CN204627666U - Tunnel pipeline fixing device - Google Patents

Tunnel pipeline fixing device Download PDF

Info

Publication number
CN204627666U
CN204627666U CN201520285574.8U CN201520285574U CN204627666U CN 204627666 U CN204627666 U CN 204627666U CN 201520285574 U CN201520285574 U CN 201520285574U CN 204627666 U CN204627666 U CN 204627666U
Authority
CN
China
Prior art keywords
pipeline
tunnel
anchor pole
bearing
fixing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520285574.8U
Other languages
Chinese (zh)
Inventor
孙扬
徐长磊
杜贵文
过曾明
郭相参
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China ENFI Engineering Corp
Original Assignee
China ENFI Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China ENFI Engineering Corp filed Critical China ENFI Engineering Corp
Priority to CN201520285574.8U priority Critical patent/CN204627666U/en
Application granted granted Critical
Publication of CN204627666U publication Critical patent/CN204627666U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of tunnel pipeline fixing device, described tunnel pipeline fixing device comprises: the anchor pole on the wall being arranged on tunnel, the Part I of described anchor pole stretches in the wall in described tunnel, and the remainder of described anchor pole is positioned at the outside of the wall in described tunnel; Bearing, described bearing is located on the described remainder of described anchor pole; With the Pipeline clip for clamping tunnel pipeline, described Pipeline clip is located on described bearing, described pipeline clamping apparatus have for through and the clamping chamber of clamping tunnel pipeline or formed described Pipeline clip and described bearing for through and clamp the clamping chamber of tunnel pipeline.Tunnel pipeline fixing device according to the utility model embodiment can install tunnel pipeline easily, easily, firmly.

Description

Tunnel pipeline fixing device
Technical field
The utility model relates to tunnel pipeline fixing device.
Background technology
Because tunnel locates below ground level, and the wall in tunnel is all curved surface, does not have flat contacting surface, therefore substantially increases the difficulty of fixing laneway pipe line bracket.
Utility model content
The utility model is intended to solve one of technical problem in correlation technique at least to a certain extent.For this reason, the utility model proposes a kind of can easily, easily, the tunnel pipeline fixing device of tunnel pipeline be firmly installed.
Comprise according to tunnel of the present utility model pipeline fixing device: the anchor pole on the wall being arranged on tunnel, the Part I of described anchor pole stretches in the wall in described tunnel, and the remainder of described anchor pole is positioned at the outside of the wall in described tunnel; Bearing, described bearing is located on the described remainder of described anchor pole; With the Pipeline clip for clamping tunnel pipeline, described Pipeline clip is located on described bearing, described pipeline clamping apparatus have for through and the clamping chamber of clamping tunnel pipeline or formed described Pipeline clip and described bearing for through and clamp the clamping chamber of tunnel pipeline.
Easily, easily, firmly tunnel pipeline can be installed according to tunnel of the present utility model pipeline fixing device.
In addition, above-mentioned according to the utility model tunnel pipeline fixing device can also have following additional technical characteristic:
The length of the Part I of described anchor pole is greater than the length of the remainder of described anchor pole.
Described anchor pole is perpendicular to the length direction in described tunnel.
Described anchor pole is multiple, and multiple described anchor pole is parallel to each other and spaced apart along the vertical direction, and wherein said bearing is located on multiple described anchor pole.
Described bearing comprises vertical portion, upper horizontal part and lower horizontal part, described vertical portion is located on described anchor pole, described upper horizontal part and described lower horizontal part to be located on described vertical portion and to extend to the direction away from described anchor pole, wherein said Pipeline clip comprises the upper Pipeline clip be located on described upper horizontal part and the underground pipelines be located on described lower horizontal part folder, described upper pipeline clamping apparatus have for through and the upper clamping chamber of clamping tunnel pipeline or formed described upper Pipeline clip and described upper horizontal part for through and clamp the upper clamping chamber of tunnel pipeline, described underground pipelines fixture have for through and the lower clamping chamber of clamping tunnel pipeline or formed described underground pipelines folder with described lower horizontal part for through and clamp the lower clamping chamber of tunnel pipeline.
Described bearing is channel-section steel.
Described Pipeline clip is U-shaped, and the opening of described Pipeline clip, towards described bearing, is formed between described Pipeline clip and described bearing and is used for through and clamps the clamping chamber of tunnel pipeline.
Described Pipeline clip comprises the first vertical section, the second vertical section and connects the segmental arc of the described first vertical section and the described second vertical section, each in described first vertical section and the described second vertical section has screw thread, wherein said bearing is provided with the first installing hole and the second installing hole, a part for described first vertical section is passed described first installing hole and is arranged with the first nut, and a part for the described second vertical section is passed described second installing hole and is arranged with the second nut.
Described first vertical section is arranged with the first elastic washer, described first elastic washer is between described bearing and described first nut, described second vertical section is arranged with the second elastic washer, and described second elastic washer is between described bearing and described second nut.
Accompanying drawing explanation
Fig. 1 is the structural representation of the tunnel pipeline fixing device according to the utility model embodiment;
Fig. 2 is the view along A-A direction of Fig. 1;
Fig. 3 is the view along B-B direction of Fig. 1.
Detailed description of the invention
Be described below in detail embodiment of the present utility model, the example of described embodiment is shown in the drawings.Be exemplary below by the embodiment be described with reference to the drawings, be intended to for explaining the utility model, and can not be interpreted as restriction of the present utility model.
Below with reference to the accompanying drawings tunnel pipeline fixing device 10 according to the utility model embodiment is described.As shown in Figure 1-Figure 3, anchor pole 101, bearing 102 and the Pipeline clip 103 for clamping tunnel pipeline for being arranged on the wall 20 in tunnel is comprised according to the tunnel pipeline fixing device 10 of the utility model embodiment.
The Part I 1011 of anchor pole 101 stretches in the wall 20 in tunnel, and the remainder 1012 of anchor pole 101 is positioned at the outside of the wall 20 in tunnel.Bearing 102 is located on the remainder 1012 of anchor pole 101.Pipeline clip 103 is located on bearing 102, Pipeline clip 103 have for through and the clamping chamber of clamping tunnel pipeline or formed Pipeline clip 103 and bearing 102 for through and clamp the clamping chamber of tunnel pipeline.In other words, tunnel pipeline is through this clamping chamber, and tunnel pipeline is clamped by this clamping chamber.
