CN107143021B - A kind of biology delaying basin - Google Patents
A kind of biology delaying basin Download PDFInfo
- Publication number
- CN107143021B CN107143021B CN201710418936.XA CN201710418936A CN107143021B CN 107143021 B CN107143021 B CN 107143021B CN 201710418936 A CN201710418936 A CN 201710418936A CN 107143021 B CN107143021 B CN 107143021B
- Authority
- CN
- China
- Prior art keywords
- layer
- filter material
- retention
- soil
- pond
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F1/00—Methods, systems, or installations for draining-off sewage or storm water
- E03F1/002—Methods, systems, or installations for draining-off sewage or storm water with disposal into the ground, e.g. via dry wells
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F1/00—Treatment of water, waste water, or sewage
- C02F1/28—Treatment of water, waste water, or sewage by sorption
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F1/00—Treatment of water, waste water, or sewage
- C02F1/58—Treatment of water, waste water, or sewage by removing specified dissolved compounds
- C02F1/62—Heavy metal compounds
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Engineering & Computer Science (AREA)
- Water Supply & Treatment (AREA)
- Environmental & Geological Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Organic Chemistry (AREA)
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Treatment Of Biological Wastes In General (AREA)
- Cultivation Of Plants (AREA)
Abstract
本发明提供了一种生物滞留池,包括:碎石基层位于所述滞留池的底部;分隔层位于所述碎石基层的上方;隔离部件位于所述分隔层的上方,所述隔离部件与所述分隔层之间存在一夹角;植土层位于所述隔离部件的一侧,所述植土层填充有普通土壤;滤料层位于所述隔板的另一侧,所述滤料层用于渗流;其中,所述植土层为中间高、四周低的凸面结构;如此,所述隔离部件将生物滞留池分为排水区及种植区;在雨量较大时,由于植土层为中间高、四周低的凸面结构,因此雨水将会流向外侧的滤料层,由滤料层对雨水进行过滤、渗透,满足了排水需求;这样植土层就不会滞留太多雨水,普通土壤渗透力不大,因此植土层可种植普通的四季常青的植物,满足了景观需求。
The present invention provides a bioretention pond, comprising: a crushed stone base layer is located at the bottom of the retention pond; a separation layer is located above the crushed stone base layer; an isolation component is located above the separation layer, and the isolation component is connected to the There is an included angle between the separation layers; the soil planting layer is located on one side of the isolation member, and the soil planting layer is filled with ordinary soil; the filter material layer is located on the other side of the partition plate, and the filter material layer It is used for seepage; wherein, the soil planting layer is a convex structure with high middle and low surrounding areas; in this way, the isolation component divides the bioretention pond into a drainage area and a planting area; when the rainfall is large, the soil planting layer is Convex structure with high middle and low surrounding, so the rainwater will flow to the outer filter material layer, and the rainwater will be filtered and infiltrated by the filter material layer to meet the drainage needs; in this way, the soil planting layer will not retain too much rainwater, ordinary soil The permeability is not large, so ordinary evergreen plants can be planted in the soil layer, which meets the needs of landscape.
Description
技术领域technical field
本发明属于地表径流处理技术领域,尤其涉及一种生物滞留池。The invention belongs to the technical field of surface runoff treatment, and in particular relates to a biological retention pond.
背景技术Background technique
随着社会经济快速发展,城市水安全及水环境问题日益严峻,越来越多的城市频繁出现大雨内涝、水体黑臭等环境问题。为此,国家提出建设海绵城市战略。海绵城市是指通过加强城市规划建设管理,充分发挥建筑、道路和绿地、水系等生态系统对雨水的吸纳、蓄渗和缓释作用,有效控制雨水径流,实现自然积存、自然渗透、自然净化的一种城市发展方式。With the rapid development of society and economy, the problems of urban water safety and water environment are becoming more and more serious. To this end, the state proposes the strategy of building a sponge city. Sponge city refers to strengthening the management of urban planning and construction, giving full play to the absorption, infiltration and slow release of rainwater by ecosystems such as buildings, roads, green spaces, and water systems, effectively controlling rainwater runoff, and realizing natural accumulation, natural infiltration, and natural purification. A way of urban development.
生物滞留池是海绵城市建设绿地系统的主要构成单元,负担着雨水调蓄和水质净化的重要功能。在下暴雨时,生物滞留池表面调蓄空间雨水排空时间在12~24小时,这就要求种植土层的高渗透率,以保障正常排水和避免植物长时间被淹。另一方面,植物生长与种植层关系密切,种植层渗透率较高将导致土壤保水性降低,水肥流失现象加重,造成植物生长不良。因此,在现有生物滞留系统中,植物选择通常要求具有良好的耐淹和耐旱性能。但是这类植物在其生长期,比如春夏季,有较好的景观效果,而在其休眠期,比如冬季,则植株枯萎,景观效果丧失。另一方面,一般的四季常青植物虽然具有较好的景观效果,但这类植物耐淹耐旱性不高,在高渗透率土壤中也生长不佳,存活率较低,在生物滞留池中难以应用。Bioretention ponds are the main components of the green space system in sponge city construction, and are responsible for the important functions of rainwater storage and water purification. During heavy rains, the drainage time of the storage space on the surface of the bioretention tank is 12 to 24 hours, which requires high permeability of the planting soil layer to ensure normal drainage and avoid long-term flooding of plants. On the other hand, plant growth is closely related to the planting layer, and the high permeability of the planting layer will lead to a decrease in soil water retention, aggravation of water and fertilizer loss, and poor plant growth. Therefore, in existing bioretention systems, plant selection is often required to have good flood and drought tolerance. However, such plants have better landscape effects in their growth periods, such as spring and summer, while in their dormant periods, such as winter, the plants wither and the landscape effects are lost. On the other hand, although the general evergreen plants have good landscape effects, these plants are not very resistant to flooding and drought, and they also grow poorly in high-permeability soils and have a low survival rate. difficult to apply.
基于此,本发明提供一种生物滞留池,以解决现有技术中的上述问题。Based on this, the present invention provides a bioretention pond to solve the above problems in the prior art.
发明内容SUMMARY OF THE INVENTION
针对现有技术存在的问题,本发明实施例提供了一种生物滞留池,用于解决现有技术中,在海绵城市的建设过程中,生物滞留池中的植物在高渗透土壤中生长时容易出现死苗现象,导致排水需求与景观需求不能并存的技术问题。In view of the problems existing in the prior art, the embodiment of the present invention provides a bioretention pond, which is used to solve the problem in the prior art that during the construction of the sponge city, the plants in the bioretention pond are easily grown in the highly permeable soil. There is a phenomenon of dead seedlings, resulting in technical problems that drainage needs and landscape needs cannot coexist.
本发明提供一种生物滞留池,所述滞留池包括:The present invention provides a biological retention pond, the retention pond includes:
碎石基层,位于所述滞留池的底部;Crushed stone base, located at the bottom of the retention pond;
分隔层,位于所述碎石基层的上方;a separation layer, located above the crushed stone base layer;
隔离部件,位于所述分隔层的上方,所述隔离部件与所述分隔层之间存在一夹角;an isolation part, located above the isolation layer, and an included angle exists between the isolation part and the isolation layer;
植土层,位于所述隔离部件的一侧,所述植土层填充有普通土壤;a soil planting layer, located on one side of the isolation member, the soil planting layer is filled with ordinary soil;
滤料层,位于所述隔离部件的另一侧,所述滤料层用于渗流;其中,所述植土层为中间高、四周低的凸面结构。The filter material layer is located on the other side of the isolation member, and the filter material layer is used for seepage; wherein, the soil planting layer is a convex structure with high middle and low surrounding.
上述方案中,所述滞留池还包括:渗管,所述渗管安装在所述滞留池的底部,所述渗管与所述滞留池底部的距离为3~5cm。In the above solution, the retention pond further comprises: a seepage pipe, the seepage pipe is installed at the bottom of the retention pond, and the distance between the seepage pipe and the bottom of the retention pond is 3-5 cm.
上述方案中,所述滤料层填充有30~50cm厚的冶金渣滤料。In the above solution, the filter material layer is filled with a metallurgical slag filter material with a thickness of 30-50 cm.
上述方案中,所述滞留池还包括:覆盖层,所述覆盖层位于所述滤料层的上方。In the above solution, the retention pond further comprises: a cover layer, and the cover layer is located above the filter material layer.
上述方案中,所述滞留池还包括:滞留层,所述滞留层为所述植土层上方的空间。In the above solution, the retention pond further comprises: a retention layer, and the retention layer is the space above the soil planting layer.
上述方案中,所述隔离部件包括:隔板或者分隔栅栏。In the above solution, the isolation component includes: a partition plate or a partition fence.
上述方案中,所述滞留池还包括:溢流井,所述溢流井的一端位于所述滞留池底部,所述溢流井的另一端位于所述滞留池的顶部。In the above solution, the retention pond further comprises: an overflow well, one end of the overflow well is located at the bottom of the retention pond, and the other end of the overflow well is located at the top of the retention pond.
上述方案中,所述滞留池还包括:过滤盖,所述过滤盖安装在所述溢流井的另一端。In the above solution, the retention tank further comprises: a filter cover installed on the other end of the overflow well.
上述方案中,所述分隔层包括:透水土工布或粗砂。In the above solution, the separation layer includes: permeable geotextile or coarse sand.
上述方案中,所述滞留池还包括:雨水管,所述雨水管安装在所述溢流井的底部3~5cm处。In the above solution, the retention tank further includes: a rainwater pipe, and the rainwater pipe is installed at 3-5 cm at the bottom of the overflow well.
本发明提供了一种生物滞留池,包括:碎石基层,所述碎石基层位于所述滞留池的底部;分隔层,所述分隔层位于所述碎石基层的上方;隔离部件,所述隔离部件位于所述分隔层的上方,所述隔离部件与所述分隔层之间存在一夹角;植土层,所述植土层位于所述隔离部件的一侧,所述植土层填充有普通土壤;滤料层,所述滤料层位于所述隔板的另一侧,所述滤料层用于渗流;其中,所述植土层为中间高、四周低的凸面结构;如此,所述隔离部件将生物滞留池分为排水区及种植区;在雨量较大时,由于植土层为中间高、四周低的凸面结构,因此雨水将会流向外侧的滤料层,由滤料层对雨水进行过滤、渗透,满足了排水需求;这样植土层就不会滞留太多雨水,普通土壤渗透力不大,因此植土层可种植普通的四季常青的植物,满足了景观需求。The invention provides a bioretention pond, comprising: a crushed stone base layer, the crushed stone base layer is located at the bottom of the retention pond; a separation layer, the separation layer is located above the crushed stone base layer; an isolation part, the The isolation component is located above the isolation layer, and there is an included angle between the isolation component and the isolation layer; the soil planting layer is located on one side of the isolation component, and the soil planting layer is filled with soil There is ordinary soil; a filter material layer, the filter material layer is located on the other side of the separator, and the filter material layer is used for seepage; wherein, the planting soil layer is a convex structure with high middle and low surrounding; so , the isolation component divides the bioretention pond into a drainage area and a planting area; when the rainfall is large, because the soil planting layer is a convex structure with high middle and low surrounding, the rainwater will flow to the outer filter material layer, which will be filtered by the filter material layer. The material layer filters and infiltrates rainwater to meet the drainage needs; in this way, the soil planting layer will not retain too much rainwater, and the permeability of ordinary soil is not large. Therefore, ordinary evergreen plants can be planted in the planting soil layer, which meets the landscape requirements. need.
附图说明Description of drawings
图1为本发明提供的生物滞留池的整体结构示意图;1 is a schematic diagram of the overall structure of a bioretention pond provided by the present invention;
图2为本发明提供的生物滞留池的局部结构示意图。Figure 2 is a schematic diagram of the partial structure of the bioretention tank provided by the present invention.
具体实施方式Detailed ways
为了解决现有技术中,在海绵城市的建设过程中,生物滞留池中的植物在高渗透土壤中生长时容易出现死苗现象,导致排水需求与景观需求不能并存的技术问题,本发明提供了一种生物滞留池,包括:碎石基层,所述碎石基层位于所述滞留池的底部;分隔层,所述分隔层位于所述碎石基层上方;隔离部件,所述隔离部件位于所述分隔层上方,所述隔离部件与所述分隔层之间存在一夹角;植土层,所述植土层位于所述隔离部件的一侧,所述植土层填充有普通土壤;滤料层,所述滤料层位于所述隔板的另一侧,所述滤料层用于渗流;其中,所述植土层为中间高、四周低的凸面结构。In order to solve the technical problem that in the prior art, during the construction of the sponge city, the plants in the bioretention ponds are prone to die seedlings when they grow in the highly permeable soil, resulting in the inability to coexist drainage requirements and landscape requirements, the present invention provides A bioretention pond, comprising: a crushed stone base layer, the crushed stone base layer is located at the bottom of the retention pond; a separation layer, the separation layer is located above the crushed stone base layer; an isolation part, the isolation part is located on the Above the separation layer, there is an included angle between the separation member and the separation layer; a soil planting layer, the soil planting layer is located on one side of the separation member, and the soil planting layer is filled with ordinary soil; filter material The filter material layer is located on the other side of the separator, and the filter material layer is used for seepage; wherein, the soil planting layer is a convex structure with high middle and low surrounding.
下面通过附图及具体实施例对本发明的技术方案做进一步的详细说明。The technical solutions of the present invention will be further described in detail below through the accompanying drawings and specific embodiments.
本实施例提供一种生物滞留池,所述生物滞留池的形状可以为方形、圆形或其他不规则形状等;所述生物滞留池如图1所示,所述生物滞留池包括:碎石基层1、分隔层2、隔离部件3、植土层4、滤料层5;其中,This embodiment provides a bioretention pond. The shape of the bioretention pond can be a square, a circle or other irregular shapes. The bioretention pond is shown in FIG. 1 , and the bioretention pond includes: crushed stone Base layer 1, separation layer 2, isolation part 3, soil planting layer 4, filter material layer 5; wherein,
所述碎石基层1位于所述滞留池的底部,用于承重及渗透水流;所述碎石基层的厚度为20~30cm,所述碎石可以为开级配碎石,压碎值≤25%;所述碎石的粒径为5~25mm。The crushed stone base layer 1 is located at the bottom of the retention pond and is used for load bearing and infiltration of water flow; the thickness of the crushed stone base layer is 20-30 cm, and the crushed stone can be open-graded crushed stone, and the crushing value is less than or equal to 25 %; the particle size of the crushed stone is 5-25 mm.
所述分隔层2位于所述碎石基层1的上方;所述分隔层2可以为透水土工布或粗砂层,所述粗砂层的厚度可以为3~5cm。The separation layer 2 is located above the gravel base layer 1; the separation layer 2 may be a permeable geotextile or a coarse sand layer, and the thickness of the coarse sand layer may be 3-5 cm.
所述隔离部件3位于所述分隔层2的上方,所述隔离部件3与所述分隔层2之间存在一夹角;所述夹角可以为45~90°,优选地为90°。以能将植土层4与滤料层5分割开。The spacer member 3 is located above the spacer layer 2, and an included angle exists between the spacer member 3 and the spacer layer 2; the included angle may be 45° to 90°, preferably 90°. Soil planting layer 4 and filter material layer 5 can be separated.
这里,所述隔离部件2可以为多个木质隔板,也可以为木质栅栏,所述隔离部件3沿着所述滞留池设置一周;其中,所述木质隔板的厚度为2~3cm,所述木质栅栏可以为圆柱形木头组成的栅栏。为了提高美观性,所述隔离部件2的高度还要高出植土层4的边缘1~2cm。Here, the isolation member 2 may be a plurality of wooden partitions or a wooden fence, and the isolation member 3 is arranged along the retention pond for a week; wherein, the thickness of the wooden partitions is 2-3 cm, so The wooden fence can be a fence composed of cylindrical wood. In order to improve the aesthetics, the height of the isolation member 2 is also 1-2 cm higher than the edge of the soil planting layer 4 .
所述植土层4位于所述隔离部件3的一侧,所述植土层填充有普通土壤,用于种植景观植物;所述植土层4为中间高、四周低的凸面结构,所述植土层4顶部最高处与边缘部最低处的高程差为3~5cm。The soil planting layer 4 is located on one side of the isolation member 3, and the soil planting layer is filled with ordinary soil for planting landscape plants; the soil planting layer 4 is a convex structure with a high middle and low surrounding areas. The difference in elevation between the highest point at the top of the soil planting layer 4 and the lowest point in the edge is 3 to 5 cm.
所述滤料层5位于所述隔离部件2的另一侧,所述滤料层用于渗流;所述滤料层5填充有30~50cm厚的冶金渣滤料,所述滤料层5的边带宽度为5~15cm。所述冶金渣滤料为钢铁冶金企业排出的固体废弃物加工而成,所述冶金渣滤料具有多孔的微粒结构,其渗透系数为1.16×10-5~5.79×10-5m/s;所述冶金渣滤料有一定的碱性,可以对雨水中的悬浮物和重金属等污染物有良好的去除作用。The filter material layer 5 is located on the other side of the isolation member 2, and the filter material layer is used for seepage; the filter material layer 5 is filled with a metallurgical slag filter material with a thickness of 30-50 cm, and the filter material layer 5 The width of the sideband is 5-15cm. The metallurgical slag filter material is processed from solid waste discharged from iron and steel metallurgical enterprises, and the metallurgical slag filter material has a porous particle structure, and its permeability coefficient is 1.16×10 -5 to 5.79×10 -5 m/s; The metallurgical slag filter material has a certain degree of alkalinity, and can have a good removal effect on pollutants such as suspended solids and heavy metals in rainwater.
在确定所述率料层5的渗透率v时,可以通过公式(1)确定:When determining the permeability v of the rate material layer 5, it can be determined by formula (1):
在公式(1)中,所述P为生物滞留池所服务的汇水分区面积,所述h为径流总量控制率转化的降雨量,所述t为生物滞留池的排空时间;所述a为生物滞留池的周长,所述b为滤料层5的宽度。In formula (1), the P is the catchment area served by the bioretention pond, the h is the rainfall converted from the total runoff control rate, and the t is the emptying time of the bioretention pond; the a is the perimeter of the bioretention tank, and b is the width of the filter material layer 5 .
这样,所述隔离部件2将生物滞留池分为排水区及种植区;在雨量较大时,由于植土层4为中间高、四周低的凸面结构,因此雨水将会流向外侧的滤料层5,由滤料层5对雨水进行过滤、渗透,满足了排水需求;这样植土层4就不会滞留太多雨水,普通土壤渗透力不大,因此植土层4可种植普通的四季常青的植物,满足了景观需求。In this way, the isolation part 2 divides the bioretention pond into a drainage area and a planting area; when the rainfall is large, since the soil planting layer 4 is a convex structure with high middle and low surrounding, the rainwater will flow to the outer filter material layer 5. The rainwater is filtered and infiltrated by the filter material layer 5 to meet the drainage needs; in this way, the soil planting layer 4 will not retain too much rainwater, and the penetration of ordinary soil is not large, so the soil planting layer 4 can be planted with ordinary four-season crops. Green plants meet the needs of landscape.
这里,为了保护滤料层,所述滞留池还包括:覆盖层6,所述覆盖层6位于所述滤料层5的上方。所述覆盖层6可以包括:卵石或陶粒,所述覆盖层6的厚度为5~10cm;所述卵石粒径为10~25mm。Here, in order to protect the filter material layer, the retention tank further includes: a cover layer 6 , and the cover layer 6 is located above the filter material layer 5 . The covering layer 6 may include: pebbles or ceramsite, the thickness of the covering layer 6 is 5-10 cm; the particle size of the pebbles is 10-25 mm.
为了可以对雨水滞留,所述滞留池还包括:滞留层7,所述滞留层7为所述植土层4上方的空间,该空间具体为相对周边地面下凹的蓄水区域,该蓄水区域的深度为10~30cm。In order to retain rainwater, the retention pond further includes: a retention layer 7, which is a space above the soil planting layer 4, and the space is specifically a concave water storage area relative to the surrounding ground. The depth of the area is 10 to 30 cm.
参见图2,所述滞留层7的高度可以由公式(2)确定:Referring to Fig. 2, the height of the retention layer 7 can be determined by formula (2):
公式(2)中,所述p1为所述生物滞留池的面积。In formula (2), the p 1 is the area of the bioretention pond.
然后通过公式(3)确定生物滞留池边部覆盖层顶与周边道路高度差d:Then, the height difference d between the top of the cover layer at the edge of the bioretention pond and the surrounding road is determined by formula (3):
d=d1+D+d2 (3)d=d 1 +D+d 2 (3)
公式(3)中,所述d1为植土层顶部与四周最低点的高度差,所述d2为溢流井9顶部与周边道路的高度差。In formula (3), the d 1 is the height difference between the top of the soil planting layer and the surrounding lowest point, and the d 2 is the height difference between the top of the overflow well 9 and the surrounding roads.
进一步地,为了可以将处理后的雨水排出滞留池,参见图1,所述滞留池还包括:渗管8,所述渗管8安装在所述滞留池的底部,所述渗管8与所述滞留池底部的距离为3~5cm。所述渗管8可以为塑料渗管、水泥渗管或不锈钢渗管;所述渗管8上设置有多个穿孔,所述穿孔开口位置为斜下45°,所述各穿孔之间的间距为8~15cm。Further, in order to discharge the treated rainwater out of the retention pond, referring to FIG. 1 , the retention pond further includes: a seepage pipe 8 , the seepage pipe 8 is installed at the bottom of the retention pond, and the seepage pipe 8 is connected to the The distance from the bottom of the retention tank is 3 to 5 cm. The infiltration pipe 8 can be a plastic infiltration pipe, a cement infiltration pipe or a stainless steel infiltration pipe; the infiltration pipe 8 is provided with a plurality of perforations, and the opening position of the perforation is 45° obliquely downward, and the spacing between the perforations is 8 to 15cm.
为了可以处理暴雨情况,所述滞留池还包括:溢流井9及雨水管10,所述溢流井9是由混凝土制成的,所述溢流井9的一端位于所述滞留池底部,与底部齐平;所述溢流井9的另一端位于所述滞留池的顶部。具体地,所述溢流井9一端的高度根据该生物滞留池所服务的汇水分区面积及滞留层7的容积确定,一般来说,所述溢流井9一端的高度需要比周围路面低5~10cm。In order to deal with the rainstorm situation, the detention pond further includes: an overflow well 9 and a rainwater pipe 10, the overflow well 9 is made of concrete, one end of the overflow well 9 is located at the bottom of the detention pond, and the The bottom is flush; the other end of the overflow well 9 is at the top of the retention pond. Specifically, the height of one end of the overflow well 9 is determined according to the area of the catchment zone served by the bioretention pool and the volume of the retention layer 7. Generally speaking, the height of one end of the overflow well 9 needs to be lower than the surrounding road surface 5~10cm.
所述雨水管10安装在所述溢流井的底部3~5cm处,所述雨水管10还与所述渗管8相连,用于将渗流排入市政管网。The rainwater pipe 10 is installed at 3-5 cm at the bottom of the overflow well, and the rainwater pipe 10 is also connected with the seepage pipe 8 for discharging seepage into the municipal pipe network.
这里,所述滞留池还包括过滤盖,所述过滤盖安装在所述溢流井9的另一端。所述过滤盖具体可以为雨水篦子。Here, the retention tank further includes a filter cover installed at the other end of the overflow well 9 . Specifically, the filter cover may be a rainwater grate.
实施例一Example 1
实际应用中,本实施例在改造区域新建一个生物滞留池,所述生物滞留池的蓄水量为0.75m3;具体实现如下:In practical application, this embodiment builds a new bioretention pond in the transformation area, and the water storage capacity of the bioretention pond is 0.75m 3 ; the specific implementation is as follows:
在改造区域开挖长3m宽2m,深约97.5cm的方形基坑,并在基坑四周及底部铺设不透水土工布;所述生物滞留池包括:碎石基层1、分隔层2、隔离部件3、植土层4、滤料层5;其中,Excavate a square foundation pit with a length of 3m and a width of 2m and a depth of about 97.5cm in the reconstruction area, and lay impermeable geotextiles around and at the bottom of the foundation pit; the bioretention pond includes: gravel base 1, separation layer 2, isolation parts 3. Soil planting layer 4, filter material layer 5; among them,
所述碎石基层1位于所述滞留池的底部,用于承重及渗透水流;所述碎石基层的厚度为30cm,所述碎石可以为开级配碎石,压碎值≤25%;所述碎石的粒径为5~25mm。The crushed stone base layer 1 is located at the bottom of the retention pond and is used for bearing load and infiltration of water flow; the thickness of the crushed stone base layer is 30cm, and the crushed stone can be open-graded crushed stone, and the crushing value is less than or equal to 25%; The particle size of the crushed stone is 5-25 mm.
