CN209723015U - A kind of power line tower composite foundation - Google Patents

A kind of power line tower composite foundation Download PDF

Info

Publication number
CN209723015U
CN209723015U CN201920359055.XU CN201920359055U CN209723015U CN 209723015 U CN209723015 U CN 209723015U CN 201920359055 U CN201920359055 U CN 201920359055U CN 209723015 U CN209723015 U CN 209723015U
Authority
CN
China
Prior art keywords
foundation
tower
steel pipe
anchor base
power line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920359055.XU
Other languages
Chinese (zh)
Inventor
刘育彤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920359055.XU priority Critical patent/CN209723015U/en
Application granted granted Critical
Publication of CN209723015U publication Critical patent/CN209723015U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

A kind of power line tower composite foundation, it is characterized by comprising armored concrete flexible foundations and spiral anchor base two large divisions, anchoring has several foundation bolts to constitute foundation bolt group in the principal post of armored concrete flexible foundation, foundation bolt group is eccentric to steel tower center position, for being connected with steel tower tower leg, the steel pipe upper end of spiral anchor base is welded with anchor plate, it is perfused with pea gravel concreten or mortar in steel pipe, the steel pipe and upper end anchor plate integral fastening of spiral anchor base are in forming composite foundation in the bottom plate of armored concrete flexible foundation.The advantages of the utility model binding reinforcement concrete flexible foundation and spiral anchor base, the characteristic for taking full advantage of upper reinforcement concrete flexible foundation and the work of lower part helical anchor foundation tunable, can effectively meet the requirement of clay, sandy soil, weak soil, marsh or deformation and bearing capacity under the big loading condition of River Network power transmission line iron tower foundation.

Description

A kind of power line tower composite foundation
Technical field
The utility model belongs to power line tower basic technology field, more particularly, to a kind of foundation bolt flexible foundation The composite foundation combined with spiral anchor base.
Background technique
Normal spiral anchor foundation have speed of application is fast, construction efficiency is high, reduce the advantages such as labor intensity and project cost, But for the transmission line of electricity of current voltage levels, the active force of iron tower foundation is increasing, merely by spiral anchor base It is unable to satisfy its bearing capacity and stability requirement, and spiral anchor base is not advantageous for pushing bearing capacity aspect.
Normal flexible shallow foundation is the main foundation pattern used always on power transmission sequence, this kind of basis is to geology item Part is of less demanding, construction is simple, is applicable to most of geological conditions, has the characteristics that applied widely.But due to transmission of electricity The base control operating condition of each leg of overhead line structures is all uplift force or lower pressure, vertical force and horizontal force pair with horizontal force component Substrate generates moment of flexure, makes substrate discontinuity, so that it is simultaneously unknown to improve basic amount of concrete and quantity of reinforcement, economy It is aobvious.
Utility model content
The purpose of the utility model is to provide a kind of eccentric foundation bolt composite foundation with Screw Anchor, for clay, Sandy soil, weak soil, marsh or the tower of River Network position, meet its bearing capacity and stability requirement, and substrate uniform force reduces basis Amount of concrete and quantity of reinforcement, improve basis economy.
To achieve the above object, the utility model provides a kind of power line tower composite foundation, it is characterised in that: including Armored concrete flexible foundation and spiral anchor base two large divisions, the interior anchoring of the principal post of armored concrete flexible foundation have severally Foot bolt constitutes foundation bolt group, and foundation bolt group is eccentric to steel tower center position, for being connected with steel tower tower leg, Screw Anchor The steel pipe upper end on basis is welded with anchor plate, and pea gravel concreten or mortar, the steel pipe of spiral anchor base and upper end are perfused in steel pipe Anchor plate integral fastening is in forming composite foundation in the bottom plate of armored concrete flexible foundation.
The foundation bolt surrounds rectangular or round, uniform force, improves stability.
The steel pipe axis and vertical direction of the spiral anchor base at 0-20 ° of angle, improve foundation anti-pulling power outward.
It is equipped with hole above the anchor plate, is used for bind precession tool.
Deep floor is set between two neighboring hole below the anchor plate.
The advantages of the utility model binding reinforcement concrete flexible foundation and spiral anchor base, take full advantage of upper reinforcement The characteristic of concrete flexible foundation and the work of lower part helical anchor foundation tunable, can effectively meet clay, sandy soil, weak soil, marsh Or the requirement of the deformation and bearing capacity under the big loading condition of River Network power transmission line iron tower foundation.Screw anchor foundation construction precession The mode manually or mechanically crept into can be used, foundation construction is smaller to soil disturbance, the bearing capacity of undisturbed soil can be given full play to, Its structure is simple, and reliable operation, mechanized operation is strong, effectively reduces earthwork excavated volume, reduces artificial investment and disappears with material Consumption, with compared with conventional bases other under geological conditions, composite foundation economic benefit is good, and because its construction is not limited by season System, speed of application is fast, while reducing environmental pollution, the construction period is greatly shortened, to power transmission line roadbed of pioneering and inventing Plinth form of construction work is of great significance.
The utility model is through analytical calculation, armored concrete flexible foundation part and spiral anchor base under ultimate bearing capacity Part can cooperate, and resist external load well.It is small using the utility model excavation of foundation pit amount through comparing, meet engineering Quantity of material is saved in the environmental protection requirement of construction.
Detailed description of the invention
Fig. 1 is the eccentric foundation bolt composite foundation elevation with Screw Anchor;
Fig. 2 is the eccentric foundation bolt composite foundation plan view with Screw Anchor;
Fig. 3 is spiral anchor base partial schematic diagram;
Fig. 4 is the cross-sectional view of the line A-A along Fig. 3;
Fig. 5 is the cross-sectional view of the line B-B along Fig. 3.
In figure:
1 represents the bottom parts of armored concrete flexible foundation;
2 represent in spiral anchor base part with cuspidated steel pipe;
3 represent the Steel coil shape blade in spiral anchor base part;
4 represent the foundation bolt connecting with steel tower tower leg;
5 represent the principal post of armored concrete flexible foundation;
6 represent the endless foraminous anchor plate in spiral anchor base part on welded still pipe outer edge;
7 represent the deep floor of the annular anchor plate in spiral anchor base part on welded still pipe outer edge;
8 represent the interior pea gravel concreten or mortar being perfused of steel pipe component in spiral anchor base part.
Specific embodiment
The preferred embodiment of the utility model is illustrated below, it should be understood that preferred embodiment described herein It is only used for describing and explaining the present invention, is not used to limit the utility model.
Referring to Fig.1, Fig. 2, the utility model mainly include armored concrete flexible foundation and spiral anchor base two large divisions, Anchoring has 4 foundation bolts in the principal post 5 of armored concrete flexible foundation, and the foundation bolt group that 4 foundation bolts surround is in side Shape and eccentric to steel tower center position, for being connected with steel tower tower leg.The wobbler action of foundation bolt group is vertical in order to make The moment of flexure that power and horizontal force generate substrate offsets, and for substrate, change eccentric force reduces or eliminates substrate into axial force Discontinuity also makes each Screw Anchor uniform force, to reduce the quantity of material on basis.It is filled in the steel pipe 2 of spiral anchor base It is marked with pea gravel concreten or mortar 8.2 upper end welding hole circular ring shape anchor plate 6 of steel pipe, circular ring shape anchor plate 6 below adjacent two hole Between be arranged triangle deep floor 7, steel pipe 2, circular ring shape anchor plate 6 and 7 three's integral fastening of triangle deep floor are in steel In the bottom plate 1 of reinforced concrete flexible foundation.3 uniform welding of spiral vane is in 2 lower part of steel pipe, the bolt of circular ring shape anchor plate 6 Construction is kept in hole, does bind precession tool use.
To increase rigidity of the steel pipe when constructing precession, pea gravel concreten or mortar 8 should be filled into advance in steel pipe 2, to It can precession use after to solidification.
Elder generation's excavation pit when construction, then using mechanically or manually mode every perfusion pea gravel concreten of precession in foundation pit Or the Screw Anchor of mortar, and the anchorage length part of Screw Anchor is reserved, it is then cast in foundation pit with eccentric foundation bolt Flexible foundation part.Under conditions of construction machinery allows, Screw Anchor steel pipe axis is overlapped with vertical direction, can be generated bigger Foundation anti-pulling power.For the basic role power that top iron tower structure transmits, uplift force component can by step foundation and Spiral anchor base part carries out the distribution of power, works at the same time, undertakes respectively.For horizontal force, the lateral of step basis will be passed through Soil provides drag.For lower pressure, Foundation pressure mainly is provided by the soil body under step sole plate.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, although ginseng The utility model is described in detail according to previous embodiment, it for those skilled in the art, still can be with It modifies to the technical solution of previous examples or equivalent replacement of some of the technical features.It is all in the utility model Spirit and principle within any modification, equivalent substitution and improvement done, should be included in the protection scope of the utility model it It is interior.

Claims (5)

1. a kind of power line tower composite foundation, it is characterised in that: including armored concrete flexible foundation and spiral anchor base Two large divisions, the interior anchoring of the principal post of armored concrete flexible foundation have several foundation bolts to constitute foundation bolt groups, foundation bolt Group is eccentric to steel tower center position, and for being connected with steel tower tower leg, the steel pipe upper end of spiral anchor base is welded with anchor plate, steel pipe It is inside perfused with pea gravel concreten or mortar, the steel pipe and upper end anchor plate integral fastening of spiral anchor base are in armored concrete flexibility Composite foundation is formed in the bottom plate on basis.
2. a kind of power line tower composite foundation according to claim 1, it is characterised in that: the foundation bolt encloses Squarely or circle.
3. a kind of power line tower composite foundation according to claim 1, it is characterised in that: the spiral anchor base Steel pipe axis and vertical direction outward at 0-20 ° of angle, improve foundation anti-pulling power.
4. a kind of power line tower composite foundation according to claim 1, it is characterised in that: above the anchor plate Equipped with hole, used for bind precession tool.
5. a kind of power line tower composite foundation according to claim 1, it is characterised in that: below the anchor plate Deep floor is set between two neighboring hole.
CN201920359055.XU 2019-03-21 2019-03-21 A kind of power line tower composite foundation Expired - Fee Related CN209723015U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920359055.XU CN209723015U (en) 2019-03-21 2019-03-21 A kind of power line tower composite foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920359055.XU CN209723015U (en) 2019-03-21 2019-03-21 A kind of power line tower composite foundation

Publications (1)

Publication Number Publication Date
CN209723015U true CN209723015U (en) 2019-12-03

Family

ID=68687621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920359055.XU Expired - Fee Related CN209723015U (en) 2019-03-21 2019-03-21 A kind of power line tower composite foundation

Country Status (1)

Country Link
CN (1) CN209723015U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023071327A1 (en) * 2021-10-27 2023-05-04 中国电建集团山东电力建设第一工程有限公司 Fabricated flexible damping screw anchor foundation and power transmission tower

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023071327A1 (en) * 2021-10-27 2023-05-04 中国电建集团山东电力建设第一工程有限公司 Fabricated flexible damping screw anchor foundation and power transmission tower

Similar Documents

Publication Publication Date Title
CN108867688A (en) A kind of offshore wind turbine gravity type foundation and its installation method
CN205242427U (en) Novel iron tower basis
CN108867684A (en) Offshore wind turbine gravity caisson basis and its installation method
CN202247934U (en) Deep-buried barrel type wind turbine generator base structure
CN201722776U (en) Beam column nodal point suitable for square steel pipe column
CN111236294A (en) Combined cylinder structure fan foundation
CN108560542A (en) A kind of waste tire cladding builds the two-directed reinforcement and its construction method of slag
CN108677992A (en) Offshore wind turbine prestressing force gravity type foundation and its installation method
CN204753621U (en) Power transmission sequence iron tower is with compound basis
CN201485863U (en) Digging rock bolt compound environment-protection basis
CN101255699B (en) Novel structure inclined inserting digging hole pile foundation
CN209723015U (en) A kind of power line tower composite foundation
CN208763050U (en) Offshore wind turbine gravity caisson basis
CN203498860U (en) Anchor rod foundation structure with concrete blocks for photovoltaic module brackets
CN208917861U (en) A kind of offshore wind turbine gravity type foundation
CN206308701U (en) A kind of important actor back taper basis high
CN204491567U (en) Pre-manufactured steel pile tube wind power generation platform
CN207092118U (en) A kind of top carries the caisson composite foundation of oblique anchor pole
CN210439324U (en) Prefabricated pier plate beam type foundation of lattice type concrete wind power tower
CN204125935U (en) A kind of micropore castinplace pile being applicable to solar photovoltaic bracket basis
CN211898511U (en) Combined cylinder structure fan foundation
CN205046569U (en) Annular wind -powered electricity generation foundation structure based on shaping of two ripple steel cylinder
CN201151913Y (en) Novel structure obliquely inserted excavation pile base
CN213390202U (en) Combined type polygonal tubular structure fan foundation
CN208472751U (en) Offshore wind turbine prestressing force gravity type foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191203

Termination date: 20210321

CF01 Termination of patent right due to non-payment of annual fee