CN108396963A - A kind of sizing steel construction hangs membrane module - Google Patents

A kind of sizing steel construction hangs membrane module Download PDF

Info

Publication number
CN108396963A
CN108396963A CN201810241426.4A CN201810241426A CN108396963A CN 108396963 A CN108396963 A CN 108396963A CN 201810241426 A CN201810241426 A CN 201810241426A CN 108396963 A CN108396963 A CN 108396963A
Authority
CN
China
Prior art keywords
hanger
mould
membrane module
idler wheel
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810241426.4A
Other languages
Chinese (zh)
Other versions
CN108396963B (en
Inventor
朱进进
杨忠富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201810241426.4A priority Critical patent/CN108396963B/en
Publication of CN108396963A publication Critical patent/CN108396963A/en
Application granted granted Critical
Publication of CN108396963B publication Critical patent/CN108396963B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/04Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/18Devices for suspending or anchoring form elements to girders placed in ceilings, e.g. hangers

Abstract

The invention discloses a kind of sizing steel constructions to hang membrane module, including hanger, hang mould, it includes two templates to hang mould, it is respectively equipped with nut on the end of screw rod both ends, fixture block is equipped on the extended segment of screw rod, there are gaps between the upper surface of fixture block and the lower surface of hanger, protrusion is equipped on the lateral wall of each template vertical section, and protrusion is placed in gap internal trolley and is fixed in the middle part of hanger lower surface, idler wheel is contacted with drum steel upper surface, it is provided with sliding slot on the end face at each template horizontal segment both ends, it is equipped with rectangular stupefied item in the side wall lower ends of side shield, spur rack is equipped on rectangular stupefied item, it is equipped with and the matched gear of spur rack in the output end of motor.Hanger is placed on section steel beam, hanger is isolated with the upper surface of section steel beam using idler wheel, it is ensured that pumping line has sufficient space and injects concrete in mould to hanging so that the concrete outsourcing construction of section steel beam can be segmented progress, in the working hour for shortening section steel beam outsourcing construction, reduce construction intensity.

Description

A kind of sizing steel construction hangs membrane module
Technical field
The present invention relates to the realm of building construction, and in particular to a kind of sizing steel construction hangs membrane module.
Background technology
High-rise building refers to the building of 40 layers or more or 100 meters of height or more, China《Civil buildings design general rule》 GB50352-2005 is provided:When building height is more than 100m, no matter house and public building are high-rise building.According to generation The new standard of high-rise building association of boundary, 300 meters or more are high-rise building.And in Specific construction, 100m or more superelevation is built It, can not be in shaped steel when building object and be equipped with steel reinforced concrete girder construction, and carrying out the construction of section steel beam external wrapping concrete in the prior art When setting up support for shuttering for the support before concrete coagulation below beam, and basis hung as template using upper layer section steel beam, It also needs to set up support for shuttering, and sets up support for shuttering not only heavy workload, and set up difficulty height, and hold when concrete is poured into a mould Easily pumping line is formed and is interfered, so that reducing the outsourcing construction efficiency of section steel beam, greatly prolongs the construction work of high-rise building Phase.
Invention content
Present invention aims at a kind of sizing steel constructions of offer to hang membrane module, realizes high-rise building section steel beam outsourcing coagulation Native rapid construction.
The present invention is achieved through the following technical solutions:
A kind of sizing steel construction hangs membrane module, including hanger and hangs mould, and the mould that hangs includes two L-shaped templates, The horizontal segment end of two templates is hinged, and screw hole is provided at the hanger both ends, after screw rod activity runs through screw hole It extends downwardly, matched nut is respectively equipped on the end of screw rod both ends, and be equipped with fixture block on the extended segment of screw rod, card There are gaps between the upper surface of block and the lower surface of hanger, are equipped on the lateral wall of each template vertical section prominent It rises, and protrusion is placed in gap;Further include idler wheel and four side shields, the idler wheel is fixed in the middle part of the hanger lower surface, And the outer circle wall of idler wheel is contacted with the upper surface of drum steel, is provided on the end face at each template horizontal segment both ends Sliding slot, the side shield side wall lower ends be equipped with the matched rectangular stupefied item of sliding slot, and on rectangular stupefied item be equipped with straight-tooth Item is all provided with there are two motor in the vertical section lateral wall of each template, is equipped in the output end of motor and is matched with spur rack Gear, U-shaped hole is equipped at the middle part of each side shield, in use, positioned at hanging on two side shields of mould the same side U-shaped hole merge constitute one for drum steel by channel.For in the prior art, during construction of super highrise building, Section steel beam for level height more than 100 meters carries out that when concrete outsourcing construction mould holder can not be set up below section steel beam Problem, applicant utilize the structural strength of section steel beam itself, hanger are placed on section steel beam, and utilize idler wheel by hanger and shaped steel The upper surface of beam is isolated, and pumping line has sufficient space and injects concrete in mould to hanging when ensuring pouring concrete construction, and Hang be equipped in the two side walls of mould for drum steel by channel so that section steel beam concrete outsourcing construction can be segmented into Row, i.e., need to only push hanger to move in a straight line, then can realize in the dry and hard subsequent continuous next segment type of progress of concrete poured The concrete outsourcing process of girder steel not only shortens the working hour of section steel beam outsourcing construction, is also greatly reduced construction intensity;
When specifically installing and using, hanger is placed in above drum steel first, and ensure that idler wheel and the upper surface of drum steel connect It touches, to reserve the cast that gap facilitates concrete, then two nuts on adjusting screw rod so that on template vertical section lateral wall Protrusion be fixed below fixture block and hanger end between gap in, to realize two template quilts that horizontal segment is hinged It is fastened in hanger, and since two templates constitute the clamping zone of a U-shaped, which is wrapped up drum steel, and On the axis direction of drum steel, there are four side shields for setting, can be to an open end in U-shaped region after two side shield splicings It is closed, concrete is then injected into the region that only there is an opening above, that is, completes the concrete outsourcing of drum steel Process.Wherein, when being moved positioned at two side shields for hanging mould the same side, the mutual cooperation of rectangular stupefied item and sliding slot is utilized so that Side shield keeps its vertical state, starts motor so that the gear on motor output end is mutually nibbled with the straight-tooth band on rectangular stupefied item It closes, and then rectangular stupefied item and side shield is driven to be moved towards the middle part of drum steel, until two side shields are complete by the both ends for hanging mould It is totally-enclosed, and after the concrete of cast is dry and hard, only need to drive hanger, hang mould and multiple side shields can be along drum steel Axis direction moves, to realize that the segmentation outsourcing of drum steel is constructed.
