CN209507278U - A kind of water conservancy construction pipe laying actinobacillus device - Google Patents
A kind of water conservancy construction pipe laying actinobacillus device Download PDFInfo
- Publication number
- CN209507278U CN209507278U CN201822204123.3U CN201822204123U CN209507278U CN 209507278 U CN209507278 U CN 209507278U CN 201822204123 U CN201822204123 U CN 201822204123U CN 209507278 U CN209507278 U CN 209507278U
- Authority
- CN
- China
- Prior art keywords
- clamp plate
- upper clamp
- cable
- water conservancy
- pipe laying
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The utility model relates to a kind of water conservancy construction pipe laying actinobacillus device, including upper clamp plate, lower clamp plate, positioning component, two fixed columns and regulating mechanism for adjusting cable elasticity, two fixed columns are vertically and symmetrically arranged;Lower clamp plate is horizontally set between two fixed columns, and the both ends of lower clamp plate are fixedly connected with two fixed columns respectively;The top between two fixed columns and being located at lower clamp plate is arranged in upper clamp plate, and one end of upper clamp plate and wherein one fixation are column articulated;The top in another fixed column and being located at the upper clamp plate other end is arranged in positioning component, and positioning component is abutted with the other end of upper clamp plate, upside of the downside of upper clamp plate close to or far from lower clamp plate under the action of positioning component;Upper clamp plate and lower clamp plate side close to each other are respectively provided with the clip slot for clamping cable;The side of upper clamp plate is arranged in regulating mechanism.The utility model has the beneficial effects that the elasticity of adjustable cable, is not easy to plug pipeline, reduces the trembling of cable, improve the efficiency of unwrapping wire.
Description
Technical field
The utility model relates to water conservancy construction technical fields, and in particular to a kind of water conservancy construction pipe laying actinobacillus device.
Background technique
There are many phases for the construction of construction of hydro project and general civil engineering such as road, railway, bridge and building construction etc.
Same place, such as: main construction object is mostly the projects such as the earthwork, the cubic meter of stone, concrete, metal structure and mechanical and electric equipment installation.But
Be, the construction of hydraulic engineering also have its alone the characteristics of: hydraulic engineering undertakes water blocking, water storage and the task of sluicing, thus to water
The performances such as stabilization, pressure-bearing, antiseepage, anti-impact, wear-resisting, the freeze proof and cracking resistance of work building have particular/special requirement, need to be according to water conservancy work
The technical specification of journey takes special construction method and measure, it is ensured that construction quality.
During water conservancy construction, it is often necessary to which the pipeline installation in pipeline, there are following during laying for pipeline
Problem: 1, due to the bending of spool in process of deployment, and not can control the speed of unwrapping wire, and cable easily blocks pipeline, leads
It causes worker that can only extract pipeline, then carries out line sending, inefficiency;2, when carrying out unwrapping wire, since cable has certain bullet
Property, it is easy to trembling, influences venting efficiency.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of water conservancy construction pipe laying actinobacillus devices, and structure is simple,
The elasticity of adjustable cable, is not easy to plug pipeline, reduces the trembling of cable, improve the efficiency of unwrapping wire.
The technical solution that the utility model solves above-mentioned technical problem is as follows:
A kind of water conservancy construction pipe laying actinobacillus device, including upper clamp plate, lower clamp plate, positioning component, two fixed columns and use
In the regulating mechanism for adjusting cable elasticity, two fixed columns are vertically and symmetrically arranged;The lower clamp plate is horizontally set on
Between two fixed columns, the both ends of the lower clamp plate are fixedly connected with two fixed columns respectively;The upper clamp plate is set
Set between two fixed columns and be located at the top of the lower clamp plate, one end of the upper clamp plate and a wherein fixation
It is column articulated;The top in another fixed column and being located at the upper clamp plate other end is arranged in the positioning component, described fixed
Hyte part is abutted with the other end of the upper clamp plate, and the downside of the upper clamp plate is close or remote under the action of the positioning component
Upside from the lower clamp plate;The upper clamp plate and lower clamp plate side close to each other are respectively provided with and clamp cable
Clip slot;The side of the upper clamp plate is arranged in the regulating mechanism.
