CN209493914U - It constructs under the conditions of a kind of high water level spats - Google Patents

It constructs under the conditions of a kind of high water level spats Download PDF

Info

Publication number
CN209493914U
CN209493914U CN201821961660.6U CN201821961660U CN209493914U CN 209493914 U CN209493914 U CN 209493914U CN 201821961660 U CN201821961660 U CN 201821961660U CN 209493914 U CN209493914 U CN 209493914U
Authority
CN
China
Prior art keywords
spats
water level
conditions
high water
diaphragm wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821961660.6U
Other languages
Chinese (zh)
Inventor
田云青
于刘燕
陈宁宁
张亚涛
杨辉
宋亚娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Research Institute of Investigation and Design of Water Conservancy and Hydropower
Original Assignee
Hebei Research Institute of Investigation and Design of Water Conservancy and Hydropower
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Research Institute of Investigation and Design of Water Conservancy and Hydropower filed Critical Hebei Research Institute of Investigation and Design of Water Conservancy and Hydropower
Priority to CN201821961660.6U priority Critical patent/CN209493914U/en
Application granted granted Critical
Publication of CN209493914U publication Critical patent/CN209493914U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses spats of constructing under the conditions of a kind of high water level, including the bearing platform that bottom of river channel is arranged, the anchoring being arranged in below bearing platform, the diaphragm wall spats being arranged on bearing platform, it is fixed on bearing platform and the side baffle being located on the outside of diaphragm wall spats and the protective dike for being fixedly mounted on diaphragm wall spats top;Protective dike is layed on sloping bank.The utility model using channel cleanout material in bank heap platform, beat cement mixing method and form diaphragm wall as spats by set, easy for construction to be easy, by channel cleanout material secondary use, without precipitation operation, the saving energy and expenses of labour.

Description

It constructs under the conditions of a kind of high water level spats
Technical field
The utility model relates to spats of constructing under the conditions of a kind of high water level.
Background technique
Channel is often referred to water channel, irrigation canals and ditches, is the channel of water flow.The infiltration, impact etc. of water flow in order to prevent in hydraulic engineering Effect needs to be arranged channel protection levee slope, concrete is arranged mostly or stone material is protected.River is newly built or maintenance channel When dykes and dams, present river bottom is needed to build construction river spats, river water level and level of ground water are relatively high, are unable to excavation construction river Road spats, it is costly using well-points dewatering.
Utility model content
The purpose of the utility model is to overcome the defects of the prior art, provide a kind of easy for construction, saving of work and time height It constructs under the conditions of water level spats.
To achieve the goals above, the technical solution that the utility model is taken is as follows:
It constructs under the conditions of a kind of high water level spats, including the bearing platform of bottom of river channel is arranged, is arranged under bearing platform The anchoring of side, the diaphragm wall spats being arranged on bearing platform are fixed on bearing platform and are located on the outside of diaphragm wall spats Side baffle and the protective dike for being fixedly mounted on diaphragm wall spats top;Protective dike is layed on sloping bank.
The diaphragm wall spats is broken into using channel cleanout material blended cement as a further improvement of the utility model, Mixing pile is formed.
It is provided in the middle part of the bearing platform as a further improvement of the utility model, and accommodates the reserved of diaphragm wall spats Slot, the reserved trench bottom are provided with liner plate, and liner plate is fixed as one with bearing platform.
The end that the bearing platform is located in river as a further improvement of the utility model, bends downward to be formed tiltedly Ramp.
The ramp angle with horizontal plane is-degree as a further improvement of the utility model,.
The upper end of the side baffle is bent to form reinforcement-pushing plate outward as a further improvement of the utility model,;It is described Reinforcement-pushing plate is located at the lower section of protective dike.
It is provided on the reinforcement-pushing plate as a further improvement of the utility model, and is supported on the oblique of protective dike lower part Support.
The diagonal brace is fixedly mounted with protective dike by rivet clasp bolt as a further improvement of the utility model,.
The side baffle sticks on the bank of the side in river, the side block as a further improvement of the utility model, The outside of plate is soil, and the inside of the side baffle is river water.
The anchoring uses screw anchor, provisional wood bolt or steel anchor rod as a further improvement of the utility model, It is inserted into the soil of bottom of river channel.
Compared with prior art, it is had the beneficial effect that acquired by the utility model:
The utility model is spats of constructing under the conditions of being applied to river high water level, and river water level and level of ground water are relatively high, Difficulty of construction is big for excavation construction river spats, costly using well-points dewatering, and the utility model is using channel cleanout material in bank Side heap platform, set beats cement mixing method and forms diaphragm wall as spats, easy for construction easy, by the secondary benefit of channel cleanout material With, without precipitation operation, the saving energy and expenses of labour;Below cement mixing method and bearing platform and side is respectively set in outside Baffle can guarantee the firm and accurate positioning of diaphragm wall spats;The end that bearing platform is located in river bends downward to be formed Ramp is provided with preformed groove on bearing platform, convenient for scraping at preformed groove the dredging material of bottom of river channel by ramp.
Detailed description of the invention
Attached drawing 1 is the structural schematic diagram of the utility model.
In the accompanying drawings:
1 river, 2 dredging material, 3 sloping banks, 4 bearing platforms, 5 anchorings, 6 liner plates, 7 ramps, 8 diaphragm wall spats, 9 side blocks Plate, 10 reinforcement-pushing plates, 11 diagonal braces, 12 rivet clasp bolts, 13 protective dikes.
Specific embodiment
Further details of narration is carried out to the utility model below in conjunction with attached drawing.
As shown in Fig. 1, it constructs under the conditions of a kind of high water level spats, including the bearing platform 4 of 1 bottom of river is arranged, sets The anchoring 5 below bearing platform 4, the diaphragm wall spats 8 being arranged on bearing platform 4 are set, is fixed on bearing platform 4 and position In the outside of diaphragm wall spats 8 side baffle 9 and be fixedly mounted on the protective dike 13 on 8 top of diaphragm wall spats;Protective dike 13 are layed on sloping bank 3.The diaphragm wall spats 8 is to break into mixing pile using 2 blended cement of channel cleanout material to be formed.It is described to hold The preformed groove for accommodating diaphragm wall spats 8 is provided in the middle part of galassing platform 4, the reserved trench bottom is provided with liner plate 6, liner plate 6 with hold Galassing platform 4 is fixed as one.The end that the bearing platform 4 is located in river 1 bends downward to form ramp 7.The slope 7 angle with horizontal plane of road is 5-10 degree.The upper end of the side baffle 9 is bent to form reinforcement-pushing plate 10 outward;The reinforcement-pushing plate 10 Positioned at the lower section of protective dike 13.The diagonal brace 11 for being supported on 13 lower part of protective dike is provided on the reinforcement-pushing plate 10.It is described oblique Support 11 is fixedly mounted with protective dike 13 by rivet clasp bolt 12.The side baffle 9 sticks on the bank of the side in river 1, institute The outside for stating side baffle 9 is soil, and the inside of the side baffle 9 is river water.The anchoring 5 uses screw anchor, provisional wood Anchor pole or steel anchor rod are inserted into the soil of 1 bottom of river.
The utility model using channel cleanout material in bank heap platform, beat cement mixing method and form diaphragm wall as shield by set Foot, it is easy for construction to be easy, channel cleanout material secondary use is operated without precipitation, saves the energy and expenses of labour;In Soil-cement Bearing platform and side baffle is respectively set in stake lower section and outside, can guarantee the firm and accurate positioning of diaphragm wall spats;It holds The end that galassing platform is located in river bends downward to form ramp, is provided with preformed groove on bearing platform, is convenient for river bottom The dredging material in portion is scraped at preformed groove by ramp.
Embodiment described above is only the preferred embodiment of the utility model, and the not feasible implementation of the utility model Exhaustion.For persons skilled in the art, it is made under the premise of without departing substantially from the utility model principle and spirit Any obvious change out, should all be contemplated as falling within the claims of the utility model.

Claims (10)

1. spats of constructing under the conditions of a kind of high water level, it is characterised in that: including the bearing platform (4) of river (1) bottom is arranged, sets It sets the anchoring (5) below bearing platform (4), be arranged that diaphragm wall spats (8) on bearing platform (4), to be fixed on load-bearing flat On platform (4) and the side baffle (9) that is located on the outside of diaphragm wall spats (8) and it is fixedly mounted on the anti-of diaphragm wall spats (8) top Bank protection dam (13);Protective dike (13) is layed on sloping bank (3).
2. spats of constructing under the conditions of a kind of high water level according to claim 1, it is characterised in that: the diaphragm wall spats It (8) is to break into mixing pile using channel cleanout material (2) blended cement and formed.
3. spats of constructing under the conditions of a kind of high water level according to claim 1, it is characterised in that: the bearing platform (4) Middle part is provided with the preformed groove for accommodating diaphragm wall spats (8), and the reserved trench bottom is provided with liner plate (6), liner plate (6) and load-bearing Platform (4) is fixed as one.
4. spats of constructing under the conditions of a kind of high water level according to claim 1-3, it is characterised in that: the load-bearing The end that platform (4) is located in river (1) bends downward to form ramp (7).
5. spats of constructing under the conditions of a kind of high water level according to claim 4, it is characterised in that: the ramp (7) with Horizontal plane angle is 5-10 degree.
6. spats of constructing under the conditions of a kind of high water level according to claim 1, it is characterised in that: the side baffle (9) Upper end is bent to form reinforcement-pushing plate (10) outward;The reinforcement-pushing plate (10) is located at the lower section of protective dike (13).
7. spats of constructing under the conditions of a kind of high water level according to claim 6, it is characterised in that: on the reinforcement-pushing plate (10) It is provided with the diagonal brace (11) for being supported on protective dike (13) lower part.
8. spats of constructing under the conditions of a kind of high water level according to claim 7, it is characterised in that: the diagonal brace (11) and anti- Bank protection dam (13) is fixedly mounted by rivet clasp bolt (12).
9. spats of constructing under the conditions of a kind of high water level according to claim 7, it is characterised in that: side baffle (9) patch The bank of the side in river (1) is leaned against, the outside of the side baffle (9) is soil, and the inside of the side baffle (9) is river water.
10. spats of constructing under the conditions of a kind of high water level according to claim 9, it is characterised in that: the anchoring (5) uses Screw anchor, provisional wood bolt or steel anchor rod are inserted into the soil of river (1) bottom.
CN201821961660.6U 2018-11-27 2018-11-27 It constructs under the conditions of a kind of high water level spats Active CN209493914U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821961660.6U CN209493914U (en) 2018-11-27 2018-11-27 It constructs under the conditions of a kind of high water level spats

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821961660.6U CN209493914U (en) 2018-11-27 2018-11-27 It constructs under the conditions of a kind of high water level spats

Publications (1)

Publication Number Publication Date
CN209493914U true CN209493914U (en) 2019-10-15

Family

ID=68151960

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821961660.6U Active CN209493914U (en) 2018-11-27 2018-11-27 It constructs under the conditions of a kind of high water level spats

Country Status (1)

Country Link
CN (1) CN209493914U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115030092A (en) * 2022-06-20 2022-09-09 长江生态环保集团有限公司 Construction process of side slope corner protector for unfavorable geology

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115030092A (en) * 2022-06-20 2022-09-09 长江生态环保集团有限公司 Construction process of side slope corner protector for unfavorable geology

Similar Documents

Publication Publication Date Title
CN106801424B (en) A kind of cofferdam construction method
CN102094425B (en) Foundation pit construction method adopting shallow buried depth Larsen steel plate pile as protective cofferdam
CN106930231B (en) A kind of construction method applied to engineering flood bank reinforcing of passing the flood period
CN108331000A (en) Caisson sinking construction method
CN211200423U (en) Civil engineering side slope protection reinforced structure
CN105133558B (en) Deep water drift net platform and its construction method
CN111042053A (en) Permanent temporary combined retaining wall structure in urban hydraulic engineering and construction method thereof
CN210368986U (en) Foundation pit supporting pile supporting structure
CN209493914U (en) It constructs under the conditions of a kind of high water level spats
CN105862662B (en) A kind of curl arched mole
CN105239530A (en) Externally bonded landscape flood prevention wall structure
CN208934002U (en) A kind of barrier wall structure
CN106759093A (en) T-shaped mixture of piles and concrete wall formula retaining wall and riverbank berm
CN219671220U (en) Ecological barricade of precast composite pile and ecological bank protection system of river course
CN114250744B (en) Ecological combined river slope retaining wall revetment
CN103821106B (en) Small-sized fishing port and channel revetment structure
CN104164871B (en) The constructional method of the two recessed occlusion water-seal pile of supporting
CN211080123U (en) Ecological bank slope protection device in river lake
RU2299945C1 (en) Bridge
CN208934005U (en) A kind of vertical curved baffle landscape pile plate wall
CN209194572U (en) A kind of corrugated steel construction retaining wall of culvert end
CN207775898U (en) A kind of inclination pile pit supporting construction
CN206768738U (en) Suspension type impact-proof wall slope protection structure
CN204875806U (en) Shoring of trench on water construction steel pipe channel -section steel framed bent
CN207405640U (en) Stake film is combined cofferdam with soil

Legal Events