Tunnel pipeline fixing device 10 according to the utility model embodiment passes through on the wall 20 in tunnel, arrange anchor pole 101 and arrange bearing 102 on anchor pole 101, thus bearing 102 can be made to be configured for installing the platform of tunnel pipeline, Pipeline clip 103 can be utilized thus easily, easily, firmly tunnel pipeline to be installed.Tunnel pipeline fixing device 10 according to the utility model embodiment can provide the rigid constraint longitudinally and the rigid constraint in horizontal direction to tunnel pipeline.
As shown in Figure 1-Figure 3, anchor pole 101, bearing 102 and Pipeline clip 103 is comprised according to the tunnel pipeline fixing device 10 of embodiments more of the present utility model.
Anchor pole 101 can be Metallic rod, and anchor pole 101 can flatly be arranged on the wall 20 in tunnel.Advantageously, anchor pole 101 is perpendicular to the length direction in tunnel, and namely the length direction of anchor pole 101 is perpendicular to the length direction in tunnel.
When tunnel is curve (namely tunnel is not extend as the crow flies), anchor pole 101 refers to perpendicular to the length direction in tunnel: anchor pole 101 is perpendicular to the length direction of the part for skyhook 101 in tunnel, and namely anchor pole 101 is perpendicular to the length direction of the part of the contiguous anchor pole 101 in tunnel.
As shown in Figure 1, in an embodiment of the present utility model, the length of the Part I 1011 of anchor pole 101 is greater than the length of the remainder 1012 of anchor pole 101.That is, the part in the wall 20 stretching into tunnel of anchor pole 101 is greater than the part of the wall 20 exposing tunnel of anchor pole 101.Anchor pole 101 more firmly can be arranged on the wall 20 in tunnel thus.
In an example of the present utility model, as depicted in figs. 1 and 2, anchor pole 101 is multiple, and multiple anchor pole 101 is parallel to each other, and multiple anchor pole 101 is spaced apart along the vertical direction.Wherein, bearing 102 is located on multiple anchor pole 101.Thus can more firmly erection support 102, and then tunnel pipeline can be more firmly installed.Shown in above-below direction arrow C as in Figure 1 and Figure 2.
As depicted in figs. 1 and 2, in examples more of the present utility model, bearing 102 comprises vertical portion 1021, upper horizontal part 1022 and lower horizontal part 1023.Vertical portion 1021 is located on anchor pole 101.Upper horizontal part 1022 and lower horizontal part 1023 are located on vertical portion 1021, and upper horizontal part 1022 is positioned at the top of lower horizontal part 1023.Upper horizontal part 1022 and lower horizontal part 1023 extend to the direction away from anchor pole 101.
Advantageously, upper horizontal part 1022 can be connected with the upper end of vertical portion 1021, and lower horizontal part 1023 can be connected with the lower end of vertical portion 1021.Specifically, bearing 102 can be channel-section steel.
Wherein, Pipeline clip 103 comprises Pipeline clip 1034 and underground pipelines folder 1035.Upper Pipeline clip 1034 is located on horizontal part 1022, and underground pipelines folder 1035 is located on lower horizontal part 1023.Upper Pipeline clip 1034 have for through and the upper clamping chamber 1041 of clamping tunnel pipeline or formed upper Pipeline clip 1034 and upper horizontal part 1022 for through and clamp the upper clamping chamber 1041 of tunnel pipeline.Underground pipelines folder 1035 have for through and the lower clamping chamber 1042 of clamping tunnel pipeline or formed underground pipelines folder 1035 and lower horizontal part 1023 for passing and clamping the lower clamping chamber 1042 of tunnel pipeline.
It is more reasonable to make thus according to the structure of the tunnel pipeline fixing device 10 of the utility model embodiment, and tunnel pipeline fixing device 10 can install fixing at least two groups (individual) tunnel pipeline.
As shown in Figure 1, Pipeline clip 103 is U-shaped, namely go up Pipeline clip 1034 and underground pipelines folder 1035 be U-shaped.The opening of Pipeline clip 103, towards bearing 102, is formed between Pipeline clip 103 and bearing 102 and is used for through and clamps the clamping chamber of tunnel pipeline.The structure of tunnel pipeline fixing device 10 not only can be made thus more reasonable, and Pipeline clip 103 can be made to clamp tunnel pipeline more securely.
Specifically, formed between upper Pipeline clip 1034 and bearing 102 and be used for through and clamp the upper clamping chamber 1041 of tunnel pipeline, formed between underground pipelines folder 1035 and bearing 102 for through and clamp the lower clamping chamber 1042 of tunnel pipeline.More specifically, formed between upper Pipeline clip 1034 and the upper surface of upper horizontal part 1022 and be used for through and clamp the upper clamping chamber 1041 of tunnel pipeline, formed between underground pipelines folder 1035 and the soffit of lower horizontal part 1023 for through and clamp the lower clamping chamber 1042 of tunnel pipeline.
As shown in Figure 1, in a concrete example of the present utility model, Pipeline clip 103 comprises the first vertical section 1032 of vertical section 1031, second and connects the segmental arc 1033 of the first vertical section 1031 and the second vertical section 1032.In other words, one end of segmental arc 1033 is connected with one end of the first vertical section 1031, and the other end of segmental arc 1033 is connected with one end of the second vertical section 1032.Advantageously, the vertical section of segmental arc 1033, first 1031 and the second vertical section 1032 are integrally formed, and namely Pipeline clip 103 can be integral piece.
Each in first vertical section 1031 and the second vertical section 1032 has screw thread.Wherein, bearing 102 is provided with the first installing hole and the second installing hole.The part of first vertical section 1031 through the first installing hole and the part being arranged with the vertical section 1032 of the first nut 1051, second pass the second installing hole and be arranged with the second nut 1052.
