CN209323777U - A kind of building curtain wall support device - Google Patents

A kind of building curtain wall support device Download PDF

Info

Publication number
CN209323777U
CN209323777U CN201821803738.1U CN201821803738U CN209323777U CN 209323777 U CN209323777 U CN 209323777U CN 201821803738 U CN201821803738 U CN 201821803738U CN 209323777 U CN209323777 U CN 209323777U
Authority
CN
China
Prior art keywords
curtain wall
building curtain
elastic support
plate
upper plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821803738.1U
Other languages
Chinese (zh)
Inventor
张国峰
田新甲
杨志祎
郭亚卿
李明新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jiayu Door Window and Curtain Wall Joint Stock Co Ltd
Original Assignee
Beijing Jiayu Door Window and Curtain Wall Joint Stock Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jiayu Door Window and Curtain Wall Joint Stock Co Ltd filed Critical Beijing Jiayu Door Window and Curtain Wall Joint Stock Co Ltd
Priority to CN201821803738.1U priority Critical patent/CN209323777U/en
Application granted granted Critical
Publication of CN209323777U publication Critical patent/CN209323777U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of building curtain wall support devices, including upper plate, lower plate, elastic support and Duo Gen connecting rod, lower plate is horizontally disposed, elastic support is vertically arranged in the upper center of lower plate, upper plate is horizontally set on the top of elastic support, and it is connect in the middle part of the upper end of elastic support and upper plate lower end, more connecting rods are vertically provided in lower plate, and it is spaced and is uniformly disposed around outside elastic support, the lower end of every connecting rod is rotatablely connected with the corresponding position of lower plate lower end respectively, the upper end passes through sliding part respectively and the lower end of upper plate is slidably connected, external force exists, it is pressed down against upper plate, upper plate overcomes the elasticity tension of elastic support to be moved downward to close to lower plate, and the upper end of every connecting rod slides into far from elastic support, the upper surface of upper plate is equipped with the fixed mechanism for fixed building curtain wall.The utility model has the beneficial effects that structure is simple, building curtain wall is convenient for disassembly and assembly, strong applicability, protects building curtain wall and wall from damage when wind-force is larger.

Description

A kind of building curtain wall support device
Technical field
The utility model relates to support device technical fields, and in particular to a kind of building curtain wall support device.
Background technique
Building curtain wall refers to the exterior wall encirclement of building not load-bearing, usually by panel (glass, metal plate, slabstone, ceramics Plate etc.) and subsequent supporting structure (aluminium cross beam and upright post, steel construction, Glass Rib etc.) composition.Curtain wall is the outer wall protection of building It encloses, not load-bearing, is hung up as curtain, therefore also known as suspension wall, it is that modern large-scale and skyscraper commonly has decoration The lightweight wall of effect.
In the prior art, building curtain wall support construction, structure is complicated, generallys use between support construction and building curtain wall solid Fixed board and bolt are fixed, and dismounting is inconvenient, and applicability is not strong;Meanwhile bolt be easy to cause safety accident when loosening; In addition, the area due to curtain wall is larger, it is easy to be influenced by wind-force and generate vibration, especially invaded being often subject to typhoon The place attacked, rigid connection between building curtain wall and support construction, the glass and wall when wind-force is larger on building curtain wall are easy In damage.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of building curtain wall support devices, and structure is simple, building Curtain wall is convenient for disassembly and assembly, strong applicability, protects building curtain wall and wall from damage when wind-force is larger.
The technical solution that the utility model solves above-mentioned technical problem is as follows:
A kind of building curtain wall support device, including upper plate, lower plate, elastic support and Duo Gen connecting rod, the lower plate are horizontal Setting, the elastic support are vertically arranged in the upper center of the lower plate, and the upper plate is horizontally set on the elastic support Top, and connect in the middle part of the upper end of the elastic support and the upper plate lower end, the more connecting rods are vertically provided at In the lower plate, and be spaced uniformly be disposed around outside the elastic support, the every connecting rod is obliquely installed, and its lower end with The upper surface of the lower plate is rotatablely connected, and the upper end of the connecting rod is slided by the lower surface of sliding part and the upper plate Connection, external force exist, and are pressed down against the upper plate, the upper plate overcomes the elasticity tension of the elastic support to be moved downward to Close to the lower plate, and the upper end of the every connecting rod slides into far from the elastic support, and the upper surface of the upper plate is set There is the fixed mechanism for fixed building curtain wall.
The beneficial effects of the utility model are: lower plate is fixed on the wall by fixing piece, and building curtain wall passes through when installation Fixed mechanism is fixed on upper plate, passes through elastic support and more connecting rod flexible connections between upper plate and lower plate;Wind-force is made With on building curtain wall, one side elastic support offsets part stress, and the upper end of another aspect connecting rod is upward by sliding part The lower end of plate is slided to offset part stress, and damage building curtain wall and wall are avoided, and protects building curtain wall and wall.
Based on the above technical solution, the utility model can also do following improvement.
Further, the elastic support is cylinder, and the more connecting rods are spaced apart around the elastic support, more The lower end of the connecting column is enclosed the circular center of circle and is located on the axis of elastic support.
Beneficial effect using above-mentioned further scheme is that the circular elastic support of more connecting rods forms annular, increases building The stability of curtain wall.
Further, each sliding part respectively includes sliding slot, guide rod, sliding block and two the first springs, the sliding slot and is Horizontally disposed bar shaped groove body, downward, multiple sliding slots are distributed on described around the elastic support notch The lower surface of plate, and along the radial distribution of the elastic support, the guide rod is bar shaped bar, is horizontally set on the corresponding cunning In slot, and its both ends extends respectively to connect with the both ends of the corresponding sliding slot, and the sliding block connects with the corresponding guide rod sliding It connecing, can be slided along the length direction of the guide rod, corresponding two the first springs are respectively sleeved on the corresponding guide rod, and The two sides of the corresponding sliding block are located at, the both ends of each first spring are mutual with the sliding slot and the sliding block respectively Close one end abuts, and the upper end of the corresponding connecting rod is rotatablely connected with the corresponding sliding block.
Beneficial effect using above-mentioned further scheme is that by the wind masterpiece used time, two first springs do not clamp sliding block, with The upper end of sliding block and guide rod is fixed;The upper end of wind-engaging masterpiece used time, guide rod generate a promotion correspondence of the sliding block to upper plate The thrust of sliding is held, so that the upper end of sliding block and guide rod is slided to the corresponding end of upper plate, part stress is offset, damage is avoided to build Curtain wall and wall.
Further, the fixed mechanism includes four groups of clamp assemblies, and building curtain wall lies in a horizontal plane in the upper end of the upper plate, Clamp assemblies described in four groups are arranged at the upper end of the upper plate, and are located at the surrounding of building curtain wall, clamp described in four groups Surrounding of the component to clamp building curtain wall jointly, building curtain wall is fixed.
Beneficial effect using above-mentioned further scheme is the surrounding that four groups of clamp assemblies clamp building curtain wall respectively, will Building curtain wall is fixed, and the stability of building curtain wall is increased.
Further, clamp assemblies described in every group respectively include guide groove, clamping plate and locating piece, and the guide groove is bar shaped Slot, four guide grooves be separately positioned on the upper surface of the upper plate and be located at building curtain wall respective side, and vertically with The respective side of building curtain wall is arranged, and each clamping plate is slidably connected by guide holder with the corresponding guide groove, the clamping plate Horizontally disposed and parallel with the respective side of building curtain wall, the locating piece is arranged on the guide groove, to lead described Any position of its sliding trace is fixed on to seat, under external force, four clamping plate synchronous slides are to close to building curtain The respective side of wall clamps the respective side of building curtain wall.
Beneficial effect using above-mentioned further scheme is that under external force, four institute's clamping plate synchronous slides are built to close The respective side of building curtain wall is clamped, increases the stability of building curtain wall by the respective side for building curtain wall;Meanwhile four clamping plates it Between distance it is adjustable, so as to be suitable for different size building curtain wall fixation, it is with strong applicability.
Further, the locating piece is a lock screw, and the side wall of the guide groove side is close to the one of building curtain wall End is equipped with a screw hole through it and with lock screw cooperation, one end ecto-entad of the lock screw far from nut It extend into the screw hole and is threadedly coupled with it, tighten the lock screw to its one end far from nut and stretch to described lead It is abutted into slot and with the corresponding guide holder, the guide holder is fixed, or to unscrew the lock screw separate to its The corresponding guide holder is unclamped far from the corresponding guide holder one end of nut.
Beneficial effect using above-mentioned further scheme is that structure is simple, easy to operate.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is one of the top view of upper plate in the utility model;
Fig. 3 is two of the top view of upper plate in the utility model;
Fig. 4 is the bottom view of upper plate in the utility model;
Fig. 5 is the enlarged drawing of A in Fig. 4;
Fig. 6 is the structural schematic diagram of the utility model middle clamp plate;
Fig. 7 is the cross-sectional view of guide holder in the utility model;
Fig. 8 is the sectional view of guide groove in the utility model.
In attached drawing, parts list represented by the reference numerals are as follows:
1, upper plate, 2, lower plate, 3, elastic support, 4, connecting rod, 5, building curtain wall, 6, guide rod, 7, sliding block, the 8, first bullet Spring, 9, guide groove, 10, clamping plate, 11, locating piece, 12, guide holder, 13, clip slot, 14, soft formation, 15, limit plate, 16, connecting column, 17, sleeve, 18, second spring, 19, card slot, 20, sliding pin.
Specific embodiment
The principles of the present invention and feature are described below in conjunction with attached drawing, example is served only for explaining that this is practical It is novel, it is not intended to limit the scope of the utility model.
As shown in Figures 1 to 8, the utility model provides a kind of building curtain wall support device, including upper plate 1, lower plate 2, bullet Property pillar 3 and Duo Gen connecting rod 4, lower plate 2 is horizontally disposed, and elastic support 3 is vertically arranged in the upper center of lower plate 2,1 water of upper plate The flat top that elastic support 3 is set, and connect in the middle part of the upper end of elastic support 3 and 1 lower end of upper plate, more connecting rods 4 are perpendicular To be arranged in lower plate 2, and be spaced uniformly be disposed around outside elastic support 3, the lower end of every connecting rod 4 respectively with 2 upper end of lower plate Corresponding position rotation connection, and the upper end passes through the lower end of sliding part and upper plate 1 respectively and is slidably connected, and external force exists, downwards Upper plate 1 is squeezed, upper plate 1 overcomes the elasticity tension of elastic support 3 to be moved downward to close to lower plate 2, and the upper end of every connecting rod 4 It slides into far from elastic support 3, the upper surface of upper plate 1 is equipped with the fixed mechanism for fixed building curtain wall 5.When installation, lower plate 2 It is fixed on the wall by fixing piece, building curtain wall 5 is fixed on upper plate 1 by fixed mechanism, is led between upper plate 1 and lower plate 2 Cross elastic support 3 and more connecting rod flexible connections;Wind-force acts on building curtain wall 5,3 counteracting portion of one side elastic support The upper end of the component of stress, another aspect connecting rod 4 is slided by sliding part to the lower end of upper plate 1 to offset part stress, avoids damaging Bad building curtain wall 5 and wall protect building curtain wall 5 and wall.
In the utility model, elastic support 3 preferably uses rubber column, and the elasticity of rubber column preferably, can be good at offsetting Part stress protects building curtain wall 5 and wall;In addition, can also be arranged upper spring on elastic support 3;The upper surface of upper plate 1 is equipped with For the fixed mechanism of fixed building curtain wall 5, lower plate 2 is fixed on the wall using fixed plate and nail.
In the utility model, elastic support 3 is cylinder, and more connecting rods 4 are spaced apart around elastic support 3, Duo Genlian The lower end of extension bar 4 is enclosed the circular center of circle and is located on the axis of elastic support 3.
In the utility model, each sliding part respectively includes sliding slot, guide rod 6, sliding block 7 and two the first springs 8, sliding slot and is Horizontally disposed bar shaped groove body, downward, sliding slot is preferentially used and is recessed by the lower surface of upper plate 1 notch;Multiple sliding slots are equal The lower surface of upper plate 1 is distributed in around elastic support 3, and along the radial distribution of elastic support 3, guide rod 6 is bar shaped bar, It is horizontally disposed in corresponding sliding slot, and its both ends extends respectively to and the connection of the both ends of corresponding sliding slot, sliding block 7 and corresponding guide rod 6 It being slidably connected, can be slided along the length direction of guide rod 6, corresponding two the first springs 8 are respectively sleeved on corresponding guide rod 6, And the two sides of corresponding sliding block 7 are located at, the both ends of each first spring 8 one end close to each other with sliding slot and sliding block 7 respectively It abuts, the upper end of corresponding connecting rod 4 is rotatablely connected with corresponding sliding block 7.Under normal circumstances, sliding block 7 is in two first springs 8 Under the action of it is fixed;When suffered wind-force is larger, building curtain wall 5 generates certain thrust, while connecting rod 4 to sliding block 7 Upper end correspond to sliding block 7 generate a reversed active force so that sliding block 7 along guide rod 6 to far from elastic support 3 direction move It is dynamic, part stress is offset, reduces the impact force between building curtain wall 5 and entire support device and wall, protects building curtain wall 5 And wall.
In the utility model, fixed mechanism includes four groups of clamp assemblies, and building curtain wall 5 lies in a horizontal plane in the upper end of upper plate 1, Four groups of clamp assemblies are arranged at the upper end of upper plate 1, and are located at the surrounding of building curtain wall 5, and four groups of clamp assemblies are to altogether With the surrounding for clamping building curtain wall 5, building curtain wall 5 is fixed.Every group of clamp assemblies respectively include guide groove 9, clamping plate 10 With locating piece 11, guide groove 9 is strip groove, and four guide grooves 9 are separately positioned on the upper surface of upper plate 1 and are located at building curtain wall 5 respective side, and be vertically arranged with the respective side of building curtain wall 5, each clamping plate 10 passes through guide holder 12 and corresponding guide groove 9 It is slidably connected, clamping plate 10 is horizontally disposed and parallel with the respective side of building curtain wall 5, and locating piece 11 is arranged on guide groove 9, uses Guide holder 12 to be fixed on to any position of its sliding trace, under external force, four 10 synchronous slides of clamping plate are to close The respective side of building curtain wall 5 clamps the respective side of building curtain wall 5.Locating piece 11 is a lock screw, guide groove herein The side wall of 9 sides is equipped with a screw hole through it and with lock screw cooperation close to one end of building curtain wall 5, and lock screw is remote One end ecto-entad from nut extend into screw hole and is threadedly coupled with it, tightens lock screw to its one end far from nut It stretches in guide groove 9 and is abutted with corresponding guide holder 12, guide holder 12 is fixed, or to unscrew lock screw separate to its Corresponding guide holder 12 is unclamped far from corresponding guide holder 12 one end of nut.
Preferably, in the utility model, every piece of clamping plate 10 is equipped with close to the end face of 5 respective side of building curtain wall for clamping The side wall of the clip slot 13 at 5 edge of building curtain wall, clip slot 13 is equipped with soft formation 14.The two sides of building curtain wall 5 are clamped by clip slot 13, Increase the stability of building curtain wall 5;Building curtain wall 5 is protected by soft formation 14, avoids grinding between building curtain wall 5 and clip slot 13 Damage.
In the utility model, for guide groove 9 preferentially using being recessed by the upper surface of upper plate 1, structure is simple.Each guiding Seat 12 respectively includes limit plate 15, connecting column 16 and sleeve 17, and 15 level of limit plate is fastened in guide groove 9, and connecting column 16 is perpendicular Straight setting, and its lower end is connect (welding) with the upper center of limit plate 15, the lower part of sleeve 17 and the top of connecting column 16 are sliding Dynamic connection, the upper end of sleeve 17 are equipped with baffle and will fix thereon with the lower end of corresponding clamping plate 10 in port closed, the upper end of baffle Connection, is equipped with more second springs 18 in sleeve 17, more second springs 18 be evenly spaced on connecting column 16 upper end and Between sleeve 17, the both ends of every second spring 18 are fixedly connected with the lower end of the upper end of connecting column 16 and baffle respectively.By Under wind-force effect, building curtain wall 5 generates thrust to clamping plate 10 and sleeve 17, and sleeve 17 is slided along connecting column 16, and more second Spring 18 offset part stress, avoid generating biggish impact force between building curtain wall 5 and wall, protect building curtain wall 5 and Wall is against damages.
Preferably, in the utility model, the side wall on 16 top of connecting column is circumferentially spaced to be equipped with multiple card slots 19, card slot 19 The multiple and one-to-one sliding pin 20 of card slot 19, multiple 20 edges of sliding pin are equipped with along the axial direction setting of connecting column 16, sleeve 17 It is circumferentially distributed on the inner wall of sleeve 17, being arranged radially along sleeve 17 of sliding pin 20, and one end of which is fixed in sleeve 17 On wall (welding), the other end is extended in corresponding card slot 19, and under external force, sliding pin 20 can be slided along card slot 19.Wind-force is made Under, the sliding pin 20 on sleeve 17 is slided along card slot 19, increases the mobile stability of sleeve 17.
It should be noted that installation when, sliding pin 20 is tightly connected in card slot 19, under normal circumstances or suffered wind-force compared with Sleeve 17 will not be slided along connecting column 16 in the case where small;When suffered wind-force is larger, wind-force pushes sleeve 17 along connection Column 16 slides, while second spring 18 offsets part stress, to buffer building curtain wall 5 to entire support device and wall Impact force protects building curtain wall 5 and wall against damages.
It should be noted that the section of guide groove 9 is inverted T-shape, limit plate 15 is stuck in guide groove 9 when installation, is increased The mobile stability of guide holder 12, while guide holder 12 when sliding also being avoided to fall off out of corresponding guide groove 9.
The principles of the present invention are as follows:
Installation process are as follows: according to the size of building curtain wall 5, adjust the position of four pieces of clamping plates 10, it is made to clamp building curtain wall 5 Edge, then positioned by locating piece 11;Lower plate 2 is fixed on the wall, building curtain wall 5 and entire branch are completed The fixation of support arrangement;
When the wind-force suffered by the building curtain wall 5 is larger, building curtain wall 5 under the action of the wind generates four pieces of clamping plates 10 certain Thrust, so that sleeve 17 is slided along connecting column 16 and connecting column 16, second spring 18 offsets part stress, reduces building curtain wall The impact force of 5 pairs of support devices;Meanwhile building curtain wall 5 generates certain thrust to sliding block 7, while the upper end of connecting rod 4 is corresponding Sliding block 7 generates a reversed active force, so that sliding block 7 is moved along guide rod 6 to the corresponding end of upper plate 1, offsets part stress, Reduce the impact force between building curtain wall 5 and entire support device and wall.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all practical at this Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the guarantor of the utility model Within the scope of shield.

Claims (6)

1. a kind of building curtain wall support device, it is characterised in that: including upper plate (1), lower plate (2), elastic support (3) and more companies Extension bar (4), the lower plate (2) is horizontally disposed, and the elastic support (3) is vertically arranged in the upper center of the lower plate (2), institute State the top that upper plate (1) is horizontally set on the elastic support (3), and the upper end of the elastic support (3) and the upper plate (1) Connection, the more connecting rods (4) are vertically provided on the lower plate (2) in the middle part of lower end, and are spaced described in uniform be disposed around Outside, the lower end of the every connecting rod (4) is rotatablely connected with the upper end corresponding position of the lower plate (2) elastic support (3) respectively, The lower end that upper end passes through sliding part and the upper plate (1) respectively is slidably connected, and under external force, is pressed down against the upper plate (1), The upper plate (1) overcomes the elasticity tension of the elastic support (3) to be moved downward to close to the lower plate (2), and described in every The upper end of connecting rod (4) slides into far from the elastic support (3), and the upper surface of the upper plate (1), which is equipped with, is used for fixed building The fixed mechanism of curtain wall (5).
2. a kind of building curtain wall support device according to claim 1, it is characterised in that: the elastic support (3) is circle Column, more connecting rod (4) lower ends are enclosed the circular center of circle and are located on the axis of the elastic support (3).
3. a kind of building curtain wall support device according to claim 2, it is characterised in that: each sliding part wraps respectively Sliding slot, guide rod (6), sliding block (7) and two the first springs (8) are included, the sliding slot is horizontally disposed bar shaped groove body, notch court Under, multiple sliding slots are distributed in the lower surface of the upper plate (1) around the elastic support (3), and along the bullet Property pillar (3) radial distribution, the guide rod (6) is bar shaped bar, is horizontally set in the corresponding sliding slot, and its both ends point It does not extend to and is connected with the both ends of the corresponding sliding slot, the sliding block (7) is slidably connected with the corresponding guide rod (6), can edge The length direction of the guide rod (6) slides, and corresponding two the first springs (8) are respectively sleeved on the corresponding guide rod (6), and Be located at the two sides of the corresponding sliding block (7), the both ends of each first spring (8) respectively with the sliding slot and the cunning Block (7) one end close to each other abuts, and the upper end of the corresponding connecting rod (4) is rotatablely connected with the corresponding sliding block (7).
4. a kind of building curtain wall support device according to claim 1, it is characterised in that: the fixed mechanism includes four groups Clamp assemblies, building curtain wall (5) lie in a horizontal plane in the upper end of the upper plate (1), and clamp assemblies described in four groups are arranged at described The upper end of upper plate (1), and it is located at the surrounding of building curtain wall (5), clamp assemblies described in four groups to clamp building curtain jointly The surrounding of wall (5), building curtain wall (5) is fixed.
5. a kind of building curtain wall support device according to claim 4, it is characterised in that: the difference of clamp assemblies described in every group Including guide groove (9), clamping plate (10) and locating piece (11), the guide groove (9) is strip groove, four guide grooves (9) Be separately positioned on the upper surface of the upper plate (1) and be located at building curtain wall (5) respective side, and vertically with building curtain wall (5) Respective side setting, each clamping plate (10) is slidably connected by guide holder (12) with the corresponding guide groove (9), the folder Plate (10) is horizontally disposed and parallel with the respective side of building curtain wall (5), and the locating piece (11) is arranged in the guide groove (9) On, the guide holder (12) to be fixed on to any position of its sliding trace, under external force, four clamping plates (10) synchronous slide clamps the respective side of building curtain wall (5) to the respective side close to building curtain wall (5).
6. a kind of building curtain wall support device according to claim 5, it is characterised in that: the locating piece (11) is one Lock screw, the side wall of guide groove (9) side close to one end of building curtain wall (5) be equipped with one through itself and with the lock The screw hole of tight screw cooperation, the lock screw extend into the screw hole far from one end ecto-entad of nut and with its screw thread Connection tightens the lock screw to its one end far from nut and stretches in the guide groove (9) and described lead with corresponding It is abutted to seat (12), the guide holder (12) are fixed, or to unscrew the lock screw separate to its one end far from nut The corresponding guide holder (12) unclamps the corresponding guide holder (12).
CN201821803738.1U 2018-10-31 2018-10-31 A kind of building curtain wall support device Active CN209323777U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821803738.1U CN209323777U (en) 2018-10-31 2018-10-31 A kind of building curtain wall support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821803738.1U CN209323777U (en) 2018-10-31 2018-10-31 A kind of building curtain wall support device

Publications (1)

Publication Number Publication Date
CN209323777U true CN209323777U (en) 2019-08-30

Family

ID=67709400

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821803738.1U Active CN209323777U (en) 2018-10-31 2018-10-31 A kind of building curtain wall support device

Country Status (1)

Country Link
CN (1) CN209323777U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115059311A (en) * 2022-07-18 2022-09-16 山西建筑工程集团有限公司 Auxiliary fixing device for glass curtain wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115059311A (en) * 2022-07-18 2022-09-16 山西建筑工程集团有限公司 Auxiliary fixing device for glass curtain wall

Similar Documents

Publication Publication Date Title
CN205578907U (en) Anchor clamps of fixed cable
CN207421515U (en) A kind of single tube earthquake-resisting support device
CN209323777U (en) A kind of building curtain wall support device
CN208565819U (en) A kind of adjustable suspension and support
CN206020764U (en) A kind of double cables of high voltage substation OPGW draw lower fastener
CN105202337A (en) Vehicle-mounted notebook computer supporting device
CN201581627U (en) Guard rail
CN104948654A (en) Noise reducing structure
CN208579033U (en) A kind of easy-to-mount iron drain-pipe fixing component
CN208209865U (en) A kind of fixation device of photovoltaic module
CN108202819A (en) A kind of device for adjusting handlebar
CN208634522U (en) A kind of natural gas line fixed frame
CN209351273U (en) Overhead contact line connects pedestal
CN208982787U (en) Pipeline suspension rod fixing device
CN207161875U (en) A kind of valve buttress applied to long distance pipeline yard
CN214590292U (en) Angle steel stand bracket sectional fixture
CN206202307U (en) The fixing device that a kind of novel subway Vehicle side power window is installed
CN218843504U (en) Suspended ceiling system
CN205371167U (en) Experiment device fixing device
CN210889911U (en) Bradyseism structure and use its booster pump bradyseism system
CN220625318U (en) Mine engineering measuring hanging hammer
CN210105989U (en) Diesel engine cylinder unit operation protection tool
CN214811067U (en) Combined water-bath test tube rack
CN208634532U (en) A kind of adjustable water pipe shock-absorbing support
CN210949001U (en) Cable sheath device of wind power tower cylinder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant