CN209397590U - A kind of installation of steel reinforcement cage and concrete casting platform - Google Patents
A kind of installation of steel reinforcement cage and concrete casting platform Download PDFInfo
- Publication number
- CN209397590U CN209397590U CN201821721369.1U CN201821721369U CN209397590U CN 209397590 U CN209397590 U CN 209397590U CN 201821721369 U CN201821721369 U CN 201821721369U CN 209397590 U CN209397590 U CN 209397590U
- Authority
- CN
- China
- Prior art keywords
- reinforcement cage
- steel reinforcement
- platform
- operation platform
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a kind of installation of steel reinforcement cage and concrete casting platforms, including pedestal and the operation platform being fixed on pedestal, the middle position of the operation platform offers steel reinforcement cage construction mouth, it is flexibly connected on the operation platform and at the position for being located at steel reinforcement cage construction mouth and is arranged in casting platform, levelling device is respectively equipped at the corner location of the operation platform, the inside of the operation platform is equipped with steel reinforcement cage positioning supporting frame.The beneficial effects of the utility model are: the platform can provide good construction area to the construction of the steel reinforcement cage in stake holes, ensure steel reinforcement cage verticality and construction personnel's safety, also good construction area can be provided to pouring for stake holes simultaneously, substantially increase the convenience during pile hole construction.
Description
Technical field
The utility model relates to construction technical field of auxiliary equipment, and in particular to a kind of installation of steel reinforcement cage and concrete
Casting platform.
Background technique
Pile foundation construction is that an essential element task, pile foundation construction usually first drill in architecture construction,
Then borehole cleaning places steel reinforcement cage after borehole cleaning is qualified, finally pours pile foundation concrete;Steel reinforcement cage is all to carry out on the ground in advance at present
It is directly transferred in stake holes after first installing by crane, but for bridge on highway, drilling depth is deeper, or even can reach
Rice up to a hundred, by crane, just directly decentralization is obviously unlikely, for this stake holes, scene is needed to carry out a section to steel reinforcement cage
Section splicing, therefore need to design such platform to install steel reinforcement cage.
Utility model content
In order to solve the problems in the existing technology, the utility model provides a kind of structurally reasonable steel reinforcement cage installation
And concrete casting platform.
The technical solution of the utility model is as follows:
A kind of installation of steel reinforcement cage and concrete casting platform, which is characterized in that including pedestal and be fixed on pedestal
Operation platform, the middle position of the operation platform offers steel reinforcement cage construction mouth, on the operation platform and is being located at steel
Setting is flexibly connected at the position of muscle cage construction mouth, and leveling is respectively equipped at casting platform, the corner location of the operation platform
The inside of device, the operation platform is equipped with steel reinforcement cage positioning supporting frame.
A kind of steel reinforcement cage installation and concrete casting platform, which is characterized in that be additionally provided on the operation platform
Level meter, the level meter include being arranged on operation platform and the vertical observation tube at the levelling device position and along construction
The connecting pipeline that platform is circumferentially arranged, the vertical observation tube are connected with connecting pipeline.
A kind of steel reinforcement cage installation and concrete casting platform, which is characterized in that the levelling device uses screw thread
Formula levelling device includes adjusting screw rod and adjusting nut, and mounting hole is opened up on the operation platform, and the adjusting nut fixation is set
It sets in mounting hole, the adjusting screw rod is threaded through on adjusting nut, and its bottom is held out against on pedestal.
A kind of steel reinforcement cage installation and concrete casting platform, which is characterized in that the steel reinforcement cage positioning supporting frame
It include four adjacent orthogonal support rods using cross locating rack, the operation platform side is equipped with installation through-hole, described
Support rod is threaded through in installation through-hole, and extends to steel reinforcement cage construction mouth position.
A kind of steel reinforcement cage installation and concrete casting platform, which is characterized in that the operation platform is being located at steel
The inner wall of muscle cage construction mouth position is equipped with overlap joint angle bar, triangular stall board is fixedly installed on the overlap joint angle bar, and pass through triangle
Floor come to steel reinforcement cage construction mouth size be adjusted.
