CN204492014U - I iron fixed mount - Google Patents

I iron fixed mount Download PDF

Info

Publication number
CN204492014U
CN204492014U CN201520175704.2U CN201520175704U CN204492014U CN 204492014 U CN204492014 U CN 204492014U CN 201520175704 U CN201520175704 U CN 201520175704U CN 204492014 U CN204492014 U CN 204492014U
Authority
CN
China
Prior art keywords
base
fixed mount
positioning
positioning rod
iron fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520175704.2U
Other languages
Chinese (zh)
Inventor
邓金云
张家元
孟小平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201520175704.2U priority Critical patent/CN204492014U/en
Application granted granted Critical
Publication of CN204492014U publication Critical patent/CN204492014U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Clamps And Clips (AREA)

Abstract

本实用新型提供了一种工字钢固定架,属于建筑设备领域,包括底座以及间隔设置的两个定位杆,所述两个定位杆垂直于所述底座的板面,且所述定位杆固定连接所述底座;所述两个定位杆分别螺接有螺母;所述两个定位杆还分别套设有保护管,所述定位杆远离所述底座的端部伸出所述保护管。本实用新型工字钢固定架结构简单,定位稳定且定位精确,能够重复使用,节省材料。

The utility model provides an I-shaped steel fixing frame, belonging to the field of construction equipment, comprising a base and two positioning rods arranged at intervals, the two positioning rods are perpendicular to the board surface of the base, and the positioning rods are fixed The base is connected; the two positioning rods are respectively screwed with nuts; the two positioning rods are respectively sleeved with protective tubes, and the ends of the positioning rods away from the base extend out of the protective tubes. The utility model has the advantages of simple structure, stable and accurate positioning of the I-shaped steel fixing frame, can be used repeatedly, and saves materials.

Description

工字钢固定架I-beam bracket

技术领域technical field

本实用新型涉及建筑谁被领域,具体而言,涉及一种工字钢固定架。The utility model relates to the field of construction equipment, in particular to an I-shaped steel fixing frame.

背景技术Background technique

建筑工地上进行墙体的混凝土浇筑时,需要将钢材埋在混凝土中,进而增加墙体的强度,使用安全且墙体的使用寿命长。When pouring concrete for the wall on the construction site, it is necessary to bury the steel in the concrete to increase the strength of the wall, which is safe to use and has a long service life.

在浇筑混凝土之前,先要将钢材固定在设定的位置,因此需要用到钢材的固定架。现有的安装钢材的固定架多为采用倒U形的锚环,先将倒U形的锚环用混凝土固定在设定的位置,U形的开口方向朝向墙体的底面。锚环固定好之后,再将钢材卡紧在锚环之间,为了使卡紧效果更好,在锚环与钢材的缝隙中填充板材。Before pouring the concrete, the steel must be fixed in the set position, so a steel fixing frame is required. Most of the existing fixing frames for installing steel are to adopt inverted U-shaped anchor rings. The inverted U-shaped anchor rings are fixed on the set position with concrete, and the U-shaped opening direction is towards the bottom surface of the body of wall. After the anchor rings are fixed, the steel is clamped between the anchor rings. In order to make the clamping effect better, the plate is filled in the gap between the anchor rings and the steel.

发明人在研究中发现,现有的混凝土浇筑时,钢材的安装至少存在如下缺点:The inventor found in the research that when the existing concrete is poured, the installation of steel has at least the following disadvantages:

其一、现有的钢材的固定架在安装时,容易产生误差,进而影响钢材的安装;其二、现有的固定架需要填充板材将钢材固定,固定效果差,浇筑过程中,钢材的位置发生变动,影响浇筑质量;其三、现有的固定架预埋在墙体中,不能重复使用,材料的利用率低。First, when the existing steel fixing frame is installed, errors are prone to occur, which in turn affects the installation of the steel; second, the existing fixing frame needs to be filled with plates to fix the steel, and the fixing effect is poor. During the pouring process, the position of the steel Changes occur, which affect the pouring quality; three, the existing fixing frame is pre-embedded in the body of wall, which cannot be reused, and the utilization rate of the material is low.

实用新型内容Utility model content

本实用新型的目的在于提供一种工字钢固定架,以改善现有的工字钢固定架固定工字钢不稳固以及工字钢固定架的使用率低的问题。The purpose of the utility model is to provide an I-beam fixing frame to improve the problems that the existing I-beam fixing frame fixes the I-beam unstable and the utilization rate of the I-beam fixing frame is low.

本实用新型是这样实现的:The utility model is achieved in that:

基于上述目的,本实用新型提供了一种工字钢固定架,包括底座以及间隔设置的两个定位杆,所述两个定位杆垂直于所述底座的板面,且所述定位杆固定连接所述底座;所述两个定位杆分别螺接有螺母;Based on the above purpose, the utility model provides an I-shaped steel fixing frame, comprising a base and two positioning rods arranged at intervals, the two positioning rods are perpendicular to the plate surface of the base, and the positioning rods are fixedly connected The base; the two positioning rods are respectively screwed with nuts;

所述两个定位杆还分别套设有保护管,所述定位杆远离所述底座的端部伸出所述保护管。The two positioning rods are respectively sleeved with protective tubes, and the ends of the positioning rods away from the base protrude from the protective tubes.

优选的,所述底座的板面上设置有两个安装孔,所述两个定位杆一一对应安装在所述两个安装孔内,在实际加工时,定位杆的截面为圆形,即采用圆形杆,便于加工和定位;在底座设置安装孔,安装孔的直径与定位杆的直径相匹配,将定位杆插装在安装孔中,定位杆的位置更加精确,固定定位杆更加方便,且固定时定位杆不易倾斜,加工质量更高,每个固定架的误差小,便于工资钢固定架的使用。Preferably, two mounting holes are provided on the board surface of the base, and the two positioning rods are installed in the two mounting holes one by one. In actual processing, the cross section of the positioning rod is circular, that is, The use of round rods is convenient for processing and positioning; a mounting hole is set on the base, the diameter of the mounting hole matches the diameter of the positioning rod, and the positioning rod is inserted into the mounting hole, the position of the positioning rod is more accurate, and it is more convenient to fix the positioning rod , and the positioning rod is not easy to tilt when fixing, the processing quality is higher, and the error of each fixing frame is small, which is convenient for the use of wage steel fixing frames.

优选的,所述底座上还设置有环形槽,所述环形槽的中轴线与所述安装孔的中轴线共线,所述保护管插装在所述环形槽内。保护管直接套装在定位杆的外周上,在工字钢定位架使用完毕后,定位杆能够从保护管中取出,工字钢固定架实现了多次重复使用;为了使定位杆取出更加方便,混凝土不能够与定位杆有较大接触面积,即,保护管要能够很好的起到隔离定位杆和混凝土的作用,所以,将保护管插在环形槽内,混凝土浇筑时,保护管的位置不容易发生移动,混凝土不易进入保护管内,保护效果好。Preferably, the base is further provided with an annular groove, the central axis of the annular groove is collinear with the central axis of the installation hole, and the protection tube is inserted into the annular groove. The protection tube is directly set on the outer circumference of the positioning rod. After the I-steel positioning frame is used, the positioning rod can be taken out from the protection tube, and the I-steel fixing frame can be reused many times; The concrete cannot have a large contact area with the positioning rod, that is, the protective tube must be able to effectively isolate the positioning rod from the concrete. Therefore, insert the protective tube into the annular groove. When the concrete is poured, the position of the protective tube It is not easy to move, and the concrete is not easy to enter the protection tube, so the protection effect is good.

优选的,与所述螺母相匹配的螺纹位于伸出所述保护管的所述定位杆上,螺纹的加工更加方便,不需要在定位杆的整个外周面加工螺纹,减小了加工难度,节省了时间。Preferably, the thread matched with the nut is located on the positioning rod protruding from the protection tube, the processing of the thread is more convenient, and it is not necessary to process the thread on the entire outer peripheral surface of the positioning rod, which reduces the difficulty of processing and saves time.

优选的,每个所述定位杆上分别螺接有两个所述螺母,两个所述螺母之间设置有垫圈,两个螺母在拧紧之后,螺母之间产生轴向力,使螺母与螺栓牙之间的摩擦力增大,进而防止螺母自动松脱的现象发生,固定效果更好,使用更加安全。Preferably, two nuts are respectively screwed on each of the positioning rods, and a washer is arranged between the two nuts. After the two nuts are tightened, an axial force is generated between the nuts, so that the nuts and the bolts The friction between the teeth is increased, thereby preventing the nut from loosening automatically, the fixing effect is better, and the use is safer.

优选的,所述底座为板状结构,加工方便,制造成本低,板状结构的板面与安装面的配合效果好,安装位置更加精确,使用更加方便。Preferably, the base is a plate structure, which is easy to process and low in manufacturing cost. The plate surface of the plate structure has a good cooperation effect with the installation surface, the installation position is more accurate, and the use is more convenient.

优选的,所述底座为矩形板,结构简单,加工方便,矩形板的对称性好,便于定位杆的安装。Preferably, the base is a rectangular plate, which has a simple structure and is easy to process, and the rectangular plate has good symmetry, which facilitates the installation of the positioning rod.

优选的,所述两个定位杆沿所述底座的长度方向间隔设置,定位杆的安装位置更加合理,便于控制定位杆之间的距离,同时能够节省底座的材料。Preferably, the two positioning rods are arranged at intervals along the length direction of the base, and the installation position of the positioning rods is more reasonable, which is convenient for controlling the distance between the positioning rods and can save the material of the base.

优选的,所述定位杆为钢筋,钢筋的力学性能好,能够承受较大的弯曲负荷和压力负荷,且其耐腐蚀性能好,使用寿命长。Preferably, the positioning rod is a steel bar, the steel bar has good mechanical properties, can bear relatively large bending load and pressure load, and has good corrosion resistance and long service life.

优选的,所述定位杆焊接在所述底座上,焊接的连接方式简单可靠,焊接操作灵活,省时省力。Preferably, the positioning rod is welded on the base, the welding connection method is simple and reliable, the welding operation is flexible, and time and effort are saved.

本实用新型的有益效果是:The beneficial effects of the utility model are:

综上所述,本实用新型提供的工字钢固定架,包括底座以及两个定位杆,将定位杆固定设置在底座上,且定位杆垂直于底座的板面,便于工字钢安装在定位杆之间,且工字钢的安装效果好,浇筑时,工字钢的位置不易发生变动,浇筑质量高;同时,所述两个定位杆分别螺接有螺母,将工字钢安装在两个定位杆之间后,把螺母旋紧在定位杆上,将工字钢固定在定位杆之间,工字钢在定位杆的轴线方向上不会发生移动,浇筑的效果好,螺纹连接简单可靠,便于拆卸;在定位杆上套装有保护管,即保护管的长度根据工字钢的高度来确定,保证浇筑过程中,混凝土不会凝固在定位杆的周面上,便于浇筑完毕后,定位杆和底座从墙体中取出,实现工字钢定位架的多次重复使用,节省材料,节省成本。In summary, the I-beam fixing frame provided by the utility model includes a base and two positioning rods. between the rods, and the installation effect of the I-beam is good, the position of the I-beam is not easy to change during pouring, and the pouring quality is high; at the same time, the two positioning rods are respectively screwed with nuts, and the I-beam is installed on the two After the two positioning rods, tighten the nut on the positioning rod, and fix the I-beam between the positioning rods. The I-beam will not move in the axial direction of the positioning rod. The pouring effect is good and the thread connection is simple. Reliable and easy to disassemble; a protective tube is set on the positioning rod, that is, the length of the protective tube is determined according to the height of the I-beam to ensure that the concrete will not solidify on the peripheral surface of the positioning rod during the pouring process, which is convenient for pouring. The positioning rod and the base are taken out from the wall, so that the I-beam positioning frame can be reused many times, saving materials and costs.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,应当理解,以下附图仅示出了本实用新型的某些实施例,因此不应被看作是对范围的限定,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他相关的附图。In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following drawings will be briefly introduced in the embodiments. It should be understood that the following drawings only show some embodiments of the present invention. Therefore, it should not be regarded as a limitation on the scope. For those skilled in the art, other related drawings can also be obtained according to these drawings without creative work.

图1为本实用新型工字钢固定架实施例一的结构图;Fig. 1 is the structural diagram of the first embodiment of the utility model I-beam fixing frame;

图2为对应图1的底座的俯视图;Fig. 2 is a top view of the base corresponding to Fig. 1;

图3为本实用新型工字钢固定架实施例二的底座的俯视图;Fig. 3 is the top view of the base of the second embodiment of the I-beam fixing frame of the present invention;

图4为本实用新型工字钢固定架一应用示意图;Fig. 4 is a schematic diagram of an application of the utility model I-beam fixing frame;

图5为本实用新型工字钢固定架另一应用示意图。Fig. 5 is a schematic diagram of another application of the I-beam fixing frame of the present invention.

附图标记汇总:Summary of reference signs:

底座101,定位杆102,螺纹103,螺母104,保护管105,安装孔106,环形槽107,垫圈108,角钢109;Base 101, positioning rod 102, thread 103, nut 104, protection tube 105, mounting hole 106, annular groove 107, washer 108, angle steel 109;

工字钢201,混凝土202。I-beam 201, concrete 202.

具体实施方式Detailed ways

建筑工地上进行墙体的混凝土浇筑时,需要将工字钢等钢材埋在混凝土中,进而增加墙体的强度,使用安全且墙体的使用寿命长。在进行浇筑时,需要依靠工字钢的辅助设备进行定位,从而便于浇筑,即需要用到工字钢固定架。现有的工字钢固定架采用倒U形的锚环,先将倒U形的锚环用混凝土固定在设定的位置,U形的开口方向朝向墙体的底面。锚环固定好之后,再将钢材卡紧在锚环之间,为了使卡紧效果更好,在锚环与钢材的缝隙中填充板材。现有的工字钢固定架规定工字钢时,工字钢的固定不稳固,浇筑过程中易发生位置的移动,从而影响浇筑的质量;且现有的固定架和工字钢一起埋在混凝土中,不能重复使用,浪费材料。When pouring concrete on the wall on the construction site, it is necessary to bury steel such as I-beams in the concrete, thereby increasing the strength of the wall, making it safe to use and having a long service life. When pouring, it is necessary to rely on the auxiliary equipment of the I-beam for positioning, so as to facilitate the pouring, that is, the I-beam fixing frame is required. The existing I-shaped steel fixing frame adopts an inverted U-shaped anchor ring, and the inverted U-shaped anchor ring is fixed on a set position with concrete, and the U-shaped opening direction is towards the bottom surface of the wall. After the anchor rings are fixed, the steel is clamped between the anchor rings. In order to make the clamping effect better, the plate is filled in the gap between the anchor rings and the steel. When the existing I-beam fixing frame specifies the I-beam, the fixing of the I-beam is not stable, and the position is prone to move during the pouring process, thereby affecting the quality of the pouring; and the existing fixing frame and the I-beam are buried together Concrete cannot be reused, wasting material.

鉴于此,本实用新型设计者设计了一种带有保护管的工字钢固定架,将工字钢固定架的定位杆插装在保护管内,浇筑过程中,混凝土不会与定位杆接触,浇筑完毕后,定位杆能够从保护管中滑出,实现了工字钢固定架的多次重复使用。In view of this, the designer of the utility model has designed a kind of I-beam fixed frame with a protective tube, and the positioning rod of the I-shaped steel fixed frame is inserted into the protective tube. During the pouring process, the concrete will not contact the positioning rod. After the pouring is completed, the positioning rod can slide out from the protection tube, realizing the repeated use of the I-beam fixing frame.

为使本实用新型实施例的目的、技术方案和优点更加清楚,下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本实用新型一部分实施例,而不是全部的实施例。通常在此处附图中描述和示出的本实用新型实施例的组件可以以各种不同的配置来布置和设计。因此,以下对在附图中提供的本实用新型的实施例的详细描述并非旨在限制要求保护的本实用新型的范围,而是仅仅表示本实用新型的选定实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。In order to make the purpose, technical solutions and advantages of the embodiments of the utility model more clear, the technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the utility model. Obviously, the described The embodiments are some embodiments of the present utility model, but not all embodiments. The components of the embodiments of the invention generally described and illustrated in the figures herein may be arranged and designed in a variety of different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

应注意到:相似的标号和字母在下面的附图中表示类似项,因此,一旦某一项在一个附图中被定义,则在随后的附图中不需要对其进行进一步定义和解释。It should be noted that like numerals and letters denote similar items in the following figures, therefore, once an item is defined in one figure, it does not require further definition and explanation in subsequent figures.

在本实用新型的描述中,需要说明的是,术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,或者是该实用新型产品使用时惯常摆放的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。此外,术语“第一”、“第二”、“第三”等仅用于区分描述,而不能理解为指示或暗示相对重要性。In the description of the present utility model, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" The orientation or positional relationship indicated by etc. is based on the orientation or positional relationship shown in the drawings, or the orientation or positional relationship that is usually placed when the product of the utility model is used. It is only for the convenience of describing the utility model and simplifying the description, rather than Any indication or implication that a referenced device or element must have a particular orientation, be constructed, and operate in a particular orientation should not be construed as limiting the invention. In addition, the terms "first", "second", "third", etc. are only used for distinguishing descriptions, and should not be construed as indicating or implying relative importance.

在本实用新型的描述中,还需要说明的是,除非另有明确的规定和限定,术语“设置”、“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本实用新型中的具体含义。In the description of the present utility model, it should also be noted that, unless otherwise specified and limited, the terms "setting", "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection , can also be detachably connected, or integrally connected; can be mechanically connected, can also be electrically connected; can be directly connected, can also be indirectly connected through an intermediary, and can be internal communication between two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present utility model in specific situations.

实施例一Embodiment one

请参阅图1-2以及图4-5,该实施例提供了一种工字钢固定架,包括底座101以及间隔设置的两个定位杆102,所述两个定位杆102垂直于所述底座101的板面,且所述定位杆102固定连接所述底座101;所述两个定位杆102分别螺接有螺母104;Please refer to Fig. 1-2 and Fig. 4-5, this embodiment provides a kind of I-beam fixed frame, comprises base 101 and two positioning rods 102 arranged at intervals, and described two positioning rods 102 are perpendicular to described base 101, and the positioning rod 102 is fixedly connected to the base 101; the two positioning rods 102 are respectively screwed with nuts 104;

所述两个定位杆102还分别套设有保护管105,所述定位杆102远离所述底座101的端部伸出所述保护管105。The two positioning rods 102 are respectively sleeved with protective tubes 105 , and the ends of the positioning rods 102 away from the base 101 protrude from the protective tubes 105 .

该工字钢固定架,包括底座101以及两个定位杆102,将定位杆102固定设置在底座101上,且定位杆102垂直于底座101的板面,便于工字钢201安装在定位杆102之间,且工字钢201的安装效果好,浇筑时,工字钢201的位置不易发生变动,浇筑质量高;同时,所述两个定位杆102分别螺接有螺母104,将工字钢201安装在两个定位杆102之间后,把螺母104旋紧在定位杆102上,能够将工字钢201固定在两个所述定位杆102之间,工字钢201在定位杆102的轴线方向上不会发生移动,浇筑的效果好,螺纹连接简单可靠,便于拆卸;在定位杆102上套装有保护管105,即保护管105的长度根据工字钢201的高度来确定,保证浇筑过程中,混凝土不会凝固在定位杆102的周面上,便于浇筑完毕后,定位杆102和底座101从墙体中取出,实现工字钢201定位架的多次重复使用,节省材料,节省成本。The I-beam fixing frame includes a base 101 and two positioning rods 102, the positioning rod 102 is fixedly arranged on the base 101, and the positioning rod 102 is perpendicular to the plate surface of the base 101, so that the I-beam 201 is installed on the positioning rod 102 Between, and the installation effect of the I-beam 201 is good, the position of the I-beam 201 is not easy to change during pouring, and the pouring quality is high; at the same time, the two positioning rods 102 are respectively screwed with nuts 104, and the I-beam After the 201 is installed between the two positioning rods 102, the nut 104 is screwed on the positioning rod 102, and the I-beam 201 can be fixed between the two positioning rods 102, and the I-beam 201 is positioned between the positioning rods 102. There will be no movement in the axial direction, the pouring effect is good, the screw connection is simple and reliable, and it is easy to disassemble; the protective tube 105 is set on the positioning rod 102, that is, the length of the protective tube 105 is determined according to the height of the I-beam 201, ensuring that the pouring During the process, the concrete will not solidify on the peripheral surface of the positioning rod 102, so that the positioning rod 102 and the base 101 can be taken out from the wall after the pouring is completed, so that the repeated use of the I-beam 201 positioning frame can be realized, saving materials and saving cost.

请参阅图4,在实际使用时,先将工字钢固定架放置在设计好的位置,通过混凝土202将底座101和连接底座101的一部分定位杆102固定,在将工字钢201放置在两个定位杆102之间,在此操作过程中,可以在工字钢201和底座101之间放置木板或者钢板等其他材料,用来调整工字钢201的高度,操作灵活多变,满足不同的施工环境,在实际操作时,选用角钢109放置在工字钢201和螺母104之间,定位效果好且强度更高,不易弯曲变形;将工字钢201调整好之后,保证保护管105的长度大于浇筑的厚度,才能有效防止混凝土与定位杆102接触,便于后续定位杆102和底座101的取出,保护管105可以采用PVC管,材料的成本低,耐腐蚀性好,便于后续定位杆102从管道中取出;最后,将螺母104旋紧在定位杆102上,为了使固定效果更好,可以在螺母104定位杆102上穿钢板或者角钢钢材,这些钢材压紧在工字钢201的表面,且锁紧在螺母104与工字钢201之间,采用该方式固定后,工字钢201在浇筑过程中位置更加不易移动,浇筑效果更好。Please refer to Fig. 4, in actual use, the I-beam fixing frame is placed on the designed position earlier, the base 101 and a part of the positioning rod 102 connecting the base 101 are fixed by the concrete 202, and the I-beam 201 is placed on the two sides. Between the two positioning rods 102, during this operation, other materials such as wood or steel plates can be placed between the I-beam 201 and the base 101 to adjust the height of the I-beam 201, and the operation is flexible and changeable to meet different requirements. In the construction environment, in actual operation, the angle steel 109 is placed between the I-beam 201 and the nut 104, the positioning effect is good, the strength is higher, and it is not easy to bend and deform; after the I-beam 201 is adjusted, the length of the protective tube 105 is guaranteed Only when it is greater than the thickness of pouring, can the concrete be effectively prevented from contacting the positioning rod 102, which is convenient for the subsequent positioning rod 102 and the base 101 to be taken out. The protective pipe 105 can be a PVC pipe. Take out in the pipeline; Finally, screw the nut 104 on the positioning rod 102, in order to make the fixing effect better, you can wear steel plate or angle steel on the nut 104 positioning rod 102, these steel materials are pressed on the surface of the I-beam 201, And it is locked between the nut 104 and the I-beam 201. After being fixed in this way, the position of the I-beam 201 is more difficult to move during the pouring process, and the pouring effect is better.

请参阅图5,该实施例的优选方案中,所述底座101的板面上设置有两个安装孔106,所述两个定位杆102一一对应安装在所述两个安装孔106内,在实际加工时,定位杆102的为圆柱形杆,便于加工和定位;在底座101设置安装孔106,安装孔106的直径与定位杆102的直径相匹配,将定位杆102插装在安装孔106中,定位杆102的位置更加精确,固定定位杆102更加方便,且固定时定位杆102不易倾斜,加工质量更高,每个固定架的误差小,便于工资钢固定架的使用。同时,定位杆102的端部插装在安装孔106内时,不凸出底座101的板面,这样,便于底座101的放置,使用更加方便。Please refer to Fig. 5, in the preferred solution of this embodiment, two installation holes 106 are provided on the board surface of the base 101, and the two positioning rods 102 are installed in the two installation holes 106 one by one, During actual processing, the positioning rod 102 is a cylindrical rod, which is convenient for processing and positioning; the mounting hole 106 is set at the base 101, and the diameter of the mounting hole 106 matches the diameter of the positioning rod 102, and the positioning rod 102 is inserted into the mounting hole In 106, the position of positioning rod 102 is more accurate, and it is more convenient to fix positioning rod 102, and positioning rod 102 is difficult for tilting when fixing, and processing quality is higher, and the error of each fixing frame is little, is convenient to the use of wage steel fixing frame. At the same time, when the end of the positioning rod 102 is inserted into the mounting hole 106, it does not protrude from the board surface of the base 101, which facilitates the placement of the base 101 and is more convenient to use.

上述实施方式的优选方案中,所述定位杆102采用钢筋,钢筋的力学性能好,能够承受较大的弯曲负荷和压力负荷,且其耐腐蚀性能好,使用寿命长;同时,定位杆102焊接在所述底座101上,焊接的连接方式简单可靠,将定位杆102与底座101的两个板面分别焊接固定,固定更加牢固,浇筑完毕后,需要将定位杆102和底座101从墙体中取出时,取出更加方便,直接敲击定位杆102露在墙体外的端部即可,敲击时,底座101随定位杆102一起运动,从墙体中滑出,操作方便。In the preferred version of the above-mentioned embodiment, the positioning rod 102 adopts steel bars, the mechanical properties of which are good, can withstand larger bending loads and pressure loads, and has good corrosion resistance and long service life; meanwhile, the positioning rods 102 are welded On the base 101, the welding connection method is simple and reliable. The positioning rod 102 and the two board surfaces of the base 101 are respectively welded and fixed, and the fixing is more firm. After the pouring is completed, the positioning rod 102 and the base 101 need to be removed from the wall When taking out, it is more convenient to take out, just directly knock the end of the positioning rod 102 exposed outside the wall, and when knocking, the base 101 moves with the positioning rod 102 and slides out from the wall, which is easy to operate.

上述实施例的优选方案中,与所述螺母104相匹配的螺纹103位于伸出所述保护管105的所述定位杆102上,螺纹103的加工更加方便,不需要在定位杆102的整个外周面加工螺纹103,减小了加工难度,节省了时间。即,由于保护管105套设在定位杆102上,位于保护管105内的定位杆102不用设置螺纹103,同样能够实现将工字钢201固定在螺母104与底座101之间。In the preferred solution of the above-mentioned embodiment, the screw thread 103 matched with the nut 104 is located on the positioning rod 102 protruding from the protection tube 105, the processing of the screw thread 103 is more convenient, and there is no need for the entire outer circumference of the positioning rod 102 Surface processing thread 103 reduces processing difficulty and saves time. That is, since the protective tube 105 is sleeved on the positioning rod 102 , the positioning rod 102 inside the protective tube 105 does not need to be provided with threads 103 , and the I-beam 201 can also be fixed between the nut 104 and the base 101 .

上述实施例的优选方案中,每个所述定位杆102上分别螺接有两个所述螺母104,两个所述螺母104之间设置有垫圈108,两个螺母104在拧紧之后,螺母104之间产生轴向力,使螺母104与螺栓牙之间的摩擦力增大,进而防止螺母104自动松脱的现象发生,固定效果更好,使用更加安全。In the preferred solution of the above-mentioned embodiment, two nuts 104 are respectively screwed on each of the positioning rods 102, and a washer 108 is arranged between the two nuts 104. After the two nuts 104 are tightened, the nuts 104 Axial force is generated between the nut 104 and the bolt teeth to increase the friction force, thereby preventing the nut 104 from automatically loosening, the fixing effect is better, and the use is safer.

上述实施例的优选方案中,所述底座101为板状结构,加工方便,制造成本低,板状结构的板面与安装面的配合效果好,安装位置更加精确,使用更加方便。进一步的,作为该实施方式的优选方案,所述底座101为矩形板,矩形板的结构简单,加工方便,矩形板的对称性好,便于确定定位杆102的安装位置,安装定位杆102时更加方便,不同的固定架之间误差小,多个固定架同时使用时,定位精确。例如,墙体的浇筑面积较大,会使用到很多的工字钢201,这些工字钢201排布为网状结构,即,多个工字钢201在直交叉设置,这时,在交叉位置需要设置至少两组所述工字钢固定架,不同的固定架的误差小,使用时,配合度高,使用方便。In the preferred solution of the above embodiment, the base 101 is a plate structure, which is easy to process and low in manufacturing cost. The plate surface of the plate structure has a good matching effect with the installation surface, the installation position is more accurate, and the use is more convenient. Further, as a preferred solution of this embodiment, the base 101 is a rectangular plate, the structure of the rectangular plate is simple, the processing is convenient, the symmetry of the rectangular plate is good, it is convenient to determine the installation position of the positioning rod 102, and it is more convenient to install the positioning rod 102. It is convenient, the error between different fixing frames is small, and when multiple fixing frames are used at the same time, the positioning is accurate. For example, the pouring area of the wall is relatively large, and a lot of I-beams 201 will be used. At least two sets of the I-beam fixing frames need to be installed in the position, and the error of different fixing frames is small, and the matching degree is high when used, and the use is convenient.

该实施例的优选方案中,所述两个定位杆102沿所述底座101的长度方向间隔设置,定位杆102的安装位置更加合理,便于控制定位杆102之间的距离,同时能够节省底座101的材料。In the preferred solution of this embodiment, the two positioning rods 102 are arranged at intervals along the length direction of the base 101, and the installation position of the positioning rods 102 is more reasonable, which is convenient for controlling the distance between the positioning rods 102, and can save the base 101 at the same time. s material.

实施例二Embodiment two

请参阅图3,该实施例也提供了一种工字钢固定架,该实施例是在实施例一的技术方案的基础上的进一步改进,实施例一描述的技术方案同样适用于本实施例,实施例一描述的技术方案不再重复描述。Please refer to Fig. 3, this embodiment also provides a kind of I-beam fixing frame, this embodiment is a further improvement on the basis of the technical solution of the first embodiment, the technical solution described in the first embodiment is also applicable to this embodiment , the technical solution described in Embodiment 1 will not be described again.

所述底座101上还设置有环形槽107,所述环形槽107的中轴线与所述安装孔106的中轴线共线,所述保护管105插装在所述环形槽107内。保护管105直接套装在定位杆102的外周上,在工字钢201定位架使用完毕后,定位杆102能够从保护管105中取出,工字钢固定架实现了多次重复使用;为了使定位杆102取出更加方便,混凝土不能够与定位杆102有较大接触面积,即,保护管105要能够很好的起到隔离定位杆102和混凝土的作用,所以,将保护管105插在环形槽107内,混凝土浇筑时,保护管105的位置不容易发生移动,混凝土不易进入保护管105内,保护效果好。The base 101 is also provided with an annular groove 107 , the central axis of the annular groove 107 is collinear with the central axis of the installation hole 106 , and the protection tube 105 is inserted into the annular groove 107 . Protection tube 105 is directly sleeved on the outer periphery of positioning bar 102, and after I-beam 201 positioning frame is used, positioning bar 102 can be taken out from protection tube 105, and I-beam fixing frame has realized repeated use; In order to make positioning It is more convenient to take out the rod 102, and the concrete cannot have a larger contact area with the positioning rod 102, that is, the protective tube 105 should be able to play the role of isolating the positioning rod 102 and the concrete well, so the protective tube 105 is inserted in the annular groove Inside 107, when the concrete is poured, the position of the protection tube 105 is not easy to move, and the concrete is not easy to enter the protection tube 105, so the protection effect is good.

以上所述仅为本实用新型的优选实施例而已,并不用于限制本实用新型,对于本领域的技术人员来说,本实用新型可以有各种更改和变化。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the utility model, and are not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present utility model shall be included in the protection scope of the present utility model.

Claims (10)

1. an i iron fixed mount, is characterized in that, comprise base and spaced two backstays, described two backstays are perpendicular to the plate face of described base, and described backstay is fixedly connected with described base; Described two backstays are bolted with nut respectively;
Described two backstays are also arranged with protection tube respectively, and described backstay stretches out described protection tube away from the end of described base.
2. i iron fixed mount according to claim 1, is characterized in that, the plate face of described base is provided with two installing holes, and described two backstay one_to_one corresponding are arranged in described two installing holes.
3. i iron fixed mount according to claim 2, is characterized in that, described base is also provided with cannelure, and the axis of described cannelure and the axis conllinear of described installing hole, described protection tube is inserted in described cannelure.
4. i iron fixed mount according to claim 1, is characterized in that, the screw thread matched with described nut is positioned at and stretches out on the described backstay of described protection tube.
5. i iron fixed mount according to claim 1, is characterized in that, each described backstay is bolted with respectively two described nuts, is provided with packing ring between two described nuts.
6. the i iron fixed mount according to any one of claim 1-5, is characterized in that, described base is platy structure.
7. i iron fixed mount according to claim 6, is characterized in that, described base is rectangular slab.
8. i iron fixed mount according to claim 7, is characterized in that, described two backstays are arranged along the length direction interval of described base.
9. i iron fixed mount according to claim 6, is characterized in that, described backstay is reinforcing bar.
10. i iron fixed mount according to claim 9, is characterized in that, described backstay is welded on described base.
CN201520175704.2U 2015-03-26 2015-03-26 I iron fixed mount Expired - Lifetime CN204492014U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520175704.2U CN204492014U (en) 2015-03-26 2015-03-26 I iron fixed mount

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520175704.2U CN204492014U (en) 2015-03-26 2015-03-26 I iron fixed mount

Publications (1)

Publication Number Publication Date
CN204492014U true CN204492014U (en) 2015-07-22

Family

ID=53571326

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520175704.2U Expired - Lifetime CN204492014U (en) 2015-03-26 2015-03-26 I iron fixed mount

Country Status (1)

Country Link
CN (1) CN204492014U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114790747A (en) * 2022-05-09 2022-07-26 天元建设集团有限公司 Positioning mechanism for steel sheet pile deep foundation pit support and mounting device thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114790747A (en) * 2022-05-09 2022-07-26 天元建设集团有限公司 Positioning mechanism for steel sheet pile deep foundation pit support and mounting device thereof
CN114790747B (en) * 2022-05-09 2023-12-12 天元建设集团有限公司 Positioning mechanism for supporting deep foundation pit of steel sheet pile and mounting device thereof

Similar Documents

Publication Publication Date Title
CN209758817U (en) Special lifting device for pipeline
CN103343639B (en) A kind of sliding mode system of efficient adjustment
CN107675836A (en) A kind of spacing frame
CN217579787U (en) A steel beam assembly adjustable pedestal system and device
CN207920077U (en) A kind of installation fixation kit of waterstop joint
CN203957075U (en) A kind of plate pipe clamp of concrete blinding
CN209428964U (en) A kind of adjustable pump line attached wall structure of elasticity
CN203769327U (en) Tower concrete pump pipe fixing device
CN208105870U (en) A kind of fixed device and it is used for deformation joint twin columns formwork device
CN109208650B (en) Fixing device for water stop copper sheet
CN215366689U (en) Smooth formula concrete road side form is to detaining socket joint support system
CN210482237U (en) Internal supporting device for dam stainless steel drain hole
CN207672426U (en) A kind of detachable fixed structure of railing
CN209466452U (en) A device for positioning and installing embedded parts for PC component production
CN212297950U (en) A new type of hoisting piece and hanger
CN210947666U (en) An anchor for fixing cantilevered I-beams
CN202152543U (en) Exposed column template support combining structure
CN207796282U (en) A kind of guide and limit holder device and its system
CN223893783U (en) A fixing device for hydraulic lifting support rods in slipform applications
CN205777538U (en) Setting assembling type reinforcing bar protection canopy structure
CN216621167U (en) a prism holder
CN211499771U (en) Assembly type building PCF board connecting assembly
CN204470890U (en) Fixed mount processing auxiliary equipment
CN217678618U (en) Curved stress surface converter of supporting structure
CN213946447U (en) Production line arm strutting arrangement convenient to equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20150722