The beneficial effects of the utility model are: the other side of upper clamp plate is arranged in dragger, is wound with cable when installation
Spool is erected at side of the regulating mechanism far from upper clamp plate by bracket;During pipe laying unwrapping wire, by the cable in spool
One end sequentially pass through regulating mechanism and clip slot and be fixed on traction mechanism and carry out unwrapping wire;Cable is adjusted by regulating mechanism
Elasticity avoids cable from trembleing during unwrapping wire;By manual adjustment positioning component the downside of upper clamp plate is leaned on
Close or remote from lower clamp plate upside with clamp or release cable, user can easily control payingoff speed when pipe laying, effectively
Cable blocking pipeline is prevented, the efficiency of sunkening cord of hydraulic engineering is substantially increased.The utility model structure is simple, and cable is adjusted
Elasticity, be not easy to plug pipeline, reduce the trembling of cable, improve the efficiency of unwrapping wire, it is practical.
Based on the above technical solution, the utility model can also do following improvement.
Further, the positioning component includes locating piece and set screw, and the locating piece is arranged in another fixation
Top on column and positioned at the upper clamp plate;Screw hole is equipped on the locating piece vertically, the set screw is vertical and screw thread connects
It connects in the screw hole, the lower end of the set screw is abutted with the other end of the upper clamp plate, tightens or unscrew the positioning
Screw makes the upper clamp plate close to or far from the lower clamp plate to clamp or unclamp cable.
Beneficial effect using above-mentioned further scheme is the downside manually tightening or unscrewing set screw and make upper clamp plate
Close to or far from the upside of lower clamp plate, so that clamp or release cable, easy to operate, it is not easy to plug pipeline, practicability is stronger.
Further, the regulating mechanism includes upper pressure roller, lower compression roller and two guide posts, and two guide posts are set vertically
It sets in the side of the upper clamp plate;The lower compression roller is horizontally set between two guide posts and puts down with the lower clamp plate
Row, the both ends of the lower compression roller are rotatablely connected with two guide posts;The upper pressure roller is horizontally set on two guiding
Top between column and positioned at the lower compression roller, the both ends of the upper pressure roller pass through slide assemblies and two guide posts respectively
It is slidably connected.
Beneficial effect using above-mentioned further scheme is that cable is passed through between upper pressure roller and lower compression roller, the two of upper pressure roller
End is moved up and down respectively by slide assemblies along two guide posts with close to or far from lower compression roller, to adjust the elastic of cable
Degree reduces cable trembling, and structure is simple, easy to adjust quick.
Further, the slide assemblies include nut, spring and sliding block, and the spring is set in the guide post and position
In the top of described lower compression roller one end;The sliding block is slidably arranged in the top in the guide post and being located at the spring, institute
The one end and the sliding block for stating pressure roller are rotatablely connected;The top of the guide post is equipped with thread segment, the nut thread connection
Top on the thread segment and positioned at the sliding block;Tighten or unscrew the nut make the sliding block move down or move up with
Make the upper pressure roller close to or far from the lower compression roller.
Beneficial effect using above-mentioned further scheme is that cable is passed through between upper pressure roller and lower compression roller, by tightening or
Unscrewing nut makes sliding block move down or move up so that upper pressure roller is close to or far from lower compression roller, and spring generates sliding block in the process
Upward elastic force is fixed with that will slide, to adjust the elasticity of cable, reduces cable trembling, structure is simple, easy to adjust
Fast.
Further, the lower end of the fixed column and the guide post is respectively equipped with support plate.
Beneficial effect using above-mentioned further scheme is to be fixed by support plate increase and the stability of guide post.
Further, the clip slot is semicircle clip slot.
Beneficial effect using above-mentioned further scheme is that the shape of semicircle clip slot and cable matches, so as to better
Carry out pipe laying unwrapping wire.
Further, the side wall of the clip slot is equipped with soft formation.
Beneficial effect using above-mentioned further scheme is the rigid contact avoided between the side wall of clip slot and cable, is protected
Protect cable.
Further, one end of the upper clamp plate is column articulated by hinge and wherein one fixation.
Beneficial effect using above-mentioned further scheme is that structure is simple, easy to operate.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of upper clamp plate and lower clamp plate installation in the utility model;
Fig. 3 is the structural schematic diagram of regulating mechanism in the utility model.
In attached drawing, parts list represented by the reference numerals are as follows:
1, upper clamp plate, 2, lower clamp plate, 3, fixed column, 4, clip slot, 5, locating piece, 6, set screw, 7, upper pressure roller, 8, pushing
Roller, 9, guide post, 10, nut, 11, spring, 12, sliding block, 13, thread segment, 14, support plate, 15, spool.
Specific embodiment
The principles of the present invention and feature are described below in conjunction with attached drawing, example is served only for explaining that this is practical
It is novel, it is not intended to limit the scope of the utility model.
As shown in Figure 1 to Figure 3, the utility model provides a kind of water conservancy construction pipe laying actinobacillus device, including upper clamp plate 1, under
Clamping plate 2, positioning component, two fixed columns 3 and the regulating mechanism for adjusting cable elasticity, two fixed columns 3 it is vertical and
It is symmetrical arranged;Lower clamp plate 2 is horizontally set between two fixed columns 3, and the both ends of lower clamp plate 2 are fixed with two fixed columns 3 respectively
Connection, generallys use welding, easy disassembly;The top between two fixed columns 3 and being located at lower clamp plate 2 is arranged in upper clamp plate 1, on
One end of clamping plate 1 and wherein 3 hinge of a fixed column are hinged, and structure is simple;Positioning component is arranged in another fixed column 3 and is located at
The top of 1 other end of upper clamp plate, positioning component are abutted with the other end of upper clamp plate 1, the upper clamp plate 1 under the action of positioning component
Upside of the downside close to or far from lower clamp plate 2;Upper clamp plate 1 and the side close to each other of lower clamp plate 2 are respectively provided with and clamp line
The clip slot 4 of cable, clip slot 4 are recessed by the respective side of clamping plate;The side of upper clamp plate 1 is arranged in regulating mechanism.When installation, traction
The other side of upper clamp plate 1 is arranged in machine, and the spool 15 for being wound with cable is erected at regulating mechanism far from upper clamp plate 1 by bracket
Side;During pipe laying unwrapping wire, one end of the cable in spool 15 is sequentially passed through into regulating mechanism and clip slot 4 and is fixed on
Unwrapping wire is carried out on traction mechanism;The elasticity that cable is adjusted by regulating mechanism, avoids cable from quivering during unwrapping wire
It is dynamic;Make the downside of upper clamp plate 1 close to or far from the upside of lower clamp plate 2 with clamp or release line by manual adjustment positioning component
Cable, user can easily control payingoff speed when pipe laying, effectively prevent cable blocking pipeline, substantially increase water conservancy work
The efficiency of sunkening cord of journey.The utility model structure is simple, and the elasticity of cable is adjusted, is not easy to plug pipeline, reduces quivering for cable
It is dynamic, the efficiency of unwrapping wire is improved, it is practical.
In the utility model, positioning component includes locating piece 5 and set screw 6, and locating piece 5 is arranged in another fixed column 3
The top of upper clamp plate 1 is gone up and is located at, locating piece 5 is welded in fixed column 3;Screw hole, set screw 6 are equipped on locating piece 5 vertically
It vertically and is threaded in screw hole, the lower end of set screw 6 is abutted with the other end of upper clamp plate 1, tightens or unscrew positioning spiral shell
Silk 6 makes upper clamp plate 1 close to or far from lower clamp plate 2 to clamp or unclamp cable.It is fixed by manually tightening or unscrewing during unwrapping wire
Position screw 6 makes the downside of upper clamp plate 1 close to or far from the upside of lower clamp plate 2, so that clamp or release cable, easy to operate,
It is not easy to plug pipeline, practicability is stronger.
In the utility model, regulating mechanism includes upper pressure roller 7, lower compression roller 8 and two guide posts 9, and two guide posts 9 are vertical
The side of upper clamp plate 1 is set;Lower compression roller 8 be horizontally set on it is between two guide posts 9 and parallel with lower clamp plate 2, lower compression roller 8
Both ends are rotatablely connected with two guide posts 9;Upper pressure roller 7 is horizontally set between two guide posts 9 and is located at the upper of lower compression roller 8
Side, the both ends of upper pressure roller 7 pass through slide assemblies respectively and are slidably connected with two guide posts 9;Slide assemblies include nut 10, spring
11 and sliding block 12, spring 11 is set in the top in guide post 9 and being located at 8 one end of lower compression roller;Sliding block 12 is slidably arranged in guiding
Top on column 9 and positioned at spring 11, the center vertical of sliding block 12 are equipped with the through-hole passed through for guide post 9, one end of upper pressure roller 7
It is rotatablely connected with sliding block 12;The top of guide post 9 is equipped with thread segment 13, and nut 10 is threaded on thread segment 13 and is located at and slides
The top of block 12;Tightening or unscrewing nut 10 makes sliding block 12 move down or move up so that upper pressure roller 7 is close to or far from lower compression roller 8.
During unwrapping wire, cable is passed through between upper pressure roller 7 and lower compression roller 8, by tightening or unscrewing nut 10 sliding block 12 is moved down
Or it moves up so that upper pressure roller 7 is close to or far from lower compression roller 8, so that upper pressure roller 7 pushes cable, to adjust the elasticity of cable;
Spring 11 generates upward elastic force to sliding block and is fixed with that will slide 12 in the process, to adjust the elasticity of cable, drops
Low cable trembling, structure is simple, easy to adjust quick.
In the utility model, the lower end of each fixed column 3 and every guide post 9 is respectively equipped with support plate 14, support plate 14
It is integrally formed respectively with fixed column 3 and guide post 9, increases the stability of fixed column 3 and guide post 9 by support plate 14.
Preferably, in the utility model, clip slot 4 is semicircle clip slot, and the shape of semicircle clip slot and cable matches, with
Just pipe laying unwrapping wire is preferably carried out;The side wall of clip slot 4 is equipped with soft formation, avoids the cell wall of clip slot 4 and the rigid contact of cable, protects
Protect cable.
The working principle of the utility model is as follows:
One end of cable in spool 15 is sequentially passed through into gap between upper pressure roller 7 and lower compression roller 8 and clip slot 4 and solid
It is scheduled on traction mechanism and carries out unwrapping wire;During unwrapping wire, upper pressure roller 7 is adjusted by the position of manual adjustment nut 10 and is pushed
Gap between roller 8 avoids cable during unwrapping wire so that upper pressure roller 7 pushes cable to adjust the elasticity of cable
It trembles;By be positioned manually screw 6 make the downside of upper clamp plate 1 close to or far from the upside of lower clamp plate 2 with clamp or pine
Burst at the seams cable, and user can easily control payingoff speed when pipe laying, effectively prevents cable blocking pipeline, substantially increases water
The efficiency of sunkening cord of sharp engineering.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all practical at this
Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the guarantor of the utility model
Within the scope of shield.
Claims (8)
1. a kind of water conservancy construction pipe laying actinobacillus device, it is characterised in that: including upper clamp plate (1), lower clamp plate (2), positioning component, two
Root fixed column (3) and the regulating mechanism for adjusting cable elasticity, two fixed columns (3) are vertically and symmetrically arranged;
The lower clamp plate (2) is horizontally set between two fixed columns (3), the both ends of the lower clamp plate (2) respectively with two institutes
Fixed column (3) is stated to be fixedly connected;The upper clamp plate (1) is arranged between two fixed columns (3) and is located at the lower clamp plate
(2) top, one end of the upper clamp plate (1) are hinged with a wherein fixed column (3);The positioning component is arranged another
On the fixed column (3) and it is located at the top of the upper clamp plate (1) other end, the positioning component and the upper clamp plate (1)
The other end abuts, and the downside of the upper clamp plate (1) is close to or far from the lower clamp plate (2) under the action of the positioning component
Upside;The upper clamp plate (1) and the lower clamp plate (2) side close to each other are respectively provided with the clip slot (4) for clamping cable;
Side of the regulating mechanism setting in the upper clamp plate (1).
2. a kind of water conservancy construction pipe laying actinobacillus device according to claim 1, it is characterised in that: the positioning component includes
Locating piece (5) and set screw (6), the locating piece (5) are arranged on another fixed column (3) and are located at the upper clamp plate
(1) top;Screw hole is equipped on the locating piece (5) vertically, the set screw (6) is vertical and is threaded in the screw hole
Interior, the lower end of the set screw (6) is abutted with the other end of the upper clamp plate (1), is tightened or is unscrewed the set screw (6)
Make the upper clamp plate (1) close to or far from the lower clamp plate (2) to clamp or unclamp cable.
3. a kind of water conservancy construction pipe laying actinobacillus device according to claim 1, it is characterised in that: the regulating mechanism includes
Upper pressure roller (7), lower compression roller (8) He Lianggen guide post (9), two guide posts (9) are vertically arranged in the upper clamp plate (1)
Side;The lower compression roller (8) be horizontally set on it is between two guide posts (9) and parallel with the lower clamp plate (2), under described
The both ends of pressure roller (8) are rotatablely connected with two guide posts (9);The upper pressure roller (7) is horizontally set on two guiding
Top between column (9) and positioned at the lower compression roller (8), the both ends of the upper pressure roller (7) pass through slide assemblies and two respectively
The guide post (9) is slidably connected.
4. a kind of water conservancy construction pipe laying actinobacillus device according to claim 3, it is characterised in that: the slide assemblies include
Nut (10), spring (11) and sliding block (12), the spring (11) are set on the guide post (9) and are located at the lower compression roller
(8) top of one end;The sliding block (12) is slidably arranged in the top on the guide post (9) and being located at the spring (11),
One end and the sliding block (12) of the upper pressure roller (7) are rotatablely connected;The top of the guide post (9) is equipped with thread segment (13),
The nut (10) is threaded in the top on the thread segment (13) and being located at the sliding block (12);It tightens or unscrews described
The sliding block (12) is made to move down or move up for nut (10) so that the upper pressure roller (7) is close to or far from the lower compression roller (8).
5. a kind of water conservancy construction pipe laying actinobacillus device according to claim 3, it is characterised in that: the fixed column (3) and
The lower end of the guide post (9) is respectively equipped with support plate (14).
6. a kind of water conservancy construction pipe laying actinobacillus device according to claim 1-5, it is characterised in that: the clip slot
It (4) is semicircle clip slot.
7. a kind of water conservancy construction pipe laying actinobacillus device according to claim 6, it is characterised in that: the side of the clip slot (4)
Wall is equipped with soft formation.
8. a kind of water conservancy construction pipe laying actinobacillus device according to claim 1, it is characterised in that: the upper clamp plate (1)
One end is hinged with a wherein fixed column (3) by hinge.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822204123.3U CN209507278U (en) | 2018-12-26 | 2018-12-26 | A kind of water conservancy construction pipe laying actinobacillus device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822204123.3U CN209507278U (en) | 2018-12-26 | 2018-12-26 | A kind of water conservancy construction pipe laying actinobacillus device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209507278U true CN209507278U (en) | 2019-10-18 |
Family
ID=68197326
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822204123.3U Active CN209507278U (en) | 2018-12-26 | 2018-12-26 | A kind of water conservancy construction pipe laying actinobacillus device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209507278U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113585664A (en) * | 2021-07-09 | 2021-11-02 | 佛山市南海晶资金属有限公司 | Powder coating hardened high-hardness aluminum alloy wall and floor |
-
2018
- 2018-12-26 CN CN201822204123.3U patent/CN209507278U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113585664A (en) * | 2021-07-09 | 2021-11-02 | 佛山市南海晶资金属有限公司 | Powder coating hardened high-hardness aluminum alloy wall and floor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203747356U (en) | Omni-bearing rotation support for cable tunnel | |
CN106950107A (en) | A kind of three-point bending fatigue experimental device | |
CN209507278U (en) | A kind of water conservancy construction pipe laying actinobacillus device | |
CN208179330U (en) | A kind of abrator head self-checking device | |
CN205016353U (en) | A closing device for transformer coil | |
CN211126800U (en) | Movable cable overhauls uses stop device | |
CN204620039U (en) | A kind of chemical test iron stand | |
CN106842474A (en) | A kind of optics clamping device | |
CN102593624A (en) | Special grounding wire for power transmission line | |
CN104061837A (en) | Sag measurement device for iron tower grounding wire | |
CN111799699A (en) | Parallel groove clamp mounting tool | |
CN211089065U (en) | High-voltage cross arm | |
CN205992719U (en) | It is easy to the TJ type jumper wire spacing rod adjusting | |
CN203893778U (en) | Sag measuring device for iron tower grounding line | |
CN103915782A (en) | Power transmission line bundled connector sag adjustment tool | |
CN205506529U (en) | Cable wire tensile test machine | |
CN204627666U (en) | Tunnel pipeline fixing device | |
CN101364716A (en) | Clamp type hot-line work fastener and using method | |
CN202533633U (en) | Insulation downlead clamp for optical cable rod | |
CN209158019U (en) | A kind of section steel cutting work holder easily adjusted | |
CN209323777U (en) | A kind of building curtain wall support device | |
CN203366950U (en) | Cable fixing frame for dry type transformer | |
CN208322781U (en) | A kind of cylinder tube wall aperture clamping regulator | |
CN206557451U (en) | Optics clamping device | |
CN204913096U (en) | Adaptation complex operating condition's spark separation device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |