CN104164871B - The constructional method of the two recessed occlusion water-seal pile of supporting - Google Patents
The constructional method of the two recessed occlusion water-seal pile of supporting Download PDFInfo
- Publication number
- CN104164871B CN104164871B CN201410327378.2A CN201410327378A CN104164871B CN 104164871 B CN104164871 B CN 104164871B CN 201410327378 A CN201410327378 A CN 201410327378A CN 104164871 B CN104164871 B CN 104164871B
- Authority
- CN
- China
- Prior art keywords
- stake
- pile
- recessed
- water
- seal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims description 28
- 210000003205 muscle Anatomy 0.000 claims abstract description 17
- 239000004744 fabric Substances 0.000 claims abstract description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 6
- 229910000831 Steel Inorganic materials 0.000 claims description 23
- 238000010276 construction Methods 0.000 claims description 23
- 239000010959 steel Substances 0.000 claims description 23
- 238000007789 sealing Methods 0.000 claims description 18
- 239000004567 concrete Substances 0.000 claims description 16
- 239000003292 glue Substances 0.000 claims description 8
- 230000003014 reinforcing effect Effects 0.000 claims description 6
- 238000003466 welding Methods 0.000 claims description 5
- 238000005266 casting Methods 0.000 claims description 4
- LNEPOXFFQSENCJ-UHFFFAOYSA-N haloperidol Chemical group C1CC(O)(C=2C=CC(Cl)=CC=2)CCN1CCCC(=O)C1=CC=C(F)C=C1 LNEPOXFFQSENCJ-UHFFFAOYSA-N 0.000 claims description 4
- 238000007689 inspection Methods 0.000 claims description 4
- 239000007788 liquid Substances 0.000 claims description 4
- 239000002184 metal Substances 0.000 claims description 4
- 230000010412 perfusion Effects 0.000 claims description 4
- 239000004033 plastic Substances 0.000 claims description 4
- 229920003023 plastic Polymers 0.000 claims description 4
- 238000007711 solidification Methods 0.000 claims description 4
- 230000008023 solidification Effects 0.000 claims description 4
- 239000011150 reinforced concrete Substances 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims description 3
- 240000007594 Oryza sativa Species 0.000 claims description 2
- 235000007164 Oryza sativa Nutrition 0.000 claims description 2
- 238000005260 corrosion Methods 0.000 claims description 2
- 230000007797 corrosion Effects 0.000 claims description 2
- 235000009566 rice Nutrition 0.000 claims description 2
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 230000015572 biosynthetic process Effects 0.000 abstract description 2
- 230000007613 environmental effect Effects 0.000 abstract description 2
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 9
- 239000010410 layer Substances 0.000 description 6
- 238000009412 basement excavation Methods 0.000 description 5
- 238000003780 insertion Methods 0.000 description 5
- 230000037431 insertion Effects 0.000 description 5
- 230000002787 reinforcement Effects 0.000 description 5
- 238000013461 design Methods 0.000 description 4
- 238000005553 drilling Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 239000004570 mortar (masonry) Substances 0.000 description 2
- 239000004575 stone Substances 0.000 description 2
- 230000000007 visual effect Effects 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000000843 powder Substances 0.000 description 1
- 239000011241 protective layer Substances 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 210000002435 tendon Anatomy 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The present invention discloses the two recessed occlusion water-seal pile of supporting. Comprising a body and pile top, pile top is provided with dowel and structure muscle, the stake body section of comprising stake, stage casing stake and hypomere stake, and the stake top of upper section stake is provided with pile cover and structure muscle, and the lower end of upper section stake is provided with dowel; The upper end of stage casing stake is provided with screw thread anchor hole, and the lower end of stage casing stake is provided with dowel; The upper end of hypomere stake is provided with screw thread anchor hole, and the hypomere of hypomere stake is provided with pile top; The both sides of described two recessed occlusion water-seal pile are double concave. The invention has the beneficial effects as follows: supporting occlusion water-seal pile, adopts the even cloth muscle of long-line pedestal single mode, integral tension stress, supporting occlusion water-seal pile two sides is double concave, and charity spiral stirrup. Can carrying out long line platform to produce, economize work, laborsaving, environmental protection, productivity height, good product quality, contributes to the profile that product formation is tall and straight, and aesthetic property and splitting resistance are all good. It is adapted to port and pier, water seal for deep foundation pit, anticorrosive, freeze-thaw-.
Description
Technical field
The present invention relates to the realm of building construction, mainly refer to a kind of supporting occlusion water-seal pile and constructional method thereof.
Background technology
In engineering construction field, along with being on the increase of high-rise, construction of super highrise building, in civil building engineering and Underground Engineering Excavation field, for in river entrance, a large amount of beach, district, ground water table is higher, intensity is low, compressibility is higher, the geology such as mud matter powder matter cohesive soil, a large amount of miscellaneous fill muck soilss are major issues for deep pit digging supporting, sealing. Base pit engineering is an ancient tradition, puts the constructional method that slope excavation is gone along with sb. to guard him with simple and easy timber, the needs of the Contemporary Architecture that is far from suitable construction, and its construction speed is slow, quality is poor, poor stability, cost height, pollutes heavy, waste goods, materials and equipments. At present at home and abroad, in the supporting of subway engineering and Highrise buildings Ji Keng, adopt boring occlusion stake more, though obtaining successful experience, but in excavation, supporting, how more to save, rapidly and efficiently, rationally in this problem, it is necessary to research further, discussion. Currently building many employing drill-pouring concrete occlusion stakes in excavation, support engineering, although this kind of occlusion stake can meet construction needs to a certain extent, but its difficulty of construction is bigger, as needed multiple stage drilling machine and a large amount of different bore Steel Sleeve, stake footpath there is very big restriction, the making of Steel Reinforcement Cage more bothers, and very easily distortion, displacement. In concrete perfusion process, it is difficult to control. Meanwhile, the time needed for concrete coagulation is longer, after occlusion stake pile, easily causes undergauge, and leakage slurry, dew muscle, honeycomb, pitted skin, main tendon protective layer thickness is difficult to ensure, finally causes leaking. The verticality of occlusion stake is also difficult to reach design requirements. Steel Reinforcement Cage very easily floats when deposit concrete, seriously affects construction quality. And under construction ground, excavate field, the supporting of big Ji Keng, sealing, owing to construction speed is too slow, the whole construction work progress of serious impact, makes engineering not expect, causes very big financial loss to enterprise, affect the raising of business economic benefit.
Summary of the invention
For solving the problems of the technologies described above, the present invention provides following technical scheme:
In the present invention, the two recessed occlusion water-seal pile of supporting, it is characterised in that, comprising a body and pile top, pile top is provided with dowel and structure muscle, the stake body section of comprising stake, stage casing stake and hypomere stake, and the stake top of upper section stake is provided with pile cover and structure muscle, and the lower end of upper section stake is provided with dowel; The upper end of stage casing stake is provided with screw thread anchor hole, and the lower end of stage casing stake is provided with dowel; The upper end of hypomere stake is provided with screw thread anchor hole, and the hypomere of hypomere stake is provided with pile top; The both sides of described biconvex occlusion water-seal pile are double concave.
In the present invention, described two recessed occlusion water-seal pile is prestress or half prestress or non-prestressed, and inside is solid or hollow, and stake body section is square or rectangle, and pile top is concrete or steel.
In the present invention, the stake body both sides of described two recessed occlusion water-seal pile are provided with convex-concave enterprise tenon, and charity stiffening web; Described double concave is provided with certain angle, and its enterprise's tenon is oblique.
In the present invention, dowel, Constructional Steel Bar, pile top are with stake body casting, and concavo-convex position is provided with the impervious sealing corrosion stability High Pressure Reinforced Concrete perfusion cannula mouth that expands.
In the present invention, described double concave is engaged symmetrical side or the sides adjacent of water-seal pile respectively in biconvex.
In the present invention, described two recessed water-seal pile also includes edge shape end plate, and described edge shape end plate is metal sheet, and there is the centre hole corresponding with described occlusion water-seal pile size center, and the profile of edge shape end plate is identical with described occlusion water-seal pile cross section lenticular; Along the anchor hole of the one week even charity respective numbers in limit on described edge shape end plate; The reinforcing bar of the lower end charity respective numbers of described edge shape end plate.
In the present invention, described two recessed water-seal pile also includes stake head plate, and described stake head plate comprises base plate, and the surrounding at base plate is provided with some reinforced holes, is provided with pile extension anchor hole inside reinforced hole, and described base plate is double concave, and the outer of described base plate is upwards rolled over.
In the present invention, the cross section of described mould is the double concave identical with described occlusion water-seal pile cross section.
In the present invention, described recessed part should support the use with being provided with protruding stake, and convex part width is less than recessed part, and convex part length is less than recessed part; With or recessed part support the use with the same stake being provided with groove, and the recessed part thickness of the two is identical with length, is wherein engaged by Steel Concrete sealing or drill-pouring occlusion.
In the present invention, on described occlusion water-seal pile, it is possible to be anchored by joint bar or the mode such as steel plate welding carries out pile extension, extend stake body length.
In addition, dowel length is less than dowel jack degree of depth 15-25mm.
In stake head plate, the angle between described base plate and outer is 100-130 degree.
On described occlusion water-seal pile, it is possible to be anchored by joint bar or the mode such as steel plate welding carries out pile extension, extend stake body length.
On described occlusion water-seal pile, every face recessed structures at least one, recessed can be square or rectangle or trapezoidal or trilateral or spination.
The constructional method of the occlusion stake in the present invention, first the lower stake end face of described occlusion water-seal pile, screw thread anchor hole, lower end are anchored rebar surface and clean clean, accumulated water, dry anhydrous after, again described occlusion water-seal pile is erected to steadily slinging, then insert described occlusion water-seal pile position, carry out leveling, vertical, piling construction; In construction process, adjust the horizontal and vertical degree of supporting occlusion water-seal pile at any time, after reaching standard-required, occlusion water-seal pile pile sinking is completed; After pile sinking completes, two are engaged water-seal piles enterprise tenon mouth and gap leveling, vertical, closed, grouting pipe place are cleaned out simultaneously, to expand, water-tight concrete pressurize light beam, tight closure looks forward to tenon mouth sealing.
Wherein, described supporting occlusion water-seal pile pile sinking, it is necessary to when stake upper end is far from ground 1-1.2 rice, first stake upper end is peripherally enclosed and prick rigid plastics cloth, and colligation is firm, then it is engaged the two epoxy resins structure glue of water-seal pile upper end pouring in supporting, after glue liquid is covered with stake top anchor hole, stake on it is erected to steadily slinging, make the dowel lower stake anchor hole of alignment, smooth vertical insertion, leveling, vertical, after inspection meets stake, pile sinking completes, solidification of biding one's time.
Wherein, first, occlusion stake is erected to steadily slinging; Then insertion occlusion stake position, carries out leveling, vertical, piling construction, the verticality of the stake of adjustment occlusion at any time in pile driving process, it has been found that problem processes in time, is engaged sunk pile by first and completes after reaching standard-required; After pile sinking completes, two occlusion stakes, tongue and grooves being poured into, the thin stone of high efficiency composition, mortar concrete tight closure are engaged, and tongue and groove carries out sealing.
Occlusion water-seal pile specification:
Above-mentioned specification, it is possible to according to design requirements, carries out design and produces.
In the present invention, the two recessed occlusion water-seal pile of described supporting, it is widely used in the deep foundation pit support occlusion sealing in civil building and Underground Engineering Excavation field, have huge development potentiality, occlusion stake campshed safeguards that overall performance is good, supporting intensity is big, sealing, impervious effective, do not need drilling construction, friction, do not need drilling mud practice, workyard is clean, pile sinking supporting occlusion water-seal pile, current techique is strong, easily control, it is convenient to promote, construction safety, fast, pile quality can be controlled preferably, improve pile bearing capacity, horizontal force resistant, anti-dam power is strong, and implement the form such as concavo-convex in stake body and be closely engaged, form overall good continuous structure, and cost is low, construction speed is fast, sealing, impervious. stake end can enter into the water-resisting layer relating to requirement and barren land layer.
Conventional supporting occlusion water-seal pile is square, rectangular pile specification
The invention has the beneficial effects as follows: supporting occlusion water-seal pile, adopts the even cloth muscle of long-line pedestal single mode, integral tension stress, supporting occlusion water-seal pile two sides is lenticular, and charity spiral stirrup. Can carrying out long line platform to produce, economize work, laborsaving, environmental protection, productivity height, good product quality, contributes to the profile that product formation is tall and straight, and aesthetic property and splitting resistance are all good. It is adapted to port and pier, water seal for deep foundation pit, freeze-thaw anticorrosive, anti-.
Accompanying drawing explanation
Fig. 1 is the two recessed occlusion water-seal pile masterplate figure of supporting of the present invention;
Fig. 2 is the two recessed occlusion water-seal pile stake body schematic cross-section of supporting;
Fig. 3 is the arrangement of reinforcement schematic diagram of the two recessed occlusion water-seal pile of supporting;
Fig. 4 is the two recessed occlusion water-seal pile steel pile top schematic diagram of supporting;
Fig. 5 is the two recessed occlusion water-seal pile steel pile top AA schematic diagram of supporting;
Fig. 6 is the arrangement of reinforcement schematic diagram of hypomere stake;
Fig. 7 is the arrangement of reinforcement schematic diagram of upper section stake;
Fig. 8 is the mode host visual pattern of the two recessed occlusion water-seal pile of supporting, wherein two recessed symmetrical; ;
Fig. 9 is the mode host visual pattern of the two recessed occlusion water-seal pile of supporting, wherein two recessed adjacent;
Figure 10 is stake head plate vertical view;
Figure 11 is stake head plate frontview;
Figure 12 is stake head plate right view;
Figure 13 is the vertical view of edge shape end plate;
Figure 14 is concavo-convex cooperation schematic diagram;
Figure 15 is the recessed schematic diagram of rectangle triangle;
Figure 16 is the recessed schematic diagram of rectangle sawtooth;
Figure 17 is the concavo-convex cooperation schematic diagram of tabular;
Figure 18 is the stake body schematic cross-section of occlusion water-seal pile; Wherein one side is two recessed, and two sides is symmetrical;
Figure 19 is the stake body schematic cross-section of occlusion water-seal pile; Wherein one side is two recessed, and two sides is adjacent.
Wherein, 1 is anchor hole; 2 for being anchored muscle; 3 is dowel; 4 is anchor hole; 5 is structure muscle; 6 is back-grouting hole; 7 is Bower Anchor muscle; 8 is main muscle jack.
Embodiment
Embodiment 1
The two recessed occlusion water-seal pile of prestress supporting, comprises a body and pile top, and pile top is provided with dowel and structure muscle, the stake body section of comprising stake, stage casing stake and hypomere stake, and the stake top of upper section stake is provided with pile cover and structure muscle, and the lower end of upper section stake is provided with dowel; The upper end of stage casing stake is provided with screw thread anchor hole, and the lower end of stage casing stake is provided with dowel; The upper end of hypomere stake is provided with screw thread anchor hole, and the hypomere of hypomere stake is provided with pile top; Dowel length is less than dowel jack degree of depth 20mm; The both sides of described two recessed occlusion water-seal pile are double concave; Described two recessed occlusion water-seal pile is solid, and stake body section is square, steel pile top. Stake body both sides are provided with convex-concave enterprise tenon, and charity stiffening web. Described double concave is provided with certain angle, and its enterprise's tenon is oblique. Described double concave is respectively at the symmetrical side of two recessed occlusion water-seal pile. Dowel, Constructional Steel Bar, pile top are with stake body casting, and concavo-convex position is provided with the impervious sealing anticorrosive concrete high pressure pouring conduit mouth that expands.
Described recessed part should support the use with being provided with protruding stake, and convex part width is less than recessed part, and convex part length is less than recessed part.
On described occlusion water-seal pile, it is anchored mode by joint bar and carries out pile extension, extend stake body length.
Edge shape end plate, described edge shape end plate is metal sheet, and there is the centre hole corresponding with described occlusion water-seal pile size center, and the profile of edge shape end plate is the double concave identical with described occlusion water-seal pile cross section; Along the anchor hole of the one week even charity respective numbers in limit on described edge shape end plate; The reinforcing bar of the lower end charity respective numbers of described edge shape end plate, the quantity of described reinforcing bar is 3 layers, and every layer can be 4.
Stake head plate, comprises base plate, and the surrounding at base plate is provided with some reinforced holes, is provided with pile extension anchor hole inside reinforced hole, and described base plate is double concave, and the outer of described base plate is upwards rolled over, and the angle between described base plate and outer is 100 degree.
The cross section of mould described in the mould of the two recessed occlusion water-seal pile of supporting is the double concave identical with described occlusion water-seal pile cross section.
Described recessed part should be provided with protruding stake, support the use, and convex part width is less than recessed part, and convex part length is less than recessed part.
On described occlusion water-seal pile, it is anchored by joint bar and carries out pile extension, extend stake body length.
On described occlusion water-seal pile, recessed one of every face, recessed can be square.
The constructional method of the two recessed occlusion water-seal pile of supporting, first the lower stake end face of described occlusion water-seal pile, screw thread anchor hole, lower end are anchored rebar surface and clean clean, accumulated water, dry anhydrous after, again described occlusion water-seal pile is erected to steadily slinging, then insert described occlusion water-seal pile position, carry out leveling, vertical, piling construction; In construction process, adjust the horizontal and vertical degree of supporting occlusion water-seal pile at any time, after reaching standard-required, occlusion water-seal pile pile sinking is completed; After pile sinking completes, two are engaged water-seal piles enterprise tenon mouth and gap leveling, vertical, closed, grouting pipe place are cleaned out simultaneously, to expand, water-tight concrete pressurize light beam, tight closure looks forward to tenon mouth sealing.
Described supporting occlusion water-seal pile pile sinking, when needing stake upper end far from 1 meter, ground, first stake upper end is peripherally enclosed and prick rigid plastics cloth, and colligation is firm, then it is engaged the two epoxy resins structure glue of water-seal pile upper end pouring in supporting, after glue liquid is covered with stake top anchor hole, stake on it is erected to steadily slinging, make the lower stake anchor hole of dowel alignment, smooth vertical insertion, leveling, vertical, after inspection meets stake, pile sinking completes, solidification of biding one's time.
Embodiment 2
The two recessed occlusion water-seal pile of non-prestressed supporting, comprises a body and pile top, and pile top is provided with dowel and structure muscle, the stake body section of comprising stake, stage casing stake and hypomere stake, and the stake top of upper section stake is provided with pile cover and structure muscle, and the lower end of upper section stake is provided with dowel; The upper end of stage casing stake is provided with screw thread anchor hole, and the lower end of stage casing stake is provided with dowel; The upper end of hypomere stake is provided with screw thread anchor hole, and the hypomere of hypomere stake is provided with steel pile top; Dowel length is less than dowel jack degree of depth 25mm; The both sides of described two recessed occlusion water-seal pile are double concave; Described two recessed occlusion water-seal pile is hollow, and stake body section is rectangle. The stake body both sides of described two recessed occlusion water-seal pile are provided with convex-concave enterprise tenon, and charity stiffening web. Described double concave is provided with certain angle, and its enterprise's tenon is oblique. Described double concave is respectively in the sides adjacent of two recessed occlusion water-seal pile, and pile top is steel. Dowel, Constructional Steel Bar, pile top are with stake body casting. Concavo-convex position is provided with expansion impervious anticorrosion sealing High Pressure Reinforced Concrete perfusion cannula mouth.
Described recessed part should support the use with the same stake being provided with groove, and the recessed part thickness of the two is identical with length, is wherein engaged by Steel Concrete sealing or drill-pouring occlusion.
On described occlusion water-seal pile, carry out pile extension by steel plate welding process, extend stake body length.
Also including edge shape end plate, described edge shape end plate is metal sheet, and there is the centre hole corresponding with described occlusion water-seal pile size center, and the profile of edge shape end plate is the double concave identical with described occlusion water-seal pile cross section; Along the anchor hole of the one week even charity respective numbers in limit on described edge shape end plate; The reinforcing bar of the lower end charity respective numbers of described edge shape end plate, the quantity of described reinforcing bar is 5 layers, and every layer can be 5.
Described two recessed water-seal pile also includes stake head plate, comprises base plate, and the surrounding at base plate is provided with some reinforced holes, pile extension anchor hole it is provided with inside reinforced hole, described base plate is double concave, and the outer of described base plate is upwards rolled over, and the angle between described base plate and outer is 130 degree.
The cross section of described mould is the double concave identical with described occlusion water-seal pile cross section.
The cross section of mould described in the mould of the two recessed occlusion water-seal pile of supporting is the double concave identical with described occlusion water-seal pile cross section.
Described recessed part should be provided with protruding stake, support the use, and convex part width is less than recessed part, and convex part length is less than recessed part.
On described occlusion water-seal pile, carry out pile extension by steel plate welding, extend stake body length.
On described occlusion water-seal pile, every face recessed structures two, recessed is trilateral.
Constructional method, first the lower stake end face of described occlusion water-seal pile, screw thread anchor hole, lower end are anchored rebar surface and clean clean, accumulated water, dry anhydrous after, more described occlusion water-seal pile is erected to steadily slinging, then insert described occlusion water-seal pile position, carry out leveling, vertical, piling construction; In construction process, adjust the horizontal and vertical degree of supporting occlusion water-seal pile at any time, after reaching standard-required, occlusion water-seal pile pile sinking is completed; After pile sinking completes, two are engaged water-seal piles enterprise tenon mouth and gap leveling, vertical, closed, grouting pipe place are cleaned out simultaneously, to expand, water-tight concrete pressurize light beam, tight closure looks forward to tenon mouth sealing.
Wherein, described supporting occlusion water-seal pile pile sinking, it is necessary to when stake upper end is far from 1.2 meters, ground, first stake upper end is peripherally enclosed and prick rigid plastics cloth, and colligation is firm, then it is engaged the two epoxy resins structure glue of water-seal pile upper end pouring in supporting, after glue liquid is covered with stake top anchor hole, stake on it is erected to steadily slinging, make the dowel lower stake anchor hole of alignment, smooth vertical insertion, leveling, vertical, after inspection meets stake, pile sinking completes, solidification of biding one's time.
Wherein, first, occlusion stake is erected to steadily slinging; Then insertion occlusion stake position, carries out leveling, vertical, piling construction, the verticality of the stake of adjustment occlusion at any time in pile driving process, it has been found that problem processes in time, is engaged sunk pile by first and completes after reaching standard-required; After pile sinking completes, two occlusion stakes, tongue and grooves being poured into, the thin stone of high efficiency composition, mortar concrete tight closure are engaged, and tongue and groove carries out sealing.
The above; it is only the present invention's preferably embodiment; but protection scope of the present invention is not limited thereto; any it is familiar with those skilled in the art in the technical scope of present disclosure; technical scheme and invention design thereof according to the present invention are equal to replacement or are changed, and all should be encompassed within protection scope of the present invention.
Claims (9)
1. the constructional method of the two recessed occlusion water-seal pile of supporting, it is characterised in that, comprise a body and pile top, pile top is provided with dowel and structure muscle, the stake body section of comprising stake, stage casing stake and hypomere stake, the stake top of upper section stake is provided with steel pile cover and structure muscle, and the lower end of upper section stake is provided with dowel, the upper end of stage casing stake is provided with screw thread anchor hole, and the lower end of stage casing stake is provided with dowel, the upper end of hypomere stake is provided with screw thread anchor hole, and the lower end of hypomere stake is provided with pile top, the both sides of described two recessed occlusion water-seal pile are double concave, described two recessed occlusion water-seal pile is prestress or half prestress or non-prestressed, and inside is solid or hollow, and stake body section is rectangle, and pile top is concrete or steel, described double concave is respectively in symmetrical side or the sides adjacent of two recessed occlusion water-seal pile, the stake body both sides of described two recessed occlusion water-seal pile are provided with convex-concave enterprise tenon, and charity stiffening web, its constructional method: first the lower stake end face of described two recessed occlusion water-seal pile, screw thread anchor hole, lower end are anchored rebar surface and clean clean, accumulated water, dry anhydrous after, again described two recessed occlusion water-seal pile is erected to steadily slinging, then insert described two recessed occlusion water-seal pile stake position, carry out leveling, vertical, piling construction, in construction process, the horizontal and vertical degree of the two recessed occlusion water-seal pile of adjustment at any time, after reaching standard-required, completes two recessed occlusion water-seal pile pile sinking, after pile sinking completes, by two two recessed occlusion water-seal pile enterprise's tenon mouths and gap leveling, vertically, close, grouting pipe place is cleaned out simultaneously, to expand, water-tight concrete pressurization light beam, tight closure enterprise tenon mouth sealing, described two recessed occlusion water-seal pile pile sinking, when needing stake upper end far from ground 1-1.2 rice, first stake upper end is peripherally enclosed and prick rigid plastics cloth, and colligation is firm, then in the two epoxy resins structure glue of two recessed occlusion water-seal pile upper end pouring, after glue liquid is covered with stake top anchor hole, stake on it is erected to steadily slinging, make the lower stake anchor hole of dowel alignment, smooth vertical inserts, leveling, vertically, after inspection meets stake, pile sinking completes, bide one's time solidification.
2. the constructional method of the two recessed occlusion water-seal pile of supporting according to claim 1, it is characterised in that: described double concave is provided with certain angle, and its enterprise's tenon is oblique.
3. the constructional method of the two recessed occlusion water-seal pile of supporting according to claim 1, it is characterised in that: dowel, Constructional Steel Bar, pile top are with stake body casting, and concavo-convex position is provided with the impervious sealing corrosion stability High Pressure Reinforced Concrete perfusion cannula mouth that expands.
4. the constructional method of the two recessed occlusion water-seal pile of supporting according to claim 1, it is characterized in that: described two recessed occlusion water-seal pile also includes edge shape end plate, described edge shape end plate is metal sheet, there is the centre hole corresponding with described two recessed occlusion water-seal pile size center, and the profile of edge shape end plate is the double concave identical with described two recessed occlusion water-seal pile cross section; Along the anchor hole of the one week even charity respective numbers in limit on described edge shape end plate; The reinforcing bar of the lower end charity respective numbers of described edge shape end plate.
5. the constructional method of the two recessed occlusion water-seal pile of supporting according to claim 1, it is characterized in that: described two recessed occlusion water-seal pile also includes stake head plate, described stake head plate comprises base plate, surrounding at base plate is provided with some reinforced holes, pile extension anchor hole it is provided with inside reinforced hole, described base plate is double concave, and the outer of described base plate is upwards rolled over.
6. the mould for the constructional method of the two recessed occlusion water-seal pile of supporting according to claim 1, it is characterised in that: the cross section of described mould is the double concave identical with described two recessed occlusion water-seal pile cross section.
7. the constructional method of the two recessed occlusion water-seal pile of supporting according to claim 1, it is characterised in that: recessed part should support the use with the stake being provided with protrusion, and convex part width is less than recessed part, and convex part length is less than recessed part; And/or recessed part supports the use with the same stake being provided with groove, and the recessed part thickness of the two is identical with length, is wherein engaged by Steel Concrete sealing or drill-pouring occlusion.
8. the constructional method of the two recessed occlusion water-seal pile of supporting according to claim 1, it is characterised in that: on described two recessed occlusion water-seal pile, it is anchored by joint bar or steel plate welding process carries out pile extension, extends stake body length.
9. the constructional method of the two recessed occlusion water-seal pile of supporting according to claim 1, it is characterised in that: on described two recessed occlusion water-seal pile, every face recessed structures at least one, recessed can be rectangle or trapezoidal or trilateral or spination.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410327378.2A CN104164871B (en) | 2014-07-10 | 2014-07-10 | The constructional method of the two recessed occlusion water-seal pile of supporting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410327378.2A CN104164871B (en) | 2014-07-10 | 2014-07-10 | The constructional method of the two recessed occlusion water-seal pile of supporting |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104164871A CN104164871A (en) | 2014-11-26 |
CN104164871B true CN104164871B (en) | 2016-06-01 |
Family
ID=51908844
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410327378.2A Expired - Fee Related CN104164871B (en) | 2014-07-10 | 2014-07-10 | The constructional method of the two recessed occlusion water-seal pile of supporting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104164871B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104863120B (en) * | 2015-05-13 | 2017-05-17 | 中国建筑第八工程局有限公司 | Occlusive pile construction method and prefabricated occlusive piles used for method |
CN105862876A (en) * | 2016-05-19 | 2016-08-17 | 邱树贵 | Concrete continuous pile, concrete continuous pile wall and construction method of concrete continuous pile wall |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2876180Y (en) * | 2005-12-05 | 2007-03-07 | 颜小荣 | Normal polygon prestressed hollow pile end plate |
KR100791263B1 (en) * | 2006-10-13 | 2008-01-04 | 김정빈 | Bolt type pile cap and the manufacture method of this |
CN101942832A (en) * | 2010-06-07 | 2011-01-12 | 大连大金马基础建设有限公司 | Full prestressed concrete integrated root solid square pile with steel pile tip and manufacturing method thereof |
CN102535438A (en) * | 2012-02-02 | 2012-07-04 | 沙焕焕 | Prefabricated embedding pile |
CN202466576U (en) * | 2012-02-28 | 2012-10-03 | 上海中技桩业股份有限公司 | Mechanical connecting device of prestressed reinforced concrete anti-pulling hollow pile |
CN103572755A (en) * | 2013-11-01 | 2014-02-12 | 中淳高科桩业股份有限公司 | Prestressed concrete precast pile |
-
2014
- 2014-07-10 CN CN201410327378.2A patent/CN104164871B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2876180Y (en) * | 2005-12-05 | 2007-03-07 | 颜小荣 | Normal polygon prestressed hollow pile end plate |
KR100791263B1 (en) * | 2006-10-13 | 2008-01-04 | 김정빈 | Bolt type pile cap and the manufacture method of this |
CN101942832A (en) * | 2010-06-07 | 2011-01-12 | 大连大金马基础建设有限公司 | Full prestressed concrete integrated root solid square pile with steel pile tip and manufacturing method thereof |
CN102535438A (en) * | 2012-02-02 | 2012-07-04 | 沙焕焕 | Prefabricated embedding pile |
CN202466576U (en) * | 2012-02-28 | 2012-10-03 | 上海中技桩业股份有限公司 | Mechanical connecting device of prestressed reinforced concrete anti-pulling hollow pile |
CN103572755A (en) * | 2013-11-01 | 2014-02-12 | 中淳高科桩业股份有限公司 | Prestressed concrete precast pile |
Also Published As
Publication number | Publication date |
---|---|
CN104164871A (en) | 2014-11-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104164868A (en) | Concave-convex support-engaged water-stopping pile | |
CN1837512B (en) | Combined cofferdam of steel slab pile and steel pipe pile an method for manufacturing the same | |
CN102900089B (en) | With the combination piling bar cofferdam of hydro-expansive rubber waterproof fore shaft | |
US20100054859A1 (en) | Hydraulic Sliding Insertion Panel and Its Using Method | |
CN203034467U (en) | Combined steel pile cofferdam with water-proof fore shafts | |
US20140314494A1 (en) | Polymer grouting method for constructing vertical supporting system | |
CN106498953A (en) | Cut slope composite supporting construction and its construction method | |
CN110004991B (en) | Underground structure anti-floating system based on convex wing foot plate and construction method | |
CN102518135A (en) | Foundation pit support construction method combining horizontal rotary jet-grouting soil bolting and bore concrete piles | |
CN103422510B (en) | Steel pipe frame type cofferdam structure and construction method | |
CN107217676A (en) | A kind of steel cylinder with seal groove and occlusion structure or steel sheet pile and steel construction diaphragm wall | |
CN113174958A (en) | Construction method for foundation pit of adjacent road under poor ground condition | |
CN110055973B (en) | Foundation pit enclosure structure under high-speed railway bridge with limited construction space and water stopping method | |
CN107059856A (en) | The ecology stake of pretensioning prestressed concrete porous hollow and its construction method | |
CN104164871B (en) | The constructional method of the two recessed occlusion water-seal pile of supporting | |
CN103866787B (en) | A kind of spacious reverse masonry method concrete cut that digs builds construction technology | |
CN106567365B (en) | Earth and rockfill dam longitudinal reinforcement construction method | |
CN104153350A (en) | Octagonal meshed water-stopping rectangular pile of support | |
CN205653804U (en) | Slope assembled warp self -adaptation protection skeleton | |
CN108316237B (en) | Revetment retaining wall | |
CN207727514U (en) | A kind of library basin antiseepage is anti-to lift structure | |
CN114250744B (en) | Ecological combined river slope retaining wall revetment | |
CN206245321U (en) | Cut slope composite supporting construction | |
CN206477240U (en) | A kind of trestle pile foundation for deep water drift net riverbed | |
CN104179170A (en) | Supporting and protecting double-convex and single-concave occluded water stopping pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160601 |
|
CF01 | Termination of patent right due to non-payment of annual fee |