A kind of steel reinforcement cage installation and concrete casting platform, which is characterized in that the operation platform includes load-bearing
Skeleton and the lateral load-bearing panel being arranged on load-bearing skeleton, longitudinal load-bearing panel, the longitudinal direction load-bearing panel and load-bearing skeleton
It is welded and fixed, the transverse direction load-bearing panel and load-bearing skeleton are hinged;The transverse direction load-bearing panel and longitudinal load-bearing panel enclose respectively
It is located at the surrounding of steel reinforcement cage construction mouth.
A kind of steel reinforcement cage installation and concrete casting platform, which is characterized in that the casting platform center
It offers and pours mouth, the casting platform is spliced using two symmetrically arranged overturning platforms, the overturning platform difference
It is flexibly connected with operation platform;The overturning platform includes lateral I-shaped steel skeleton and longitudinal I-shaped steel skeleton, the transverse direction work
Welding setting installation panel on word steel skeleton and longitudinal I-shaped steel skeleton, the casting platform pass through longitudinal I-shaped steel skeleton overlap joint
On operation platform.
A kind of steel reinforcement cage installation and concrete casting platform, which is characterized in that be located on the operation platform
Steel reinforcement cage constructs mouth two sides equipped with hinged seat, and the casting platform is movably connected on operation platform by hinged seat.
A kind of steel reinforcement cage installation and concrete casting platform, which is characterized in that the tube chamber welds with base setting is being applied
On work platform and it is located at two side positions of steel reinforcement cage construction mouth.
A kind of steel reinforcement cage installation and concrete casting platform, which is characterized in that the area of the casting platform is big
In the area for being equal to steel reinforcement cage construction mouth.
The beneficial effects of the utility model are:
1) operation platform is set on pedestal, steel reinforcement cage construction mouth is offered on operation platform, construction personnel is existed
Concatenation construction is carried out to steel reinforcement cage above stake holes, provides better construction environment for construction personnel, improve construction efficiency and
The quality of construction.
2) steel reinforcement cage positioning supporting frame is set inside operation platform, prevents in work progress steel reinforcement cage because extraneous factor generates
It shakes, influences the concatenation construction of steel reinforcement cage.
3) it is respectively equipped with levelling device at four corner locations of operation platform, horizontal tune can be carried out to operation platform
Section, guarantees the levelness of operation platform, to improve the stability of work progress.
4) level meter is set near levelling device on operation platform, it, can be clear bright by transparent vertical observation tube
Reading platform horizontality, so that levelling device be assisted quick and precisely to be leveled work.
5) operation platform is equipped with casting platform, and casting platform is flexibly connected with operation platform, constructs and completes in steel reinforcement cage
Afterwards, casting platform can be overturn and is spliced, thus to concreting work is carried out in stake holes.
6) platform can provide good construction area to the construction of the steel reinforcement cage in stake holes, while also can be to stake holes
It pours and good construction area is provided, substantially increase the convenience during pile hole construction.
Detailed description of the invention
Fig. 1 is the three dimensional structure diagram of the utility model;
Fig. 2 is the overlooking structure diagram of the utility model;
Fig. 3 is the face the A-A the schematic diagram of the section structure of the utility model;
In figure: 1- pedestal, 2- levelling device, 3- operation platform, 4- casting platform, the vertical observation tube of 5-, 6- support rod, 7-
Pour mouth, 8- transverse direction load-bearing panel, 9- triangular stall board, 10- connecting pipeline, the longitudinal direction 11- I-shaped steel skeleton, the longitudinal direction 12- weight-bearing surface
Plate, 13- load-bearing skeleton, 14- overturn platform, 15- hinged seat, 16- transverse direction I-shaped steel skeleton, 17- installation panel.
Specific embodiment
Below in conjunction with Figure of description, utility model is further described.
As shown in Figure 1-3, a kind of steel reinforcement cage mounting platform, including pedestal 1, levelling device 2, operation platform 3, casting platform
4, vertical observation tube 5, support rod 6, pour mouth 7, lateral load-bearing panel 8, triangular stall board 9, connecting pipeline 10, longitudinal I-shaped reinforcing bar
Frame 11, longitudinal load-bearing panel 12, load-bearing skeleton 13, overturning platform 14, hinged seat 15, lateral I-shaped steel skeleton 16 and installation panel
17。
A kind of installation of steel reinforcement cage and concrete casting platform, including pedestal 1 and the operation platform being fixed on pedestal 1
3, the middle position of the operation platform 3 offers steel reinforcement cage construction mouth, constructs on the operation platform 3 and being located at steel reinforcement cage
It is flexibly connected setting at the position of mouth and is respectively equipped with levelling device 2 at casting platform 4, the corner location of the operation platform 3,
The inside of the operation platform 3 is equipped with steel reinforcement cage positioning supporting frame.
