CN103089010A - Cradle construction device replacing reinforced concrete beam bottom protection layer and cradle construction method - Google Patents

Cradle construction device replacing reinforced concrete beam bottom protection layer and cradle construction method Download PDF

Info

Publication number
CN103089010A
CN103089010A CN2013100147232A CN201310014723A CN103089010A CN 103089010 A CN103089010 A CN 103089010A CN 2013100147232 A CN2013100147232 A CN 2013100147232A CN 201310014723 A CN201310014723 A CN 201310014723A CN 103089010 A CN103089010 A CN 103089010A
Authority
CN
China
Prior art keywords
hook bolts
hook
bolts
concrete beam
topping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100147232A
Other languages
Chinese (zh)
Other versions
CN103089010B (en
Inventor
张凤勇
王龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
CMTCC Shanghai Shisanye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd, CMTCC Shanghai Shisanye Construction Co Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201310014723.2A priority Critical patent/CN103089010B/en
Publication of CN103089010A publication Critical patent/CN103089010A/en
Application granted granted Critical
Publication of CN103089010B publication Critical patent/CN103089010B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention relates to a cradle construction device replacing a reinforced concrete beam bottom protection layer and a cradle construction method. The cradle construction device comprises angle steel pieces and hook bolts. The two angle steel pieces are welded together at the position close to two end faces of the angle steel pieces through two straight-strip-shaped steel connecting plates, and a straight joint is formed between the two angle steel pieces. The hook bolts penetrate through the straight joint of the two angle steel pieces. Threads which are matched with adjusting nuts in size are arranged on straight hook parts of the upper portions of the hook bolts in a machining mode. The adjusting nuts can rotate at the positions of the straight hook parts, where the threads are machined, of the upper portions of the hook bolts. Square steel base plates are installed between the adjusting nuts and the angle steel pieces, the straight hook parts of the upper portions of the hook bolts penetrate through central holes of the square steel base plates, and bent hook parts of the lower portions of the hook bolts can hook vertical reinforcing ribs. The cradle construction device is easy to manufacture, convenient to install, strong in pertinence and simple to operate, improves construction efficiency, guarantees project quality and reduces project cost.

Description

Suspension bracket construction equipment and the method for topping at the bottom of a kind of instead of steel Concrete Beam Reinforced
Technical field
The present invention relates to cast-in-situ steel reinforced concrete girder construction process field, particularly suspension bracket construction equipment and the method for topping at the bottom of a kind of instead of steel Concrete Beam Reinforced.
Background technology
In general cast-in-situ steel reinforced concrete beam construction, need a lot of concrete pad formation of reinforcing bar bottom placement reinforcement cover at the bottom of beam, yet concrete pad is installed difficulty and frangible.Treat that reinforcing bar and form work engineering install, be difficult to adjust as the reinforcement cover existing problems.And the present invention has substituted cushion block by special tool, is conducive to raise the efficiency reduce costs, and has good application and promotional value.
Summary of the invention
Technical problem to be solved by this invention is to provide suspension bracket construction equipment and the method for topping at the bottom of a kind of instead of steel Concrete Beam Reinforced, makes easily, and is easy for installation; with strong points, simple to operate, improved efficiency of construction; guarantee workmanship, reduced engineering cost.
the technical solution adopted for the present invention to solve the technical problems is: suspension bracket construction equipment and the method for topping at the bottom of a kind of instead of steel Concrete Beam Reinforced, comprise angle member and HOOK BOLTS, described angle member is placed in the upper surface of beam forms, described two angle members are won in succession by two blocks of vertical bar shaped steel and are welded together in the position near the angle member both ends of the surface, and form one straight joint between the angle member that two root beads are connected together, described HOOK BOLTS passes two straight joints between angle member, described HOOK BOLTS part fixedly is on the top of angle member, the part of hook is in the bottom of angle member, described HOOK BOLTS top part fixedly is processed with the screw thread that matches with the adjusting nut size, described adjusting nut can be in the part processing threaded position turn fixedly of HOOK BOLTS top, between described adjusting nut and angle member, steel plate square washer is installed, described HOOK BOLTS top part is fixedly passed the centre bore of steel plate square washer, the part of described HOOK BOLTS bottom hook can catch on longitudinal reinforcement.
What between described two angle members, the width of straight joint and vertical bar shaped steel were won in succession is equal in length.
Described HOOK BOLTS has one group at least.
Described HOOK BOLTS can not move in the straight joint between two angle members before adjusting nut is tightened.
The diameter dimension of the centre bore of described steel plate square washer and HOOK BOLTS top section diameter size fixedly consist of matched in clearance.
When described HOOK BOLTS catches on longitudinal reinforcement in the part of bottom hook; can the pressure of HOOK BOLTS finally be passed to beam forms by tightening adjusting nut; in tightening the process of adjusting nut; HOOK BOLTS moves on slowly; and cage of reinforcement is sling, make form between the inner bottom surface of cage of reinforcement and beam forms distance for reinforcement cover space at the bottom of the beam of 25mm and therein concreting form reinforcement cover.
Described HOOK BOLTS need to take out HOOK BOLTS before the concrete ot-yet-hardened of building from installing upper dismounting, and floating the concrete compacting of HOOK BOLTS position disturbance.
Beneficial effect
The present invention relates to suspension bracket construction equipment and the method for topping at the bottom of a kind of instead of steel Concrete Beam Reinforced; make easily, easy for installation, with strong points; simple to operate; it is characterized in that utilizing suspension bracket that cage of reinforcement is sling, replaced concrete protective layer pad, saved concrete pad; reduced engineering cost; improved efficiency of construction, guaranteed workmanship, can have enough to meet the need to use and be convenient to promote.
Description of drawings
Fig. 1 is that the present invention uses schematic diagram;
Fig. 2 is front elevational schematic of the present invention;
Fig. 3 is schematic top plan view of the present invention;
Fig. 4 is connection detail of the present invention;
Fig. 5 is the connection detail of steel plate square washer of the present invention on angle member.
The specific embodiment
Below in conjunction with specific embodiment, further set forth the present invention.Should be understood that these embodiment only to be used for explanation the present invention and be not used in and limit the scope of the invention.Should be understood that in addition those skilled in the art can make various changes or modifications the present invention after the content of having read the present invention's instruction, these equivalent form of values fall within the application's appended claims limited range equally.
as shown in Fig. 1-5, the present invention relates to suspension bracket construction equipment and the method for topping at the bottom of a kind of instead of steel Concrete Beam Reinforced, comprise angle member 4 and HOOK BOLTS 5, described angle member 4 is placed in the upper surface of beam forms 3, described two angle members 4 are won in succession by two blocks of vertical bar shaped steel and 8 are being welded together near the position of angle member 4 both ends of the surface, and form one straight joint between the angle member 4 that two root beads are connected together, described HOOK BOLTS 5 passes two straight joints between angle member 4, described HOOK BOLTS 5 part fixedly is on the top of angle member 4, the part of hook is in the bottom of angle member 4, described HOOK BOLTS 5 tops part fixedly is processed with the screw thread that matches with adjusting nut 6 sizes, described adjusting nut 6 can be in the part processing threaded position turn fixedly of HOOK BOLTS 5 tops, between described adjusting nut 6 and angle member 4, steel plate square washer 7 is installed, described HOOK BOLTS 5 tops part is fixedly passed the centre bore of steel plate square washer 7, the part of described HOOK BOLTS 5 bottom hooks can catch on longitudinal reinforcement 2, the width of the straight joint between described two angle members 4 and vertical bar shaped steel win in succession 8 equal in length, described HOOK BOLTS 5 has one group at least, described HOOK BOLTS 5 can not move in the straight joint between two angle members 4 before adjusting nut 6 is tightened, the diameter dimension of the centre bore of described steel plate square washer 7 and HOOK BOLTS 5 tops section diameter size fixedly consist of matched in clearance, described HOOK BOLTS 5 is when the part of bottom hook catches on longitudinal reinforcement 2, can the pressure of HOOK BOLTS 5 finally be passed to beam forms 3 by tightening adjusting nut 6, in the process of tightening adjusting nut 6, HOOK BOLTS 5 moves on slowly, and cage of reinforcement 1 is sling, make form between the inner bottom surface of cage of reinforcement 1 and beam forms 3 distance for reinforcement cover space 9 at the bottom of the beam of 25mm and wherein concreting form reinforcement cover, described HOOK BOLTS 5 is before the concrete ot-yet-hardened of building, HOOK BOLTS 5 need to be taken out from installing upper dismounting, and floating the concrete compacting of HOOK BOLTS 5 position disturbances.
Embodiment 1
after steel concrete beam steel and form work engineering install, lay topping hanger device at the bottom of reinforced concrete beam according to a determining deviation along the length direction of reinforced concrete beam, utilize HOOK BOLTS 5 to catch on longitudinal reinforcement 2, by tightening adjusting nut 6, the pressure of HOOK BOLTS 5 is finally passed to beam forms 3 by two angle members 4 with pressure, its objective is cage of reinforcement is hung 1, make cage of reinforcement hang 1 and produce the distance of 25mm left and right with beam forms 3 inner bottom surface, reinforcement cover space 9 at the bottom of the formation beam, and concreting forms reinforcement cover wherein, treat that concreting is complete, removable protective layer hanger device before the concrete ot-yet-hardened, utilize special-purpose iron plate that the concrete compacting of HOOK BOLTS 5 position disturbances is floating, at the bottom of the reinforced concrete beam that removes, the topping hanger device cleans up and just can continue to use, easy for installation, simple to operate.

Claims (7)

1. the suspension bracket construction equipment of topping at the bottom of an instead of steel Concrete Beam Reinforced, comprise angle member (4) and HOOK BOLTS (5), it is characterized in that, described angle member (4) is placed in the upper surface of beam forms (3), described two angle members (4) by two blocks of vertical bar shaped steel win in succession (8) welding together near the position of angle member (4) both ends of the surface, and form one straight joint between the angle member (4) that two root beads are connected together, described HOOK BOLTS (5) passes the straight joint between two angle members (4), described HOOK BOLTS (5) part fixedly is on the top of angle member (4), the part of hook is in the bottom of angle member (4), described HOOK BOLTS (5) top part fixedly is processed with the screw thread that matches with adjusting nut (6) size, described adjusting nut (6) can be in the part processing threaded position turn fixedly of HOOK BOLTS (5) top, between described adjusting nut (6) and angle member (4), steel plate square washer (7) is installed, described HOOK BOLTS (5) top part is fixedly passed the centre bore of steel plate square washer (7), the part of described HOOK BOLTS (5) bottom hook can catch on longitudinal reinforcement (2).
2. the suspension bracket construction equipment of topping at the bottom of a kind of instead of steel Concrete Beam Reinforced according to claim 1, is characterized in that, the width of the straight joint between described two angle members (4) and vertical bar shaped steel the equal in length of (8) of winning in succession.
3. the suspension bracket construction equipment of topping at the bottom of a kind of instead of steel Concrete Beam Reinforced according to claim 1, is characterized in that, described HOOK BOLTS (5) has one group at least.
4. the suspension bracket construction equipment of topping at the bottom of a kind of instead of steel Concrete Beam Reinforced according to claim 1, is characterized in that, described HOOK BOLTS (5) can not move in the straight joint between two angle members (4) before adjusting nut (6) is tightened.
5. the suspension bracket construction equipment of topping at the bottom of a kind of instead of steel Concrete Beam Reinforced according to claim 1; it is characterized in that, the diameter dimension of the centre bore of described steel plate square washer (7) and HOOK BOLTS (5) top section diameter size fixedly consist of matched in clearance.
6. the using method of the suspension bracket construction equipment of topping at the bottom of a kind of instead of steel Concrete Beam Reinforced according to claim 1, it is characterized in that, when described HOOK BOLTS (5) catches on longitudinal reinforcement (2) in the part of bottom hook, can the pressure of HOOK BOLTS (5) finally be passed to beam forms (3) by tightening adjusting nut (6), in the process of tightening adjusting nut (6), HOOK BOLTS (5) moves on slowly, and cage of reinforcement (1) is sling, make form between the inner bottom surface of cage of reinforcement (1) and beam forms (3) distance for reinforcement cover space (9) at the bottom of the beam of 25mm and therein concreting form reinforcement cover.
7. the using method of the suspension bracket construction equipment of topping at the bottom of a kind of instead of steel Concrete Beam Reinforced according to claim 6; it is characterized in that; described HOOK BOLTS (5) is before the concrete ot-yet-hardened of building; HOOK BOLTS (5) need to be taken out from installing upper dismounting, and floating the concrete compacting of HOOK BOLTS (5) position disturbance.
CN201310014723.2A 2013-01-15 2013-01-15 The suspension bracket construction equipment of topping at the bottom of a kind of alternative reinforced concrete beam and method Active CN103089010B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310014723.2A CN103089010B (en) 2013-01-15 2013-01-15 The suspension bracket construction equipment of topping at the bottom of a kind of alternative reinforced concrete beam and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310014723.2A CN103089010B (en) 2013-01-15 2013-01-15 The suspension bracket construction equipment of topping at the bottom of a kind of alternative reinforced concrete beam and method

Publications (2)

Publication Number Publication Date
CN103089010A true CN103089010A (en) 2013-05-08
CN103089010B CN103089010B (en) 2015-07-29

Family

ID=48202096

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310014723.2A Active CN103089010B (en) 2013-01-15 2013-01-15 The suspension bracket construction equipment of topping at the bottom of a kind of alternative reinforced concrete beam and method

Country Status (1)

Country Link
CN (1) CN103089010B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930459A (en) * 2017-04-23 2017-07-07 江苏旺材科技有限公司 A kind of superimposed sheet hoard strip hangs shell template
CN108396963A (en) * 2018-03-22 2018-08-14 中国五冶集团有限公司 A kind of sizing steel construction hangs membrane module
CN108518070A (en) * 2018-05-31 2018-09-11 中铁十六局集团城市建设发展有限公司 One kind having enough to meet the need general accurate adjustment control for cast-in-situ slabs tendon protective layer
CN109025072A (en) * 2018-08-21 2018-12-18 中国十七冶集团有限公司 A kind of construction method of plate above formula beam bottom cover to reinforcement
CN109653445A (en) * 2019-02-22 2019-04-19 南通市达欣工程股份有限公司 The thickness adjusting apparatus and method of cover to reinforcement

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2509266Y (en) * 2001-09-29 2002-09-04 陈国君 Beam Protection Layer bearer
CN201738499U (en) * 2009-03-26 2011-02-09 浙江国泰建设集团有限公司 Steel bar protective layer position limiting cushion block of cast steel bar concrete beam post
CN201771111U (en) * 2010-03-04 2011-03-23 中冶实久建设有限公司 Reinforced negative reinforcement cover controller
CN102425304A (en) * 2011-08-30 2012-04-25 中铁六局集团有限公司 Method for replacing or increasing steel reinforced protection layer cushion block
CN202324363U (en) * 2011-10-08 2012-07-11 青岛理工大学 Concrete cover thickness locator with holding device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2509266Y (en) * 2001-09-29 2002-09-04 陈国君 Beam Protection Layer bearer
CN201738499U (en) * 2009-03-26 2011-02-09 浙江国泰建设集团有限公司 Steel bar protective layer position limiting cushion block of cast steel bar concrete beam post
CN201771111U (en) * 2010-03-04 2011-03-23 中冶实久建设有限公司 Reinforced negative reinforcement cover controller
CN102425304A (en) * 2011-08-30 2012-04-25 中铁六局集团有限公司 Method for replacing or increasing steel reinforced protection layer cushion block
CN202324363U (en) * 2011-10-08 2012-07-11 青岛理工大学 Concrete cover thickness locator with holding device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930459A (en) * 2017-04-23 2017-07-07 江苏旺材科技有限公司 A kind of superimposed sheet hoard strip hangs shell template
CN108396963A (en) * 2018-03-22 2018-08-14 中国五冶集团有限公司 A kind of sizing steel construction hangs membrane module
CN108518070A (en) * 2018-05-31 2018-09-11 中铁十六局集团城市建设发展有限公司 One kind having enough to meet the need general accurate adjustment control for cast-in-situ slabs tendon protective layer
CN108518070B (en) * 2018-05-31 2024-03-19 中铁十六局集团城市建设发展有限公司 Be used for general fine tuning control of cast-in-situ slab reinforcement protective layer turnover
CN109025072A (en) * 2018-08-21 2018-12-18 中国十七冶集团有限公司 A kind of construction method of plate above formula beam bottom cover to reinforcement
CN109653445A (en) * 2019-02-22 2019-04-19 南通市达欣工程股份有限公司 The thickness adjusting apparatus and method of cover to reinforcement
CN109653445B (en) * 2019-02-22 2021-01-12 南通市达欣工程股份有限公司 Thickness adjusting device and method for steel bar protection layer

Also Published As

Publication number Publication date
CN103089010B (en) 2015-07-29

Similar Documents

Publication Publication Date Title
CN103089010A (en) Cradle construction device replacing reinforced concrete beam bottom protection layer and cradle construction method
CN103046466A (en) Detectable, replaceable and adjustable arch bridge suspender system and method for constructing same
CN203905512U (en) Adjustable device for installing steel beams in place
CN206091259U (en) Adjustable steel configuration operation hanging flower basket
CN202717501U (en) Pile foundation reinforcement cage lifting ring
CN204212392U (en) I iron anchor system
CN204199667U (en) Detachable builder's jack corner tripod
CN109736352B (en) Beret beam fixing device and method for suspension pipeline
CN202214139U (en) Unhooking prevention device
CN202578001U (en) Movable reinforced steel bar binding mold applicable to movable mold frame
CN205975635U (en) Foundation pit support structure
CN103195235A (en) Design and calculation for detachable steel plate type steel fixture
CN204000617U (en) Bolt bracket
CN203067936U (en) High-altitude pipeline installation safe lifting bracket
CN203586819U (en) Anchoring brick hanging element
CN204099721U (en) Non-welding electric gas/HVAC support at the bottom of a kind of floor
CN203462743U (en) Adjustable cantilever frame I-beam anchoring embedded part
CN205421317U (en) Assembled basis mounting adjustment ware
CN204023859U (en) Plain type NZ Built-in pipe mould anti-floating lifting hook device
CN205802788U (en) Replacing cutting edge lifting device is cut in a kind of segmentation
CN204571334U (en) A kind of security protection platform built for piping lane
CN104499644A (en) Crossbeam with lapping bars and triangular rib plates
CN204573344U (en) A kind of factory building house beam pipeline elevator
CN204754225U (en) Can have enough to meet need a support
CN102815368B (en) In ship building process, fixed segments falls terraced device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Co-patentee after: MCC Tiangong Group Co., Ltd.

Patentee after: SHANGHAI MCC NO.13 CONSTRUCTION CO., LTD.

Address before: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Co-patentee before: MCC Tiangong Group Co., Ltd.

Patentee before: CMTCC Shanghai Shisanye Construction Co., Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Co-patentee after: MCC Tiangong Group Co., Ltd.

Patentee after: Shanghai twenty Metallurgical Construction Co., Ltd.

Address before: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Co-patentee before: MCC Tiangong Group Co., Ltd.

Patentee before: SHANGHAI MCC NO.13 CONSTRUCTION CO., LTD.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20190627

Address after: Room A, Room 403, 1325 Mudanjiang Road, Baoshan District, Shanghai, 20199

Co-patentee after: China Twenty Metallurgical Group Co., Ltd.

Patentee after: Shanghai twenty Metallurgical Construction Co., Ltd.

Address before: Room A, Room 403, 1325 Mudanjiang Road, Baoshan District, Shanghai, 20199

Co-patentee before: MCC Tiangong Group Co., Ltd.

Patentee before: Shanghai twenty Metallurgical Construction Co., Ltd.

TR01 Transfer of patent right