CN204826640U - Steel construction rag bolt's installation mould - Google Patents
Steel construction rag bolt's installation mould Download PDFInfo
- Publication number
- CN204826640U CN204826640U CN201520520127.6U CN201520520127U CN204826640U CN 204826640 U CN204826640 U CN 204826640U CN 201520520127 U CN201520520127 U CN 201520520127U CN 204826640 U CN204826640 U CN 204826640U
- Authority
- CN
- China
- Prior art keywords
- plate
- location
- steel
- channel
- section steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a steel construction rag bolt's installation mould, to be these installation moulds constitute the installation rag bolt support of adjustable height by locating plate and adjustable steel pipe to its characteristics, the rectangle steel sheet of locating plate for being equipped with the several locating hole, its one side are equipped with and fix a position channel -section steel and the reflector plate of steel sheet for same level surface, adjustable steel pipe is three and is just fixing a position under the steel sheet with fixed setting of equilateral triangle, the reflector plate is for setting up the surveying marker in the channel -section steel outside. Compared with the prior art, the utility model have accurate, fix a position and install fast, the efficiency of construction is high, the human error that appears in the work progress that can significantly reduce for steel construction rag bolt's installation is standardized, in order to reach the requirement of construction specification to installation rag bolt precision.
Description
Technical field
The utility model relates to construction and installation technical field, specifically a kind of installation mold of steel work stone bolt.
Background technology
At present, in the construction of steel-structure factory building, its relative position fundamentally between foot bolt adopts steel plate positioning mode, the method also makes the position boring of bolt thereon in advance by prefabricated specific steel plate, bolt is through in advance relative position position of opening determined between bolt, during construction in advance bolt twist solid on steel plate and bolt build fixing after pull down steel plate.But cushion cap respectively organizes stone bolt when general layout is located, then substantially still adopt conventional approach, namely then manually carry out the adjustment that bolt relative position respectively organized by cushion cap by playing line of ink marker determination axis.The location of foot bolt is the quality critical control point of Construction of Steel Structure fundamentally, and the location for stone bolt relates to Relatively orientation between bolt and the location of bolt on single basis and on general layout is emphasis in Construction of Steel Structure always.
Although prior art solves the location of bolt on a cushion cap foundation well, but larger, during the more construction of hydropower of cushion cap, this steel plate localization method needs on cushion cap, to carry out manual setting location separately one by one, not only add workload, and be difficult to ensure enough precision for each axis often being organized the location, position of bolt on general layout between each cushion cap, often code requirement cannot be reached, need to drop into the more time removes to adjust cushion cap and respectively organizes relative position between bolt to ensure to reach construction and installation requirement simultaneously, cause the waste in time and manpower.
Utility model content
The purpose of this utility model is the installation mold of a kind of steel work stone bolt provided for the deficiencies in the prior art, total powerstation and transit is adopted to locate the unification that the installation mold being arranged on each cushion cap stone bolt carries out on axis, pre-embedded bolt is enable to position precisely, rapidly and install, improve efficiency of construction, reduce the human error occurred in work progress, make the installation code of steel work stone bolt, make every effort to strengthen quality control, to reach the requirement of job specfication for mounting foot bolt precision by normalized construction.
The concrete technical scheme realizing the utility model object is: a kind of installation mold of steel work stone bolt, be characterized in forming the adjustable stone bolt mounting bracket of height by location-plate and adjustable steel pipe, described location-plate is the rectangular steel plates being provided with several locating hole, it is channel-section steel and the reflector plate of same level surface that its side is provided with location-plate, channel-section steel and location-plate are for welding, and reflector plate and channel-section steel are bonding; Described adjustable steel pipe is three and under being arranged on location-plate with equilateral triangle, adjustable steel pipe and location-plate are fixedly connected with for vertical; Described channel-section steel is arranged on the long side of location-plate, and its one end is concordant with location-plate, and the length that the other end stretches out is 1/2nd length of location-plate; Described reflector plate is two and same axis is arranged on survey mark outside channel-section steel, and two reflector plates are separately positioned on 1/3rd places of channel-section steel and the other end of channel-section steel.
The utility model compared with prior art has precisely, position rapidly and install, efficiency of construction is high, the human error occurred in work progress can be greatly reduced, make the installation code of steel work stone bolt, make every effort to strengthen quality control, to reach the requirement of job specfication for mounting foot bolt precision by normalized construction.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation;
Fig. 2 is Fig. 1 top view;
Fig. 3 is the utility model concrete utilization schematic diagram.
Detailed description of the invention
Embodiment 1
Accompanying drawings 1 ~ accompanying drawing 2, the utility model is by location-plate 1 and adjustable steel pipe
4the stone bolt mounting bracket that composition height is adjustable; Described location-plate 1 is for being provided with the rectangular steel plates of several locating hole 5, and its side is provided with and location-plate
1for the channel-section steel of same level surface
2and reflector plate
3, channel-section steel
2with location-plate 1 for welding, reflector plate
3with channel-section steel
2for bonding; Described adjustable steel pipe
4be three and be arranged on location-plate with equilateral triangle
1under, adjustable steel pipe
4with location-plate
1for being vertically fixedly connected with; Described channel-section steel
2be arranged on location-plate
1side, long limit, its one end and location-plate
1concordant, the length that the other end stretches out is location-plate
11/2nd is long; Described reflector plate
3be two and same axis is arranged on channel-section steel
2the survey mark in outside, two reflector plates
3be separately positioned on channel-section steel
21/3rd places and channel-section steel
2the other end.
Accompanying drawings 3, the utility model uses like this: be fastened on by pre-embedded bolt on the locating hole 5 of location-plate 1, then be placed on the position of required construction bearing platform 6, adjustable steel pipe 4 position of adjustment A point and height, first guarantee that A point reflection sheet 3 center is in location survey station 7 eyepiece center of reticule, and found range by the total powerstation of a location survey station 7, make the spacing according calculation value of this location survey station 7 and A point reflection sheet 3, then the height of the adjustable steel pipe 4 of B and C point is in kind adjusted, the reflector plate 3 of channel-section steel 2 other end is highly positioned on parallel location survey station 7 eyepiece crosshair horizon.If reflector plate 3 not yet overlaps with parallel location survey station 7 eyepiece center of reticule, should be center of circle fulcrum with the adjustable steel pipe 4 of A point, rotating retaining plate 1 slightly in the horizontal direction, be adjusted to this reflector plate 3 center in parallel location survey station 7 eyepiece center of reticule, and it is identical with the range finding of last location survey station 7 by this distance of total station survey of its parallel location survey station 7, the now work in place of installation mold completes, and pre-embedded bolt is also just in the position of designing requirement.Then the pre-embedded bolt be fastened on location-plate 1 is welded by the embedded bar of spacer bars with cushion cap 6, the nut of pre-embedded bolt is unloaded after welding, installation mold is taken out, the screw thread of pre-embedded bolt is bought oil and carries out concrete building and maintenance with after plastic sheeting wrapping.
More than just be further described the utility model, and be not used to limit this patent, all be the utility model equivalence enforcement, within the right that all should be contained in this patent.
Claims (1)
1. an installation mold for steel work stone bolt, it is characterized in that this installation mold by location-plate (1) and adjustable steel pipe (
4) the adjustable stone bolt mounting bracket of composition height, described location-plate (1) for being provided with the rectangular steel plates of several locating hole (5), its side be provided with location-plate (
1) for same level surface channel-section steel (
2) and reflector plate (
3), channel-section steel (
2) with location-plate (1) for welding, reflector plate (
3) and channel-section steel (
2) for bonding; Described adjustable steel pipe (
4) be three and with equilateral triangle be arranged on location-plate (
1) under, adjustable steel pipe (
4) and location-plate (
1) for be vertically fixedly connected with; Described channel-section steel (
2) be arranged on location-plate (
1) long side, its one end and location-plate (
1) concordant, the length that the other end stretches out be location-plate (
1) 1/2nd long; Described reflector plate (
3) be two and same axis be arranged on channel-section steel (
2) outside survey mark, two reflector plates (
3) be separately positioned on channel-section steel (
2) 1/3rd places and channel-section steel (
2) the other end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520520127.6U CN204826640U (en) | 2015-07-17 | 2015-07-17 | Steel construction rag bolt's installation mould |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520520127.6U CN204826640U (en) | 2015-07-17 | 2015-07-17 | Steel construction rag bolt's installation mould |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204826640U true CN204826640U (en) | 2015-12-02 |
Family
ID=54684255
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520520127.6U Active CN204826640U (en) | 2015-07-17 | 2015-07-17 | Steel construction rag bolt's installation mould |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204826640U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106284399A (en) * | 2016-08-31 | 2017-01-04 | 中国冶集团有限公司 | The building pre-buried locating template of pedestal anchor bolt and construction method |
-
2015
- 2015-07-17 CN CN201520520127.6U patent/CN204826640U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106284399A (en) * | 2016-08-31 | 2017-01-04 | 中国冶集团有限公司 | The building pre-buried locating template of pedestal anchor bolt and construction method |
CN106284399B (en) * | 2016-08-31 | 2018-10-23 | 中国一冶集团有限公司 | Build the pre-buried locating template of pedestal anchor bolt and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209636847U (en) | Adjustable tower crane basis built-in fitting accurate positioning instrument | |
CN203603586U (en) | Equipment support regulating device | |
CN102926538B (en) | Reaction box and construction method of reaction wall | |
CN105525625A (en) | Construction method and device of pre-embedded bolts of fixed steel column base | |
CN203247603U (en) | High-order rag bolt positioner | |
CN202298628U (en) | Automatic steel pipe column perpendicularity adjusting device using reverse construction method | |
CN203783165U (en) | Multi-directional accurate adjusting device for embedded part | |
CN104032969A (en) | Precise positioning and process regulation and control device for vibration isolation support embedded plate | |
CN201962804U (en) | Embedded part embedding structure for ultralong device foundation platform | |
CN205024714U (en) | Steel construction house steel column foot crab -bolt positioner | |
CN207392771U (en) | A kind of guide type steel column locator | |
CN104120802A (en) | Simple method for mounting and locating seismic isolation support | |
CN201560398U (en) | Inner steel mould for accurately positioning tower column cable sleeves of cable-stayed bridge | |
CN103061249A (en) | Quick positioning construction device and construction method for steel-pipe column of bridge | |
CN204826640U (en) | Steel construction rag bolt's installation mould | |
CN105064681B (en) | Installing method of steel structure foundation screw bolt | |
CN106758663A (en) | Buried rubber fastening band installs positioning construction method in one kind | |
CN203383331U (en) | Steel mold used for simply and conveniently positioning section steel column embedded bolt | |
CN205476528U (en) | Precast pile device of taking one's place fast | |
CN202100018U (en) | High-precision positioning fixture for large-scale pre-buried bolts | |
CN202644563U (en) | Installation device for embedded foundation bolt of small facility | |
CN204187217U (en) | A kind of annular bolt collar group integral built-in and positioning tool | |
CN203160707U (en) | Adjustable t-shaped controller | |
CN203905510U (en) | High-precision embedded bolt mold | |
CN202000681U (en) | Three-dimensional die bracket for concrete embedded parts |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |