CN209643420U - Function composite rainwater flower bed and the rainwater energy-dissipation purification system for using this flower bed - Google Patents
Function composite rainwater flower bed and the rainwater energy-dissipation purification system for using this flower bed Download PDFInfo
- Publication number
- CN209643420U CN209643420U CN201821903808.0U CN201821903808U CN209643420U CN 209643420 U CN209643420 U CN 209643420U CN 201821903808 U CN201821903808 U CN 201821903808U CN 209643420 U CN209643420 U CN 209643420U
- Authority
- CN
- China
- Prior art keywords
- flower bed
- rainwater
- layer
- altar
- function composite
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Treatment Of Biological Wastes In General (AREA)
Abstract
本实用新型涉及功能复合型雨水花坛及采用这种花坛的雨水消能净化系统,所述花坛包括由坛壁和坛底构成的坛体,所述坛体的顶部为敞口,所述坛体的顶部敞口上覆盖有格栅,所述坛体内设有种植土层和颗粒层,所述种植土层位于所述颗粒层的上面,与所述颗粒层之间通过透水布隔开,所述颗粒层的下部埋设有花坛排水管,所述花坛排水管穿过所述坛壁,其外端口位于所述坛体的外面。所述消能净化系统包括花坛和雨落管,所述雨落管的下端口位于散流坡面的上游的上方,所述花坛位于所述散流坡面的下游,以能够提高花坛对雨水的净化能力及对雨水冲击的适应能力。
The utility model relates to a functional composite rainwater flower bed and a rainwater energy dissipation and purification system using the flower bed. The flower bed includes an altar body composed of an altar wall and an altar bottom. The top opening of the tank is covered with a grid, and the pot is provided with a planting soil layer and a granular layer, and the planting soil layer is located on the granular layer, and is separated from the granular layer by a permeable cloth. A flower bed drainage pipe is embedded in the lower part of the granular layer, and the flower bed drainage pipe passes through the altar wall, and its outer port is located outside the altar body. The energy dissipation purification system includes a flower bed and a rain drop pipe, the lower port of the rain drop pipe is located above the upstream of the diffuse flow slope, and the flower bed is located downstream of the diffuse flow slope, so as to improve the protection of the flower bed from rainwater. The purification ability and the adaptability to the impact of rainwater.
Description
技术领域technical field
本实用新型涉及功能复合型雨水花坛,还涉及采用这种花坛的雨水消能净化系统,属环境保护及园林绿化技术领域。The utility model relates to a functional composite rainwater flower bed, and also relates to a rainwater energy dissipation and purification system using the flower bed, which belongs to the technical field of environmental protection and landscaping.
背景技术Background technique
现有建筑物的屋面落水经雨落管(或称雨水管、落水管)从屋面搪沟引入地下排水管道,进入城市排水系统,由污水处理厂进行净化处理,在实现雨污分流的系统中,雨水径流由排水管道收集后,就近排入河道等城市水体,以减少污水处理厂的处理量,并实现水体补水,但这些传统处理方式不利于雨水的充分利用,同时更不能有效地消除雨水中的污染物,对城市水环境存在一定的不利影响。The rainwater from the roof of the existing building is introduced into the underground drainage pipe from the roof ditch through the rainwater pipe (or rainwater pipe, downpipe), and then enters the urban drainage system, where it is purified by the sewage treatment plant. In the system that realizes rain and sewage diversion, rainwater After the runoff is collected by the drainage pipes, it is discharged into the nearby urban water bodies such as rivers to reduce the treatment capacity of the sewage treatment plant and achieve water replenishment. However, these traditional treatment methods are not conducive to the full use of rainwater, and at the same time cannot effectively eliminate Pollutants have certain adverse effects on the urban water environment.
海绵城市是当下解决城市水环境问题的有力手段,在相关政策的支持下,其理论体系和技术措施都在实践中不断发展和完善,目前业内开始尝试将雨落管的水引入高位花坛,将雨水净化与花坛绿化结合起来,雨水经过高位花坛后,其中的固体颗粒物和大分子有机物等水污染物被花坛截,实现了一定程度的净化,绕后再进入雨水排水和利用系统。但是,由于高位花坛基本上沿用传统花坛,还存在一些不足,主要表现为:一是水质净化能力差,无法处理接入阳台洗衣机污水等特殊情况的雨落管雨水;二是当雨水冲力较大时,需要设置石笼等缓冲设施,而设置石笼则需要额外的空间,植物栽植也会受较大的影响。Sponge city is a powerful means to solve urban water environment problems at present. With the support of relevant policies, its theoretical system and technical measures have been continuously developed and improved in practice. Rainwater purification is combined with flowerbed greening. After the rainwater passes through the high-level flowerbed, water pollutants such as solid particles and macromolecular organic matter are intercepted by the flowerbed to achieve a certain degree of purification, and then enter the rainwater drainage and utilization system. However, because the high-level flower beds basically follow the traditional flower beds, there are still some deficiencies, mainly as follows: first, the water purification ability is poor, and it is impossible to deal with the rainwater of the rainwater pipe connected to the sewage of the washing machine on the balcony; When setting up gabions and other buffer facilities, additional space is required for setting up gabions, and planting will also be greatly affected.
实用新型内容Utility model content
为解决上述技术问题,本实用新型提供了一种功能复合型雨水花坛及一种采用这种花坛的雨水消能净化系统,以提高花坛对雨水的净化能力及对雨水冲击的适应能力。In order to solve the above technical problems, the utility model provides a functional composite rainwater flower bed and a rainwater energy dissipation and purification system using this flower bed, so as to improve the rainwater purification ability of the flower bed and the adaptability to the impact of rainwater.
本实用新型的技术方案是:一种功能复合型雨水花坛,包括由坛壁和坛底构成的坛体,所述坛体的顶部为敞口,所述坛体的顶部敞口上覆盖有格栅,所述坛体内设有种植土层和颗粒层,所述种植土层位于所述颗粒层的上面,与所述颗粒层之间通过透水布隔开,所述颗粒层的下部埋设有花坛排水管,所述花坛排水管穿过所述坛壁,其外端口位于所述坛体的外面。The technical scheme of the utility model is: a functional composite rainwater flower bed, including a pot body composed of a wall and a bottom, the top of the pot body is open, and the top opening of the pot body is covered with a grid , the altar is provided with a planting soil layer and a granular layer, the planting soil layer is located above the granular layer, and is separated from the granular layer by a permeable cloth, and a flower bed drainage is buried in the lower part of the granular layer The flower bed drainage pipe passes through the wall of the altar, and its outer port is located outside the altar body.
所述格栅与所述种植土层之间优选留有间距,以利于植物生长,并减缓水流对种植土的冲击。There is preferably a gap between the grid and the planting soil layer, so as to facilitate the growth of plants and slow down the impact of water flow on the planting soil.
所述格栅可以呈蜂巢状,例如,可以采用生态蜂格。所述格栅也可以为矩形或正六边形格栅(水平截面形状为矩形或正六边形的网格状)。The grid can be in the shape of a honeycomb, for example, an ecological honeycomb grid can be used. The grid can also be a rectangular or regular hexagonal grid (a grid with a horizontal cross-section shape of a rectangle or a regular hexagon).
为保证强度,所述格栅通常应具有一定的竖向高度(或称格栅厚度)。In order to ensure strength, the grid should generally have a certain vertical height (or grid thickness).
所述坛体优选为矩形坛体(水平截面形状为矩形),以适应于接入散流雨水,并在场地一定的情况下增加处理能力。The altar body is preferably a rectangular altar body (horizontal cross-sectional shape is rectangular), so as to be suitable for connecting scattered rainwater and increase the processing capacity under certain conditions.
位于颗粒层内的所述花坛排水管通常可以采用花管(或称滤水管),其侧壁上分布有透水孔,其内端口通常应封堵住或者用丝网等过滤材料包裹,以便起到过滤作用,并防止大块物体进入而发生堵塞。The flower bed drainage pipe located in the granular layer can usually be a flower pipe (or called a water filter pipe), and its side wall is distributed with water-permeable holes, and its inner port should usually be blocked or wrapped with a filter material such as a silk screen, so as to prevent water leakage. To filter, and prevent large objects from entering and clogging.
所述透水土工布优选包围在所述种植土层的底部和全部侧面,形成带底的筒状,所述透水土工布的立面(对应于筒壁的部位)外侧贴附在所述坛壁上,以更好地防止种植土中的物质流失。The permeable geotextile preferably surrounds the bottom and all sides of the planting soil layer to form a bottomed cylinder, and the outside of the permeable geotextile (corresponding to the part of the cylinder wall) is attached to the altar wall to better prevent the loss of substances in the planting soil.
所述颗粒层优选包括沸石层、陶粒/活性炭层和粗砂层,所述沸石层、陶粒/活性炭层和粗砂层上下依次设置,以通过相应的颗粒级配和材料性质,优化支承和透水及过滤效果,并更好地截留和吸附有机物、颗粒物、总氮、总磷等污染物。The granular layer preferably includes a zeolite layer, a ceramsite/activated carbon layer and a coarse sand layer, and the zeolite layer, ceramsite/activated carbon layer and coarse sand layer are arranged up and down in order to optimize the support through the corresponding particle gradation and material properties. And water permeability and filtration effect, and better intercept and absorb organic matter, particulate matter, total nitrogen, total phosphorus and other pollutants.
所述陶粒/活性炭层为陶粒层、或者为活性炭层,或者为陶粒层和活性炭层,当为陶粒层和活性炭层,所述陶粒层位于所述活性炭层的上面或者下面。The ceramsite/activated carbon layer is a ceramsite layer, or an activated carbon layer, or a ceramsite layer and an activated carbon layer. When it is a ceramsite layer and an activated carbon layer, the ceramsite layer is located above or below the activated carbon layer.
所述排水管通常埋设在所述粗砂层内。The drainage pipe is usually buried in the coarse sand layer.
一种雨水消能净化系统,包括花坛和雨落管,还包括散流坡面,所述花坛采用本实用新型公开的任一功能复合型雨水花坛,所述雨落管安装在墙体上,其下端口位于所述散流坡面的上游的上方,所述花坛位于所述散流坡面的下游,其坛体的顶端高度不高于与其邻接的散流坡面。A rainwater energy dissipation and purification system, including a flower bed and a rain drop pipe, and also includes a diffuse flow slope, the flower bed adopts any functional composite rainwater flower bed disclosed in the utility model, and the rain drop pipe is installed on the wall, The lower port is located above the upstream of the diffused flow slope, the flower bed is located downstream of the diffused flow slope, and the height of the top of the altar body is not higher than the adjacent diffused flow slope.
所述散流坡面可以采用任意材料制成,其位置、形状和大小应适应于使从雨落管下端口流出的水以散流方式流入花坛,通过将雨落管的束流变为散流,能够起到良好的消能作用,且均匀进入花坛,有利于减少对花坛的水流冲击,改善净化效果。The diffuser slope can be made of any material, and its position, shape and size should be adapted to allow the water flowing out from the lower port of the raindrop tube to flow into the flower bed in a diffuse way. Flow can play a good role in energy dissipation, and evenly enter the flower bed, which is beneficial to reduce the impact of water flow on the flower bed and improve the purification effect.
所述散流坡面的上游边缘可以连接所述墙体,由此可以有效地限制水流只能向花坛方向流。The upstream edge of the diffused flow slope can be connected to the wall, thereby effectively restricting the water flow only to the flower bed.
所述散流坡面可以为略有坡度的地面,也可以采用板材制成。当所述散流坡面采用悬空的板材或高于地面的坡面时,在上游边缘应设置向上凸起的挡水堰,或者,在除邻接花坛的下游边缘外的所有边缘处都设置向上凸起的挡水堰,以使水流只能进入花坛。The diffused flow slope can be a slightly sloped ground, or can be made of plates. When the diffuser slope adopts a suspended plate or a slope above the ground, an upwardly protruding weir should be provided on the upstream edge, or an upwardly protruding weir should be provided on all edges except the downstream edge adjacent to the flower bed. Raised weirs so that water can only enter the flower beds.
所述花坛排水管可以接入城市雨水系统,例如,通过管道接入城市雨水系统的雨水处理装置或雨水蓄水装置,或接入LID(Low Impact Development,低影响开发)设施。The flower bed drainage pipe can be connected to the urban rainwater system, for example, connected to the rainwater treatment device or rainwater storage device of the urban rainwater system through pipelines, or connected to LID (Low Impact Development, low-impact development) facilities.
本实用新型的有益效果是:通过各层的合理设置,有效地提高了对雨水的净化能力和对雨水冲击的适应能力,同时满足了常见情形下的雨水净化和消能要求:由于顶部设有了格栅,有效地提高了载荷较大,能够有效地防止因踩踏等对花坛的破坏以及对花坛内土壤结构的破坏,避免因土壤(种植土)被压实了导致透水率降低,进而允许根据实际需要设置花坛位置和高度,满足多种场地条件和绿化布局要求,有利于保护植物生长,同时雨水随水量大小逐格流入,具有消能和对大块物体的过滤作用;由于种植土不会被压实,能够形成有利于适宜于植物和土壤内微生物生长的条件,且有利于提高透水率以及过滤能力,保证透水率不低于100(mm/hr),对TSS去除率达到80%,TP去除率60%,TN去除率50%,重金属去除率45%-95%,病原体去除率70%-100%;由于设置了透水的土工布包围在种植土层的下面和四周,在保证所需透水效果的同时,有效地减少或避免了水流中夹带的胶体和固体悬浮颗粒物,不仅避免了种植土基质及营养物质的流失,而且也避免了因这些物质混入水中对水的污染;由于分层设置了不同颗粒和功能的填料层,以沸石、陶粒、活性炭等按一定比例分层布置,不仅实现了对土工布及种植土层的有效支承,而且同时还实现对TP、TN、COD、氮、磷等物质的进一步过滤和去除。The beneficial effects of the utility model are: through the rational setting of each layer, the ability to purify rainwater and the adaptability to rainwater impacts are effectively improved, and at the same time meet the requirements of rainwater purification and energy dissipation in common situations: since the top is equipped with The grid is installed, which effectively increases the load and can effectively prevent the damage to the flower bed and the soil structure in the flower bed due to trampling, etc., and avoid the reduction of water permeability caused by the compaction of the soil (planting soil), thereby allowing Set the position and height of the flower bed according to the actual needs to meet various site conditions and greening layout requirements, which is conducive to protecting the growth of plants. It will be compacted, which can form conditions suitable for the growth of plants and microorganisms in the soil, and is conducive to improving the water permeability and filtration capacity, ensuring that the water permeability is not less than 100 (mm/hr), and the removal rate of TSS reaches 80%. , TP removal rate is 60%, TN removal rate is 50%, heavy metal removal rate is 45%-95%, pathogen removal rate is 70%-100%. At the same time as the required water permeability effect, it effectively reduces or avoids the colloid and solid suspended particles entrained in the water flow, not only avoids the loss of planting soil matrix and nutrients, but also avoids the pollution of water due to the mixing of these substances into the water; Packing layers with different particles and functions are arranged in layers, and zeolite, ceramsite, activated carbon, etc. are layered in a certain proportion, which not only realizes effective support for geotextiles and planting soil layers, but also realizes support for TP, TN, Further filtration and removal of COD, nitrogen, phosphorus and other substances.
附图说明Description of drawings
图1是本实用新型涉及的功能复合型雨水花坛的构造示意图;Fig. 1 is the structural representation of the functional compound rainwater flower bed that the utility model relates to;
图2是本实用新型涉及的雨水消能净化系统的构造示意图。Fig. 2 is a structural schematic diagram of the rainwater energy dissipation and purification system involved in the utility model.
具体实施方式Detailed ways
下面结合附图对本实用新型做进一步说明。Below in conjunction with accompanying drawing, the utility model is further described.
参见图1,本实用新型的功能复合型雨水花坛包括由坛壁和坛底构成的坛体14,所述坛体的顶部为敞口,所述坛体的顶部敞口上覆盖有格栅11,所述坛体内设有种植土层18和颗粒层,所述种植土层位于所述颗粒层的上面,与所述颗粒层之间通过透水布12隔开,所述颗粒层的下部埋设有花坛排水管15,所述花坛排水管穿过所述坛壁,其外端口位于所述坛体的外面。Referring to Fig. 1, the functional composite rainwater flower bed of the present utility model includes an altar body 14 composed of an altar wall and an altar bottom, the top of the altar body is open, and the top opening of the altar body is covered with a grid 11, A planting soil layer 18 and a granular layer are arranged in the altar body, and the planting soil layer is located above the granular layer, separated from the granular layer by a permeable cloth 12, and a flower bed is buried in the lower part of the granular layer. The drainage pipe 15, the flower bed drainage pipe passes through the altar wall, and its outer port is located outside the altar body.
所述颗粒层优选包括沸石层13、陶粒/活性炭层16和粗砂层17,所述沸石层、陶粒/活性炭层和粗砂层上下依次设置,种植土层上种植植物19。The granular layer preferably includes a zeolite layer 13, a ceramsite/activated carbon layer 16 and a coarse sand layer 17, and the zeolite layer, ceramsite/activated carbon layer and coarse sand layer are arranged up and down in sequence, and plants 19 are planted on the planting soil layer.
参见图2,本实用新型的雨水消能净化系统包括花坛10和雨落管30,还包括散流坡面20,所述花坛采用本实用新型公开的任一功能复合型雨水花坛,所述雨落管安装在墙体40上,其下端口位于所述散流坡面的上游的上方,所述花坛位于所述散流坡面的下游,其坛体的顶端高度不高于与其邻接的散流坡面。Referring to Fig. 2, the rainwater energy dissipation and purification system of the present utility model includes a flower bed 10 and a rain drop pipe 30, and also includes a diffuser slope 20. The flower bed adopts any functional composite rainwater flower bed disclosed in the utility model, and the rainwater The drop pipe is installed on the wall 40, and its lower port is located above the upstream of the diffuser slope, and the flower bed is located downstream of the diffuser slope, and the height of the top of the altar is not higher than that of the adjacent diffuser. flow slope.
在建筑周围设置功能复合型雨水花坛作为雨水净化装置来接纳和净化屋面雨水,屋面雨水先流经花坛,花坛内填有渗透性能好、净化能力强的种植土,可以采用现有技术下具有良好性能的人工混合土,雨水经过渗透净化,再通过下游低势绿地等LID设施进行渗透或者排入相应的雨水系统。Set up functional composite rainwater flower beds around the building as rainwater purification devices to receive and purify roof rainwater. The roof rainwater first flows through the flower beds, and the flower beds are filled with planting soil with good permeability and strong purification capabilities. High-performance artificial mixed soil, rainwater is infiltrated and purified, and then infiltrated through LID facilities such as low-lying green land downstream or discharged into the corresponding rainwater system.
这种花坛适应于含有阳台污水的雨落管,相对于现有接入地下排水管的雨落管而言,相对于将雨落管截断,使其下端口悬空,雨水落下后经坡面的散水散排,流入花坛进行处理,经花坛消能和净化作用后,通过花坛底部的暗管(花坛排水管)排出,可以根据实际需求可接入蓄水池进行回用,或接入其他LID设施进行滞留和下渗,也可接入排水管网。This kind of flower bed is suitable for the rain downpipe containing sewage from the balcony. Compared with the existing rain downpipe connected to the underground drainage pipe, the rain downpipe is cut off so that the lower port is suspended, and the rainwater falls through the slope of the slope. Scattered water flows into the flower bed for treatment. After the energy dissipation and purification of the flower bed, it is discharged through the hidden pipe (flower bed drainage pipe) at the bottom of the flower bed. It can be connected to the reservoir for reuse according to actual needs, or connected to other LIDs The facilities are retained and infiltrated, and can also be connected to the drainage network.
依据现有绿化方式,可以在所述花坛的下游设置绿地和/或地下排水系统的进水口,雨水量过大的时候,将直接翻过花坛进行散排或流入绿地、LID设施等。According to the existing greening method, the green space and/or the water inlet of the underground drainage system can be set in the downstream of the flower bed. When the amount of rainwater is too large, it will directly turn over the flower bed for dispersal or flow into the green space, LID facilities, etc.
采用本实用新型处理雨水的方式具有以下四个主要作用,(1)增加径流形成到进入管网的时间,缓解排水管网峰值压力;(2)屋顶雨水具有一定含量的污染物,通过雨落管在源头对水质进行处理的可操作性更好,成本更低;(3)老旧小区存在改接管道的情况,将阳台洗衣、洗菜的污水接入雨落管,有必要对雨落管的排水就地进行处理;(4)老旧小区未建绿色屋顶的房屋,屋面径流系数较高,同时雨水收集比较方便,通过断接雨落管比较方便收集到污染物相对单一的雨水,便于进行处理后回用。The rainwater treatment method of the utility model has the following four main functions: (1) increase the time from runoff formation to entering the pipe network, and relieve the peak pressure of the drainage pipe network; It is more operable to treat the water quality at the source, and the cost is lower; (3) There is a situation in the old community that the pipes are reconnected, and the sewage from washing and washing vegetables on the balcony is connected to the rainwater pipe. (4) For houses in old communities without green roofs, the roof runoff coefficient is relatively high. At the same time, rainwater collection is more convenient. It is more convenient to collect rainwater with relatively single pollutants through disconnected rainwater pipes. Easy to reuse after processing.
使用生态蜂格等格栅作为高位花坛盖板具有以下优点:(1)载荷较大,防止踩踏导致土壤结构变化、透水率降低;(2)保护植物生长;(3)雨水随水量大小逐格流入,具有消能和过滤的作用。The use of ecological honeycomb grids and other grilles as high-level flowerbed cover boards has the following advantages: (1) Large load, preventing trampling from causing changes in soil structure and lowering water permeability; (2) Protecting plant growth; (3) Rainwater varies with the amount of water. Inflow has the functions of energy dissipation and filtration.
生态蜂格对下面生物改良土壤等结构起保护作用,由其承担主要的地面压力负荷,其负载能力和材质应根据其上部压力选择。上部压力一般来自高位花坛顶面平行地面布置时机动车行驶或人行踩踏,高于地面布置则无需考虑荷载,选用轻质材料。Ecological honeycomb protects the biologically improved soil and other structures below, and bears the main ground pressure load. Its load capacity and material should be selected according to its upper pressure. The upper pressure generally comes from when the top surface of the high flower bed is arranged parallel to the ground by motor vehicles or people stepping on it. If it is higher than the ground, there is no need to consider the load, and light materials are selected.
通过种植土的合理选用,在生态蜂格等的保护下,可以形成含有特定微生物群的生物改良土壤,适宜植物和微生物生长,获得的实验结果为:透水系数不低于100(mm/hr),对TSS去除率达到80%,TP去除率60%,TN去除率50%,重金属去除率45%-95%,病原体去除率70%-100%。Through the reasonable selection of planting soil, under the protection of ecological honeycomb, etc., a biologically improved soil containing specific microbial groups can be formed, which is suitable for the growth of plants and microorganisms. The obtained experimental results are: the water permeability coefficient is not less than 100 (mm/hr) , The removal rate of TSS reaches 80%, the removal rate of TP is 60%, the removal rate of TN is 50%, the removal rate of heavy metal is 45%-95%, and the removal rate of pathogen is 70%-100%.
颗粒层中,用沸石、陶粒、活性炭等按一定比例分层布置,实现对TP、TN、COD、氮、磷等物质的过滤和去除,有针对性的选择填料层,按不同水源和水质要求进行处理。In the granular layer, zeolite, ceramsite, activated carbon, etc. are arranged in layers in a certain proportion to achieve the filtration and removal of TP, TN, COD, nitrogen, phosphorus and other substances, and the filler layer is selected in a targeted manner, according to different water sources and water quality request for processing.
花坛排水管为排水暗管,用于将过滤后的水导出高位花坛。The flower bed drainage pipe is a drainage hidden pipe, which is used to export the filtered water out of the high flower bed.
根据实际需要设置下游设施/排水管网,经高位花坛处理的雨水,通过排水暗管连接下游雨水井、污水井或LID设施等,以进行雨水的收集和回用。Set up downstream facilities/drainage pipe network according to actual needs, and the rainwater treated by high-level flower beds is connected to downstream rainwater wells, sewage wells or LID facilities through hidden drainage pipes to collect and reuse rainwater.
本实用新型具有下列特点:The utility model has the following characteristics:
1)使用生态蜂格等格栅进行消能,节省空间,保证了植物的生长从而保证了景观效果。1) Use grids such as ecological bee grids to dissipate energy, save space, ensure the growth of plants and ensure the landscape effect.
2)生态蜂格等格栅使花坛可以抵抗来自上面的压力,花坛顶部可以平行地面布置,由此省去了现有技术下布置石笼的占地面积,从而增加了其使用范围和布置方式。2) The grilles such as ecological bee grids make the flower bed resist the pressure from above, and the top of the flower bed can be arranged parallel to the ground, thus saving the floor area of the gabion arrangement in the prior art, thereby increasing its use range and arrangement method .
3)选用优质生物改良土和颗粒层填料,将水质处理技术与花坛结合,使之在保持花坛原有功能基础上具备对特殊水质污染的净化能力。3) Select high-quality bio-improved soil and granular layer filler, and combine water quality treatment technology with flower beds, so that it has the ability to purify special water pollution on the basis of maintaining the original functions of flower beds.
4)由于给花坛增添了功能,扩展了其适用性并保证了景观效果。4) Due to adding functions to the flower bed, it expands its applicability and ensures the landscape effect.
本实用新型公开的各优选和可选的技术手段,除特别说明外及一个优选或可选技术手段为另一技术手段的进一步限定外,均可以任意组合,形成若干不同的技术方案。The preferred and optional technical means disclosed in the utility model can be combined arbitrarily to form several different technical solutions, unless otherwise specified and one preferred or optional technical means is further limited by another technical means.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201821903808.0U CN209643420U (en) | 2018-11-19 | 2018-11-19 | Function composite rainwater flower bed and the rainwater energy-dissipation purification system for using this flower bed |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201821903808.0U CN209643420U (en) | 2018-11-19 | 2018-11-19 | Function composite rainwater flower bed and the rainwater energy-dissipation purification system for using this flower bed |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209643420U true CN209643420U (en) | 2019-11-19 |
Family
ID=68505082
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201821903808.0U Active CN209643420U (en) | 2018-11-19 | 2018-11-19 | Function composite rainwater flower bed and the rainwater energy-dissipation purification system for using this flower bed |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209643420U (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112854362A (en) * | 2021-01-27 | 2021-05-28 | 广东迈基建设工程有限公司 | Water obtaining and saving configuration project for building |
| CN113502708A (en) * | 2021-06-16 | 2021-10-15 | 五冶集团上海有限公司 | Method for preventing ice, snow and plump of ultra-large slope roof in severe cold area |
| CN113816491A (en) * | 2021-09-30 | 2021-12-21 | 南京师范大学 | A comprehensive treatment method for urban black and odorous river channels with hardened base |
| CN115581157A (en) * | 2022-10-28 | 2023-01-10 | 南京大学建筑规划设计研究院有限公司 | Sponge flower bed integrating rainwater purification, regulation and storage and recycling and use method |
| CN117530079A (en) * | 2023-12-07 | 2024-02-09 | 中国建筑第八工程局有限公司 | Multifunctional high-level water storage flower bed structure and roof rainwater recycling method |
-
2018
- 2018-11-19 CN CN201821903808.0U patent/CN209643420U/en active Active
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112854362A (en) * | 2021-01-27 | 2021-05-28 | 广东迈基建设工程有限公司 | Water obtaining and saving configuration project for building |
| CN113502708A (en) * | 2021-06-16 | 2021-10-15 | 五冶集团上海有限公司 | Method for preventing ice, snow and plump of ultra-large slope roof in severe cold area |
| CN113816491A (en) * | 2021-09-30 | 2021-12-21 | 南京师范大学 | A comprehensive treatment method for urban black and odorous river channels with hardened base |
| CN115581157A (en) * | 2022-10-28 | 2023-01-10 | 南京大学建筑规划设计研究院有限公司 | Sponge flower bed integrating rainwater purification, regulation and storage and recycling and use method |
| CN117530079A (en) * | 2023-12-07 | 2024-02-09 | 中国建筑第八工程局有限公司 | Multifunctional high-level water storage flower bed structure and roof rainwater recycling method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN208235696U (en) | A rain garden system based on water purification of sponge ecosystem | |
| CN103132485B (en) | External water interception and purification type urban river multi-element ecological embankment physical structural system | |
| CN206472556U (en) | A kind of multifunctional ecological tree pond for being used for pavement rainwater purification and utilizing | |
| CN100497210C (en) | Farmer life sewage treatment system using scattered fields with landscape function | |
| CN106869237A (en) | A kind of gardens rainwater-collecting water storage system and its construction method | |
| CN110468947B (en) | Ecological tree pool | |
| CN207211336U (en) | A kind of novel rainwater is detained filtration system | |
| CN110818196A (en) | System and method for purifying and recycling surface runoff water resource | |
| CN211285935U (en) | Rainwater comprehensive treatment system | |
| CN108328873B (en) | Multi-layer filtration system for urban green belts | |
| CN212224166U (en) | Rainwater collecting and utilizing system for expressway service area | |
| CN206971036U (en) | Lawn watering system for sponge city | |
| CN209670011U (en) | A sunken green space structure | |
| CN207794187U (en) | A kind of rainwater ecological pond system | |
| CN102677764B (en) | System for source or transmission process adjustment and control aiming at mountainous city non-point source pollution | |
| CN212116350U (en) | An ecological tree pond that prevents roots from damaging the ground | |
| CN211849903U (en) | A sloping rain garden | |
| CN211200669U (en) | Ecological tree pond | |
| CN205061699U (en) | Biological filter | |
| CN201835205U (en) | Road capable of filtering and collecting rainwater on road surface | |
| CN118835671A (en) | Air guide permeation promotion and low-carbon operation and maintenance system of green sponge water storage facility | |
| CN207582228U (en) | A kind of roadside greening rainwater regulating pondage system | |
| CN110725179A (en) | A multifunctional rainwater tree well structure and its operation and maintenance method | |
| CN207110007U (en) | Sponge city modularization road rain water runoff treatment system | |
| CN206337087U (en) | A kind of rice field runoff regulation intercepts with nitrogen phosphorus and removes filtration system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| PP01 | Preservation of patent right |
Effective date of registration: 20250806 Granted publication date: 20191119 |
|
| PP01 | Preservation of patent right |