CN205992719U - It is easy to the TJ type jumper wire spacing rod adjusting - Google Patents
It is easy to the TJ type jumper wire spacing rod adjusting Download PDFInfo
- Publication number
- CN205992719U CN205992719U CN201621032170.9U CN201621032170U CN205992719U CN 205992719 U CN205992719 U CN 205992719U CN 201621032170 U CN201621032170 U CN 201621032170U CN 205992719 U CN205992719 U CN 205992719U
- Authority
- CN
- China
- Prior art keywords
- wire
- threaded rod
- threaded
- rod
- connecting tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及一种便于调节的TJ型跳线间隔棒,用于输电线路耐张塔多分裂跳线与导线的支撑与保护。The utility model relates to an easily adjustable TJ-type wire jumper spacer, which is used for the support and protection of multi-split jumper wires and wires in tension towers of power transmission lines.
背景技术Background technique
输电线路中经常出现跳线碰触屏蔽环、导线的现象,而一旦跳线与导线或屏蔽环碰触,在风等外力作用下,容易导致跳线、导线等部件被磨损,以及电化学腐蚀对设备造成损伤。In transmission lines, jumpers often touch shielding rings and wires. Once jumpers touch wires or shielding rings, under the action of external forces such as wind, it is easy to cause wear and electrochemical corrosion of jumpers and wires. damage to the equipment.
施工人员为了消除上述缺陷,需要重新调整TJ型跳线间隔棒,现有的TJ型跳线间隔棒包括连接杆以及两个分别固定在连接杆的两端的夹头,在重新调整时,需要先将TJ型跳线间隔棒两端线夹打开,取下间隔棒,然后重新选定核实位置,保证跳线与屏蔽环、导线核实位置后,再安装间隔棒,安装时需要人员配合固定跳线与导线的相对位置,可以看出,上述消缺过程较为麻烦,且需要多人配合才能处理。In order to eliminate the above-mentioned defects, the construction workers need to readjust the TJ jumper spacer. The existing TJ jumper spacer includes a connecting rod and two chucks respectively fixed on the two ends of the connecting rod. When readjusting, it is necessary to first Open the clamps at both ends of the TJ-type jumper spacer, remove the spacer, and then re-select the verification position to ensure that the jumper, shielding ring, and wire are verified, and then install the spacer. During installation, personnel are required to cooperate with fixing the jumper and From the relative positions of the wires, it can be seen that the above-mentioned defect elimination process is cumbersome and requires the cooperation of multiple people.
实用新型内容Utility model content
本实用新型所要解决的技术问题是提供一种结构简单、易于维护,能快捷地消除碰触隐患的便于调节的TJ型跳线间隔棒。The technical problem to be solved by the utility model is to provide a TJ-type wire jumper spacer that is simple in structure, easy to maintain, and can quickly eliminate hidden dangers of touching.
为了解决上述技术问题,本实用新型采用如下技术方案:便于调节的TJ型跳线间隔棒,包括连接管、第一线夹和第二线夹,所述连接管的内表面制有内螺纹,所述第一线夹上设有第一螺纹杆,所述第二线夹上设有第二螺纹杆,所述第一螺纹杆螺纹连接在所述连接管的一端,且所述第一螺纹杆上螺纹连接有第一螺母,所述第二螺纹杆螺纹连接在所述连接管的另一端,且所述第二螺纹杆上螺纹连接有第二螺母。In order to solve the above-mentioned technical problems, the utility model adopts the following technical scheme: the TJ type wire jumper spacer that is easy to adjust includes a connecting pipe, a first wire clip and a second wire clip, and the inner surface of the connecting pipe is provided with an internal thread, so The first threaded rod is provided with a first threaded rod, the second threaded rod is provided with a second threaded rod, the first threaded rod is threadedly connected to one end of the connecting pipe, and the first threaded rod is A first nut is threaded, the second threaded rod is threaded at the other end of the connecting pipe, and a second nut is threaded on the second threaded rod.
进一步地,所述连接管的中部的相对两侧分别开有贯通所述连接管的管壁的施工孔。Further, the opposite sides of the middle part of the connecting pipe are respectively provided with construction holes penetrating through the pipe wall of the connecting pipe.
进一步地,所述连接管、第一线夹和第二线夹构成“一”字形结构。Further, the connecting pipe, the first wire clip and the second wire clip form a "one"-shaped structure.
进一步地,所述第一线夹和第二线夹的结构相同,均由基座、握体、螺杆和紧定螺母构成,所述握体的一端铰接在基座的一端,所述螺杆的一端活动穿过基座的另一端并铰接在握体的另一端,所述紧定螺母螺纹连接在所述螺杆的另一端,所述基座和握体的相对面分别设有凹槽。Further, the first wire clamp and the second wire clamp have the same structure, and both are composed of a base, a handle, a screw and a set nut, one end of the handle is hinged to one end of the base, and one end of the screw The other end of the base is moved through and hinged to the other end of the grip body, the set nut is screwed to the other end of the screw rod, grooves are respectively provided on the opposite surfaces of the base and the grip body.