Level meter is additionally provided on operation platform 3, the level meter includes being arranged on operation platform and close to levelling device 2
Vertical observation tube 5 at position and the connecting pipeline 10 being circumferentially arranged along operation platform, the vertical observation tube 5 and connecting pipeline
10 are connected;Vertical observation tube 5 constitutes linker with connecting pipeline 10, and vertical observation tube 5 is transparent pipe fitting, and construction personnel can
The fluid level condition in pipe fitting is clearly observed, so that levelling device 2 is assisted to level operation platform 3, it is very convenient and practical.
Levelling device 2 includes adjusting screw rod and adjusting nut using screw-type levelling device, is opened up on the operation platform 3
Mounting hole, the adjusting nut are fixed in mounting hole, and the adjusting screw rod is threaded through on adjusting nut, and its bottom is pushed up
Tightly on pedestal 1.When adjustment, it is only necessary to which construction personnel rotates adjusting screw rod forward or backwards, thus to operation platform 3
It is promoted or is declined.
Steel reinforcement cage positioning supporting frame includes four adjacent orthogonal support rods 6, the construction using cross locating rack
3 side of platform is equipped with installation through-hole, and the support rod 6 is threaded through in installation through-hole, and extends to steel reinforcement cage construction mouth position.In steel
When muscle cage concatenation construction, effective position support can be carried out to the steel reinforcement cage in stake holes, be installed convenient for the splicing of steel reinforcement cage.
It is being located at steel reinforcement cage construction mouth two sides equipped with hinged seat 15 on operation platform 3, the casting platform 4 passes through hinged seat
15 are movably connected on operation platform 3, and in steel reinforcement cage installation, casting platform 4 is in the open state on operation platform 3, makes
It obtains steel reinforcement cage construction mouth to expose, to install steel reinforcement cage.
Operation platform 3 is equipped on the inner wall for being located at steel reinforcement cage construction mouth position overlaps angle bar, solid on the overlap joint angle bar
Triangular stall board 9 is set surely, and steel reinforcement cage construction mouth size is adjusted by triangular stall board 9, it is various sizes of to adapt to
Pile hole construction.
Operation platform 3 includes load-bearing skeleton 13 and the lateral load-bearing panel 8 being arranged on load-bearing skeleton 13, longitudinal weight-bearing surface
Plate 12, the longitudinal direction load-bearing panel 12 are welded and fixed with load-bearing skeleton 13, and the transverse direction load-bearing panel 8 is cut with scissors with load-bearing skeleton 13
It connects.Lateral load-bearing panel 8 and longitudinal load-bearing panel 12 are disposed around steel reinforcement cage construction mouth surrounding, can be in order to which construction personnel is entire
It walks about on operation platform;Due to having certain memory space in load-bearing skeleton 13, some construction tools, lateral load-bearing can be placed
Panel 8 and load-bearing skeleton 13 are hinged, so that lateral load-bearing panel 8 is able to carry out opening, convenient for the pick-and-place of construction tool.
4 center of casting platform, which is equipped with, pours mouth 7, and casting platform 4 is spliced using two overturning platforms 14, institute
Stating overturning platform 14 includes lateral 16 frame of I-shaped reinforcing bar and longitudinal I-shaped steel skeleton 11, the transverse direction I-shaped steel skeleton 16 and longitudinal
Welding setting installation panel 17 on I-shaped steel skeleton 11, the casting platform 4 pass through longitudinal I-shaped steel skeleton 11 and are overlapped on construction
On platform 3.When stake holes is in casting concrete, construction personnel can stand on casting platform 4, by pouring in 7 pairs of stake holes of mouth
Casting concrete.
Pedestal 1, which welds, to be arranged on operation platform 3 and is located at the end positions of steel reinforcement cage construction mouth, so that steel reinforcement cage is applied
Work mouth can be carried out corresponding with stake holes position.
The area of casting platform 4 is more than or equal to the area of steel reinforcement cage construction mouth, prevents from starting a leak on operation platform, generates
Security risk.
The course of work:
The mounting platform is allocated and transported to the top position of stake holes by crane first, and is slowly transferred to, so that pedestal position
In two side position of stake holes and steel reinforcement cage construction mouth it is corresponding with stake holes;
Steel reinforcement cage installation: (two overturning platforms of casting platform are in the open state at this time)
The first segment steel reinforcement cage bound is allocated and transported to stake holes with crane, and stretches out stake holes certain altitude, by four branch
Strut is inserted into respectively in the gap of steel reinforcement cage, so that steel reinforcement cage is fixed, crane is in the second section steel reinforcement cage that will have been bound
Above allocation and transportation to first segment steel reinforcement cage, construction personnel station carries out the second section steel reinforcement cage and first segment steel reinforcement cage on operation platform
Docking, and so on, it is completed until entire steel reinforcement cage docks.
Concreting:
Two overturning platforms close, to form casting platform on operation platform surface, construction personnel stands in casting platform
On, concrete delivery pipe insertion is poured into mouth, to progress filling concrete work in stake holes.
Claims (10)
1. a kind of steel reinforcement cage installation and concrete casting platform, which is characterized in that including pedestal (1) and be fixed at pedestal
(1) operation platform (3) on, the middle position of the operation platform (3) offer steel reinforcement cage construction mouth, the operation platform
(3) it is flexibly connected on and at the position for being located at steel reinforcement cage construction mouth and is arranged in casting platform (4), the operation platform (3)
It is respectively equipped at corner location levelling device (2), the inside of the operation platform (3) is equipped with steel reinforcement cage positioning supporting frame.
2. a kind of steel reinforcement cage installation according to claim 1 and concrete casting platform, which is characterized in that the construction is flat
Level meter is additionally provided on platform (3), the level meter includes that setting is perpendicular on operation platform and at levelling device (2) position
Straight observation tube (5) and the connecting pipeline (10) being circumferentially arranged along operation platform (3), the vertical observation tube (5) and connecting pipeline
(10) it is connected.
3. a kind of steel reinforcement cage installation according to claim 1 and concrete casting platform, which is characterized in that the leveling dress
It includes adjusting screw rod and adjusting nut that (2), which are set, using screw-type levelling device, opens up mounting hole on the operation platform (3), institute
It states adjusting nut to be fixed in mounting hole, the adjusting screw rod is threaded through on adjusting nut, and its bottom is held out against in pedestal
(1) on.
4. a kind of steel reinforcement cage installation according to claim 1 and concrete casting platform, which is characterized in that the steel reinforcement cage
Positioning supporting frame includes four adjacent orthogonal support rods (6) using cross locating rack, and operation platform (3) side is set
There is installation through-hole, the support rod (6) is threaded through in installation through-hole, and extends to steel reinforcement cage construction mouth position.
5. a kind of steel reinforcement cage installation according to claim 1 and concrete casting platform, which is characterized in that the construction is flat
Platform (3) is equipped with overlap joint angle bar on the inner wall for being located at steel reinforcement cage construction mouth position, and triangle rib is fixedly installed on the overlap joint angle bar
Plate (9), and steel reinforcement cage construction mouth size is adjusted by triangular stall board (9).
6. a kind of steel reinforcement cage installation according to claim 1 and concrete casting platform, which is characterized in that the construction is flat
Platform (3) includes load-bearing skeleton (13) and the lateral load-bearing panel (8) being arranged on load-bearing skeleton (13), longitudinal load-bearing panel
(12), longitudinal load-bearing panel (12) is welded and fixed with load-bearing skeleton (13), the transverse direction load-bearing panel (8) and load-bearing skeleton
(13) hinged;The transverse direction load-bearing panel (8) and longitudinal load-bearing panel (12) are disposed around the surrounding of steel reinforcement cage construction mouth respectively.
7. a kind of steel reinforcement cage installation according to claim 1 and concrete casting platform, which is characterized in that it is described pour it is flat
Platform (4) center, which offers, to be poured mouth (7), and the casting platform (4) is spelled using two symmetrically arranged overturning platforms (14)
It connects, the overturning platform (14) is flexibly connected with operation platform (3) respectively;The overturning platform (14) includes lateral I-shaped
It is welded on steel skeleton (16) and longitudinal I-shaped steel skeleton (11), the transverse direction I-shaped steel skeleton (16) and longitudinal I-shaped steel skeleton (11)
Setting installation panel (17) is connect, the casting platform (4) passes through longitudinal I-shaped steel skeleton (11) and is overlapped on operation platform (3).
8. a kind of steel reinforcement cage installation according to claim 1 or claim 7 and concrete casting platform, which is characterized in that described to apply
It is being located at steel reinforcement cage construction mouth two sides equipped with hinged seat (15) on work platform (3), the casting platform (4) passes through hinged seat (15)
It is movably connected on operation platform (3).
9. a kind of steel reinforcement cage installation according to claim 1 and concrete casting platform, which is characterized in that the pedestal
(1) welding is arranged on operation platform (3) and is located at two side positions of steel reinforcement cage construction mouth.
10. a kind of steel reinforcement cage installation according to claim 1 and concrete casting platform, which is characterized in that described to pour
The area of platform (4) is more than or equal to the area of steel reinforcement cage construction mouth.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821721369.1U CN209397590U (en) | 2018-10-23 | 2018-10-23 | A kind of installation of steel reinforcement cage and concrete casting platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821721369.1U CN209397590U (en) | 2018-10-23 | 2018-10-23 | A kind of installation of steel reinforcement cage and concrete casting platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209397590U true CN209397590U (en) | 2019-09-17 |
Family
ID=67878878
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821721369.1U Active CN209397590U (en) | 2018-10-23 | 2018-10-23 | A kind of installation of steel reinforcement cage and concrete casting platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209397590U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109252511A (en) * | 2018-10-23 | 2019-01-22 | 杭州市市政工程集团有限公司 | A kind of installation of steel reinforcement cage and concrete casting platform |
-
2018
- 2018-10-23 CN CN201821721369.1U patent/CN209397590U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109252511A (en) * | 2018-10-23 | 2019-01-22 | 杭州市市政工程集团有限公司 | A kind of installation of steel reinforcement cage and concrete casting platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109252511A (en) | A kind of installation of steel reinforcement cage and concrete casting platform | |
CN104532813B (en) | A kind of aquatic building operation platform and erection method, using method | |
CN105735319B (en) | A kind of large diameter steel pipe stand column pile fast positioning plumbing device and construction method | |
CN205189423U (en) | Bar planting auxiliary device | |
CN108643192A (en) | Brace in Deep Footing Groove supporting ultralong steel tube column pile construction method | |
CN201258496Y (en) | One-column and one-pile correcting device | |
CN105586833B (en) | Stiff skeleton steel reinforcement cage global formation large-scale cast-in-place tall pier and thin wall construction method | |
CN103352428A (en) | Suspension bridge cable bent tower beam non-support construction method | |
WO2013110126A1 (en) | Automated formwork climbing system | |
CN209397590U (en) | A kind of installation of steel reinforcement cage and concrete casting platform | |
CN103669634B (en) | Construction method and the structure of after-pouring damping wall | |
CN102828469A (en) | Positioning mounting construction method for triangular steel constructed pillar of inclined-leg steel box | |
CN210918297U (en) | Auxiliary device for positioning embedded bolt | |
CN208183758U (en) | The stake holes lattice column positioning and plumbing system of dry method pore-forming | |
CN205894490U (en) | Steel core concrete column and pile foundation connection structure | |
CN110106881A (en) | A kind of steel-pipe pile construction guidance locating rack and construction method | |
CN207177255U (en) | The detachable suspension scaffold of concrete wall | |
CN212641437U (en) | Pile-forming orifice operation device for large-diameter ultra-deep cast-in-place pile | |
CN212956530U (en) | Upright pile verticality control and positioning leading-in device | |
CN104831832A (en) | Assembly type shearing wall structure and mounting method thereof | |
CN210342034U (en) | Building jacking deviation correcting device | |
CN209277162U (en) | A kind of stake holes pours job platform | |
CN102296600A (en) | Method for positioning middle pile of spread built subway station | |
CN107587770A (en) | Disjunctor storehouse synchronization slding form operation method | |
CN106939557A (en) | A kind of pin-connected panel bracket casting platform of brace support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |