CN203905512U - Adjustable device for installing steel beams in place - Google Patents

Adjustable device for installing steel beams in place Download PDF

Info

Publication number
CN203905512U
CN203905512U CN201420224862.8U CN201420224862U CN203905512U CN 203905512 U CN203905512 U CN 203905512U CN 201420224862 U CN201420224862 U CN 201420224862U CN 203905512 U CN203905512 U CN 203905512U
Authority
CN
China
Prior art keywords
plate
place
girder steel
steel
shaped chuck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420224862.8U
Other languages
Chinese (zh)
Inventor
郑洋
陈韬
颜冬
王超
赵龙生
陈刚
徐丹
陈冬杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Steel Structure Wuhan Corp Ltd
Original Assignee
China Construction Steel Structure Jiangsu Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Jiangsu Corp Ltd filed Critical China Construction Steel Structure Jiangsu Corp Ltd
Priority to CN201420224862.8U priority Critical patent/CN203905512U/en
Application granted granted Critical
Publication of CN203905512U publication Critical patent/CN203905512U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses an adjustable device for installing steel beams in place, and belongs to the field of steel structure engineering construction. The device comprises a U-shaped jacket, a regulating assembly, a split bolt and an in-place plate, wherein the U-shaped jacket is formed by welding an upper clamp plate and a lower clamp plate through a vertical plate; a clamp groove capable of accommodating a steel beam flange plate is formed between the upper clamp plate and the lower clamp plate; the lower clamp plate is provided with regulating screw bolt holes; the regulating assembly comprises a pad plate, regulating screw rods and regulating screw nuts; the pad plate is arranged between the upper and lower clamp plates of the U-shaped jacket, and is connected with the U-shaped jacket through the regulating screw rods and the regulating screw nuts; and the in-place plate is a rectangular strip provided with split bolt holes and is welded and connected to the upper clamp plate of the U-shaped jacket. The device can be practically used for installing various kinds of steel beams with H-shaped cross sections and I-shaped steel beams in place, and has the advantages that the steel beam lifting speed is increased; the damage that may be caused to parent metal by welding and cutting the in-place plate is avoided; meanwhile, the material loss is reduced; and the construction cost is saved.