That is, in the described part that first nut 1051 is sleeved on the first vertical section 1031 and with the threaded engagement in a described part for the first vertical section 1031, in the described part that the second nut 1052 is sleeved on the second vertical section 1032 and with the threaded engagement in a described part for the second vertical section 1032.Wherein, the first nut 1051 and the second nut 1052 are resisted against on bearing 102.Such as, as depicted in figs. 1 and 2, be sleeved on the first nut 1051 on Pipeline clip 1034 and the second nut 1052 is resisted against on the soffit of horizontal part 1022, be sleeved on the first nut 1051 on underground pipelines folder 1035 and the second nut 1052 is resisted against on the upper surface of lower horizontal part 1023.
By rotating the first nut 1051 and the second nut 1052, Pipeline clip 103 can be made to move to the direction of contiguous bearing 102, and then the clamping chamber between Pipeline clip 103 and bearing 102 can be reduced, thus tunnel pipeline can be clamped securely.Wherein, the length of the screw thread in the first vertical section 1031 and the second vertical section 1032 is longer, the adjustable range of the size in the clamping chamber between Pipeline clip 103 and bearing 102 is larger, thus tunnel pipeline fixing device 10 can be made can to clamp the tunnel pipeline of various sizes securely, thus can the scope of application of kaneh pipeline fixing device 10.
Advantageously, as depicted in figs. 1 and 2, first vertical section 1031 is arranged with the first elastic washer 1061, first elastic washer 1061 is between bearing 102 and the first nut 1051, second vertical section 1032 is arranged with the second elastic washer 1062, second elastic washer 1062 between bearing 102 and the second nut 1052.Tunnel pipeline can be clamped securely thus.
After utilizing Pipeline clip 103 to clamp tunnel pipeline, the first elastic washer 1061 and the second elastic washer 1062 are resisted against on bearing 102, and the first nut 1051 is resisted against on the first elastic washer 1061, and the second nut 1052 is resisted against on the second elastic washer 1062.
In description of the present utility model, it will be appreciated that, term " " center ", " longitudinal direction ", " transverse direction ", " length ", " width ", " thickness ", " on ", D score, " front ", " afterwards ", " left side ", " right side ", " vertically ", " level ", " top ", " end " " interior ", " outward ", " clockwise ", " counterclockwise ", " axis ", " radial direction ", orientation or the position relationship of the instruction such as " circumference " are based on orientation shown in the drawings or position relationship, only the utility model and simplified characterization for convenience of description, instead of indicate or imply that the device of indication or element must have specific orientation, with specific azimuth configuration and operation, therefore can not be interpreted as restriction of the present utility model.
In addition, term " first ", " second " only for describing object, and can not be interpreted as instruction or hint relative importance or imply the quantity indicating indicated technical characteristic.Thus, be limited with " first ", the feature of " second " can express or impliedly comprise at least one this feature.In description of the present utility model, the implication of " multiple " is at least two, such as two, three etc., unless otherwise expressly limited specifically.
In the utility model, unless otherwise clearly defined and limited, the term such as term " installation ", " being connected ", " connection ", " fixing " should be interpreted broadly, and such as, can be fixedly connected with, also can be removably connect, or integral; Can be mechanical connection, also can be electrical connection or each other can communication; Can be directly be connected, also indirectly can be connected by intermediary, can be the connection of two element internals or the interaction relationship of two elements, unless otherwise clear and definite restriction.For the ordinary skill in the art, the concrete meaning of above-mentioned term in the utility model can be understood as the case may be.
In the utility model, unless otherwise clearly defined and limited, fisrt feature second feature " on " or D score can be that the first and second features directly contact, or the first and second features are by intermediary mediate contact.And, fisrt feature second feature " on ", " top " and " above " but fisrt feature directly over second feature or oblique upper, or only represent that fisrt feature level height is higher than second feature.Fisrt feature second feature " under ", " below " and " below " can be fisrt feature immediately below second feature or tiltedly below, or only represent that fisrt feature level height is less than second feature.
In the description of this manual, specific features, structure, material or feature that the description of reference term " embodiment ", " some embodiments ", " example ", " concrete example " or " some examples " etc. means to describe in conjunction with this embodiment or example are contained at least one embodiment of the present utility model or example.In this manual, to the schematic representation of above-mentioned term not must for be identical embodiment or example.And the specific features of description, structure, material or feature can combine in one or more embodiment in office or example in an appropriate manner.In addition, when not conflicting, the feature of the different embodiment described in this manual or example and different embodiment or example can carry out combining and combining by those skilled in the art.
Although illustrate and described embodiment of the present utility model above, be understandable that, above-described embodiment is exemplary, can not be interpreted as restriction of the present utility model, those of ordinary skill in the art can change above-described embodiment, revises, replace and modification in scope of the present utility model.

Claims (9)

1. a tunnel pipeline fixing device, is characterized in that, comprising:
Anchor pole on the wall being arranged on tunnel, the Part I of described anchor pole stretches in the wall in described tunnel, and the remainder of described anchor pole is positioned at the outside of the wall in described tunnel;
Bearing, described bearing is located on the described remainder of described anchor pole; With
For clamping the Pipeline clip of tunnel pipeline, described Pipeline clip is located on described bearing, described pipeline clamping apparatus have for through and the clamping chamber of clamping tunnel pipeline or formed described Pipeline clip and described bearing for through and clamp the clamping chamber of tunnel pipeline.
2. tunnel according to claim 1 pipeline fixing device, is characterized in that, the length of the Part I of described anchor pole is greater than the length of the remainder of described anchor pole.
3. tunnel according to claim 1 pipeline fixing device, is characterized in that, described anchor pole is perpendicular to the length direction in described tunnel.
4. tunnel according to claim 1 pipeline fixing device, is characterized in that, described anchor pole is multiple, and multiple described anchor pole is parallel to each other and spaced apart along the vertical direction, and wherein said bearing is located on multiple described anchor pole.
5. tunnel according to claim 1 pipeline fixing device, it is characterized in that, described bearing comprises vertical portion, upper horizontal part and lower horizontal part, described vertical portion is located on described anchor pole, described upper horizontal part and described lower horizontal part to be located on described vertical portion and to extend to the direction away from described anchor pole, wherein said Pipeline clip comprises the upper Pipeline clip be located on described upper horizontal part and the underground pipelines be located on described lower horizontal part folder, described upper pipeline clamping apparatus have for through and the upper clamping chamber of clamping tunnel pipeline or formed described upper Pipeline clip and described upper horizontal part for through and clamp the upper clamping chamber of tunnel pipeline, described underground pipelines fixture have for through and the lower clamping chamber of clamping tunnel pipeline or formed described underground pipelines folder with described lower horizontal part for through and clamp the lower clamping chamber of tunnel pipeline.
6. tunnel according to claim 5 pipeline fixing device, is characterized in that, described bearing is channel-section steel.
7. tunnel according to claim 1 pipeline fixing device, is characterized in that, described Pipeline clip is U-shaped, and the opening of described Pipeline clip, towards described bearing, is formed between described Pipeline clip and described bearing and is used for through and clamps the clamping chamber of tunnel pipeline.
8. tunnel according to claim 7 pipeline fixing device, it is characterized in that, described Pipeline clip comprises the first vertical section, the second vertical section and connects the segmental arc of the described first vertical section and the described second vertical section, each in described first vertical section and the described second vertical section has screw thread, wherein said bearing is provided with the first installing hole and the second installing hole, a part for described first vertical section is passed described first installing hole and is arranged with the first nut, and a part for the described second vertical section is passed described second installing hole and is arranged with the second nut.
9. tunnel according to claim 8 pipeline fixing device, it is characterized in that, described first vertical section is arranged with the first elastic washer, described first elastic washer is between described bearing and described first nut, described second vertical section is arranged with the second elastic washer, and described second elastic washer is between described bearing and described second nut.
CN201520285574.8U 2015-05-05 2015-05-05 Tunnel pipeline fixing device Active CN204627666U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520285574.8U CN204627666U (en) 2015-05-05 2015-05-05 Tunnel pipeline fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520285574.8U CN204627666U (en) 2015-05-05 2015-05-05 Tunnel pipeline fixing device

Publications (1)

Publication Number Publication Date
CN204627666U true CN204627666U (en) 2015-09-09

Family

ID=54046705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520285574.8U Active CN204627666U (en) 2015-05-05 2015-05-05 Tunnel pipeline fixing device

Country Status (1)

Country Link
CN (1) CN204627666U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104806292A (en) * 2015-05-05 2015-07-29 中国恩菲工程技术有限公司 Tunnel pipeline fixing device
CN109098517A (en) * 2018-09-30 2018-12-28 北京科技大学 A kind of stringing pole of stringing formula pure electric vehicle underground carry scraper stringing system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104806292A (en) * 2015-05-05 2015-07-29 中国恩菲工程技术有限公司 Tunnel pipeline fixing device
CN109098517A (en) * 2018-09-30 2018-12-28 北京科技大学 A kind of stringing pole of stringing formula pure electric vehicle underground carry scraper stringing system
CN109098517B (en) * 2018-09-30 2024-04-05 北京科技大学 Overhead line pole of overhead line type pure electric underground scraper overhead line system

Similar Documents

Publication Publication Date Title
CN205424120U (en) Net twine pipeline bracket
CN204627666U (en) Tunnel pipeline fixing device
CN109163146B (en) Pipeline installation structure and installation method thereof
RU2015107232A (en) INSTALLATION SYSTEM FOR THE ENGINE, METHOD FOR INSTALLING THE ELEMENT ON THE ENGINE AND DESIGN FOR INSTALLING THE AUXILIARY PART OF THE ENGINE ON THE ENGINE
CN104806292A (en) Tunnel pipeline fixing device
CN105673942A (en) Groove top type pipeline hanger
CN204254033U (en) A kind of marine water pipe hanger structure
CN211549780U (en) Tunnel pipeline, electromechanical device support fixing device
CN204942760U (en) Double flute hanger
CN203395384U (en) Adjustable modular pipe clamp
CN205770186U (en) A kind of airborne equipment mounting bracket
CN205480108U (en) Low pressure circuit pressuretrol mounting structure
CN204937534U (en) A kind of structure in order to eliminate structure predetermincd tension
CN205716033U (en) A kind of under environment of extremely trembling with fear the heavy load of convenient construction by adjustable pipe holder system
CN108916476A (en) A kind of adjustable type oil pipeline support
CN204492014U (en) I iron fixed mount
CN204729420U (en) A kind of bidirectional fastening type setscrew
CN204389754U (en) Cable brackets
CN202493781U (en) Angle-steel free pipe clamp
CN104084746B (en) For the positioner of weld metal pipe
CN204312869U (en) A kind of modified model card code
CN203383517U (en) Accurate steel column axis positioning regulator
CN207174047U (en) A kind of pipe clamp packing device
CN209096653U (en) A kind of chassis pipeline and harness pipeline exchange fixed bracket
CN213954546U (en) Municipal works are with built on stilts pipeline support holder

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant