CN108979168A - Steel girder erection bracket and its installation and application - Google Patents
Steel girder erection bracket and its installation and application Download PDFInfo
- Publication number
- CN108979168A CN108979168A CN201811002481.4A CN201811002481A CN108979168A CN 108979168 A CN108979168 A CN 108979168A CN 201811002481 A CN201811002481 A CN 201811002481A CN 108979168 A CN108979168 A CN 108979168A
- Authority
- CN
- China
- Prior art keywords
- positioning pipe
- bolt
- steel beam
- shape steel
- tiger
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
技术领域technical field
本发明涉及建筑构件领域,是一种钢梁安装支架及其安装使用方法。The invention relates to the field of building components, and relates to a steel beam installation bracket and an installation and use method thereof.
背景技术Background technique
目前,钢框架结构梁的安装一般有两种方式,一种是采用码板焊接于待安装的钢梁上翼缘板,将钢梁焊接的码板搭接于待对接的钢结构牛腿上,然后通过外部工人完成对接连接操作;另一种方式是待安装的钢梁通过吊装设备悬停在安装位置,再由工人进行对接连接操作。上述第一种方式需要焊接码板,且钢梁对接安装后,为了保证后续正常施工及美观,需要将码板割除,并需要打磨和补漆操作,较为繁琐,人工劳动强度大,效率不高;而第二种方式采用悬吊连接,虽然相比第一种方式效率高,但需要多名操作人员跟随吊装,随时进行钢梁的临时固定,劳动强度同样较大,且对吊机设备占用时间长,影响施工进度。为此,有待对现有的钢梁安装结构和方式进行改进。At present, there are generally two ways to install steel frame structural beams. One is to use the code plate to be welded to the upper flange plate of the steel beam to be installed, and the code plate welded to the steel beam is lapped on the steel structure corbel to be connected, and then The butt connection operation is completed by external workers; another way is that the steel beam to be installed hovers at the installation position through the hoisting equipment, and then the workers perform the butt connection operation. The above-mentioned first method needs to weld the code plate, and after the steel beams are butted and installed, in order to ensure the subsequent normal construction and aesthetics, the code plate needs to be cut off, and it needs to be polished and repainted, which is cumbersome, labor-intensive, and inefficient. ; while the second method adopts suspension connection, although it is more efficient than the first method, it requires many operators to follow the hoisting and temporarily fix the steel beam at any time, the labor intensity is also relatively large, and it takes up a lot of space for the crane equipment. A long time will affect the construction progress. For this reason, the existing steel girder installation structure and method need to be improved.
发明内容Contents of the invention
为克服上述不足,本发明的目的是向本领域提供一种钢梁安装支架及其安装使用方法,使其解决现有同类安装支架安装操作较为繁琐,效率不高,投入人工和机械成本较大的技术问题。其目的是通过如下技术方案实现的。In order to overcome the above-mentioned shortcomings, the purpose of the present invention is to provide a steel beam mounting bracket and its installation and use method in the field, so as to solve the problem that the installation operation of the existing similar mounting brackets is relatively cumbersome, the efficiency is not high, and the labor and mechanical costs are relatively large. technical problems. Its purpose is achieved through the following technical solutions.
一种钢梁安装支架,该钢梁安装支架用于对接工字型钢梁;其结构要点在于所述钢梁安装支架包括定位管及对接工字型钢梁时相对于工字型钢梁呈对称设置的两个担梁组件,各担梁组件均包括担梁、虎口板、筋板、定位管套,担梁为角钢,担梁的夹角内侧由一端至另一端依次焊接筋板和至少两块虎口板,且虎口板设有与所述工字型钢梁的上翼缘板相嵌配合的虎口,所述筋板焊接固定一个螺母,螺母螺纹连接调节螺栓,所述定位管套焊接固定于担梁顶侧面中部;当两个担梁组件呈对接工字型钢梁的对称状态时,一个担梁组件中虎口板的虎口与另一个担梁组件中虎口板的虎口水平对齐,且两个担梁组件的定位管套的管孔对齐,所述调节螺栓、螺母位于与所述虎口板虎口相嵌配合的工字型钢梁上翼缘板的上方位置,且调节螺栓与上翼缘板板面垂直;所述定位管与两个担梁组件的定位管套的管孔插接配合,定位管套与定位管之间通过插销定位。上述结构中,担梁采用角钢,强度较高;担梁内侧设置多块虎口板,提高对工字型钢梁对接支撑的稳定性和可靠性;通过设置调节螺栓,方便调整工字型钢梁对接的齐平度;上述定位管套与定位管之间通过插销固定,从而将两个担梁组件相连形成一个稳定的支架整体,实现对工字型钢梁可靠、稳定的对接。A steel beam installation bracket, the steel beam installation bracket is used for docking I-shaped steel beams; the key points of its structure are that the steel beam installation bracket includes positioning pipes and when docking with I-shaped steel beams, it is Two beam assemblies are arranged symmetrically, each beam assembly includes a beam, a tiger mouth plate, a rib plate, and a positioning sleeve, the beam is an angle steel, and the inner side of the included angle of the beam is sequentially welded from one end to the other end with a rib plate and at least Two tiger mouth plates, and the tiger mouth plate is provided with a tiger mouth that fits with the upper flange plate of the I-shaped steel beam. The rib plate is welded and fixed with a nut, and the nut is screwed to the adjusting bolt. The positioning sleeve is welded It is fixed in the middle of the side of the top of the beam; when the two beam components are in a symmetrical state of butt joint I-shaped steel beams, the tiger mouth of the tiger mouth plate in one beam component is horizontally aligned with the tiger mouth of the tiger mouth plate in the other beam component, and The pipe holes of the positioning sleeves of the two beam assemblies are aligned, the adjusting bolts and nuts are located above the upper flange plate of the I-shaped steel beam that fits with the tiger mouth plate, and the adjusting bolts and the upper flange plate The board surface is vertical; the positioning pipe is plugged and matched with the pipe holes of the positioning pipe sleeves of the two supporting beam components, and the positioning pipe sleeve and the positioning pipe are positioned by a bolt. In the above structure, the supporting beam is made of angle steel, which has high strength; multiple tiger mouth plates are arranged on the inner side of the supporting beam to improve the stability and reliability of the butt support of the I-shaped steel beam; by setting the adjusting bolt, it is convenient to adjust the I-shaped steel beam The flushness of the docking; the above-mentioned positioning sleeve and the positioning pipe are fixed by a bolt, so that the two beam components are connected to form a stable whole bracket, and the reliable and stable docking of the I-shaped steel beam is realized.
上述钢梁安装支架中,各所述担梁组件中的筋板设有相邻的两块,两块筋板之间焊接所述螺母。通过该结构,提高螺栓与筋板之间的稳固性,提高担梁组件的强度。In the above-mentioned steel beam mounting bracket, two adjacent ribs are provided in each of the beam assemblies, and the nuts are welded between the two ribs. Through this structure, the stability between the bolt and the reinforcement plate is improved, and the strength of the supporting beam assembly is improved.
上述钢梁安装支架中,所述定位管套设有插销孔,所述定位管沿长度方向设有均匀分布的定位销孔,插销孔与定位销孔之间通过所述插销定位。通过该结构,方便调整两个担梁组件相互间的间距,以适应所需对接的工字型钢梁的上翼缘板宽度尺寸。In the above-mentioned steel beam mounting bracket, the positioning tube sleeve is provided with pin holes, and the positioning tube is provided with positioning pin holes evenly distributed along the length direction, and the pin holes are positioned through the pin holes. Through this structure, it is convenient to adjust the distance between the two supporting beam components, so as to adapt to the width of the upper flange plate of the I-shaped steel beam that needs to be connected.