The length of the rectangular stupefied item is more than the length of the sliding slot.Further, the length of rectangular stupefied item is more than sliding slot Length, while ensure straight-tooth band length be more than sliding slot length, i.e., after electric motor starting, can realize two positioned at the same side A side shield is stitched together completely, and leave behind for drum steel by channel, to avoid concrete reveal;Simultaneously in form removal When, it is ensured that side shield can quickly overcome the bonding resistance of concrete, to shorten construction working hour.
The number at least two of the idler wheel.Further, due to hang mould installation after, hang mould, hanger and The weight of the concrete of cast is all carried by idler wheel, therefore, the number of idler wheel is arranged to two or two or more, And above-mentioned rollers are uniformly distributed and are fixed below hanger, and ensure to contact with the upper surface of drum steel, to ensure entirely to hang mould The stability in use of component;Also, membrane module is hung during step pouring to be moved integrally, and multiple idler wheels can ensure to hang It in membrane module smooth transition to another section of drum steel, avoids hanging membrane module deviation occurs in moving process, ensure entire drum The consistency of shape after the concrete outsourcing process of steel.
The idler wheel is steel wheel.Preferably, utilizing steel wheel excellent load-carrying properties and wearability, it is ensured that hanger and work Spacing size between shaped steel is consistent in long-time work progress, and then it is equal to improve distribution of the concrete on drum steel Evenness.
The hanger takes the shape of the letter U, and the screw rod activity runs through two vertical sections of the hanger.Further, the extension of U-shaped Arm can carry out the vertical section of template local package, have certain limit function to template, can avoid pouring in concrete Template vertical section is formed after note and is squeezed, the impaired probability of template deformation is reduced.
Compared with prior art, the present invention having the following advantages and advantages:
1, a kind of sizing steel construction of the present invention hangs membrane module, and using the structural strength of section steel beam itself, hanger is placed in type On girder steel, and hanger is isolated with the upper surface of section steel beam using idler wheel, pumping line has when ensuring pouring concrete construction Sufficient space injects concrete to hanging in mould, and hang be equipped in the two side walls of mould for drum steel by channel so that type The concrete outsourcing construction of girder steel can be segmented progress, i.e., need to only hanger be pushed to move in a straight line, then can realize and pour The dry and hard subsequent continuous concrete outsourcing process for carrying out next segment type girder steel of concrete, not only shorten section steel beam outsourcing construction Working hour is also greatly reduced construction intensity;
2, a kind of sizing steel construction of the present invention hangs membrane module, and the length of rectangular stupefied item is more than the length of sliding slot, ensures simultaneously The length of straight-tooth band is more than the length of sliding slot, i.e., after electric motor starting, can realize that two side shields positioned at the same side are spelled completely Be connected together, and leave behind for drum steel by channel, to avoid concrete reveal;
3, a kind of sizing steel construction of the present invention hangs membrane module, and the hanger of U-shaped can carry out the vertical section of template local packet It wraps up in, has certain limit function to template, can avoid forming extruding to template vertical section after concrete is poured into a mould, reduce mould The impaired probability of plate deformation.
Description of the drawings
Attached drawing described herein is used for providing further understanding the embodiment of the present invention, constitutes one of the application Point, do not constitute the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the structural schematic diagram of side shield.
Label and corresponding parts title in attached drawing:
1- hangers, 2- idler wheels, 3- drum steel, 4- templates, 5- fixture blocks, 6- screw rods, 7- sliding slots, 8- motors, 9- gears, 10- Spur rack, the channels 11-, 12- side shields.
Specific implementation mode
To make the objectives, technical solutions, and advantages of the present invention clearer, with reference to embodiment and attached drawing, to this Invention is described in further detail, and exemplary embodiment of the invention and its explanation are only used for explaining the present invention, do not make For limitation of the invention.
Embodiment 1
As depicted in figs. 1 and 2, the present embodiment includes hanger 1 and hangs mould, and the mould that hangs includes two L-shaped templates 4, the horizontal segment end of two templates 4 is hinged, and is provided with screw hole at 1 both ends of the hanger, 6 activity of screw rod runs through spiral shell It is extended downwardly behind hole, is respectively equipped with matched nut on 6 both ends end of screw rod, and be equipped on the extended segment of screw rod 6 Fixture block 5, there are gaps between the upper surface and the lower surface of hanger 1 of fixture block 5, in the outside of each 4 vertical section of the template Wall is equipped with protrusion, and protrusion is placed in gap;Further include idler wheel 2 and four side shields 12, the idler wheel 2 is fixed on the extension In the middle part of 1 lower surface of arm, and the outer circle wall of idler wheel 2 is contacted with the upper surface of drum steel 3, in each 4 horizontal segment of the template Sliding slot 7 is provided on the end face at both ends, the side shield 12 side wall lower ends be equipped with the matched rectangular stupefied item of sliding slot 7, And spur rack 10 is equipped on rectangular stupefied item, it is all provided with there are two motor 8 in the vertical section lateral wall of each template 4, in motor 8 Output end be equipped with 10 matched gear 9 of spur rack, the middle part of each side shield 12 be equipped with U-shaped hole, use When, merge positioned at the U-shaped hole hung on two side shields 12 of mould the same side constitute one for drum steel 3 by channel 11.Needle To in the prior art, during construction of super highrise building, the section steel beam for level height more than 100 meters carries out outside concrete The problem of mould holder can not be set up below section steel beam when packet construction, applicant utilizes the structural strength of section steel beam itself, will hang Arm 1 is placed on section steel beam, and hanger 1 is isolated with the upper surface of section steel beam using idler wheel 2, when ensuring pouring concrete construction Pumping line has sufficient space and injects concrete in mould to hanging, and hang be equipped in the two side walls of mould for drum steel 3 by Channel 11 so that the concrete outsourcing construction of section steel beam can be segmented progress, i.e., only hanger 1 need to be pushed to move in a straight line, then can It is enough to realize in the dry and hard subsequent continuous concrete outsourcing process for carrying out next segment type girder steel of concrete poured, not only shorten type In the working hour of girder steel outsourcing construction, it is also greatly reduced construction intensity;
When specifically installing and using, hanger 1 is placed in 3 top of drum steel first, and ensure the upper table of idler wheel 2 and drum steel 3 Face contacts, to reserve the cast that gap facilitates concrete, then two nuts on adjusting screw rod 6 so that outside 4 vertical section of template Protrusion on side wall be fixed below fixture block 5 and 1 end of hanger between gap in, with realize that horizontal segment is hinged two A template 4 is fastened in hanger 1, and since two templates 4 constitute the clamping zone of a U-shaped, and the U-shaped region is by drum steel 3 are wrapped up, and on the axis direction of drum steel 3, and there are four side shields 12 for setting, can be to U after two splicings of side shields 12 One open end in shape region is closed, and is then injected concrete into the region that only there is an opening above, that is, is completed The concrete outsourcing process of drum steel 3.Wherein, when being moved positioned at two side shields 12 for hanging mould the same side, rectangular stupefied item is utilized With the mutual cooperation of sliding slot 7 so that side shield 12 keeps its vertical state, starts motor 8 so that the tooth on 8 output end of motor Wheel 9 is meshed with the straight-tooth band on rectangular stupefied item, and then rectangular stupefied item and side shield 12 is driven to be moved towards the middle part of drum steel 3 It is dynamic, until two side shields 12 completely enclose the both ends for hanging mould, and after the concrete of cast is dry and hard, only need to drive hanger 1, Hanging mould and multiple side shields 12 can move along the axis direction of drum steel 3, to realize that the segmentation outsourcing of drum steel 3 is applied Work.
Embodiment 2
As depicted in figs. 1 and 2, the length of rectangular stupefied item described in the present embodiment is more than the length of the sliding slot 7.Rectangular stupefied item Length be more than sliding slot 7 length, while ensure straight-tooth band length be more than sliding slot 7 length, i.e., motor 8 start after, can Realize and be stitched together completely positioned at two side shields 12 of the same side, and leave behind for drum steel 3 by channel 11, to keep away Exempt from concrete leakage;Simultaneously in form removal, it is ensured that side shield 12 can quickly overcome the bonding resistance of concrete, to shorten construction Working hour.
Embodiment 3
As depicted in figs. 1 and 2, the number at least two of the idler wheel 2 in the present embodiment.Due to hanging mould installation knot Shu Hou, the weight for hanging the concrete of mould, hanger 1 and cast all carry by idler wheel 2, therefore, the number of idler wheel 2 are set It is set to two or two or more, and above-mentioned rollers 2 are uniformly distributed and are fixed on 1 lower section of hanger, and ensured upper with drum steel 3 Surface contacts, to ensure entirely to hang the stability in use of membrane module;Also, it hangs membrane module during step pouring can integrally move It is dynamic, and multiple idler wheels 2 can ensure to hang in membrane module smooth transition to another section of drum steel 3, it avoids hanging membrane module and is being moved through Deviation occurs in journey, ensures the consistency of shape after the concrete outsourcing process of entire drum steel 3.
Preferably, utilizing steel wheel excellent load-carrying properties and wearability, it is ensured that between hanger 1 and drum steel 3 It is consistent in long-time work progress away from size, and then improves distribution consistency degree of the concrete on drum steel 3.
Embodiment 4
As depicted in figs. 1 and 2, in the present embodiment, the hanger 1 takes the shape of the letter U, and 6 activity of the screw rod runs through the hanger 1 Two vertical sections.The hanger 1 of U-shaped can carry out the vertical section of template 4 local package, have certain limit to template 4 Function can avoid forming extruding to 4 vertical section of template after concrete is poured into a mould, reduce the impaired probability of 4 deformation of template.
Above-described specific implementation mode has carried out further the purpose of the present invention, technical solution and advantageous effect It is described in detail, it should be understood that the foregoing is merely the specific implementation mode of the present invention, is not intended to limit the present invention Protection domain, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should all include Within protection scope of the present invention.

Claims (5)

1. a kind of sizing steel construction hangs membrane module, including hanger (1) and hang mould, it is characterised in that:The mould that hangs includes two The horizontal segment end of L-shaped template (4), two templates (4) is hinged, and spiral shell is provided at the hanger (1) both ends Hole, screw rod (6) activity extend downwardly after screw hole, and matched nut is respectively equipped on screw rod (6) both ends end, and Fixture block (5) is equipped on the extended segment of screw rod (6), there are gap between the upper surface and the lower surface of hanger (1) of fixture block (5), Protrusion is equipped on the lateral wall of each template (4) vertical section, and protrusion is placed in gap;Further include idler wheel (2) and Four side shields (12), the idler wheel (2) is fixed in the middle part of the hanger (1) lower surface, and the outer circle wall and work of idler wheel (2) The upper surface of shaped steel (3) contacts, and sliding slot (7) is provided on the end face at each template (4) horizontal segment both ends, described The side wall lower ends of side shield (12) be equipped with the matched rectangular stupefied item of sliding slot (7), and on rectangular stupefied item be equipped with spur rack (10), be all provided with there are two motor (8) in the vertical section lateral wall of each template (4), the output end of motor (8) be equipped with it is straight Rack (10) matched gear (9) is equipped with U-shaped hole, in use, positioned at mould is hung at the middle part of each side shield (12) U-shaped hole on two side shields (12) of the same side merge constitute one for drum steel (3) by channel (11).
2. a kind of sizing steel construction according to claim 1 hangs membrane module, it is characterised in that:The length of the rectangular stupefied item More than the length of the sliding slot (7).
3. a kind of sizing steel construction according to claim 1 hangs membrane module, it is characterised in that:The number of the idler wheel (2) At least two.
4. a kind of sizing steel construction according to claim 3 hangs membrane module, it is characterised in that:The idler wheel (2) is steel wheel.
5. a kind of sizing steel construction according to Claims 1 to 4 any one hangs membrane module, it is characterised in that:The extension Arm (1) takes the shape of the letter U, and the screw rod (6) activity runs through two vertical sections of the hanger (1).
CN201810241426.4A 2018-03-22 2018-03-22 Design steel construction hangs mould subassembly Active CN108396963B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810241426.4A CN108396963B (en) 2018-03-22 2018-03-22 Design steel construction hangs mould subassembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810241426.4A CN108396963B (en) 2018-03-22 2018-03-22 Design steel construction hangs mould subassembly

Publications (2)

Publication Number Publication Date
CN108396963A true CN108396963A (en) 2018-08-14
CN108396963B CN108396963B (en) 2020-03-20

Family

ID=63093059

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810241426.4A Active CN108396963B (en) 2018-03-22 2018-03-22 Design steel construction hangs mould subassembly

Country Status (1)

Country Link
CN (1) CN108396963B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764646A (en) * 2020-07-09 2020-10-13 温州品力智能幕墙门窗有限公司 Design steel construction hangs mould subassembly

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1699503A (en) * 1928-05-02 1929-01-15 Henry H Lampert Form clamp
GB687126A (en) * 1951-05-22 1953-02-04 Lemuel Rush Vines Beam form kicker tie
JPH01182460A (en) * 1988-01-14 1989-07-20 Shimizu Corp Beam mold frame
JP3200813B2 (en) * 1999-05-27 2001-08-20 日本鋼管ライトスチール株式会社 Beam formwork structure and its forming method
CN201605810U (en) * 2009-10-30 2010-10-13 华南理工大学 Profile steel beam self-bearing suspended formwork supporter
CN201865346U (en) * 2010-10-26 2011-06-15 中联世纪建设集团有限公司 Construction template structure for large-section stiff concrete beam of structure-shifting layer
CN103089010A (en) * 2013-01-15 2013-05-08 中冶天工上海十三冶建设有限公司 Cradle construction device replacing reinforced concrete beam bottom protection layer and cradle construction method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1699503A (en) * 1928-05-02 1929-01-15 Henry H Lampert Form clamp
GB687126A (en) * 1951-05-22 1953-02-04 Lemuel Rush Vines Beam form kicker tie
JPH01182460A (en) * 1988-01-14 1989-07-20 Shimizu Corp Beam mold frame
JP3200813B2 (en) * 1999-05-27 2001-08-20 日本鋼管ライトスチール株式会社 Beam formwork structure and its forming method
CN201605810U (en) * 2009-10-30 2010-10-13 华南理工大学 Profile steel beam self-bearing suspended formwork supporter
CN201865346U (en) * 2010-10-26 2011-06-15 中联世纪建设集团有限公司 Construction template structure for large-section stiff concrete beam of structure-shifting layer
CN103089010A (en) * 2013-01-15 2013-05-08 中冶天工上海十三冶建设有限公司 Cradle construction device replacing reinforced concrete beam bottom protection layer and cradle construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764646A (en) * 2020-07-09 2020-10-13 温州品力智能幕墙门窗有限公司 Design steel construction hangs mould subassembly

Also Published As

Publication number Publication date
CN108396963B (en) 2020-03-20

Similar Documents

Publication Publication Date Title
CN207847066U (en) A kind of construction formwork for placing
CN205676844U (en) A kind of for one-piece casting trench furrow bank with the molding sliding formwork of base plate
CN108821134B (en) Construction equipment hoisting device
CN207079477U (en) A kind of mobile formwork bottom web reinforcement skeleton pricks hanging apparatus in advance
CN108396963A (en) A kind of sizing steel construction hangs membrane module
CN103437285B (en) Full space support cast-in-place box beam construction technology
CN208105078U (en) Bridge triangular hanging basket
CN208748494U (en) A kind of alignment device of highway roadside stone laydown machine
CN204685733U (en) A kind of lift reforming station
CN209741673U (en) Bridge anticollision barrier's no pull rod construction structures
CN204627628U (en) The adjustable top template device of fully automatic hydraulic concrete-liner steel formwork trolley
CN203343386U (en) Scraper for cleaning side wall and bottom plate of sand mixing machine simultaneously
CN204874929U (en) Can discharge weaving roller of flyings and impurity
CN203160139U (en) Wide multiple-main-truss basket travelling unit
CN205818147U (en) A kind of highway special T girder prefabricated pedestal
CN207609427U (en) A kind of simple multispan formula tunnel inverted arch trestle structure
CN208137479U (en) A kind of reinforcement type building transformational structure
CN105422139A (en) Tunnel ditch cable trough trolley
CN202272818U (en) Plaster die for producing quartz crucibles
CN206233116U (en) Construction moving platform car on the outside of a kind of bridge-collision-avoidance wall
CN103437305A (en) Center ditch formwork of urban railway underground line monolithic roadbed
CN203373674U (en) Center gutterway formwork of urban railway underground line monolithic track-bed
CN204748915U (en) Novel hang roller forming reinforced concrete drain pipe maintenance structure
CN205950978U (en) Pour formula wallboard forming die car
CN204941571U (en) A kind of railway tunnel supporting and protection structure of improvement

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant