CN202717501U CN 201220372273 CN201220372273U CN202717501U CN 202717501 U CN202717501 U CN 202717501U CN 201220372273 CN201220372273 CN 201220372273 CN 201220372273 U CN201220372273 U CN 201220372273U CN 202717501 U CN202717501 U CN 202717501U
Authority
CN
China
Prior art keywords
pipe
pile foundation
suspension ring
lifting ring
reinforcement cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220372273
Other languages
Chinese (zh)
Inventor
张立波
黄相锋
孙贵华
宋海真
董志云
张伯奇
伊文虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Civil Engineering Co Ltd filed Critical China Construction Civil Engineering Co Ltd
Priority to CN 201220372273 priority Critical patent/CN202717501U/en
Application granted granted Critical
Publication of CN202717501U publication Critical patent/CN202717501U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a pile foundation reinforcement cage lifting ring. The pile foundation reinforcement cage lifting ring comprises a lifting ring body, an upper pipe, a lower pipe and a lifting hook, wherein the lifting ring body is connected with the upper end of the upper pipe, the lifting hook is connected with the lower end of the lower pipe, and the lower end of the upper pipe is inserted into the upper end of the lower pipe. A plurality of pin holes used to fix the upper pipe are arranged in the pipe wall of the upper end of the lower pipe. The pile foundation reinforcement cage lifting ring solves the problems that the length of a traditionally welded lifting ring needs to be calculated according to actual conditions on site and welding process needs to be carried out, and has the advantages of saving resources and time.

Description

A kind of pile foundation steel bar cage suspension ring
Technical field
The utility model relates to a kind of suspender, is specifically related to a kind of steel reinforcement cage suspension ring.
Background technology
Pile foundation steel bar cage is installed general work progress: steel reinforcement cage is transported to the scene, and crane hangs in the hole, according to steel reinforcement cage and aperture position relationship processing suitable length suspension ring, with suspension ring and steel reinforcement cage welding, adjusts the steel reinforcement cage position, by suspension ring steel reinforcement cage is fixed.There is following shortcoming in prior art because ground, aperture is uneven, and suspension ring all need to process separately time-consuming taking a lot of work according to field condition at every turn; Use and once need adopt afterwards gas welding that it is cut off from steel reinforcement cage, substantially scrap; All need weld at every turn, time-consuming, and welding quality should not guarantee.
The utility model content
In order to solve the above problem that exists in the background technology, the utility model provides a kind of pile foundation steel bar cage suspension ring, avoid the traditional welding suspension ring all to need to calculate suspension ring length according to on-site actual situations at every turn, all needed the technique of welding, saved resource and time.And it is simple in structure, easy to adjust to be somebody's turn to do invention, and cost is lower, is easy to promote.
For achieving the above object, the utility model adopts following technical scheme:
The beneficial effects of the utility model are:
A kind of pile foundation steel bar cage suspension ring comprise suspension ring, upper pipe, lower pipe and suspension hook, and suspension ring link to each other with upper pipe upper end, and suspension hook links to each other with lower pipe lower end, and the lower end of upper pipe is plugged in the upper end of lower pipe, is provided with a plurality of pin-and-holes for fixing upper pipe on the upper end tube wall of lower pipe.
Described suspension ring are provided with leading screw on the lower end, and upper pipe is provided with screw on the upper end, and suspension ring are connected with screw by leading screw with upper pipe.
Suspension hook adopts with lower pipe captives joint.
Spacing between the described pin-and-hole is greater than 10cm.
Be provided with anti-come-up fastener on the described suspension hook.
The utlity model has following advantage:
1, can use repeatedly after the time processing.
2, adjust length, quick and easy for installation
3, accurate positioning, and can adjust.
4, can save material, the labour cost of each processing, welding hanging ring, save time.
Description of drawings
Below in conjunction with accompanying drawing the utility model is further specified
Fig. 1 is the structural representation of the utility model embodiment 1;
Wherein: the 1-suspension ring: the 2-leading screw; The 3-screw; The upper pipe of 4-; The 5-pin-and-hole; Manage under the 6-; The anti-come-up of 7-fastener; The 8-suspension hook.
The specific embodiment
Below in conjunction with description of drawings and the specific embodiment the utility model is further described:
Embodiment 1
As shown in Figure 1, pile foundation steel bar cage suspension ring described in the utility model comprise suspension ring 1, upper pipe 4, lower pipe 6 and suspension hook 8, and described suspension ring are provided with leading screw 2 on 1 lower end, and upper pipe is provided with screw 3 on 4 upper ends, and suspension ring 1 and upper pipe 4 are connected spiral by leading screw 2 and are connected with screw.Suspension hook 8 and lower pipe 6 lower ends are fixedly linked, and the lower end of upper pipe 4 is plugged in the upper end of lower pipe 6, are provided with a plurality of pin-and-holes 5 for fixing upper pipe 4 on the upper end tube wall of lower pipe 6.Spacing between the described pin-and-hole 5 is greater than 10cm.Be provided with anti-come-up fastener 7 on the described suspension hook 8.
During use, with suspension hook collude strengthen stirrup to the steel reinforcement cage the top on, regulate than big-length (greater than 10cm) by the pin-and-hole between the upper, lower tube, by leading screw finely tune (0 ~ 10cm), reached the purpose of accurate spacer bar cage.
It will be recognized by those skilled in the art, under the prerequisite that does not depart from protection scope of the present invention, can carry out various modifications, variation and combination to above-mentioned embodiment, and think that this modification, variation and combination are within the scope of originality thought.

Claims (5)

1. pile foundation steel bar cage suspension ring, comprise suspension ring (1), upper pipe (4), lower pipe (6) and suspension hook (8), suspension ring (1) link to each other with upper pipe (4) upper end, suspension hook (8) links to each other with lower pipe (6) lower end, it is characterized in that: the lower end of upper pipe (4) is plugged in the upper end of lower pipe (6), is provided with a plurality of pin-and-holes (5) for fixing upper pipe (4) on the upper end tube wall of lower pipe (6).
2. a kind of pile foundation steel bar cage suspension ring as claimed in claim 1, it is characterized in that being provided with leading screw (2) on described suspension ring (1) lower end, upper pipe (4) is provided with screw (3) on the upper end, and suspension ring (1) are connected 3 by leading screw (2) with screw with upper pipe (4)) connect.
3. a kind of pile foundation steel bar cage suspension ring as claimed in claim 1 is characterized in that suspension hook (8) adopts with lower pipe (6) to captive joint.
4. a kind of pile foundation steel bar cage suspension ring as claimed in claim 1 is characterized in that spacing between the described pin-and-hole (5) is greater than 10cm.
5. a kind of pile foundation steel bar cage suspension ring as claimed in claim 1 is characterized in that being provided with on the described suspension hook (8) anti-come-up fastener (7).
CN 201220372273 2012-07-30 2012-07-30 Pile foundation reinforcement cage lifting ring Expired - Fee Related CN202717501U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220372273 CN202717501U (en) 2012-07-30 2012-07-30 Pile foundation reinforcement cage lifting ring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220372273 CN202717501U (en) 2012-07-30 2012-07-30 Pile foundation reinforcement cage lifting ring

Publications (1)

Publication Number Publication Date
CN202717501U true CN202717501U (en) 2013-02-06

Family

ID=47619331

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220372273 Expired - Fee Related CN202717501U (en) 2012-07-30 2012-07-30 Pile foundation reinforcement cage lifting ring

Country Status (1)

Country Link
CN (1) CN202717501U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104098020A (en) * 2014-08-04 2014-10-15 浙江乔兴建设集团有限公司 Construction stirrup cage hoisting device
CN104098021A (en) * 2014-08-04 2014-10-15 浙江乔兴建设集团有限公司 Construction lifting hook structure
CN104140038A (en) * 2014-08-04 2014-11-12 浙江乔兴建设集团有限公司 Reinforcement cage lifting part
CN104210937A (en) * 2014-08-30 2014-12-17 常州市合达油泵有限公司 Telescope lifting hook
CN104652424A (en) * 2015-02-12 2015-05-27 中国水利水电第五工程局有限公司 Movable lifting hook for lifting reinforcing cage
CN107738982A (en) * 2017-11-25 2018-02-27 苏州听毅华环保科技有限公司 A kind of transport mechanism of large-scale workpiece
CN108996383A (en) * 2018-07-23 2018-12-14 中铁三局集团华东建设有限公司 Buried diaphram wall steel reinforcement cage hanging steel bar hanging apparatus and its construction method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104098020A (en) * 2014-08-04 2014-10-15 浙江乔兴建设集团有限公司 Construction stirrup cage hoisting device
CN104098021A (en) * 2014-08-04 2014-10-15 浙江乔兴建设集团有限公司 Construction lifting hook structure
CN104140038A (en) * 2014-08-04 2014-11-12 浙江乔兴建设集团有限公司 Reinforcement cage lifting part
CN104098021B (en) * 2014-08-04 2016-04-06 浙江乔兴建设集团有限公司 A kind of Suspension hook structure for building
CN104140038B (en) * 2014-08-04 2016-04-06 浙江乔兴建设集团有限公司 One effective reinforcement cage hanging piece
CN104098020B (en) * 2014-08-04 2016-04-06 浙江乔兴建设集团有限公司 A kind of reinforcement for architecture cage lifting appliance
CN104210937A (en) * 2014-08-30 2014-12-17 常州市合达油泵有限公司 Telescope lifting hook
CN104652424A (en) * 2015-02-12 2015-05-27 中国水利水电第五工程局有限公司 Movable lifting hook for lifting reinforcing cage
CN107738982A (en) * 2017-11-25 2018-02-27 苏州听毅华环保科技有限公司 A kind of transport mechanism of large-scale workpiece
CN108996383A (en) * 2018-07-23 2018-12-14 中铁三局集团华东建设有限公司 Buried diaphram wall steel reinforcement cage hanging steel bar hanging apparatus and its construction method

Similar Documents

Publication Publication Date Title
CN202717501U (en) Pile foundation reinforcement cage lifting ring
CN203558702U (en) Lifting appliance for steel reinforcement cages
CN206156567U (en) Thin cylinder body hoist
CN109736352B (en) Beret beam fixing device and method for suspension pipeline
CN204434056U (en) Steel bar hanger
CN204958154U (en) Chimney glass steel inner tube hydraulic lifting special lifting device
CN203624808U (en) Detachable steel structure hanger
CN204456908U (en) A kind of heavy beam equipment
CN202645027U (en) Pipe type screw corrector
CN203066491U (en) Locator for installing round tube type connection member
CN205975635U (en) Foundation pit support structure
CN205134546U (en) But quick detachable I -steel built -in fitting of encorbelmenting of cyclic utilization
CN202181614U (en) Steel pipe fixing device for joist steel
CN203373116U (en) Turning-over tool of steel bridge plate units
CN103938642B (en) A kind of pile foundation reinforcement cover adjusting device
CN208814490U (en) A kind of novel drainage ditch cover plate hanging apparatus
CN201695968U (en) Pipeline holding clamp
CN204983681U (en) Novel reinforcing bar hopper
CN201458509U (en) Combined hoisting tool for large-sized pipes
CN204917530U (en) Buffer base
CN203451059U (en) Portable device for maintenance hoisting for deepwater well
CN204848024U (en) Girder steel hoist device for construction
CN203845685U (en) Filling pile concrete feeding pipe hoisting and buckling device
CN203845686U (en) Joist steel hoisting tool
CN203491640U (en) Split type stay wire disc

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION CO.

Free format text: FORMER OWNER: CHINA CONSTRUCTION CIVIL CONSTRUCTION CORP.

Effective date: 20141218

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100068 FENGTAI, BEIJING TO: 200122 PUDONG NEW AREA, SHANGHAI

TR01 Transfer of patent right

Effective date of registration: 20141218

Address after: 200122 Pudong New Area Century Avenue, Shanghai, No. 27, layer 1568

Patentee after: China Construction Eighth Engineering Division Co., Ltd.

Address before: 100068 Beijing city Fengtai District Road No. 8 Building No. 1

Patentee before: China Building Civil Construction Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130206

Termination date: 20190730

CF01 Termination of patent right due to non-payment of annual fee