Description

Adjustable girder steel installation in position device
Technical field
The utility model relates to a kind of adjustable girder steel installation in position device being applicable in Construction of Steel Structure.Belong to steel building construction field.
Background technology
Along with the quickening of Urbanization in China, the upsurge of investment construction high buildings and large mansions is persistently overheating throughout the country, and many highrise buildings are rised sheer from level ground, and becomes local landmark building.The construction of these highrise buildings adopts Core Walls Structure-steel frame structural system more, steel frame is comprised of steel column and girder steel conventionally, wherein girder steel adopts H type or I shape more, though can improve to a certain extent installation effectiveness by modes such as string hang, beam-post, beam-beam connecting node fail effectively to raise the efficiency on processing all the time.
Current a kind of prior art as shown in Figure 1, employing is welded the method for plate in place and girder steel is carried out temporarily in place at the top flange plate two ends of girder steel, plate in place can be welded on girder steel in processing factory or job site, steel beam lifting finishes construction to be welded or bolt construction complete after, cut plate in place.Adopt in this way girder steel is carried out to installation in position, need to weld plate in place at every girder steel two ends, increased the input of people, material, equipment, improved construction cost; In transportation, due to the existence of girder steel top flange plate plate in place, girder steel and girder steel are stacked and can not effectively be guaranteed firmly, have increased the input of transportation fixation, affect transportation safety; After must cutting after installation, can carry out the construction of follow-up floor support plate, limited the sequence of construction of each operation, increase construction period, need to carry out high-altitude cutting operation simultaneously, increase the high-altitude workload of starting to exchange fire, especially the plate cutting in place at post-intercolumniation girder steel two ends, relate to and face limit fire operation, have larger potential safety hazard, the cutting of plate in place may damage girder steel in addition, cause spillage of material, affect structural safety.
From above-mentioned prior art, to finding out the introduction of steel girder erection construction in place, at least there is following problems in existing technology in place: (1) increases workload and the cost of processing factory or job site; (2) affect component conveying; (3) affect efficiency of construction; (4) affect construction safety; (5) affect component quality.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned deficiency, and a kind of adjustable girder steel installation in position device is provided, and can reduce workload and the cost of job site, improves efficiency of construction and component quality, guarantees construction safety, facilitates component conveying.
The purpose of this utility model is achieved in that a kind of adjustable girder steel installation in position device, it comprises U-shaped chuck, adjusting part, split bolt and plate in place, described U-shaped chuck and just for plate is two groups, described U-shaped chuck is welded by riser by train wheel bridge and lower plate, forms the clip slot that can hold girder steel frange plate between described train wheel bridge and lower plate; Described adjusting part comprises backing plate, adjusting screw(rod) and adjusting nut, described backing plate is arranged between train wheel bridge and lower plate by adjusting screw(rod) and adjusting nut, the train wheel bridge of described plate in place and U-shaped chuck fixes, and it is just plate that described split bolt is used for connecting two.
Between the train wheel bridge upper surface of described U-shaped chuck and plate in place, by trapezoidal floor, be connected.
At least two respectively of described adjusting screw(rod) and adjusting nuts, described adjusting screw(rod) fixes with backing plate after running through the lower plate of U-shaped chuck, and described adjusting nut is arranged on the lower plate below of U-shaped chuck.
Compared with prior art, the utlity model has following beneficial effect is:
1, this device is installed on ground before can lifting at the scene, easy for installation;
2, this device, without weld plate in place on girder steel, is convenient to girder steel transportation, and is not injured girder steel body, saves material;
3, this device can directly be removed after steel girder erection, has avoided high-altitude cutting fire operation, has improved working security when reducing spillage of material;
4, this device can change according to the top flange plate varied in thickness of girder steel, and its adjustability is stronger, can flexible Application in the steel girder erection operation of different thicknesss of slab, and simple in structure, pattern is single, is convenient to batch machining and makes, highly versatile, can reuse.
Accompanying drawing explanation
Fig. 1 is the steel girder erection schematic diagram in place that prior art provides;
Fig. 2 the invention provides device steel girder erection schematic diagram in place;
Fig. 3 is Fig. 2 shown device top view;
Fig. 4 is Fig. 2 shown device elevation;
Fig. 5 is Fig. 2 shown device lateral view.
Wherein:
Girder steel 1
Train wheel bridge 2
Lower plate 3
Riser 4
Backing plate 5
Adjusting nut 6
Adjusting screw(rod) 7
Plate 8 in place
Trapezoidal floor 9
Split bolt 10.
The specific embodiment
Referring to Fig. 2-Fig. 5, the utility model relates to a kind of adjustable girder steel installation in position device, comprise U-shaped chuck, adjusting part, split bolt 10 and plate in place 8, described U-shaped chuck is welded by riser 4 by train wheel bridge 2 and lower plate 3, between described train wheel bridge 2 and lower plate 3, form the clip slot that can hold girder steel frange plate, on described lower plate 3, be provided with adjusting bolt hole; Described adjusting part comprises backing plate 5, adjusting screw(rod) 7, adjusting nut 6, and described backing plate 5 is arranged on by adjusting screw(rod) 7 and adjusting nut 6 between the train wheel bridge 2 and lower plate 3 of U-shaped chuck, and described adjusting screw(rod) 7 connects by perforation plug welding with backing plate 5; Described plate in place 8 is the rectangle lath with split bolt hole, with train wheel bridge 2 welding of U-shaped chuck.Train wheel bridge 2 and the plate 8 in place of described U-shaped chuck are welded to connect by trapezoidal floor 9, and described split bolt 10 is placed in the U-shaped chuck of the Nei Jiang both sides, split bolt hole of plate 8 in place and fixes.Before girder steel 1 lifting, device is clipped on the top flange plate of girder steel 1 both sides, termination, by adjusting part by device and the fixation of girder steel top flange plate, by split bolt by two U-shaped chuck fixations, by hanging device hoisting steel beam, girder steel is placed on and is installed on steel column bracket or girder steel by device, detaching device after welding procedure or bolt construction complete.
In the present embodiment, train wheel bridge 2, lower plate 3, riser 4, backing plate 5, plate in place 8 and trapezoidal floor 9 thicknesss of slab are 20mm, and material is Q345B; Adjusting bolt hole gauge lattice are Φ 22, and adjusting screw(rod) 7 is D20, tapping length 100mm; Adjusting nut 6 specifications are M20; Split bolt hole gauge lattice are Φ 14, and split bolt 10 specifications are D12, length 300mm, and elongated tapping, nut is joined at two ends.
The U-shaped chuck comprising in the present embodiment, plate in place 8 are two groups, by two groups of split bolts 10, are connected and fixed.Single group supporting two groups of adjusting screw(rod)s 7 of U-shaped chuck and adjusting nut 6; The U-shaped chuck of single group and plate in place 8 are welded to connect by two trapezoidal floors 9.
Described train wheel bridge 2, lower plate 3, riser 4, backing plate 5, plate in place 8 and trapezoidal floor 9 thicknesss of slab can according to engineering girder steel 1 top flange plate, slab be thick is optimized; The specification of adjusting screw(rod) 7, adjusting nut 6, split bolt 10 and quantity can be adjusted according to engineering girder steel 1 single-piece maximum weight; The light or wide less girder steel 1 of top flange plate plate for single-piece weight, can be optimized or only use one group of U-shaped chuck, adjusting part and plate in place 8 by adjusting train wheel bridge 2, lower plate 3, riser 4, backing plate 5, plate in place 8 and trapezoidal floor 9 specifications.

Claims (3)

1. an adjustable girder steel installation in position device, it is characterized in that it comprises U-shaped chuck, adjusting part, split bolt (10) and plate in place (8), described U-shaped chuck and be just two groups for plate (8), described U-shaped chuck is welded by riser (4) by train wheel bridge (2) and lower plate (3), forms the clip slot that can hold girder steel frange plate between described train wheel bridge (2) and lower plate (3); Described adjusting part comprises backing plate (5), adjusting screw(rod) (7) and adjusting nut (6), described backing plate (5) is arranged between train wheel bridge (2) and lower plate (3) by adjusting screw(rod) (7) and adjusting nut (6), described plate in place (8) fixes with the train wheel bridge (2) of U-shaped chuck, and described split bolt (10) is just plate (8) for connecting two.
2. a kind of adjustable girder steel installation in position device according to claim 1, is connected by trapezoidal floor (9) between train wheel bridge (2) upper surface that it is characterized in that described U-shaped chuck and plate in place (8).
3. a kind of adjustable girder steel installation in position device according to claim 1 and 2, it is characterized in that at least two respectively of described adjusting screw(rod) (7) and adjusting nuts (6), described adjusting screw(rod) (7) fixes with backing plate (5) after running through the lower plate (3) of U-shaped chuck, and described adjusting nut (6) is arranged on below the lower plate (3) of U-shaped chuck.
CN201420224862.8U 2014-05-05 2014-05-05 Adjustable device for installing steel beams in place Expired - Lifetime CN203905512U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420224862.8U CN203905512U (en) 2014-05-05 2014-05-05 Adjustable device for installing steel beams in place

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420224862.8U CN203905512U (en) 2014-05-05 2014-05-05 Adjustable device for installing steel beams in place

Publications (1)

Publication Number Publication Date
CN203905512U true CN203905512U (en) 2014-10-29

Family

ID=51779800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420224862.8U Expired - Lifetime CN203905512U (en) 2014-05-05 2014-05-05 Adjustable device for installing steel beams in place

Country Status (1)

Country Link
CN (1) CN203905512U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103993746A (en) * 2014-05-05 2014-08-20 中建钢构江苏有限公司 Adjustable steel beam in-place mounting device
CN104594510A (en) * 2015-01-12 2015-05-06 金陵科技学院 Connecting structure for girder and inclined struts of portable house
CN104594509A (en) * 2015-01-12 2015-05-06 金陵科技学院 Connecting structure for dual-girder and inclined struts of portable house
CN106363560A (en) * 2016-11-29 2017-02-01 中国冶集团有限公司 Adjustable portable H-shaped steel structural aerial butting positioning clamp
CN108571067A (en) * 2018-04-10 2018-09-25 东南大学 A kind of assembled Self-resetting prestressed concrete frame friction energy-dissipating combined joint
CN108979168A (en) * 2018-08-30 2018-12-11 宁波建工工程集团有限公司 Steel girder erection bracket and its installation and application
CN110700413A (en) * 2019-10-19 2020-01-17 深圳金鑫绿建股份有限公司 Detachable steel beam mounting connecting piece and steel beam connecting method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103993746A (en) * 2014-05-05 2014-08-20 中建钢构江苏有限公司 Adjustable steel beam in-place mounting device
CN104594510A (en) * 2015-01-12 2015-05-06 金陵科技学院 Connecting structure for girder and inclined struts of portable house
CN104594509A (en) * 2015-01-12 2015-05-06 金陵科技学院 Connecting structure for dual-girder and inclined struts of portable house
CN106363560A (en) * 2016-11-29 2017-02-01 中国冶集团有限公司 Adjustable portable H-shaped steel structural aerial butting positioning clamp
CN108571067A (en) * 2018-04-10 2018-09-25 东南大学 A kind of assembled Self-resetting prestressed concrete frame friction energy-dissipating combined joint
CN108571067B (en) * 2018-04-10 2019-11-08 东南大学 A kind of assembled Self-resetting prestressed concrete frame friction energy-dissipating combined joint
CN108979168A (en) * 2018-08-30 2018-12-11 宁波建工工程集团有限公司 Steel girder erection bracket and its installation and application
CN110700413A (en) * 2019-10-19 2020-01-17 深圳金鑫绿建股份有限公司 Detachable steel beam mounting connecting piece and steel beam connecting method

Similar Documents

Publication Publication Date Title
CN203905512U (en) Adjustable device for installing steel beams in place
CN103993746A (en) Adjustable steel beam in-place mounting device
CN202299464U (en) Steel column rapid hoisting and in-position correcting device
CN204676914U (en) A kind of rope support that slips safely
CN104674992A (en) Supporting method and structure of suspended steel bar truss deck
CN202416881U (en) Steel girder mounting auxiliary appliance
CN204703480U (en) A kind of integral supporting structure for building
CN206769170U (en) A kind of furred ceiling conversion layer structure
CN204152216U (en) The assembling operating platform that a kind of Construction of Steel Structure is general
CN211173170U (en) A appurtenance for girder steel installation
CN205088951U (en) Many function combination jackscrew
CN204299162U (en) To encorbelment steel I-beam anchor structure
CN204000620U (en) Bridge girder erection machine carrying device
CN204960324U (en) Suspension type floor formwork support device
CN203361596U (en) Auxiliary support of integrated lifting operation platform
CN202181614U (en) Steel pipe fixing device for joist steel
CN110593299A (en) Leveling device for embedded part of transformer
CN203889913U (en) Steel beam suspension fixing device with adjusting function
CN204455876U (en) Paste the constructing structure of fiber composite plate
CN204024083U (en) The adjustable frame that a kind of steel structure truss slippage uses
CN202866303U (en) Installing and positioning fixing support for steel structure frame primary and secondary beam and secondary beam
CN204754225U (en) Can have enough to meet need a support
CN203546898U (en) Detachable clamp-fixing engineering scaffold for factory building installation
CN208137461U (en) A kind of steel beam fixing device
CN204326499U (en) A kind of attachment anchor device for building operations elevator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160229

Address after: 430100 Yao Industrial Park, Caidian Economic Development Zone, Wuhan, Hubei

Patentee after: CSCEC STEEL STRUCTURE WUHAN CO.,LTD.

Address before: 214434 Jingjiang Park, Wuxi, Jiangsu, No. 6, No.

Patentee before: CHINA CONSTRUCTION STEEL STRUCTURE JIANGSU Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20141029