上述钢梁安装支架中,所述定位管的中部设有一个垂直于所述工字型钢梁上翼缘板的插销孔,该插销孔穿接一根螺纹插销,且螺纹插销由定位管上侧面穿接至定位管下侧面后螺纹连接一个锁紧螺母,锁紧螺母与定位管焊接固定。通过该结构,在对接工字型钢梁时,调整螺纹插销与锁紧螺母,使螺纹插销与工字型钢梁的上翼缘板板面抵紧,从而提高钢梁安装支架与工字型钢梁之间的稳固状态。In the above-mentioned steel beam installation bracket, a pin hole perpendicular to the upper flange plate of the I-shaped steel beam is provided in the middle of the positioning tube, and a threaded pin is inserted through the pin hole, and the threaded pin is passed through the upper side of the positioning tube After being connected to the lower side of the positioning tube, a locking nut is threaded, and the locking nut is welded and fixed with the positioning tube. With this structure, when the I-shaped steel beam is connected, adjust the threaded pin and the lock nut so that the threaded pin and the upper flange of the I-shaped steel beam are pressed against each other, thereby improving the connection between the steel beam mounting bracket and the I-shaped beam. Stability between steel beams.
上述钢梁安装支架中,所述插销和螺纹插销均为L型插销。该L型插销方便手动操作。In the above-mentioned steel beam installation bracket, the bolts and threaded bolts are both L-shaped bolts. The L-shaped latch is convenient for manual operation.
该钢梁安装支架的安装使用方法是将待安装工字型钢梁与主框架工字型钢梁对接,首先将两个担梁组件中虎口板的虎口分别与待安装工字型钢梁的上翼缘板两侧板面相嵌配合,使担梁组件对待安装工字型钢梁形成悬吊支撑;再将两个担梁组件的定位管套与定位管之间通过所述插销定位固定,定位固定后,调节定位管中部的螺纹插销,使螺纹插销抵紧所述待安装工字型钢梁上翼缘板的板面,即钢梁安装支架与待安装工字型钢梁之间形成固定;固定后将两个担梁组件的筋板位置搭设于主框架工字型钢梁上翼缘板板面,调节所述调节螺栓,使主框架工字型钢梁与待安装工字型钢梁水平对齐,最后通过连接板、螺栓件、螺母件将待安装工字型钢梁与主框架工字型钢梁连接固定,即完成对接操作;完成对接后,旋松所述螺纹插销,并取下所述定位管套、定位管之间的插销,即可卸除所述钢梁安装支架。该安装使用方法采用搭接的方式,对接较为方便、效率,且钢梁安装支架对接完成后易于拆卸,拆卸后可重复使用,节约资源,成本较低。The installation and use method of the steel beam installation bracket is to connect the I-shaped steel beam to be installed with the I-shaped steel beam of the main frame. The two sides of the upper flange plate are fitted together, so that the supporting beam assembly forms a suspension support for the I-shaped steel beam to be installed; then the positioning sleeve and the positioning pipe of the two supporting beam assemblies are positioned and fixed through the said bolt, After the positioning is fixed, adjust the threaded pin in the middle of the positioning pipe so that the threaded pin is pressed against the plate surface of the upper flange plate of the I-shaped steel beam to be installed, that is, a fixation is formed between the steel beam mounting bracket and the I-shaped steel beam to be installed; After fixing, place the ribs of the two beam assemblies on the upper flange surface of the I-shaped steel beam of the main frame, and adjust the adjusting bolts so that the I-shaped steel beam of the main frame is horizontally aligned with the I-shaped steel beam to be installed , and finally connect and fix the I-shaped steel beam to be installed with the I-shaped steel beam of the main frame through the connecting plate, bolts and nuts to complete the docking operation; after the docking is completed, unscrew the threaded bolt and remove the The bolt between the positioning pipe sleeve and the positioning pipe can be removed to remove the steel beam mounting bracket. The installation and use method adopts a lap joint, which is more convenient and efficient, and the steel beam installation bracket is easy to disassemble after butt joint, and can be reused after disassembly, saving resources and low cost.
本发明整体结构较为简单,成本较低,能实现钢梁可靠对位安装,安装较为方便,劳动强度低,效率高,且易于拆卸,拆卸后可重复使用,适合作为各类钢框架结构梁尤其是工字型钢梁的对接支架使用,及同类支架结构或安装对接方法的改进。The overall structure of the present invention is relatively simple, the cost is low, and the reliable alignment installation of steel beams can be realized. The installation is more convenient, the labor intensity is low, the efficiency is high, and it is easy to disassemble. It is used for the butt joint support of I-shaped steel beams, and is an improvement of similar support structures or installation butt joint methods.
附图说明Description of drawings
图1是本发明的爆炸结构示意图。Fig. 1 is a schematic diagram of the explosion structure of the present invention.
图2是本发明对接工字型钢梁的结构示意图,图中作了A-A、B-B、C-C剖视。Fig. 2 is the structural representation of butt joint I-shaped steel beam of the present invention, has done A-A, B-B, C-C section among the figure.
图3是图2的顶面结构示意图。FIG. 3 is a schematic diagram of the top surface structure of FIG. 2 .
图4是图2的A-A剖视结构示意图。Fig. 4 is a schematic diagram of the cross-sectional structure along line A-A of Fig. 2 .
图5是图2的B-B剖视结构示意图。Fig. 5 is a schematic diagram of the B-B sectional structure in Fig. 2 .
图6是图2的C-C剖视结构示意图。FIG. 6 is a schematic cross-sectional structure diagram of C-C in FIG. 2 .
图7是本发明对接工字型钢梁的实施状态结构示意图。Fig. 7 is a structural schematic diagram of the implementation state of butt joint I-shaped steel beams of the present invention.
图中序号及名称为:1、担梁组件,2、担梁,3、虎口板,301、虎口,4、筋板,5、螺母,6、调节螺栓,7、定位管套,701、插销孔,8、插销,9、定位管,901、定位销孔,10、螺纹插销,11、锁紧螺母,12、待安装工字型钢梁,13、主框架工字型钢梁,14、连接板。The serial numbers and names in the figure are: 1. Bearing beam assembly, 2. Bearing beam, 3. Hukou plate, 301, Hukou, 4. Rib plate, 5. Nut, 6. Adjusting bolt, 7. Positioning sleeve, 701, Latch pin Hole, 8, latch, 9, positioning pipe, 901, positioning pin hole, 10, threaded latch, 11, lock nut, 12, I-shaped steel beam to be installed, 13, main frame I-shaped steel beam, 14, connecting plate.
具体实施方式Detailed ways
现结合附图,对本发明作进一步描述。Now in conjunction with accompanying drawing, the present invention will be further described.
如图1-6所示,该钢梁安装支架包括定位管9及对接工字型钢梁时相对于工字型钢梁呈对称设置的两个担梁组件1,各担梁组件均包括担梁2、虎口板3、筋板4、定位管套7,担梁为角钢,担梁的夹角内侧一端和中部均焊接一块虎口板,且虎口板设有与工字型钢梁的上翼缘板相嵌配合的虎口301。担梁的夹角内侧另一端焊接两块平行相邻设置的筋板,两块筋板之间焊接一个螺母5,担梁顶侧面设有与螺母对应的用于穿接调节螺栓的穿孔,调节螺栓6穿过穿孔螺纹连接上述螺母。担梁的顶侧面中部焊接定位管套。当两个担梁组件呈对接工字型钢梁的对称状态时,一个担梁组件中虎口板的虎口与另一个担梁组件中虎口板的虎口水平对齐,且两个担梁组件的定位管套的管孔对齐,调节螺栓、螺母位于与虎口板虎口相嵌配合的工字型钢梁上翼缘板的上方位置,且调节螺栓与上翼缘板板面垂直。定位管与两个担梁组件的定位管套的管孔插接配合,且定位管套设有插销孔701,定位管沿长度方向设有均匀分布的定位销孔901,插销孔与定位销孔之间通过L型的插销8定位。上述定位管的中部设有一个垂直于工字型钢梁上翼缘板的插销孔,该插销孔穿接一根L型的螺纹插销10,且螺纹插销由定位管上侧面穿接至定位管下侧面后螺纹连接一个锁紧螺母11,锁紧螺母与定位管焊接固定。As shown in Figure 1-6, the steel beam installation bracket includes a positioning pipe 9 and two beam assemblies 1 that are symmetrically arranged relative to the I-shaped steel beam when it is docked with the I-shaped steel beam. Beam 2, tiger mouth plate 3, rib plate 4, positioning pipe sleeve 7, the supporting beam is angle steel, a tiger mouth plate is welded at the inner end and the middle of the included angle of the shoulder beam, and the tiger mouth plate is provided with the upper wing of the I-shaped steel beam The tiger's mouth 301 that edge plate fits together. The other end of the inner side of the included angle of the supporting beam is welded with two parallel and adjacent ribs, and a nut 5 is welded between the two ribs. The bolt 6 is threaded through the perforation to connect the above-mentioned nut. The middle part of the top side of the supporting beam is welded with a positioning sleeve. When the two beam components are in a symmetrical state of butt joint I-shaped steel beams, the tiger mouth of the tiger mouth plate in one beam component is horizontally aligned with the tiger mouth of the tiger mouth plate in the other beam component, and the positioning tubes of the two beam components The pipe holes of the sleeve are aligned, the adjusting bolts and nuts are located above the upper flange plate of the I-shaped steel beam that fits with the tiger’s mouth plate, and the adjusting bolts are perpendicular to the upper flange plate surface. The positioning tube is plugged with the tube holes of the positioning sleeves of the two beam assemblies, and the positioning sleeve is provided with pin holes 701, and the positioning tube is provided with evenly distributed positioning pin holes 901 along the length direction. Position by L-shaped latch 8 between them. The middle part of the positioning tube is provided with a pin hole perpendicular to the upper flange plate of the I-shaped steel beam. The pin hole is connected with an L-shaped threaded pin 10, and the threaded pin is connected from the upper side of the positioning tube to the lower side of the positioning tube. A locking nut 11 is threaded in the back, and the locking nut is welded and fixed with the positioning pipe.
如图2-7所示,该钢梁安装支架的具体安装使用方法为:首先将钢梁安装支架固定于待安装工字型钢梁12的两端,具体为:各钢梁安装支架中的两个担梁组件1的虎口板3通过虎口301分别与待安装工字型钢梁的上翼缘板两侧板面相嵌配合,使担梁组件对待安装工字型钢梁形成悬吊支撑;再将各钢梁安装支架中两个担梁组件的定位管套7与定位管9之间通过插销8定位固定,定位固定后,调节定位管中部的螺纹插销10,使螺纹插销抵紧待安装工字型钢梁上翼缘板的板面,即两个钢梁安装支架与待安装工字型钢梁之间形成固定。固定后,通过吊机悬吊待安装工字型钢梁,使待安装工字型钢梁两端的钢梁安装支架中的筋板4位置搭设于主框架工字型钢梁13上翼缘板板面,通过人工调整筋板位置的调节螺栓6,使主框架工字型钢梁与待安装工字型钢梁水平对齐;最后,通过连接板、螺栓件、螺母件将待安装工字型钢梁与主框架工字型钢梁连接固定,即完成对接操作。完成对接后,旋松上述螺纹插销,并取下定位管套、定位管之间的插销,即可卸除钢梁安装支架,以待下次对接使用。As shown in Figure 2-7, the specific installation and use method of the steel beam mounting bracket is: first, the steel beam mounting bracket is fixed on the two ends of the I-shaped steel beam 12 to be installed, specifically: each steel beam mounting bracket The tiger mouth plates 3 of the two supporting beam assemblies 1 are respectively embedded and matched with the two sides of the upper flange plate of the I-shaped steel beam to be installed through the tiger mouth 301, so that the supporting beam assembly forms a suspension support for the I-shaped steel beam to be installed; Then position and fix between the positioning sleeves 7 and the positioning tubes 9 of the two beam assemblies in each steel beam mounting bracket through the pin 8. After the positioning is fixed, adjust the threaded pin 10 in the middle of the positioning tube so that the threaded pin is tight and ready to be installed. The plate surface of the upper flange plate of the I-shaped steel beam, that is, the two steel beam mounting brackets are fixed to the I-shaped steel beam to be installed. After fixing, suspend the I-shaped steel beam to be installed by a crane, so that the ribs 4 in the steel beam installation brackets at both ends of the I-shaped steel beam to be installed are erected on the upper flange plate of the main frame I-shaped steel beam 13 On the panel surface, manually adjust the adjusting bolt 6 of the position of the rib plate, so that the I-shaped steel beam of the main frame is horizontally aligned with the I-shaped steel beam to be installed; finally, the I-shaped steel beam to be installed The steel beam is connected and fixed with the I-shaped steel beam of the main frame, and the docking operation is completed. After the docking is completed, unscrew the above-mentioned threaded bolt, and remove the bolt between the positioning sleeve and the positioning pipe, and then the steel beam mounting bracket can be removed for the next docking use.
以上内容旨在说明本发明的技术手段,并非限制本发明的技术范围。本领域技术人员结合现有公知常识对本发明做显而易见的替代或改进,亦落入本发明权利要求的保护范围之内。The above content is intended to illustrate the technical means of the present invention, but not to limit the technical scope of the present invention. Obvious substitutions or improvements made by those skilled in the art in combination with existing common knowledge also fall within the protection scope of the claims of the present invention.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201811002481.4A CN108979168A (en) | 2018-08-30 | 2018-08-30 | Steel girder erection bracket and its installation and application |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201811002481.4A CN108979168A (en) | 2018-08-30 | 2018-08-30 | Steel girder erection bracket and its installation and application |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN108979168A true CN108979168A (en) | 2018-12-11 |
Family
ID=64547633
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201811002481.4A Pending CN108979168A (en) | 2018-08-30 | 2018-08-30 | Steel girder erection bracket and its installation and application |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108979168A (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109667436A (en) * | 2018-12-31 | 2019-04-23 | 宁波二十冶建设有限公司 | A kind of Multifunctional mobile tripod and application method |
| CN110886389A (en) * | 2019-11-26 | 2020-03-17 | 乐清市智能装备与制造研究院 | Detachable positioning mechanism for connecting steel beams |
| CN112031419A (en) * | 2020-08-24 | 2020-12-04 | 宁波建工工程集团有限公司 | Box girder mounting bracket and its installation and use method |
| CN112459445A (en) * | 2020-12-04 | 2021-03-09 | 聂峻峰 | Overhanging type scaffold for constructional engineering |
| CN117842864A (en) * | 2023-12-22 | 2024-04-09 | 上海建工五建集团有限公司 | Steel beam hoisting device and method of using the same |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH1130040A (en) * | 1997-07-11 | 1999-02-02 | Kishi:Kk | Architectural girders |
| WO2012057510A2 (en) * | 2010-10-28 | 2012-05-03 | Han Bong-Kil | Structure for constructing a high-rise building having a reinforced concrete structure comprising a steel frame |
| CN202416881U (en) * | 2011-12-02 | 2012-09-05 | 中国华冶科工集团有限公司 | Steel girder mounting auxiliary appliance |
| CN202745396U (en) * | 2012-08-04 | 2013-02-20 | 深圳建升和钢结构建筑安装工程有限公司 | Dismountable steel girder butt joint location fastener |
| CN203475851U (en) * | 2013-08-05 | 2014-03-12 | 中建钢构有限公司 | Device for hoisting steel beam in position |
| CN203905512U (en) * | 2014-05-05 | 2014-10-29 | 中建钢构江苏有限公司 | Adjustable device for installing steel beams in place |
| CN204139624U (en) * | 2014-09-02 | 2015-02-04 | 中建钢构有限公司 | H profile steel beam Fast Installation positioning apparatus |
| CN205841393U (en) * | 2016-07-05 | 2016-12-28 | 湖南普云智能科技股份有限公司 | A kind of multi-functional U-clamp |
| CN209066900U (en) * | 2018-08-30 | 2019-07-05 | 宁波建工工程集团有限公司 | Steel girder erection bracket |
-
2018
- 2018-08-30 CN CN201811002481.4A patent/CN108979168A/en active Pending
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH1130040A (en) * | 1997-07-11 | 1999-02-02 | Kishi:Kk | Architectural girders |
| WO2012057510A2 (en) * | 2010-10-28 | 2012-05-03 | Han Bong-Kil | Structure for constructing a high-rise building having a reinforced concrete structure comprising a steel frame |
| CN202416881U (en) * | 2011-12-02 | 2012-09-05 | 中国华冶科工集团有限公司 | Steel girder mounting auxiliary appliance |
| CN202745396U (en) * | 2012-08-04 | 2013-02-20 | 深圳建升和钢结构建筑安装工程有限公司 | Dismountable steel girder butt joint location fastener |
| CN203475851U (en) * | 2013-08-05 | 2014-03-12 | 中建钢构有限公司 | Device for hoisting steel beam in position |
| CN203905512U (en) * | 2014-05-05 | 2014-10-29 | 中建钢构江苏有限公司 | Adjustable device for installing steel beams in place |
| CN204139624U (en) * | 2014-09-02 | 2015-02-04 | 中建钢构有限公司 | H profile steel beam Fast Installation positioning apparatus |
| CN205841393U (en) * | 2016-07-05 | 2016-12-28 | 湖南普云智能科技股份有限公司 | A kind of multi-functional U-clamp |
| CN209066900U (en) * | 2018-08-30 | 2019-07-05 | 宁波建工工程集团有限公司 | Steel girder erection bracket |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109667436A (en) * | 2018-12-31 | 2019-04-23 | 宁波二十冶建设有限公司 | A kind of Multifunctional mobile tripod and application method |
| CN110886389A (en) * | 2019-11-26 | 2020-03-17 | 乐清市智能装备与制造研究院 | Detachable positioning mechanism for connecting steel beams |
| CN110886389B (en) * | 2019-11-26 | 2025-04-29 | 乐清市智能装备与制造研究院 | Removable positioning mechanism for steel beam connection |
| CN112031419A (en) * | 2020-08-24 | 2020-12-04 | 宁波建工工程集团有限公司 | Box girder mounting bracket and its installation and use method |
| CN112459445A (en) * | 2020-12-04 | 2021-03-09 | 聂峻峰 | Overhanging type scaffold for constructional engineering |
| CN112459445B (en) * | 2020-12-04 | 2022-04-05 | 山东历控建设发展有限公司 | Overhanging type scaffold for constructional engineering |
| CN117842864A (en) * | 2023-12-22 | 2024-04-09 | 上海建工五建集团有限公司 | Steel beam hoisting device and method of using the same |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205393883U (en) | H shaped steel equipment fixture | |
| CN110056088A (en) | It is a kind of can the connection structure of Fast Installation girder steel and the installation method of girder steel | |
| CN115217498A (en) | A quick-installed foldable support bracket | |
| CN106988537A (en) | A kind of installation method of sheet truss combining structure | |
| CN106499201A (en) | A kind of dismountable safety rope tool-type holding clamp and its using method | |
| CN218438252U (en) | Assembled formwork system based on steel structure building outer cantilever cast-in-place concrete member | |
| CN209066900U (en) | Steel girder erection bracket | |
| CN204608825U (en) | A kind of three-chip type stone bolt locating rack | |
| CN102926536A (en) | Template unilateral reinforcement combination tool and template unilateral reinforcement construction method | |
| CN207260376U (en) | The connection mode of new steel framed building wall | |
| CN205778937U (en) | A kind of auxiliary device being accurately positioned preliminary bracing steel arch-shelf unit and junction steel plate | |
| CN211647260U (en) | Can dismantle fastening type even wall spare | |
| CN210134525U (en) | Connecting structure capable of quickly mounting steel beam | |
| CN217813511U (en) | Steel supporting assembly suitable for shield tunnel construction | |
| CN218933898U (en) | Quick positioner of H type steel column | |
| CN112031419A (en) | Box girder mounting bracket and its installation and use method | |
| CN110821147A (en) | Expansion joint shear wall combination template capable of being assembled and disassembled quickly | |
| CN205476391U (en) | Builder's jack | |
| CN212984631U (en) | A drop plate hanging form | |
| CN108797365A (en) | Formwork for bridge piers and its construction method | |
| CN209620242U (en) | Strenthening member for basement structure | |
| CN104088453A (en) | Scaffold edge support structure and use method thereof | |
| CN108867890A (en) | The integral prefabricated node of beam column of the junction with rigid template bracket and its construction method | |
| CN110454192B (en) | A tunnel secondary lining trolley end template | |
| CN209837661U (en) | Building templates convenient to dismouting |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181211 |
|