进一步地,所述第一螺纹杆和第二螺纹杆分别固定在第一线夹和第二线夹的基座上。Further, the first threaded rod and the second threaded rod are respectively fixed on the bases of the first wire clip and the second wire clip.
本实用新型的有益效果为:The beneficial effects of the utility model are:
本实用新型结构简单,易于制作,在第一线夹和第二线夹分别固定在跳线、导线或者耐张拉杆上后,通过拧动连接管,就可以调整第一螺纹杆和第二螺纹杆的伸出长度,从而改变第一线夹和第二线夹之间的距离,使跳线与导线(耐张拉杆)的间距增大或缩小,并且通过第一螺母和第二螺母将第一螺纹杆和第二螺纹杆与连接管紧固起来。因此在竣工验收、日常运维工作中,发现跳线与导线或屏蔽环有碰触现象时,本实用新型不需要将间隔棒整个拆下,只需通过调节连接管就可以调节两个线夹的距离,从而能非常快捷地消除跳线碰触导线或屏蔽环的隐患,而且在安装时,这种设计也能够便于安装调试。The utility model has a simple structure and is easy to manufacture. After the first wire clamp and the second wire clamp are respectively fixed on jumpers, wires or tension rods, the first threaded rod and the second threaded rod can be adjusted by twisting the connecting pipe. The protruding length, thereby changing the distance between the first clamp and the second clamp, increasing or reducing the distance between the jumper wire and the wire (tension rod), and through the first nut and the second nut to connect the first thread The rod and the second threaded rod are fastened to the connecting pipe. Therefore, in the completion acceptance and daily operation and maintenance work, when the jumper wire is found to be in contact with the wire or the shielding ring, the utility model does not need to remove the spacer bar entirely, and the two wire clips can be adjusted only by adjusting the connecting pipe Therefore, the hidden danger of the jumper touching the wire or the shielding ring can be eliminated very quickly, and this design can also facilitate installation and debugging during installation.
本实用新型当线夹损坏时,可以直接更换相应的线夹即可,不需要更换整个跳线间隔棒,具有易于维护,降低成本的优点。When the wire clip is damaged, the utility model can directly replace the corresponding wire clip without replacing the entire wire jumper spacer, and has the advantages of easy maintenance and low cost.
附图说明Description of drawings
图1是本实用新型一实施例的结构示意图。Fig. 1 is a schematic structural view of an embodiment of the utility model.
附图中各部件的标记为:1连接管、11施工孔、21第一线夹、22第二线夹、31第一螺纹杆、32第二螺纹杆、41第一螺母、42第二螺母、01基座、02握体、03螺杆、04紧定螺母、05凹槽。The marks of each part in the accompanying drawings are: 1 connecting pipe, 11 construction hole, 21 first wire clamp, 22 second wire clamp, 31 first threaded rod, 32 second threaded rod, 41 first nut, 42 second nut, 01 Base, 02 Grip, 03 Screw, 04 Set Nut, 05 Groove.
具体实施方式detailed description
下面结合附图对本实用新型作进一步描述:Below in conjunction with accompanying drawing, the utility model will be further described:
参见图1。See Figure 1.
本实用新型一实施例的便于调节的TJ型跳线间隔棒,包括连接管1、第一线夹21和第二线夹22,所述连接管1的内表面制有内螺纹,所述第一线夹21上设有第一螺纹杆31,所述第二线夹22上设有第二螺纹杆32,所述第一螺纹杆31螺纹连接在所述连接管1的一端,且所述第一螺纹杆31上螺纹连接有第一螺母41,所述第二螺纹杆32螺纹连接在所述连接管1的另一端,且所述第二螺纹杆32上螺纹连接有第二螺母42。The TJ-type wire jumper spacer that is easy to adjust according to an embodiment of the utility model includes a connecting pipe 1, a first wire clamp 21 and a second wire clamp 22, the inner surface of the connecting pipe 1 is formed with internal threads, and the first The clamp 21 is provided with a first threaded rod 31, the second clamp 22 is provided with a second threaded rod 32, the first threaded rod 31 is threadedly connected to one end of the connecting pipe 1, and the first A first nut 41 is threaded on the threaded rod 31 , the second threaded rod 32 is threaded on the other end of the connecting pipe 1 , and a second nut 42 is threaded on the second threaded rod 32 .
相比于现有技术,本实用新型通过设置第一螺纹杆31和第二螺纹杆32与连接管1螺纹配合,以此将第一线夹21和第二线夹22连接起来,第一线夹21和第二线夹22用于固定在跳线、导线或者耐张拉杆上,通过拧动连接管1,就可以调整第一螺纹杆31和第二螺纹杆32的伸出长度,从而使跳线与导线(耐张拉杆)的间距增大或缩小,并且通过第一螺母41和第二螺母42可以将第一螺纹杆31和第二螺纹杆32与连接管1紧固起来。这种结构不仅安装方便,而且在重新调整时,不需要整个拆下。Compared with the prior art, the utility model connects the first wire clamp 21 and the second wire clamp 22 by setting the first threaded rod 31 and the second threaded rod 32 to thread the connecting pipe 1, and the first wire clamp 21 and the second clamp 22 are used to fix on jumpers, wires or tension rods, by twisting the connecting pipe 1, the extension length of the first threaded rod 31 and the second threaded rod 32 can be adjusted, so that the jumper The distance from the wire (tension rod) increases or decreases, and the first threaded rod 31 and the second threaded rod 32 can be fastened to the connecting pipe 1 by the first nut 41 and the second nut 42 . This structure is not only easy to install, but also does not need to be completely dismantled when readjusting.
另外,当线夹损坏时,可以直接更换相应的线夹即可,不需要更换整个跳线间隔棒,具有易于维护,降低成本的优点。In addition, when the wire clip is damaged, the corresponding wire clip can be directly replaced without replacing the entire jumper spacer, which has the advantages of easy maintenance and low cost.
本实施例中,所述连接管1的中部的相对两侧分别开有贯通所述连接管1的管壁的施工孔11。施工孔11用于专用工具插入,从而可以通过专用工具旋转连接管1。In this embodiment, the opposite sides of the middle part of the connecting pipe 1 are respectively provided with construction holes 11 penetrating through the pipe wall of the connecting pipe 1 . The construction hole 11 is used for special tool insertion, so that the connecting pipe 1 can be rotated by the special tool.
本实施例中,所述连接管1、第一线夹21和第二线夹22构成“一”字形结构。这种结构设计合理,便于操作、控制。In this embodiment, the connecting pipe 1 , the first wire clamp 21 and the second wire clamp 22 form a "one"-shaped structure. This structure design is reasonable, easy to operate and control.
本实施例中,所述第一线夹21和第二线夹22的结构相同,均由基座01、握体02、螺杆03和紧定螺母04构成,所述握体02的一端铰接在基座01的一端,所述螺杆03的一端活动穿过基座01的另一端并铰接在握体02的另一端,所述紧定螺母04螺纹连接在所述螺杆03的另一端,所述基座01和握体02的相对面分别设有凹槽05。这种结构的线夹安装、拆卸方便,而且在重新调整时,不需要拆下整个线夹,只要将紧定螺母04拧松,即可使跳线、导线或者耐张拉杆与线夹之间进行滑动,方便调整和调试。In this embodiment, the first wire clamp 21 and the second wire clamp 22 have the same structure, and are both composed of a base 01, a grip body 02, a screw rod 03 and a set nut 04, and one end of the grip body 02 is hinged on the base One end of the seat 01, one end of the screw rod 03 moves through the other end of the base 01 and is hinged on the other end of the grip body 02, the set nut 04 is threaded on the other end of the screw rod 03, and the base The opposite surfaces of 01 and grip body 02 are respectively provided with grooves 05 . The wire clip of this structure is easy to install and disassemble, and when readjusting, it is not necessary to remove the entire wire clip, as long as the set nut 04 is loosened, the gap between the jumper wire, wire or tension rod and the wire clip can be made Slide for easy adjustment and debugging.
本实施例中,所述第一螺纹杆31和第二螺纹杆32分别固定在第一线夹21和第二线夹22的基座01上。这样连接,在使用时,不会妨碍到线夹的动作,方便操作。In this embodiment, the first threaded rod 31 and the second threaded rod 32 are respectively fixed on the bases 01 of the first wire clamp 21 and the second wire clamp 22 . In this way, when in use, the action of the wire clip will not be hindered, and the operation is convenient.
连接管、第一线夹、第二线夹、第一螺纹杆、第二螺纹杆、第一螺母、第二螺母这些部件分别采用钢质材料制作,并进行热镀锌处理。The connecting pipe, the first wire clip, the second wire clip, the first threaded rod, the second threaded rod, the first nut, and the second nut are made of steel materials respectively, and are hot-dip galvanized.
应当理解本文所述的例子和实施方式仅为了说明,本领域技术人员可根据它做出各种修改或变化,在不脱离本实用新型精神实质的情况下,都属于本实用新型的保护范围。It should be understood that the examples and implementations described herein are only for illustration, and those skilled in the art can make various modifications or changes based on them, all of which belong to the protection scope of the present utility model without departing from the spirit of the utility model.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621032170.9U CN205992719U (en) | 2016-08-31 | 2016-08-31 | It is easy to the TJ type jumper wire spacing rod adjusting |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621032170.9U CN205992719U (en) | 2016-08-31 | 2016-08-31 | It is easy to the TJ type jumper wire spacing rod adjusting |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205992719U true CN205992719U (en) | 2017-03-01 |
Family
ID=58104915
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201621032170.9U Expired - Fee Related CN205992719U (en) | 2016-08-31 | 2016-08-31 | It is easy to the TJ type jumper wire spacing rod adjusting |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205992719U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107171087A (en) * | 2017-06-12 | 2017-09-15 | 武城县光明电力工程有限公司 | A kind of electric power parallel groove clamp |
| CN110011250A (en) * | 2019-04-23 | 2019-07-12 | 河南送变电建设有限公司 | A tensile string suitable for adjusting wire length |
| CN110380356A (en) * | 2019-07-04 | 2019-10-25 | 国家电网有限公司 | Wire clamp replaces tool |
-
2016
- 2016-08-31 CN CN201621032170.9U patent/CN205992719U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107171087A (en) * | 2017-06-12 | 2017-09-15 | 武城县光明电力工程有限公司 | A kind of electric power parallel groove clamp |
| CN110011250A (en) * | 2019-04-23 | 2019-07-12 | 河南送变电建设有限公司 | A tensile string suitable for adjusting wire length |
| CN110380356A (en) * | 2019-07-04 | 2019-10-25 | 国家电网有限公司 | Wire clamp replaces tool |
| CN110380356B (en) * | 2019-07-04 | 2024-09-06 | 国家电网有限公司 | Wire Clamp Replacement Tool |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204397266U (en) | A kind of self-centering vertical tube pipe welding machine clamp | |
| CN106384971B (en) | A kind of transmission line of electricity parallel groove clamp fast assembling-disassembling auxiliary tool | |
| CN205992719U (en) | It is easy to the TJ type jumper wire spacing rod adjusting | |
| CN204361637U (en) | Fault indicator for overhead lines fixture | |
| CN204361636U (en) | Fault detector two link type sectional fixtures | |
| CN205363643U (en) | Transmission line iron tower inclined measures supplementary anchor clamps | |
| CN203481723U (en) | Adjustable lifting type fixing device applied for manufacturing cable joint | |
| CN205578901U (en) | But regulation cable support | |
| CN205038896U (en) | Cable fixing sleeve is used in training | |
| CN211209120U (en) | A drainage wire bracket | |
| CN205429607U (en) | Cable straightener | |
| CN202363811U (en) | Cross arm clamping device for replacing insulator of direct-current 500kv straight-line string | |
| CN210744698U (en) | A kind of distribution network and hooking clip | |
| CN211790448U (en) | A cable laying device for emergency repair of electric power | |
| CN204464865U (en) | A kind of instrument changing 110kV strain insulator list insulator string | |
| CN105047066A (en) | Training cable fixing sleeve | |
| CN204131004U (en) | Four loop straight line steel tube tower circle cross-arm jigs | |
| CN210577431U (en) | Secondary distribution line pipe spacer | |
| CN210246134U (en) | Multifunctional insulating support | |
| CN209217574U (en) | A kind of glass insulator replacement fixture | |
| CN207149288U (en) | A kind of bending part can protective cable | |
| CN207616147U (en) | A kind of metal building material cutting machine auxiliary clamp | |
| CN204947472U (en) | 500kV transmission line tangent tower carries line structure and universal support saddle | |
| CN204706863U (en) | Cable clamp sleeve pipe | |
| CN207283037U (en) | A kind of electric cable support |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: No. 397, Tongcheng South Road, Baohe District, Hefei City, Anhui Province 230061 Patentee after: STATE GRID ANHUI POWER SUPPLY COMPANY OVERHAUL BRANCH Patentee after: STATE GRID CORPORATION OF CHINA Address before: No.415 Wuhu Road, Baohe District, Hefei City, Anhui Province 230061 Patentee before: Maintenance Company Of State Grid Anhui Electric Power Company Patentee before: State Grid Corporation of China |
|
| CP01 | Change in the name or title of a patent holder | ||
| CP01 | Change in the name or title of a patent holder |
Address after: No. 397, Tongcheng South Road, Baohe District, Hefei City, Anhui Province 230061 Patentee after: Super high voltage branch of State Grid Anhui Electric Power Co.,Ltd. Patentee after: STATE GRID CORPORATION OF CHINA Address before: No. 397, Tongcheng South Road, Baohe District, Hefei City, Anhui Province 230061 Patentee before: STATE GRID ANHUI POWER SUPPLY COMPANY OVERHAUL BRANCH Patentee before: STATE GRID CORPORATION OF CHINA |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170301 |