所述分隔层2位于所述碎石基层1的上方;所述分隔层2可以为透水土工布或粗砂层,所述粗砂层的厚度可以为4cm。The separation layer 2 is located above the gravel base layer 1; the separation layer 2 may be a permeable geotextile or a coarse sand layer, and the thickness of the coarse sand layer may be 4 cm.
所述隔离部件3位于所述分隔层2的上方,所述隔离部件3与所述分隔层2之间存在一夹角;所述夹角为90o。以能将植土层4与滤料层5分隔开。The isolation member 3 is located above the isolation layer 2, and there is an included angle between the isolation member 3 and the isolation layer 2; the included angle is 90 ° . Soil planting layer 4 and filter material layer 5 can be separated.
本实施例中,所述隔离部件2为多块木质隔板,所述隔离部件3沿着所述滞留池设置一周;其中,所述木质隔板的厚度为2cm、长46cm、宽20cm;且隔板距离生物滞留池的外围约10cm;为了提高美观性,所述隔离部件2的高度还要高出植土层4的边缘1~2cm。In this embodiment, the isolation member 2 is a plurality of wooden clapboards, and the isolation member 3 is arranged along the retention tank for a week; wherein, the thickness of the wooden clapboard is 2cm, 46cm long, and 20cm wide; and The partition plate is about 10 cm away from the periphery of the bioretention tank; in order to improve the aesthetics, the height of the isolation member 2 is also 1-2 cm higher than the edge of the planting soil layer 4 .
所述植土层4位于所述隔离部件3的一侧,所述植土层填充有普通土壤,用于种植景观植物;所述植土层4为中间高、四周低的凸面结构,所述植土层4的高度为50cm。The soil planting layer 4 is located on one side of the isolation member 3, and the soil planting layer is filled with ordinary soil for planting landscape plants; the soil planting layer 4 is a convex structure with a high middle and low surrounding areas. The height of the soil planting layer 4 is 50 cm.
所述滤料层5位于所述隔离部件2的另一侧,所述滤料层用于渗流;所述滤料层5填充有40cm厚的冶金渣滤料,所述滤料层5的边带宽度为10cm。所述冶金渣滤料为钢铁冶金企业排出的固体废弃物加工而成,所述冶金渣滤料具有多孔的微粒结构,其渗透系数1.89×10-5m/s;所述冶金渣滤料有一定的碱性,可以对雨水中的悬浮物和重金属等污染物有良好的去除作用。The filter material layer 5 is located on the other side of the isolation member 2, and the filter material layer is used for seepage; the filter material layer 5 is filled with a metallurgical slag filter material with a thickness of 40 cm, and the edge of the filter material layer 5 is The belt width is 10cm. The metallurgical slag filter material is processed from solid waste discharged from iron and steel metallurgical enterprises, and the metallurgical slag filter material has a porous particle structure with a permeability coefficient of 1.89×10 -5 m/s; the metallurgical slag filter material has A certain degree of alkalinity can effectively remove pollutants such as suspended solids and heavy metals in rainwater.
在确定所述率料层5的渗透率v时,可以通过公式(1)确定:When determining the permeability v of the rate material layer 5, it can be determined by formula (1):
在公式(1)中,所述P为生物滞留池所服务的汇水分区面积,本实施例中P为30m2;所述h为径流总量控制率转化的降雨量,所述h为25mm;所述t为生物滞留池的排空时间;所述t为12~24h;所述a为生物滞留池的周长,所述生物滞留池的长度为3m,宽度为2m;所述b为滤料层5的宽度,所述b为10cm。最后计算得出的渗透系数为1.45×10-5~2.89×10-5m/s,因此所选用的冶金渣滤料渗透系数满足排水需求。In formula (1), the P is the catchment zone area served by the bioretention pond, and in this embodiment, P is 30 m 2 ; the h is the rainfall converted from the total runoff control rate, and the h is 25 mm ; the t is the emptying time of the bioretention tank; the t is 12-24h; the a is the circumference of the bioretention tank, the length of the bioretention tank is 3m, the width is 2m; the b is The width of the filter material layer 5, the b is 10cm. The permeability coefficient finally calculated is 1.45×10 -5 ~ 2.89×10 -5 m/s, so the selected metallurgical slag filter material permeability coefficient meets the drainage requirements.
这样,所述隔离部件2将生物滞留池分为排水区及种植区;在雨量较大时,由于植土层4为中间高、四周低的凸面结构,因此雨水将会流向外侧的滤料层5,由滤料层5对雨水进行过滤、渗透,满足了排水需求;这样植土层4就不会滞留太多雨水,普通土壤渗透力不大,因此植土层4可种植普通的四季常青的植物,满足了景观需求。In this way, the isolation part 2 divides the bioretention pond into a drainage area and a planting area; when the rainfall is large, since the soil planting layer 4 is a convex structure with high middle and low surrounding, the rainwater will flow to the outer filter material layer 5. The rainwater is filtered and infiltrated by the filter material layer 5 to meet the drainage needs; in this way, the soil planting layer 4 will not retain too much rainwater, and the penetration of ordinary soil is not large, so the soil planting layer 4 can be planted with ordinary four-season crops. Green plants meet the needs of landscape.
这里,为了保护滤料层,所述滞留池还包括:覆盖层6,所述覆盖层6位于所述滤料层5的上方。所述覆盖层6包括:卵石层,所述覆盖层6的厚度为5cm;所述卵石粒径为10~25mm。Here, in order to protect the filter material layer, the retention tank further includes: a cover layer 6 , and the cover layer 6 is located above the filter material layer 5 . The covering layer 6 includes: a pebble layer, the thickness of the covering layer 6 is 5 cm; the particle size of the pebble is 10-25 mm.
为了可以对雨水滞留,所述滞留池还包括:滞留层7,所述滞留层7为所述植土层4上方的空间,该空间具体为相对周边地面下凹的蓄水区域,该蓄水区域的深度为12.5cm。In order to retain rainwater, the retention pond further includes: a retention layer 7, which is a space above the soil planting layer 4, and the space is specifically a concave water storage area relative to the surrounding ground. The depth of the area is 12.5 cm.
参见图2,所述滞留层7的高度可以由公式(2)确定:Referring to Fig. 2, the height of the retention layer 7 can be determined by formula (2):
公式(2)中,所述p1为所述生物滞留池的面积。In formula (2), the p 1 is the area of the bioretention pond.
然后通过公式(3)确定生物滞留池边部覆盖层顶与周边道路高度差d:Then, the height difference d between the top of the cover layer at the edge of the bioretention pond and the surrounding road is determined by formula (3):
d=d1+D+d2 (3)d=d 1 +D+d 2 (3)
公式(3)中,所述d1为植土层顶部与四周最低点的高度差,所述d1为5cm,所述d2为溢流井9顶部与周边道路的高度差,所述d1为5cm。In formula (3), the d 1 is the height difference between the top of the soil planting layer and the surrounding lowest point, the d 1 is 5 cm, the d 2 is the height difference between the top of the overflow well 9 and the surrounding roads, and the d 1 is 5cm.
进一步地,为了可以将处理后的雨水排出滞留池,参见图1,所述滞留池还包括:渗管8,所述渗管8安装在所述滞留池的底部,所述渗管8与所述滞留池底部的距离为4cm。所述渗管8为塑料渗管;所述渗管8上设置有多个穿孔,所述穿孔开口位置为斜下45°,所述各穿孔之间的间距为10cm。Further, in order to discharge the treated rainwater out of the retention pond, referring to FIG. 1 , the retention pond further includes: a seepage pipe 8 , the seepage pipe 8 is installed at the bottom of the retention pond, and the seepage pipe 8 is connected to the The distance from the bottom of the retention pond was 4 cm. The infiltration pipe 8 is a plastic infiltration pipe; a plurality of perforations are arranged on the infiltration pipe 8 , the opening position of the perforation is 45° obliquely downward, and the distance between the perforations is 10 cm.
为了可以处理暴雨情况,所述滞留池还包括:溢流井9及雨水管10,所述溢流井9是由混凝土制成的,所述溢流井9的一端位于所述滞留池底部,与底部齐平;所述溢流井9的另一端位于所述滞留池的顶部。具体地,所述溢流井9一端的高度根据该生物滞留池所服务的汇水分区面积及滞留层7的容积确定,一般来说,所述溢流井9一端的高度需要比周围路面低5cm。In order to deal with the rainstorm situation, the detention pond further includes: an overflow well 9 and a rainwater pipe 10, the overflow well 9 is made of concrete, one end of the overflow well 9 is located at the bottom of the detention pond, and the The bottom is flush; the other end of the overflow well 9 is at the top of the retention pond. Specifically, the height of one end of the overflow well 9 is determined according to the area of the catchment zone served by the bioretention pool and the volume of the retention layer 7. Generally speaking, the height of one end of the overflow well 9 needs to be lower than the surrounding road surface 5cm.
所述雨水管10安装在所述溢流井的底部4cm处,所述雨水管10还与所述渗管8相连,用于将渗流排入市政管网。The rainwater pipe 10 is installed at the bottom 4 cm of the overflow well, and the rainwater pipe 10 is also connected with the seepage pipe 8 for discharging seepage into the municipal pipe network.
这里,所述滞留池还包括过滤盖,所述过滤盖安装在所述溢流井9的另一端。所述过滤盖具体可以为雨水篦子。Here, the retention tank further includes a filter cover installed at the other end of the overflow well 9 . Specifically, the filter cover may be a rainwater grate.
实施例二Embodiment 2
实际应用中,本实施例在改造区域新建一个生物滞留池,所述生物滞留池的蓄水量为0.9m3;具体实现如下:In practical application, this embodiment builds a new bioretention pond in the transformation area, and the water storage capacity of the bioretention pond is 0.9m 3 ; the specific implementation is as follows:
在改造区域开挖半径1m,深约102cm的圆形基坑,并在基坑四周及底部铺设不透水土工布;述生物滞留池包括:碎石基层1、分隔层2、隔离部件3、植土层4、滤料层5;其中,Excavate a circular foundation pit with a radius of 1m and a depth of about 102cm in the transformation area, and lay impermeable geotextiles around and at the bottom of the foundation pit; the bioretention pond includes: gravel base 1, separation layer 2, isolation parts 3, planting Soil layer 4, filter material layer 5; wherein,
所述碎石基层1位于所述滞留池的底部,用于承重及渗透水流;所述碎石基层的厚度为25cm,所述碎石可以为开级配碎石,压碎值≤25%;所述碎石的粒径为5~25mm。The crushed stone base layer 1 is located at the bottom of the retention pond and is used for load-bearing and permeation of water flow; the thickness of the crushed stone base layer is 25cm, and the crushed stone can be open-graded crushed stone, and the crushing value is less than or equal to 25%; The particle size of the crushed stone is 5-25 mm.
所述分隔层2位于所述碎石基层1的上方;所述分隔层2为透水土工布。The separation layer 2 is located above the crushed stone base layer 1; the separation layer 2 is a water-permeable geotextile.
所述隔离部件3位于所述分隔层2的上方,所述隔离部件3与所述分隔层2之间存在一夹角;所述夹角为90o。以能将植土层4与滤料层5分隔开。The spacer member 3 is located above the spacer layer 2, and there is an included angle between the spacer member 3 and the spacer layer 2; the included angle is 90°. Soil planting layer 4 and filter material layer 5 can be separated.
本实施例中,所述隔离部件2为多块木质隔板,所述隔离部件3沿着所述滞留池设置一周;其中,所述木质隔板的厚度为2cm、长41cm、宽20cm;且隔板距离生物滞留池的外围约15cm;为了提高美观性,所述隔离部件2的高度还要高出植土层4的边缘1~2cm。In this embodiment, the isolation member 2 is a plurality of wooden partitions, and the isolation member 3 is arranged along the retention tank for a week; wherein, the thickness of the wooden partition is 2cm, 41cm long, and 20cm wide; and The separator is about 15 cm away from the periphery of the bioretention tank; in order to improve the aesthetics, the height of the isolation member 2 is also 1-2 cm higher than the edge of the planting soil layer 4 .
所述植土层4位于所述隔离部件3的一侧,所述植土层填充有普通土壤,用于种植景观植物;所述植土层4为中间高、四周低的凸面结构,所述植土层4的高度为43cm。The soil planting layer 4 is located on one side of the isolation member 3, and the soil planting layer is filled with ordinary soil for planting landscape plants; the soil planting layer 4 is a convex structure with a high middle and low surrounding areas. The height of the soil planting layer 4 is 43 cm.
所述滤料层5位于所述隔离部件2的另一侧,所述滤料层用于渗流;所述滤料层5填充有35cm厚的冶金渣滤料,所述滤料层5的边带宽度为15cm。所述冶金渣滤料为钢铁冶金企业排出的固体废弃物加工而成,所述冶金渣滤料具有多孔的微粒结构,其渗透系数2.48×10-5m/s;所述冶金渣滤料有一定的碱性,可以对雨水中的悬浮物和重金属等污染物有良好的去除作用。The filter material layer 5 is located on the other side of the isolation member 2, and the filter material layer is used for seepage; the filter material layer 5 is filled with a metallurgical slag filter material with a thickness of 35 cm, and the edge of the filter material layer 5 is The belt width is 15cm. The metallurgical slag filter material is processed from solid waste discharged from iron and steel metallurgical enterprises, and the metallurgical slag filter material has a porous particle structure with a permeability coefficient of 2.48×10 -5 m/s; the metallurgical slag filter material has A certain degree of alkalinity can effectively remove pollutants such as suspended solids and heavy metals in rainwater.
在确定所述率料层5的渗透率v时,可以通过公式(1)确定:When determining the permeability v of the rate material layer 5, it can be determined by formula (1):
在公式(1)中,所述P为生物滞留池所服务的汇水分区面积,本实施例中P为30m2;所述h为径流总量控制率转化的降雨量,所述h为30mm;所述t为生物滞留池的排空时间;所述t为12~24h;所述a为生物滞留池的周长,所述生物滞留池的半径为1m;所述b为滤料层5的宽度,所述b为15cm。最后计算得出的渗透系数为1.38×10-5~2.76×10-5m/s,因此所选用的冶金渣滤料渗透系数满足排水需求。In formula (1), the P is the catchment zone area served by the bioretention pond, and in this embodiment, P is 30 m 2 ; the h is the rainfall converted from the total runoff control rate, and the h is 30 mm ; the t is the emptying time of the bioretention tank; the t is 12 to 24 hours; the a is the circumference of the bioretention tank, and the radius of the bioretention tank is 1 m; the b is the filter material layer 5 width, the b is 15cm. The final calculated permeability coefficient is 1.38×10 -5 to 2.76×10 -5 m/s, so the selected metallurgical slag filter material permeability coefficient meets the drainage requirement.
这样,所述隔离部件2将生物滞留池分为排水区及种植区;在雨量较大时,由于植土层4为中间高、四周低的凸面结构,因此雨水将会流向外侧的滤料层5,由滤料层5对雨水进行过滤、渗透,满足了排水需求;这样植土层4就不会滞留太多雨水,普通土壤渗透力不大,因此植土层4可种植普通的四季常青的植物,满足了景观需求。In this way, the isolation part 2 divides the bioretention pond into a drainage area and a planting area; when the rainfall is large, since the soil planting layer 4 is a convex structure with high middle and low surrounding, the rainwater will flow to the outer filter material layer 5. The rainwater is filtered and infiltrated by the filter material layer 5 to meet the drainage needs; in this way, the soil planting layer 4 will not retain too much rainwater, and the penetration of ordinary soil is not large, so the soil planting layer 4 can be planted with ordinary four-season crops. Green plants meet the needs of landscape.
