Digging composite environmental protection base of anchorage bar adding rock
Technical field
The utility model relates to the basic field of high pressure, super-pressure and extra-high voltage power line tower.
Background technology
State Grid Corporation of China to power engineering construction related environmental protection pay much attention to, environmental protection work is brought up to the height of national grid sustainable development.Requirement among the DL/T5219-2005 " aerial power transmission line basic engineering technical stipulation "; basic engineering must adhere to protecting environment and the principle that economizes on resources; according to circuit landform, execution conditions, geotechnical investigation data; take all factors into consideration basic pattern and design scheme, make basic engineering reach the purpose of safety, economical rationality.
Pole and tower foundation is as the important component part of overhead transmission line, and its cost, duration and labor consumption account for very big proportion in whole line project.Add up according to interrelated data: in general overhead transmission line engineering construction, the basis duration accounts for half of whole duration of a project, the basis freight volume accounts for 60%, and expense accounts for 15%~35% of body cost, and the shared ratio of foundation cost expense also can be higher under the special foundation condition.This shows,, reduce engineering construction cost, select for use science and rational basic pattern and construction technology imperative with suiting measures to local conditions for concrete and the amount of reinforcement that reduces the project of transmitting and converting electricity pole and tower foundation.
The basis accomplished not only economy but also environmental protection in power transmission sequence in the past, no more than adopting undisturbed soil basis pattern, Here it is draws and digs type basis or Rock Bolt Foundation.Digging foundation is direct digging foundation hole in ground, inserts reinforcing bar, penetration concrete and the basis that forms.This basis earthwork is less, and is less to landform and vegetation deterioration, can make full use of the undisturbed soil characteristic, pull out bearing capacity on it to improve, and can reduce the lateral deformation on basis, do not need formwork when casting concrete again, but the reduction of erection time is reduced operating expenses, and what it calculated employing is shearing method.
Rock Bolt Foundation is a kind of base for post of directly building on the rock, is directly to hole, insert reinforcing bar on rock, pours into cementitious materialss such as pea gravel concreten or mortar then, the basis that reinforcing bar and rock tight bond are formed.Though this basic calculation is complicated, calculating train of thought is more clearly.Because this basis utilizes rock itself, have advantages such as the concrete of saving, steel and site operation workload are little, remarkable economic efficiency is arranged.
In a word, digging foundation or Rock Bolt Foundation are paid attention to by vast work about electric power person once coming out as a kind of basic pattern.On the one hand, they have made full use of the high-bearing of undisturbed soil or rock, the characteristics of low distortion, bear big vertical force of shaft tower and horizontal force; On the other hand, its excavated volume is little, has reduced environment damage, has reduced base concrete and steel material again.Certainly, for digging foundation himself shortcoming is arranged also, it is higher to the geology conditional request, and general requirements geology is viscosity class soil, draws to dig for broken rock and soil and foundation ditch to be difficult to moulding and maybe can not to draw the tower position of digging and can not use.Because it is limited that the expansion of digging foundation bottom is dug, the base plate diameter should not be too big, uses in the tower position that basic role power is bigger, and economic benefit is not too obvious.For Rock Bolt Foundation himself shortcoming is arranged also, this basic general requirements rock is exposed, or covering layer and weathered layer are more shallow, but this tower position is difficult to just in time appear on the tower position of circuit.If the rock stratum is very dark, just be difficult to use, often be designed to heavy excavation type basis this moment, and earth volume is very big, influences environment, does not make full use of the bearing capacity of basement rock again.
Investigation shows that a lot of regional geology conditions mainly are that the face of land is covered by argillic horizon, and thickness is generally 1.5~2.5m, below is severely-weathered or the medium weathering rock stratum.As adopting the heavy excavation pattern, easily cause environment extensive damage and the big consequence of Foundation Design consumable quantity on this regional electric power line pole tower basis; If employing digging foundation, thickness of clay soil are often not enough, can't all manually draw and dig; If employing rock foundation needs also to cause excavated volume to increase top layer clay excavation, be unfavorable for environmental protection.
The utility model content
Technical problem to be solved in the utility model provides a kind of digging composite environmental protection base of anchorage bar adding rock; can make full use of undisturbed soil ground bearing capacity height, the little good engineering mechanics performance of distortion; satisfy the environmental protection requirement of engineering construction, the economical with materials amount.
For solving the problems of the technologies described above, the utility model provides a kind of digging composite environmental protection base of anchorage bar adding rock, it is characterized in that: comprise the digging foundation that constitutes by basic principal post and basic chassis, arrangement of reinforcement, anchor pole, the basis principal post is a cylinder, principal post upper end, basis is provided with stone bolt, round table-like basic chassis is positioned at below the basic principal post, arrangement of reinforcement is to dispose main muscle at basic principal post circumference, main muscle lower end anchors in the basic chassis, main muscle circumference configuration is some circular stirrups up and down, main muscle and dowel are positioned on the same circumference, dowel, main muscle and stirrup colligation or weld together, anchor pole is mortar or pea gravel concreten and the dowel bottom composition in the mechanical hole building, there is screw thread the dowel upper end and is with nut and pad, basis principal post and basic chassis are linked as integral body by main muscle and dowel, and by the moulding of concrete one-time-concreting, basic chassis and anchor pole are linked as integral body by running through whole basis dowel up and down.
In order to increase anchorage effect, double welding is connected to bar dowel in the dowel lower end.
The utility model calculates and verification experimental verification by analysis; but digging foundation part and the collaborative work of anchor pole part under ultimate bearing capacity; resist external load well; can make full use of undisturbed soil ground bearing capacity height, the little good engineering mechanics performance of distortion; satisfy the environmental protection requirement of engineering construction, the economical with materials amount.
Description of drawings
Fig. 1 is the digging composite environmental protection base of anchorage bar adding rock elevation;
Fig. 2 is a digging composite environmental protection base of anchorage bar adding rock 1-1 sectional drawing;
Fig. 3 is a digging composite environmental protection base of anchorage bar adding rock 2-2 sectional drawing;
Fig. 4 is a digging composite environmental protection base of anchorage bar adding rock dowel schematic diagram.
The specific embodiment
With reference to Fig. 1, Fig. 2, Fig. 3, Fig. 4, the utility model comprises the digging foundation that is made of basic principal post 1 and basic chassis 2, arrangement of reinforcement, anchor pole 10, the basis principal post is a cylinder, principal post upper end, basis is provided with stone bolt 4, round table-like basic chassis is positioned at below the basic principal post, arrangement of reinforcement is to dispose main muscle 5 at basic principal post circumference, main muscle lower end anchors in the basic chassis, main muscle circumference configuration is some circular stirrups 6 up and down, main muscle and dowel 3 are positioned on the same circumference, dowel, main muscle and stirrup colligation or weld together, anchor pole is mortar or pea gravel concreten and the dowel bottom composition in the mechanical hole building 9, there is screw thread the dowel upper end and is with nut and pad 7, and dowel lower end double welding is connected to bar dowel 8.Basis principal post and basic chassis are linked as integral body by main muscle and dowel, and by the moulding of concrete one-time-concreting, basic chassis and anchor pole are linked as integral body by running through whole basis dowel up and down.
Chassis, basis and basic principal post adopt digging foundation to calculate principle and promptly adopt shearing method, and the bottom adopts rock bolt to calculate principle.Digging foundation part and anchor pole part are resisted the active force that the top iron tower transmits together, wherein the cohesion between the relative shearing of the soil body and anchor pole and the rock is born jointly on the surface of shear that formed in the soil body by digging foundation of uplift force and horizontal force, and downforce and horizontal force are born by the rock face under the basic chassis.