil erosion, and environment-friendly advantage is obvious.Modularization, the factorial production can be achieved, it is simple for production, machining accuracy is high.

Description

A kind of dry operation assembled spiral steel pile basis
Technical field
The utility model belongs to Electric Design technical field more particularly to a kind of dry operation assembled spiral steel pile basis.
Background technique
Currently, the construction of China's ultra-high-tension power transmission line remains in based on manpower, and the state supplemented by machinery, construction machinery Change degree is low.Construction equipment is simple, and personnel's operation intensity is big, low efficiency, risk are higher.As economic society is fast-developing, One line construction personnel is in short supply, and labor cost persistently increases, and the form of construction work of manpower-intensive type is unsustainable.With transmission line of electricity The research of the development of design, overall process mechanized construction is also more and more important.For response State Grid Corporation of China " amphitypy three is new " Construction requirements, provide one kind can batch production processing, assembled construction, reduce live " wet construction ", realize environmental protection construction, raising is applied Work efficiency rate promotes site machineryization construction, reduces labour's investment, reduces site safety risk, improve the electric power of construction quality Pole and tower foundation is a problem urgently to be resolved at present.
Utility model content
The application aims to solve the problem that one of the technical problems existing in the prior art.For this purpose, one of the purpose of this utility model Be to provide it is a kind of can batch production processing, assembled construction, process it is simple, convenient for the dry operation assembled spiral steel of constructing operation Pile foundation.
In order to solve the above technical problems, the technical solution adopted by the utility model is:
A kind of dry operation assembled spiral steel pile basis, is embedded in the spiral steel pile in soil layer, the spiral including spinning Piling bar is formed by steel pipe and around the endless spiral being welded on outer wall of steel pipe, and company is respectively welded in the top and bottom end of the steel pipe It is connected to pile crown flange and pile top, has been bolted connection column foot pedestal on the pile crown flange.
Further, the column foot pedestal is by the rectangular thick steel plate in top, the cross ribbed stiffener and column foot flange welding at middle part It forms, the pile crown flange is bolted connection with the column foot flange, and the rectangular thick steel plate in top is equipped with and shaft tower The kidney slot of tower leg connection.
Further, the pile top is the drill bit that spade antifriction alloy bucket tooth adds pick.
Further, the bottom of the pile crown flange is welded with several stiffeners.
Further, the spiral steel pile, column foot pedestal, pile crown flange and bolt surface are using spray zinc processing.
Further, the density of the spiral steel pile, column foot pedestal and bolt is not more than 7850kg/m3, and intensity is in Q235 Grade or more.
A kind of steel pipe pile foundation electric power line pole tower, including above-mentioned dry operation assembled spiral steel pile basis and tower body, it is described Tower body is fastenedly connected by the shaft tower tower leg of bottom with the column foot bolt of lower base.
Compared with prior art, the utility model has the beneficial effects that:
1) process is simple, is convenient for constructing operation, and a large amount of artificial, efficiency raising about three has been saved compared with conventional cast-in-place basis Times, greatly shorten the duration.
2) generate during spiral steel pile precession without spoir, the stability on entire basis, Er Qieke not only can be improved To reduce soil erosion, environment-friendly advantage is obvious.
3) column foot pedestal, pile crown flange and spiral steel pile can be prefabricated on demand various sizes of section and length in factory, Realize modularization, the factorial production, it is simple for production, machining accuracy is high.
4) steel tower is connect with basis by column foot pedestal, no setting is required cushion cap, can flexible modulation basis pile position deviation, with it He compares undisturbed soil assembling type base, and the connection of this foundation pattern is simple and reliable, and component production is simple, wet-less operation, and no spoir is excellent Gesture is larger.
5) helical blade can be adjusted according to geology Data Design, make its compression, tension and horizontal bearing capacity various aspects stress Performance meets design requirement.
6) spiral steel pile combines long-acting special anti-corrosion method with sacrificial anode using reserved corrosion allowance, can guarantee spiral steel Pile foundation 60 years normal uses of service life under general environment.
7) this foundation pattern can effectively adapt to the requirement of mechanized construction using Fully-mechanized, dry operation.
8) in the lower tower position of soil resistivity, the effect for reaching grounding resistance-reducing may be implemented using spiral steel pile natural grounding Fruit, no setting is required artificial earthing.Not only reduce ground connection expense in this way, simplify construction process, and reduces environment and break ring It is compensated with young crops, the especially reparation of the industrial crops such as nursery, there is good economic benefit.
9) speed of application is fast, is suitable for after calamity the special circumstances such as quick-recovery fastly.
10) after steel tower is removed, spiral steel pile easily can be extracted stake by reversely rotating, and the rate of recovery is up to 100%, in nothing It is also reusable under corrosion condition.
In conclusion the utility model meets the construction requirements of State Grid Corporation of China " amphitypy three new " route, economic benefit, Social benefit is significant, there is preferable promotional value.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the direction A-A schematic cross-section in Fig. 1;
Fig. 3 is the direction B-B schematic cross-section in Fig. 1;
Fig. 4 is the direction C-C schematic cross-section in Fig. 1.
Specific embodiment
The utility model is further described below in conjunction with the drawings and specific embodiments.
Referring to figures 1-4, a kind of dry operation assembled spiral steel pile basis, the spiral steel being embedded in including spinning in soil layer Stake 1, spiral steel pile 1 is formed by steel pipe 1-1 and around the endless spiral 1-2 being welded on steel pipe 1-1 outer wall, is filled out in steel pipe 1-1 Filled with spoir.The top and bottom end of steel pipe 1-1, which is respectively welded, is connected with pile crown flange 3 and pile top 4, and pile crown flange 3 is equipped with tower Leg base 5, column foot pedestal 5 include the cross ribbed stiffener 5-2 and column foot flange 5-3 of the rectangular thick steel plate 5-1 in top, middle part, middle part Cross ribbed stiffener 5-2 company end respectively with top rectangular thick steel plate 5-1 and column foot flange 5-3 be welded to connect, pile crown flange and The face that column foot flange is connected is flange face, and it is tight by bolt 6 that bolt hole, pile crown flange and column foot flange are equipped on flange face It is solidly connected, on top, rectangular thick steel plate 5-1 is equipped with the kidney slot connecting with shaft tower tower leg, is connected, be can be convenient using kidney slot The installation of shaft tower tower leg is adjusted.
The present embodiment process is simple, is convenient for constructing operation, has saved compared with conventional cast-in-place basis largely manually, efficiency mentions Gao Yuesan times, greatly shorten the duration.Without spoir during spiral steel pile precession, the stability on entire basis not only can be improved, And soil erosion can be reduced, environment-friendly advantage is obvious.Column foot pedestal, pile crown flange and spiral steel pile can be prefabricated on demand in factory At various sizes of section and length, modularization, the factorial production are realized, it is simple for production, machining accuracy is high.Steel tower and basis are logical Cross the connection of column foot pedestal, no setting is required cushion cap, can flexible modulation basis pile position deviation, with other undisturbed soil assembling type base phases Than the connection of this foundation pattern is simple and reliable, and component production is simple, wet-less operation, no spoir, and advantage is larger.
Preferably, pile top 4 is the drill bit that spade antifriction alloy bucket tooth adds pick.
Preferably, the bottom of pile crown flange 3 is welded with several stiffeners 8.
Preferably, spiral steel pile 1, column foot pedestal 5, pile crown flange 3 and 6 surface of bolt are using spray zinc processing, spiral steel pile 1, the density of column foot pedestal 5 and bolt 6 is not more than 7850kg/m3, and intensity is at Q235 grades or more.
The work progress that the utility model ring does operation assembled spiral steel pile basis is as follows:
1) modular members such as the corresponding spiral steel pile of prefabrication, column foot pedestal, pile crown flange.
2) construction line setting, unwrapping wire precision controlling is within deviation range.
3) stake machine is in place.
4) spiral steel pile for transporting scene to lifted, feed stake, put fixator, verticality corrects.
5) stake machine is punched to 0.3 meter of underground.
6) verticality is proofreaded.
7) stake, on-demand pile extension are bored.
8) it unloads fixator and shifts.
9) column foot pedestal is installed.
A kind of steel pipe pile foundation electric power line pole tower, including above-mentioned dry operation assembled spiral steel pile basis and tower body, tower body It is fastenedly connected by the shaft tower tower leg and column foot bolt of lower base of bottom.Steel tower is connect with basis by column foot pedestal, and no setting is required Cushion cap, can flexible modulation basis pile position deviation, compared with other undisturbed soil assembling type bases, this foundation pattern connection simply may be used It leans on, component production is simple, wet-less operation, no spoir, and advantage is larger.After steel tower is removed, spiral steel pile can be light by reversely rotating Pine extracts stake, and the rate of recovery is also reusable in corrosion-free situation up to 100%.
Above-described embodiment is only to clearly demonstrate examples for clearly illustrating the present invention, rather than the restriction to embodiment. For those of ordinary skill in the art, other various forms of variations can also be made on the basis of the above description Or it changes.Here without can not be also exhaustive to all embodiments.And the obvious variation thus amplified out Or it changes among still in the protection scope of the utility model.

Claims (6)

1. a kind of dry operation assembled spiral steel pile basis, it is characterised in that: it is embedded in the spiral steel pile in soil layer including spinning, The spiral steel pile is formed by steel pipe and around the endless spiral being welded on outer wall of steel pipe, the top and bottom end point of the steel pipe It is not welded and connected with pile crown flange and pile top, has been bolted connection column foot pedestal on the pile crown flange.
2. dry operation assembled spiral steel pile basis according to claim 1, it is characterised in that: the column foot pedestal is by tower Footwork is blue, the cross ribbed stiffener of shaft tower junction steel plate and support connection therebetween forms, the pile crown flange and the tower Footwork orchid is bolted connection, and the shaft tower junction steel plate is equipped with the kidney slot connecting with shaft tower tower leg.
3. dry operation assembled spiral steel pile basis according to claim 1, it is characterised in that: the pile top is that spade is resistance to Adjustment gold bushel tooth adds the drill bit of pick.
4. dry operation assembled spiral steel pile basis according to claim 1, it is characterised in that: the bottom of the pile crown flange Several stiffeners are welded between portion and steel pipe.
5. dry operation assembled spiral steel pile basis according to claim 1, it is characterised in that: the spiral steel pile, tower Leg base, pile crown flange and bolt surface are using spray zinc processing.
6. dry operation assembled spiral steel pile basis according to claim 1, it is characterised in that: the spiral steel pile, tower The density of leg base and bolt is not more than 7850kg/m3, and intensity is at Q235 grades or more.
CN201822075446.7U 2018-12-11 2018-12-11 A kind of dry operation assembled spiral steel pile basis Active CN209585023U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822075446.7U CN209585023U (en) 2018-12-11 2018-12-11 A kind of dry operation assembled spiral steel pile basis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822075446.7U CN209585023U (en) 2018-12-11 2018-12-11 A kind of dry operation assembled spiral steel pile basis

Publications (1)

Publication Number Publication Date
CN209585023U true CN209585023U (en) 2019-11-05

Family

ID=68348764

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822075446.7U Active CN209585023U (en) 2018-12-11 2018-12-11 A kind of dry operation assembled spiral steel pile basis

Country Status (1)

Country Link
CN (1) CN209585023U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111893874A (en) * 2020-07-31 2020-11-06 广西交科集团有限公司 Anticorrosion method for lower structure connecting part of pile-column integrated prefabricated bridge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111893874A (en) * 2020-07-31 2020-11-06 广西交科集团有限公司 Anticorrosion method for lower structure connecting part of pile-column integrated prefabricated bridge

Similar Documents

Publication Publication Date Title
CN209585023U (en) A kind of dry operation assembled spiral steel pile basis
CN105604081A (en) Offshore wind turbine rock-socketed foundation suitable for batholithic seabed and construction method of offshore wind turbine rock-socketed foundation
CN204753621U (en) Power transmission sequence iron tower is with compound basis
CN204825949U (en) Marine fan basis connection structure of pipe posture of driving piles in advance
CN204608823U (en) A kind of anchor bar bundle embedding rock formula offshore wind turbine High-Rise Pile Cap Foundation
CN106193092B (en) A kind of wind turbine discharge structure and its water discharge method and production method
CN204491567U (en) Pre-manufactured steel pile tube wind power generation platform
CN205116207U (en) Offshore wind farm fan combined type embedded rock pile basis
CN204540076U (en) A kind of energy-conservation cliff greening system
CN103790156A (en) Square buckle plate mechanical pile splicing method for precast square piles
CN106555399A (en) A kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement and its construction method
CN103790157A (en) Circular buckle plate mechanical pile splicing method for precast square piles
CN105804111B (en) A kind of Length discrepancy leg offshore wind farm jacket basis and its construction method
CN106703065B (en) Rock-bolt blower foundation underwater construction engineering method
CN209339163U (en) A kind of support construction for open-pit slope
CN105714844A (en) Compound foundation for power transmission tower
CN209723015U (en) A kind of power line tower composite foundation
CN203684258U (en) Prefabricated concrete rod sleeve foundation
CN102493495B (en) Method and structure for reinforcing high voltage transmission tower
CN203411988U (en) Independent medium-sized pile foundation
CN104695411B (en) Prefabricated composite structural steel pile tube wind power generation platform
CN206448270U (en) A kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement
CN205776308U (en) A kind of Length discrepancy lower limb offshore wind farm catheterostat basis
CN104033000A (en) Wind power tower with long and short legs
CN103790153A (en) Circular buckle plate mechanical pile splicing method for precast square piles

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant