Prefabricated composite structural steel pile tube wind power generation platform
Technical field
The present invention relates to a kind of offshore wind power generation basic facility, particularly relate to a kind of pre-manufactured steel pile tube wind
Power generation platform.
Background technology
Wind-powered electricity generation is new forms of energy with the fastest developing speed in world wide, and up to the present, China exists
Large quantities of land wind energy turbine set has been built up in the Inner Mongol, Xinjiang, Gansu, northeast and the coastal region in east China.But
Along with the fast development of wind-powered electricity generation industry, land wind-resources has used totally, and offshore wind farm is imperative,
And China has very long coastline, and abundant offshore wind energy resource, offshore wind farm will obtain considerable
Development.The data announced according to National Energy Board will have 44 offshore wind farm projects in showing following 2 years
Go into operation, it can be seen that the coming years, offshore wind farm market prospect was the most wide.
Generally land wind power foundation is broadly divided into concrete spread foundation and pile foundation, sea turn
Power generating basis and land wind power foundation are clearly distinguished from, owing to seabed generally is Muddy Bottoms
Soil or the soft soil foundation of flour sand great soil group, foundation bearing capacity is the most on the low side, and offshore wind power generation basic is also
The impact of wave to be considered, containing substantial amounts of sulfate ion and chloride ion, therefore sea turn in sea water
The etching problem of power generating basis sea water to be considered.
Existing Oversea wind power generation platform pile foundation structure is substantially piling bar, and steel are in the seawater
Corrosion phenomenon always is the key factor affecting platform service life, and platform needs a large amount of scenes to water
Building operation, work on the spot amount is big, and operation inconvenience, efficiency is low.Along with increasing Oversea wind is sent out
Level platform comes into operation, and studies a kind of side effectively extending platform service life and improving on-the-spot efficiency
Formula has major and immediate significance.
Summary of the invention
Present invention is primarily targeted at, overcome the defect that existing offshore wind power platform exists, and carry
For a kind of novel Prefabricated composite structural steel pile tube wind power generation platform, extend the service life of platform, from
And be more suitable for practicality, and there is the value in industry.
The object of the invention to solve the technical problems realizes by the following technical solutions.Foundation
The Prefabricated composite structural steel pile tube wind power generation platform that the present invention proposes, includes fastener for connection section, puts down
Platform, prefabricated pile and foundation steel pile,
Described fastener for connection section is arranged on the platform upper surface of horizontal positioned, described fastener for connection section and institute
State platform perpendicular,
The lower surface of described platform is supported by multiple prefabricated piles being disposed in parallel relation to one another, described prefabricated pile
Bottom is connected with foundation steel pile;Described platform uses grouting treatment with prefabricated pile junction, it is ensured that even
Connect intensity, and when the absolute altitude of junction is positioned at climax more than water level, it is to avoid seawater corrosion.
The position that described platform lower surface is connected with prefabricated pile is provided with groove, the top of described prefabricated pile
Portion's card and in described groove;
It is connected by bayonet arrangement with between foundation steel pile bottom described prefabricated pile, described foundation steel pile
Being squeezed into sea bed supporting course by piling machinery, foundation steel pile top absolute altitude exceeds sea bed elevation of top.
Further, aforesaid Prefabricated composite structural steel pile tube wind power generation platform, described platform is
Triangular structure, at the gable top of the lower surface that described groove is separately positioned on described platform, institute
State prefabricated pile to be arranged in described groove so that connect more firm.
Further, aforesaid Prefabricated composite structural steel pile tube wind power generation platform, described prefabricated pile
For combinative structure, internal for being perpendicular to the reinforcing bar that described platform is arranged, the outer surface of described reinforcing bar is arranged
There are external wrapping concrete, a large amount of sulfate ions comprised in significantly more efficient prevention sea water and chloride ion band
The etching problem come, prefabricated pile uses prefabrication, has only to integral hoisting at the scene during construction,
Save on-site construction operations difficulty, improve efficiency.
Further, aforesaid Prefabricated composite structural steel pile tube wind power generation platform, described prefabricated pile
Bottom be provided with bayonet arrangement.
Further, aforesaid Prefabricated composite structural steel pile tube wind power generation platform, described bayonet socket is tied
The internal diameter of structure is more than the external diameter of described foundation steel pile, and the top of described foundation steel pile is arranged on described bayonet socket
In the bayonet socket of structure, connecting portion uses grouting treatment, and connecting portion is higher than sea bed absolute altitude, is positioned at
In sea water.
Further, aforesaid Prefabricated composite structural steel pile tube wind power generation platform, the also company of including
Fishplate bar, described connecting plate is cirque structure, and described connecting plate is welded on outside described fastener for connection section
Portion, is bolted and fixes on the platform.
Further, aforesaid Prefabricated composite structural steel pile tube wind power generation platform, described steel pipe connecting
What the outer surface of the section of connecing tilted is fixedly installed bracing members, and described bracing members is multiple, preferably 3.
Further, aforesaid Prefabricated composite structural steel pile tube wind power generation platform, described bracing members
And in 30 °~60 ° of angles, preferably 30 ° or 45 ° between horizontal plane.
By technique scheme, the Prefabricated composite structural steel pile tube wind power generation platform of the present invention is at least
Have the advantage that
The Prefabricated composite structural steel pile tube wind power generation platform infrastructure of the present invention, is positioned in sea water
For steel reinforced concrete prefabricated pile, by arranging concrete in reinforcing bar outer wrapping, can solve to greatest extent
The etching problem that a large amount of sulfate ions and the chloride ion comprised in sea water brings, by by work platforms,
Steel reinforced concrete prefabricated pile uses the operation of prefabrication, greatly reduces the operation of marine site operation
Amount, improves efficiency;The lower outside welding of fastener for connection section arranges connecting plate, by increasing capacitance it is possible to increase steel pipe connecting
The section of connecing and the bonding strength of platform;Tilt in the periphery of fastener for connection section arranges multiple bracing members, uses
In supporting steel pipe linkage section, its fixed effect of significantly more efficient guarantee.
Described above is only the general introduction of technical solution of the present invention, in order to better understand the present invention's
Technological means, and can be practiced according to the content of description, below with presently preferred embodiments of the present invention
And after coordinating accompanying drawing to describe in detail such as.
Accompanying drawing explanation
Fig. 1 is the structural representation of Prefabricated composite structural steel pile tube wind power generation platform of the present invention;
Fig. 2 is the top view of Prefabricated composite structural steel pile tube wind power generation platform of the present invention;
Labelling implication in figure: 1. fastener for connection section, 2. bracing members, 3. connecting plate, 4. platform, 5. sea water,
6. sea bed, 7. bolt, 8. groove, 9. reinforcing bar, 10. prefabricated pile, 11. foundation steel pile, 12. external wrapping concretes,
13. bayonet arrangement.
Detailed description of the invention
By further illustrate the present invention by reaching the technological means taked and effect of predetermined invention, with
Lower combination accompanying drawing and preferred embodiment, after the detailed description of the invention detailed description such as of the present invention.
The structure of the Prefabricated composite structural steel pile tube wind power generation platform of the present invention as shown in Figure 1 and Figure 2
Schematic diagram, includes fastener for connection section 1, bracing members 2, connecting plate 3, platform 4, sea water 5, sea bed
6, bolt 7, groove 8, reinforcing bar 9, prefabricated pile 10, foundation steel pile 11, external wrapping concrete 12 and card
Mouth structure 13.
Fastener for connection section 1 and the horizontally disposed perpendicular setting of platform 4, be positioned at the upper surface of platform 4
Centre position, wherein connecting plate 3 is a cirque structure, and annular connecting plate 3 is welded on steel pipe
Bottom the excircle of linkage section 1, it is fixed on platform 4 by bolt 4.In fastener for connection section 1
Three bracing members 2 it are provided with uniformly on excircle, bracing members 2 one end connecting platform 4 upper surface, one
The excircle of end joint steel pipe linkage section 1, wherein bracing members 2 is arranged horizontal by 45 ° of angles, has
Its fixing stability of the guarantee of effect.
Wherein platform 4 is armored concrete precast construction part, is shaped as triangle, at the end of platform 4
Being provided with circular groove 8 on lower surface, the diameter of circular groove 8 is slightly larger than the external diameter of prefabricated pile 10,
Block in groove 8 structure of platform 4 bottom is inserted on prefabricated pile 10 top and fix, thus supporting flat
Platform 4, connecting portion use grouting treatment, and more than water level time absolute altitude is positioned at climax, effectively keep away
Exempt from the corrosion of sea water.
The cross section of prefabricated pile 10 is circular, uses factory process prefabricated, has only to whole time at the construction field (site)
Body is installed, and prefabricated pile 10 is main by reinforcing bar 9, the commercially available external wrapping concrete 12 with anticorrosion ability
Form with bottom bayonet arrangement 13.Prefabricated pile 10 top is connected with platform 4, bottom and foundation steel pile
11 are connected.Wherein the bayonet socket internal diameter of prefabricated pile 10 lower end bayonet arrangement 13 is slightly larger than foundation steel pile 11
External diameter, by the top card of foundation steel pile 11 with in the bayonet socket of bayonet arrangement 13 during connection, wherein blocks
Mouth junction is positioned in sea water 5, uses underwater grouting to process, it is ensured that the intensity of junction.
Foundation steel pile 11 is round steel pipe, and its top absolute altitude is positioned at more than the elevation of top of sea bed 6, by
Piling machinery is driven into sea bed 6 supporting course, to ensure fixing firmness.
When concrete installation operation, foundation steel pile 11 is driven into sea bed 6 supporting course and fixes by piling machinery,
Prefabricated pile 10 integral hoisting factory process completed, to foundation steel pile 11 end face elevation location, is passed through
Prefabricated pile 10 is fixed on foundation steel pile 11 upper end by prefabricated pile 10 lower end bayonet arrangement 13, and even
The place of connecing carries out underwater grouting process, it is ensured that installation strength.
After prefabricated pile 10 installation and junction, lower end have some strength, by the reinforcing bar of prefabrication
Concrete platform 4 lifts to prefabricated pile 10 end face absolute altitude, groove 8 and the prefabricated pile 10 of platform 4
End face one_to_one corresponding, and grouting treatment is used in groove 8 junction, strengthen interconnection function.
After armored concrete prefabricated platform 4 installation, by top steel pipe linkage section 1 by lower margin spiral shell
Bolt 7 is connected on platform 4, arranges three uniformly at fastener for connection section 1 excircle after having connected
Bracing members 2, it is ensured that its stability.Wind power tower drum carries out corresponding to fastener for connection section 1 by flange
Connect.
The above, be only presently preferred embodiments of the present invention, and the present invention not makees any form
On restriction, although the present invention is disclosed above with preferred embodiment, but is not limited to this
Bright, any those skilled in the art, in the range of without departing from technical solution of the present invention, when can
The technology contents utilizing the disclosure above is made a little change or is modified to the Equivalent embodiments of equivalent variations,
In every case it is the content without departing from technical solution of the present invention, implements above according to the technical spirit of the present invention
Any simple modification, equivalent variations and the modification that example is made, all still falls within the model of technical solution of the present invention
In enclosing.