这里,为了保护滤料层,所述滞留池还包括:覆盖层6,所述覆盖层6位于所述滤料层5的上方。所述覆盖层6包括:卵石层,所述覆盖层6的厚度为5cm;所述卵石粒径为10~25mm。Here, in order to protect the filter material layer, the retention tank further includes: a cover layer 6 , and the cover layer 6 is located above the filter material layer 5 . The covering layer 6 includes: a pebble layer, the thickness of the covering layer 6 is 5 cm; the particle size of the pebble is 10-25 mm.
为了可以对雨水滞留,所述滞留池还包括:滞留层7,所述滞留层7为所述植土层4上方的空间,该空间具体为相对周边地面下凹的蓄水区域。In order to retain rainwater, the retention pond further includes: a retention layer 7, the retention layer 7 is the space above the soil planting layer 4, and the space is specifically a concave water storage area relative to the surrounding ground.
参见图2,所述滞留层7的高度可以由公式(2)确定:Referring to Fig. 2, the height of the retention layer 7 can be determined by formula (2):
公式(2)中,所述p1为所述生物滞留池的面积。In formula (2), the p 1 is the area of the bioretention pond.
然后通过公式(3)确定生物滞留池边部覆盖层顶与周边道路高度差d:Then, the height difference d between the top of the cover layer at the edge of the bioretention pond and the surrounding road is determined by formula (3):
d=d1+D+d2 (3)d=d 1 +D+d 2 (3)
公式(3)中,所述d1为植土层顶部与四周最低点的高度差,所述d1为3cm,所述d2为溢流井9顶部与周边道路的高度差,所述d1为5cm。In formula (3), the d 1 is the height difference between the top of the soil planting layer and the surrounding lowest point, the d 1 is 3 cm, the d 2 is the height difference between the top of the overflow well 9 and the surrounding roads, and the d 1 is 5cm.
进一步地,为了可以将处理后的雨水排出滞留池,参见图1,所述滞留池还包括:渗管8,所述渗管8安装在所述滞留池的底部,所述渗管8与所述滞留池底部的距离为5cm。所述渗管8为塑料渗管;所述渗管8上设置有多个穿孔,所述穿孔开口位置为斜下45°,所述各穿孔之间的间距为10cm。Further, in order to discharge the treated rainwater out of the retention pond, referring to FIG. 1 , the retention pond further includes: a seepage pipe 8 , the seepage pipe 8 is installed at the bottom of the retention pond, and the seepage pipe 8 is connected to the The distance from the bottom of the retention tank was 5 cm. The infiltration pipe 8 is a plastic infiltration pipe; a plurality of perforations are arranged on the infiltration pipe 8 , the opening position of the perforation is 45° obliquely downward, and the distance between the perforations is 10 cm.
为了可以处理暴雨情况,所述滞留池还包括:溢流井9及雨水管10,所述溢流井9是由混凝土制成的,所述溢流井9的一端位于所述滞留池底部,与底部齐平;所述溢流井9的另一端位于所述滞留池的顶部。具体地,所述溢流井9一端的高度根据该生物滞留池所服务的汇水分区面积及滞留层7的容积确定,一般来说,所述溢流井9一端的高度需要比周围路面低5cm。In order to deal with the rainstorm situation, the detention pond further includes: an overflow well 9 and a rainwater pipe 10, the overflow well 9 is made of concrete, one end of the overflow well 9 is located at the bottom of the detention pond, and the The bottom is flush; the other end of the overflow well 9 is at the top of the retention pond. Specifically, the height of one end of the overflow well 9 is determined according to the area of the catchment zone served by the bioretention pool and the volume of the retention layer 7. Generally speaking, the height of one end of the overflow well 9 needs to be lower than the surrounding road surface 5cm.
所述雨水管10安装在所述溢流井的底部5cm处,所述雨水管10还与所述渗管8相连,用于将渗流排入市政管网。The rainwater pipe 10 is installed at the bottom 5 cm of the overflow well, and the rainwater pipe 10 is also connected with the seepage pipe 8 for discharging seepage into the municipal pipe network.
这里,所述滞留池还包括过滤盖,所述过滤盖安装在所述溢流井9的另一端。所述过滤盖具体可以为雨水篦子。Here, the retention tank further includes a filter cover installed at the other end of the overflow well 9 . Specifically, the filter cover may be a rainwater grate.
实施例三Embodiment 3
实际应用中,本实施例在改造区域新建一个生物滞留池,所述生物滞留池的蓄水量为0.7m3;具体实现如下:In practical application, this embodiment builds a new bioretention pond in the transformation area, and the water storage capacity of the bioretention pond is 0.7m 3 ; the specific implementation is as follows:
在改造区域开挖边长为4m、深90cm的正三角形基坑,并在基坑四周及底部铺设不透水土工布;述生物滞留池包括:碎石基层1、分隔层2、隔离部件3、植土层4、滤料层5;其中,Excavate a equilateral triangle foundation pit with a side length of 4m and a depth of 90cm in the reconstruction area, and lay impermeable geotextiles around and at the bottom of the foundation pit; the bioretention pond includes: gravel base 1, separation layer 2, isolation parts 3, Planting soil layer 4, filter material layer 5; wherein,
所述碎石基层1位于所述滞留池的底部,用于承重及渗透水流;所述碎石基层的厚度为20cm,所述碎石可以为开级配碎石,压碎值≤25%;所述碎石的粒径为5~25mm。The crushed stone base layer 1 is located at the bottom of the retention pond and is used for load bearing and infiltration of water flow; the thickness of the crushed stone base layer is 20cm, and the crushed stone can be open-graded crushed stone, and the crushing value is less than or equal to 25%; The particle size of the crushed stone is 5-25 mm.
所述分隔层2位于所述碎石基层1的上方;所述分隔层2为透水土工布。The separation layer 2 is located above the crushed stone base layer 1; the separation layer 2 is a water-permeable geotextile.
所述隔离部件3位于所述分隔层2的上方,所述隔离部件3与所述分隔层2之间存在一夹角;所述夹角为90°。以能将植土层4与滤料层5分隔开。The isolation member 3 is located above the isolation layer 2, and an included angle exists between the isolation member 3 and the isolation layer 2; the included angle is 90°. Soil planting layer 4 and filter material layer 5 can be separated.
本实施例中,所述隔离部件2为多块木质隔板,所述隔离部件3沿着所述滞留池设置一周;其中,所述木质隔板的厚度为2cm、长40cm、宽20cm;且隔板距离生物滞留池的外围约15cm;为了提高美观性,所述隔离部件2的高度还要高出植土层4的边缘1~2cm。In this embodiment, the isolation member 2 is a plurality of wooden clapboards, and the isolation member 3 is arranged along the retention tank for a week; wherein, the thickness of the wooden clapboard is 2cm, 40cm long, and 20cm wide; and The separator is about 15 cm away from the periphery of the bioretention tank; in order to improve the aesthetics, the height of the isolation member 2 is also 1-2 cm higher than the edge of the planting soil layer 4 .
所述植土层4位于所述隔离部件3的一侧,所述植土层填充有普通土壤,用于种植景观植物;所述植土层4为中间高、四周低的凸面结构,所述植土层4的高度为44cm。The soil planting layer 4 is located on one side of the isolation member 3, and the soil planting layer is filled with ordinary soil for planting landscape plants; the soil planting layer 4 is a convex structure with a high middle and low surrounding areas. The height of the soil planting layer 4 is 44 cm.
所述滤料层5位于所述隔离部件2的另一侧,所述滤料层用于渗流;所述滤料层5填充有36cm厚的冶金渣滤料,所述滤料层5的边带宽度为8cm。所述冶金渣滤料为钢铁冶金企业排出的固体废弃物加工而成,所述冶金渣滤料具有多孔的微粒结构,其渗透系数1.23×10-5m/s;所述冶金渣滤料有一定的碱性,可以对雨水中的悬浮物和重金属等污染物有良好的去除作用。The filter material layer 5 is located on the other side of the isolation member 2, and the filter material layer is used for seepage; the filter material layer 5 is filled with a metallurgical slag filter material with a thickness of 36 cm, and the edge of the filter material layer 5 is The belt width is 8cm. The metallurgical slag filter material is processed from solid waste discharged from iron and steel metallurgical enterprises, and the metallurgical slag filter material has a porous particle structure with a permeability coefficient of 1.23×10 -5 m/s; the metallurgical slag filter material has A certain degree of alkalinity can effectively remove pollutants such as suspended solids and heavy metals in rainwater.
在确定所述率料层5的渗透率v时,可以通过公式(1)确定:When determining the permeability v of the rate material layer 5, it can be determined by formula (1):
在公式(1)中,所述P为生物滞留池所服务的汇水分区面积,本实施例中P为35m2;所述h为径流总量控制率转化的降雨量,所述h为20mm;所述t为生物滞留池的排空时间;所述t为12~24h;所述a为生物滞留池的周长,所述生物滞留池的边长为4m;所述b为滤料层5的宽度,所述b为8cm。最后计算得出的渗透系数为8.44×10-6~1.69×10-5m/s,因此所选用的冶金渣滤料渗透系数满足排水需求。In formula (1), the P is the area of the catchment zone served by the bioretention pond, and in this embodiment, P is 35 m 2 ; the h is the rainfall converted from the total runoff control rate, and the h is 20 mm ; the t is the emptying time of the bioretention tank; the t is 12-24h; the a is the circumference of the bioretention tank, and the side length of the bioretention tank is 4m; the b is the filter material layer 5 width, the b is 8cm. The permeability coefficient finally calculated is 8.44×10 -6 ~ 1.69×10 -5 m/s, so the selected metallurgical slag filter material permeability coefficient meets the drainage requirements.
这样,所述隔离部件2将生物滞留池分为排水区及种植区;在雨量较大时,由于植土层4为中间高、四周低的凸面结构,因此雨水将会流向外侧的滤料层5,由滤料层5对雨水进行过滤、渗透,满足了排水需求;这样植土层4就不会滞留太多雨水,普通土壤渗透力不大,因此植土层4可种植普通的四季常青的植物,满足了景观需求。In this way, the isolation part 2 divides the bioretention pond into a drainage area and a planting area; when the rainfall is large, since the soil planting layer 4 is a convex structure with high middle and low surrounding, the rainwater will flow to the outer filter material layer 5. The rainwater is filtered and infiltrated by the filter material layer 5 to meet the drainage needs; in this way, the soil planting layer 4 will not retain too much rainwater, and the penetration of ordinary soil is not large, so the soil planting layer 4 can be planted with ordinary four-season crops. Green plants meet the needs of landscape.
这里,为了保护滤料层,所述滞留池还包括:覆盖层6,所述覆盖层6位于所述滤料层5的上方。所述覆盖层6包括:卵石层,所述覆盖层6的厚度为3cm;所述卵石粒径为10~25mm。Here, in order to protect the filter material layer, the retention tank further includes: a cover layer 6 , and the cover layer 6 is located above the filter material layer 5 . The covering layer 6 includes: a pebble layer, the thickness of the covering layer 6 is 3 cm; the particle size of the pebble is 10-25 mm.
为了可以对雨水滞留,所述滞留池还包括:滞留层7,所述滞留层7为所述植土层4上方的空间,该空间具体为相对周边地面下凹的蓄水区域。In order to retain rainwater, the retention pond further includes: a retention layer 7, the retention layer 7 is the space above the soil planting layer 4, and the space is specifically a concave water storage area relative to the surrounding ground.
参见图2,所述滞留层7的高度可以由公式(2)确定:Referring to Fig. 2, the height of the retention layer 7 can be determined by formula (2):
公式(2)中,所述p1为所述生物滞留池的面积。In formula (2), the p 1 is the area of the bioretention pond.
然后通过公式(3)确定生物滞留池边部覆盖层顶与周边道路高度差d:Then, the height difference d between the top of the cover layer at the edge of the bioretention pond and the surrounding road is determined by formula (3):
d=d1+D+d2 (3)d=d 1 +D+d 2 (3)
公式(3)中,所述d1为植土层顶部与四周最低点的高度差,所述d1为5cm,所述d2为溢流井9顶部与周边道路的高度差,所述d1为6cm。In formula (3), the d 1 is the height difference between the top of the soil planting layer and the surrounding lowest point, the d 1 is 5 cm, the d 2 is the height difference between the top of the overflow well 9 and the surrounding roads, and the d 1 is 6cm.
进一步地,为了可以将处理后的雨水排出滞留池,参见图1,所述滞留池还包括:渗管8,所述渗管8安装在所述滞留池的底部,所述渗管8与所述滞留池底部的距离为3.5cm。所述渗管8为塑料渗管;所述渗管8上设置有多个穿孔,所述穿孔开口位置为斜下45°,所述各穿孔之间的间距为10cm。Further, in order to discharge the treated rainwater out of the retention pond, referring to FIG. 1 , the retention pond further includes: a seepage pipe 8 , the seepage pipe 8 is installed at the bottom of the retention pond, and the seepage pipe 8 is connected to the The distance from the bottom of the retention pond was 3.5 cm. The infiltration pipe 8 is a plastic infiltration pipe; a plurality of perforations are arranged on the infiltration pipe 8 , the opening position of the perforation is 45° obliquely downward, and the distance between the perforations is 10 cm.
为了可以处理暴雨情况,所述滞留池还包括:溢流井9及雨水管10,所述溢流井9是由混凝土制成的,所述溢流井9的一端位于所述滞留池底部,与底部齐平;所述溢流井9的另一端位于所述滞留池的顶部。具体地,所述溢流井9一端的高度根据该生物滞留池所服务的汇水分区面积及滞留层7的容积确定,一般来说,所述溢流井9一端的高度需要比周围路面低6cm。In order to deal with the rainstorm situation, the detention pond further includes: an overflow well 9 and a rainwater pipe 10, the overflow well 9 is made of concrete, one end of the overflow well 9 is located at the bottom of the detention pond, and the The bottom is flush; the other end of the overflow well 9 is at the top of the retention pond. Specifically, the height of one end of the overflow well 9 is determined according to the area of the catchment zone served by the bioretention pool and the volume of the retention layer 7. Generally speaking, the height of one end of the overflow well 9 needs to be lower than the surrounding road surface 6cm.
所述雨水管10安装在所述溢流井的底部4.5cm处,所述雨水管10还与所述渗管8相连,用于将渗流排入市政管网。The rainwater pipe 10 is installed at the bottom 4.5 cm of the overflow well, and the rainwater pipe 10 is also connected with the seepage pipe 8 for discharging seepage into the municipal pipe network.
这里,所述滞留池还包括过滤盖,所述过滤盖安装在所述溢流井9的另一端。所述过滤盖具体可以为雨水篦子。Here, the retention tank further includes a filter cover installed at the other end of the overflow well 9 . Specifically, the filter cover may be a rainwater grate.
本发明实施例提供的生物滞留池能带来的有益效果至少是:The beneficial effects that the bioretention pond provided in the embodiment of the present invention can bring are at least:
本发明提供了一种生物滞留池,所述系统包括:碎石基层,所述碎石基层位于所述滞留池的底部;分隔层,所述分隔层位于所述碎石基层上方;隔离部件,所述隔离部件位于所述分隔层上方,所述隔离部件与所述分隔层之间存在一夹角;植土层,所述植土层位于所述隔离部件的一侧,所述植土层填充有普通土壤;滤料层,所述滤料层位于所述隔板的另一侧,所述滤料层用于渗流;其中,所述植土层为中间高、四周低的凸面结构;如此,所述隔离部件将生物滞留池分为排水区及种植区;由于植土层为中间高、四周低的凸面结构,因此雨水将会流向外侧的滤料层,由滤料层对雨水进行过滤、渗透,满足了排水需求;并且滤料层与土体分离设置,不存在相互干扰,可定期对滤料层进行回收和替换,方便维护且不损坏植物;这样植土层就不会滞留太多雨水,普通土壤渗透力不大,因此植土层可种植普通的四季常青的植物,扩大了种植范围,满足了景观需求;另外,由于隔离部件上端超出植土层边缘1~2cm,当平时对植物洒水维护时,仅向种植区洒水且总水量较少,水留在植土层缓慢下渗滋养植物;当下小雨时,道路上的水流入生物滞留池边部直接下渗;当雨较大时,雨水可通过溢流充填滞留层;当下暴雨时,超标雨水通过溢流井排放。进一步地,因植土层仅承担少量下渗功能(在计算排水时不予考虑)有利于减少雨水渗透过程对原生土壤生态系统的冲击,有利于保持原生土壤生态平衡,使得生物滞留池更符合海绵城市多使用本地植物和低影响开发的理念。The invention provides a bioretention pond, the system comprising: a crushed stone base layer, the crushed stone base layer is located at the bottom of the retention pond; a separation layer, the separation layer is located above the crushed stone base layer; an isolation component, The isolation component is located above the isolation layer, and there is an included angle between the isolation component and the isolation layer; the soil planting layer is located on one side of the isolation component, and the soil planting layer is located at one side of the isolation component. Filled with ordinary soil; filter material layer, the filter material layer is located on the other side of the partition plate, and the filter material layer is used for seepage; wherein, the planting soil layer is a convex structure with high middle and low surrounding; In this way, the isolation component divides the bioretention pond into a drainage area and a planting area; since the soil planting layer is a convex structure with a high middle and low surrounding areas, the rainwater will flow to the outer filter material layer, and the rainwater will be treated by the filter material layer. Filtration and infiltration meet the drainage needs; and the filter material layer and the soil are set separately, without mutual interference, and the filter material layer can be recycled and replaced regularly, which is convenient for maintenance and does not damage the plants; in this way, the soil planting layer will not be retained There is too much rain, and the penetration of ordinary soil is not large, so ordinary evergreen plants can be planted in the soil layer, which expands the planting range and meets the needs of landscape; When the plants are usually sprinkled and maintained, only the planting area is sprinkled with a small amount of water, and the water remains in the planting soil layer and slowly infiltrates to nourish the plants; when it rains lightly, the water on the road flows into the edge of the bioretention pond and infiltrates directly; When the rain is heavy, the rainwater can fill the stagnant layer through the overflow; when it rains heavily, the rainwater that exceeds the standard is discharged through the overflow well. Further, because the planted soil layer only undertakes a small amount of infiltration function (not considered in the calculation of drainage), it is beneficial to reduce the impact of the rainwater infiltration process on the native soil ecosystem, and is conducive to maintaining the ecological balance of the native soil, making the bioretention pond more suitable for Sponge cities use native plants and the idea of low-impact development.
以上所述,仅为本发明的较佳实施例而已,并非用于限定本发明的保护范围,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。The above are only preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present invention shall be included in the within the protection scope of the present invention.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710418936.XA CN107143021B (en) | 2017-06-06 | 2017-06-06 | A kind of biology delaying basin |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710418936.XA CN107143021B (en) | 2017-06-06 | 2017-06-06 | A kind of biology delaying basin |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN107143021A CN107143021A (en) | 2017-09-08 |
| CN107143021B true CN107143021B (en) | 2019-07-23 |
Family
ID=59780053
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710418936.XA Expired - Fee Related CN107143021B (en) | 2017-06-06 | 2017-06-06 | A kind of biology delaying basin |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107143021B (en) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108002669A (en) * | 2018-01-20 | 2018-05-08 | 长安大学 | A kind of road is used for the rainwater biology delaying basin for removing removing heavy metals |
| CN108558122A (en) * | 2018-01-24 | 2018-09-21 | 广州市环境保护工程设计院有限公司 | A kind of high efficient block biology gaseous-waste holdup system |
| CN109809632A (en) * | 2019-02-01 | 2019-05-28 | 江苏大学 | A Bioretention Pond for Improving Nitrogen and Phosphorus Removal Capability |
| CN109763559B (en) * | 2019-02-25 | 2020-08-11 | 悉地(苏州)勘察设计顾问有限公司 | Design method of biological detention pond |
| CN112302135A (en) * | 2020-10-23 | 2021-02-02 | 重庆交通大学 | Bioretention system |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105804198A (en) * | 2016-04-06 | 2016-07-27 | 上海交通大学 | Greenbelt structure integrating rainwater storage and utilization |
| CN205530581U (en) * | 2016-01-29 | 2016-08-31 | 徐州市市政设计院有限公司 | Tree pool afforests drainage facility |
| CN205839849U (en) * | 2016-07-27 | 2016-12-28 | 中国电建集团西北勘测设计研究院有限公司 | A kind of collect, store, arrange integrated rain flood and cut stagnant culvert |
| CN106499034A (en) * | 2016-12-20 | 2017-03-15 | 盐城工学院 | A kind of rainwater utilization system and urban road |
| CN106759824A (en) * | 2016-12-06 | 2017-05-31 | 徐冉云 | A kind of tree pond for purifying storage rainwater |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7080480B2 (en) * | 2004-01-15 | 2006-07-25 | Urban Root L.L.C. | Integrated tree root and storm water system |
| US20130175216A1 (en) * | 2012-01-06 | 2013-07-11 | Contech Stormwater Solutions Inc. | Phosphorous mitigation for green filter beds |
-
2017
- 2017-06-06 CN CN201710418936.XA patent/CN107143021B/en not_active Expired - Fee Related
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN205530581U (en) * | 2016-01-29 | 2016-08-31 | 徐州市市政设计院有限公司 | Tree pool afforests drainage facility |
| CN105804198A (en) * | 2016-04-06 | 2016-07-27 | 上海交通大学 | Greenbelt structure integrating rainwater storage and utilization |
| CN205839849U (en) * | 2016-07-27 | 2016-12-28 | 中国电建集团西北勘测设计研究院有限公司 | A kind of collect, store, arrange integrated rain flood and cut stagnant culvert |
| CN106759824A (en) * | 2016-12-06 | 2017-05-31 | 徐冉云 | A kind of tree pond for purifying storage rainwater |
| CN106499034A (en) * | 2016-12-20 | 2017-03-15 | 盐城工学院 | A kind of rainwater utilization system and urban road |
Also Published As
| Publication number | Publication date |
|---|---|
| CN107143021A (en) | 2017-09-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109356225A (en) | A kind of Multifunctional rain ecological utilization system | |
| CN106917522B (en) | A kind of Outdoor Parking position system based on sponge the idea of the city | |
| CN205348351U (en) | Have quality of water purification performance's rainfall runoff control system concurrently | |
| CN105804198A (en) | Greenbelt structure integrating rainwater storage and utilization | |
| CN107143021A (en) | a bioretention pond | |
| CN206467746U (en) | A kind of concave herbaceous field Rainwater collection system | |
| CN208949673U (en) | A kind of Road ecology drainage band | |
| CN102359145A (en) | Baffled water holding garden system for treating rainwater collected in urban residential area | |
| CN208379724U (en) | The Rain Garden of Collapsible Loess District | |
| CN207062672U (en) | A kind of permeable pavement structure | |
| CN211646629U (en) | Energy dissipation type flower bed suitable for drainage of sponge city high-rise building | |
| CN101283663B (en) | Roof greening and planting pool convenient for collecting rain water | |
| CN107503426A (en) | A kind of wet land system and its construction method for integrating rainwater-collecting, regulating and storing, purifying | |
| CN208105449U (en) | A kind of ecostagnation pond | |
| CN206616662U (en) | A kind of residential quarter sponge urban facilities system | |
| CN214301064U (en) | Rainwater infiltration system based on ecological parking lot | |
| CN214657144U (en) | Novel ecological bank protection suitable for northwest loess plateau area | |
| CN206337737U (en) | Ecological roof garden percolation structures for slowing down rainfall runoff | |
| CN211849903U (en) | A sloping rain garden | |
| CN210658597U (en) | Sponge city view is with green structure of sinking | |
| CN205295848U (en) | Firm type ecology system of mating formation of permeating water | |
| CN109423937A (en) | A kind of residential quarters system for reclaiming rainwater | |
| CN204780521U (en) | Composite water storage and drainage environment-friendly ground | |
| CN108668787B (en) | Ecological reconstruction structure of stereoplasm bank protection | |
| CN207727746U (en) | A kind of ecologic rainwater well lid construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190723 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |