CN209584965U - A kind of ecological bank protection structure efficiently using river bottom mud - Google Patents
A kind of ecological bank protection structure efficiently using river bottom mud Download PDFInfo
- Publication number
- CN209584965U CN209584965U CN201821914865.9U CN201821914865U CN209584965U CN 209584965 U CN209584965 U CN 209584965U CN 201821914865 U CN201821914865 U CN 201821914865U CN 209584965 U CN209584965 U CN 209584965U
- Authority
- CN
- China
- Prior art keywords
- layer
- barricade
- river
- bottom mud
- protection structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/30—Flood prevention; Flood or storm water management, e.g. using flood barriers
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a kind of ecological bank protection structures for efficiently using river bottom mud, including shore protection retaining wall, plant layer and cover plant layer, and described cover plants layer and be covered in the plantation layer, the shore protection retaining wall and the angled setting of the plantation layer and positioned at river side;The geotechnical grid with geotechnological checkerwork cell in streamline grid type is laid on the plantation layer, bed mud is from injection after river extraction in the geotechnical grid.The ecological bank protection structure; by setting shore protection retaining wall, plants layer and cover plant layer; continuous three layers of design; and by laying the geotechnical grid with geotechnological checkerwork cell in streamline grid type on plantation layer; bed mud is injected in geotechnical grid; so that the utilization rate of river bottom mud is promoted; shore protection repair is strong; it avoids because of the improper bring secondary pollution of sediment; and the treatment in situ of bed mud, labour cost is low, and engineering construction is easy; it is profitable on ecology, be conducive to the bank protection structure in the popularization and application of bank of river ecological protection technical field.
Description
Technical field
The utility model relates to bank of river ecological protection technical field, the life of specifically a kind of effective use river bottom mud
State bank protection structure.
Background technique
With the continuous development of social economy and industry, the discharge aggravation of industrial wastewater, sanitary sewage, a large amount of polluters
It is discharged into river, river bottom mud increases, and substrate deterioration leads to black and odorous water, and aquatic animals and plants are dead, human health has been seriously endangered,
Therefore, how to effectively improve and handle the pith that river bottom mud has become river comprehensive improvement.
Currently, the main methods of bed mud mainly have dredging method and stabilizing method in situ, and dredging method is mechanically
Bed mud is dug out, reduces river endogenous pollution, but the subsequent processing to bed mud not can effectively solve, such as directly landfill can induce
Secondary environmental pollution, or then manpower expends big, somewhat expensive to addition chemicals treatment.Stabilizing method in situ mainly passes through external adding water
Mud, phosphate, lime etc. solidify medicament, change the physicochemical characteristic of bed mud, solidify pollutant, however after constraining to a certain extent
The continuous utilization of resources for solidifying bed mud.
At the same time, river bank slope is generally using manually earthing earth is filled out, and surface layer planting plants, this structure is to the pollution of river
The clean-up effect of object is very poor, and rainwater and washing away for rainwash are easier to cause soil erosion, and there are certain defects.
Summary of the invention
In order to overcome above-mentioned defect in the prior art, the utility model provides a kind of life for efficiently using river bottom mud
State bank protection structure, the bank protection structure is ingenious, efficiently uses river bottom mud, improves bed mud utilization rate, and adsorb using ecological revetment
And degradation of contaminant, the stability of bank protection structure has been effectively ensured, has been conducive to the bank protection structure in bank of river ecological protection skill
The popularization and application in art field.
In order to achieve the above-mentioned object of the invention, the utility model adopts the following technical solution: a kind of effective use river bottom mud
Ecological bank protection structure, including shore protection retaining wall, plant layer and cover plant layer, described cover plants layer and be covered in the plantation layer, described
Shore protection retaining wall is with the angled setting of the plantation layer and positioned at river side;It lays on the plantation layer in streamline grid type
Geotechnical grid with geotechnological checkerwork cell, bed mud is from injection after river extraction in the geotechnical grid.
As a kind of preferred embodiment of the utility model, the shore protection retaining wall includes shore protection barricade outer layer and shore protection barricade
Internal layer, the shore protection barricade internal layer include barricade plantation layer, barricade middle layer and barricade fixing layer, the barricade fixing layer, gear
Wall middle layer and barricade plantation layer are set gradually from bottom to top.
As a kind of preferred embodiment of the utility model, the U-shaped structure of shore protection barricade outer layer, by porous brick stacking
At.
As a kind of preferred embodiment of the utility model, the barricade middle layer is modified zeolite layer, including among barricade
Upper layer and barricade immediate underlying layer, the barricade centre are filled with the FeZn-LDHs modified zeolite that partial size is 5~10mm in upper layer,
The FeZn-LDHs modified zeolite that the barricade immediate underlying layer is 10~20mm filled with partial size.
As a kind of preferred embodiment of the utility model, described 3 layers of geotechnique's checkerwork cell point, 6 settings of every layer of distribution.
As a kind of preferred embodiment of the utility model, the barricade fixing layer is concrete layer, by concrete material system
At.
As a kind of preferred embodiment of the utility model, the shore protection retaining wall is vertically arranged with river water face.
As a kind of preferred embodiment of the utility model, the angle between the shore protection retaining wall and the plantation layer is arranged
It is 30 °~90 °.
The utility model has the following beneficial effects: the ecology shield of one of the utility model effective use river bottom mud
Bank structure by setting shore protection retaining wall, plants layer and covers plant layer, continuous three layers of design, and by laying on plantation layer
In the geotechnical grid with geotechnological checkerwork cell of streamline grid type, bed mud is injected in geotechnical grid, so that the utilization of river bottom mud
Rate is promoted, and shore protection repair is strong, avoids because of the improper bring secondary pollution of sediment, and the treatment in situ of bed mud, people
With low, engineering construction is easy expenses of labour, profitable on ecology, is conducive to the bank protection structure in bank of river ecological protection technical field
It promotes and applies.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that the ecological bank protection structure of river bottom mud is efficiently used in embodiment;
Fig. 2 is the structural schematic diagram of shore protection retaining wall in the ecological bank protection structure for efficiently use in embodiment river bottom mud;
Fig. 3 is that the structure of single geotechnical grid with holes in the ecological bank protection structure for efficiently use in embodiment river bottom mud is shown
It is intended to;
Fig. 4 is the structure exhibition of single geotechnical grid with holes in the ecological bank protection structure for efficiently use in embodiment river bottom mud
Open schematic diagram;
Fig. 5 is the structural representation of multiple geotechnical grids in the ecological bank protection structure for efficiently use in embodiment river bottom mud
Figure;
Fig. 6 is the structural schematic diagram of shore protection retaining wall in the ecological bank protection structure for efficiently use in embodiment river bottom mud.
Appended drawing reference: 1, layer is planted;2, plant layer is covered;3, shore protection retaining wall;31, barricade fixing layer;32, barricade middle layer;
321, upper layer among barricade;322, barricade immediate underlying layer;33, barricade plants layer;34, barricade outer layer;4, river water face;6, Tu Gongge
Room;61, geotechnological checkerwork cell.
Specific embodiment
It elaborates with reference to the accompanying drawing to embodiment.
Embodiment: as shown in Figures 1 to 6, a kind of ecological bank protection structure efficiently using river bottom mud is mainly kept off by shore protection
Cob wall 3 is planted layer 1 and is covered and plants the composition of layer 2, covers plant layer 2 and is covered on above-mentioned plantation layer 1, shore protection retaining wall 3 and above-mentioned plantation layer
The 1 angled geotechnical grid with geotechnological checkerwork cell 61 for being arranged and being fixed on river side, plant that laying on layer 1 is in streamline grid type
6, bed mud also sprays bottom into geotechnical grid 6 in above-mentioned geotechnical grid 6, while by injection apparatus from injection after river extraction
The substances such as mud modifying agent, curing agent and fibre plant, fibre plant are stringy solids, and ingredient is shredded coconut meat or stalk, and raw material is easily received
Collection.Use cost is low, and the addition of curing agent and fibre plant keeps bed mud easily blocking, bed mud is prevented to be lost, while can strengthen bed mud
Structure, 6 upper layer of geotechnical grid are to cover to plant layer 2, plant enriching plant, aperture is densely distributed, so that the enriching plant root system of every room
It mutually grows, staggeredly, so that bank protection structure is stronger, avoids the adverse effects such as landslide.
It covers and plants layer 2 on plantation layer 1, every lattice geotechnical grid 6 uniformly sprays vegetable seeds, is changed according to river water level, is covered
It plants, 2 points are humidogene area and bank slope area, and Plants selection super enriching plant can effectively adsorb heavy metal and nitrogen phosphorus etc. in bed mud and seek
Substance is supported, can be after planting plants after bed mud solidification, sample detection bed mud content of material ingredient determines the kind covered and plant layer plant according to this
Class.
Shore protection retaining wall 3 includes shore protection barricade outer layer 34 and shore protection barricade internal layer, and above-mentioned shore protection barricade internal layer includes barricade
Layer 33, barricade middle layer 32 and barricade fixing layer 31 are planted, above-mentioned barricade fixing layer 31 is concrete layer, by concrete material
Piling is made, and above-mentioned barricade fixing layer 31, barricade middle layer and barricade plantation layer 33 are set gradually from bottom to top, above-mentioned shore protection gear
The U-shaped structure of wall outer layer 34, is stacked by porous brick, is connected between 3 surface layer of shore protection retaining wall and plantation layer 1, can be in time
The moisture flowed down from plantation layer 1 toward river direction is leaked, moisture includes moisture, rainwater and rainwash contained by sprinkling bed mud
Deng other moisture, above-mentioned barricade middle layer is upper layer 321 and barricade immediate underlying layer 322 among modified zeolite layer, including barricade, on
State the FeZn-LDHs modified zeolite for being 5~10mm filled with partial size in upper layer 321 among barricade, above-mentioned barricade immediate underlying layer 322
The FeZn-LDHs modified zeolite for being 10~20mm filled with partial size, FeZn-LDHs modified zeolite divide different-grain diameter to fill full barricade
Intermediate upper layer 321 and barricade immediate underlying layer 322 can be filtered the moisture that plantation layer 1 leaks, nitrogen, phosphorus etc. in adsorption moisture
Nutriment, purification flow into the water quality in river.
3 top of shore protection retaining wall is slightly above 4 ordinary water level of river water face, avoids water flow directly washing away to plantation layer 1, influences to plant
The quality of layer 1 is planted, and shore protection retaining wall 3 stops plantation layer 1 for bearing the lateral stress of plantation layer 1 perpendicular to river water face 4
It glides.
Plantation layer 1 is covered by the geotechnical grid 6 with geotechnological checkerwork cell 61, and 6 ingredient of geotechnical grid is high density polyethylene (HDPE)
(HDPE), chemical property stabilization, resistance to oxidation, acid and alkali-resistance, will not pollute, Tu Gongge, and 6 are arranged in streamline grid-shaped, have
There is the geotechnological checkerwork cell 61 of 4 pieces of dense distributions at certain retractility, four sides, are in " matrix pattern ", and geotechnological checkerwork cell 61 divides 3 layers, every layer
Distribution 6, the block of " matrix pattern " enable the root system for covering the plant on plant layer 2 to grow by geotechnological checkerwork cell 61, staggeredly, increase
The strong fixed function of root system, reduces a possibility that bed mud flows back through water, reduces river secondary pollution to a certain extent,
The non-porous sections of the block of " matrix pattern " have obstructed the reflux of plantation layer contained humidity from upper, middle and lower-ranking, extend and cover plant layer
On 2 plant to organic pollutant, heavy metal, nutriment adsorption time, strengthen cover plant 2 plant of layer suction-operated, prolong
The radial pressure of shore protection retaining wall 3 is delayed.
The floristics for planting layer 2 is covered according to the selection of the heterogeneity of bed mud, and the higher bed mud of Ni metal content covers plant, and 2 is wet
Dayflower is planted at raw area's plantation cyperus alternifolius, bank slope;The higher bed mud of metal Pb content covers and plants 2 humidogene area of floor plantation east perfume
Vetiver is planted at Pu, bank slope;The higher bed mud of nutriment phosphorus content covers and plants 2 humidogene area of floor plantation cattail, plants at bank slope
Rye grass, river bottom mud, adhesion agent and the fibre plant of the sprinkling of bed mud injection apparatus are planted covering, 2 surfaces mixing, after moisture runoff
Clod is formed, plant growth is easy to, the plant for covering plant layer 2 plays the role of three, first is that root system can preferably absorb in bed mud
Various pollutants matter plays the role of processing and recycles bed mud;Second is that root system is fixed on plantation layer, the water of plantation layer is alleviated
Soil flow is lost, and the service life of ecological revetment is enhanced;Third is that improving greening and the landscape utility of entire ecological revetment.
Angle between shore protection retaining wall 3 and above-mentioned plantation layer 1 is set as 30 °~90 °, alleviates shore protection retaining wall 3
Radial pressure ensure that the service life of shore protection retaining wall 3, reduce construction cost.
Continuous three layers of design in ecological revetment, so that the utilization rate of river bottom mud is promoted, shore protection repair is strong, avoids
Sediment improper bring secondary pollution, the treatment in situ of bed mud, labour cost is low, and engineering construction is easy, ecological benefits
It is high.
Whole ecological bank protection structure design is reasonable, novel, has the advantage that
One, shore protection retaining wall 3 filtering and suction-operated it is obvious, structure design so that filler be conducive to replacement, it is high-efficient;
Two, the design planted layer 1 and cover plant layer 2 strengthens adsorption effect, has done specific aim processing to soil erosion, greatly
Ground improves the utilization rate of bed mud, reduces pollution, has given full play to the ecological benefits of bank protection structure, can effectively handle bottom
Mud;
Three, the floristics for planting layer 2 is covered by classifying and selecting after Soil K+adsorption, and specific aim is had more to the absorption of polluter.
The foregoing description of the disclosed embodiments can be realized professional and technical personnel in the field or using originally practical new
Type.Various modifications to these embodiments will be readily apparent to those skilled in the art, and determine herein
The General Principle of justice can be realized in other embodiments without departing from the spirit or scope of the present utility model;Cause
This, the present invention will not be limited to the embodiments shown herein, and is to fit to and principles disclosed herein
The widest scope consistent with features of novelty.
Although appended drawing reference in figure is used more herein: 1, planting layer;2, plant layer is covered;3, shore protection retaining wall;31, it keeps off
Wall fixing layer;32, barricade middle layer;321, upper layer among barricade;322, barricade immediate underlying layer;33, barricade plants layer;34, it keeps off
Wall outer layer;4, river water face;6, geotechnical grid;61, the terms such as geotechnological checkerwork cell, but it does not exclude the possibility of using other terms.
The use of these terms is merely for the convenience of describing and explaining the nature of the invention;It is construed as any one
Additional limitation is all contrary to the spirit of the present invention.
Claims (8)
1. a kind of ecological bank protection structure for efficiently using river bottom mud, it is characterised in that: including shore protection retaining wall (3), plantation layer
(1) it and covers and plants layer (2), described cover plants layer (2) and be covered in the plantation layer (1), the shore protection retaining wall (3) and the plantation layer
(1) angled to be arranged and be located at river side;Lay on plantation layer (1) is in streamline grid type with geotechnological checkerwork cell (61)
Geotechnical grid (6), bed mud is from injection after river extraction in the geotechnical grid (6).
2. a kind of ecological bank protection structure for efficiently using river bottom mud according to claim 1, it is characterised in that: the shield
Bank retaining wall (3) includes shore protection barricade outer layer (34) and shore protection barricade internal layer, and the shore protection barricade internal layer includes barricade plantation layer
(33), barricade middle layer (32) and barricade fixing layer (31), the barricade fixing layer (31), barricade middle layer and barricade plant layer
(33) it sets gradually from bottom to top.
3. a kind of ecological bank protection structure for efficiently using river bottom mud according to claim 2, it is characterised in that: the shield
Bank barricade outer layer (34) U-shaped structure, is stacked by porous brick.
4. a kind of ecological bank protection structure for efficiently using river bottom mud according to claim 2, it is characterised in that: the gear
Wall middle layer is upper layer (321) and barricade immediate underlying layer (322) among modified zeolite layer, including barricade, on the barricade centre
The FeZn-LDHs modified zeolite for being 5~10mm filled with partial size in layer (321), the barricade immediate underlying layer (322) are filled with grain
Diameter is the FeZn-LDHs modified zeolite of 10~20mm.
5. a kind of ecological bank protection structure for efficiently using river bottom mud according to claim 1, it is characterised in that: the soil
3 layers of work checkerwork cell (61) point, 6 settings of every layer of distribution.
6. a kind of ecological bank protection structure for efficiently using river bottom mud according to claim 2, it is characterised in that: the gear
Wall fixing layer (31) is concrete layer, is made of concrete material.
7. a kind of ecological bank protection structure for efficiently using river bottom mud according to claim 1, it is characterised in that: the shield
Bank retaining wall (3) is vertically arranged with river water face (4).
8. a kind of ecological bank protection structure for efficiently using river bottom mud according to claim 1, it is characterised in that: the shield
Angle between bank retaining wall (3) and plantation layer (1) is set as 30 °~90 °.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821914865.9U CN209584965U (en) | 2018-11-20 | 2018-11-20 | A kind of ecological bank protection structure efficiently using river bottom mud |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821914865.9U CN209584965U (en) | 2018-11-20 | 2018-11-20 | A kind of ecological bank protection structure efficiently using river bottom mud |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209584965U true CN209584965U (en) | 2019-11-05 |
Family
ID=68376921
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821914865.9U Expired - Fee Related CN209584965U (en) | 2018-11-20 | 2018-11-20 | A kind of ecological bank protection structure efficiently using river bottom mud |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209584965U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111608138A (en) * | 2020-05-20 | 2020-09-01 | 中电建十一局工程有限公司 | Construction method for slope protection of ecological landscape of urban internal lake |
CN112523166A (en) * | 2020-11-06 | 2021-03-19 | 河海大学 | Method for constructing ecological bank protection |
-
2018
- 2018-11-20 CN CN201821914865.9U patent/CN209584965U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111608138A (en) * | 2020-05-20 | 2020-09-01 | 中电建十一局工程有限公司 | Construction method for slope protection of ecological landscape of urban internal lake |
CN112523166A (en) * | 2020-11-06 | 2021-03-19 | 河海大学 | Method for constructing ecological bank protection |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103215920B (en) | Sectored multi-step ecological buffer revetment system | |
CN105123189B (en) | A kind of riverbank ecology buffer strip and its construction method | |
CN203451288U (en) | Compound ecological ditch for treating surface source sewage in village | |
CN206472556U (en) | A kind of multifunctional ecological tree pond for being used for pavement rainwater purification and utilizing | |
CN102296567B (en) | Soft isolation zone method for slope protection at bank zone and surface source pollution control | |
CN209643420U (en) | Function composite rainwater flower bed and the rainwater energy-dissipation purification system for using this flower bed | |
CN107653961A (en) | A kind of rain collector | |
CN208379724U (en) | The Rain Garden of Collapsible Loess District | |
CN211283925U (en) | Formula of sinking buffering area highway runoff purifier | |
CN208434404U (en) | A kind of sponge city pavement ecology tree pond | |
CN209584965U (en) | A kind of ecological bank protection structure efficiently using river bottom mud | |
CN203080471U (en) | Fan-shaped multi-step type ecological buffering type bank protection system | |
CN2767433Y (en) | Ecological concrete purifying trough at running water shore | |
CN207267822U (en) | A kind of plant life filtration system for improving city overland runoff polluted by nitrogen and removing | |
CN106865776B (en) | Multistage water-stacking rotary purification system for sponge urban low-lying land | |
CN214457158U (en) | Waterfront river greenery patches ground source rainwater clean system | |
CN110776106A (en) | Hierarchical ecological treatment system for treating rural domestic sewage and rain sewage | |
CN110106828A (en) | A kind of ecological permeable dam suitable for small watershed in mountain river water quality strengthened purification | |
CN107905208B (en) | Water and soil conservation structure for accelerating rock weathering in stony desertification region and construction method thereof | |
CN207645999U (en) | A kind of resident living area initial rainwater runoff intercepts, purification equipment | |
CN211813686U (en) | Hierarchical ecological treatment system for treating rural domestic sewage and rain sewage | |
CN211339192U (en) | Ecological remediation system suitable for exogenous pollution control of urban lakes | |
CN204741963U (en) | A rainwater garden for greenbelt in middle of road | |
CN208413993U (en) | A kind of water purification system for the relatively slow river of water flow | |
CN205348113U (en) | Ecological interception system of filler - plant society formula irrigation canals and ditches - bank protection nitrogen phosphorus of can regenerating |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191105 Termination date: 20211120 |
|
CF01 | Termination of patent right due to non-payment of annual fee |