CN209339377U - A kind of installation fixed structure of building wall board - Google Patents
A kind of installation fixed structure of building wall board Download PDFInfo
- Publication number
- CN209339377U CN209339377U CN201822168100.1U CN201822168100U CN209339377U CN 209339377 U CN209339377 U CN 209339377U CN 201822168100 U CN201822168100 U CN 201822168100U CN 209339377 U CN209339377 U CN 209339377U
- Authority
- CN
- China
- Prior art keywords
- fixed plate
- wallboard
- fixed
- plate
- supporting beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model discloses a kind of installation fixed structures of building wall board, belong to technical field of buildings, its key points of the technical solution are that including multiple wallboards and fixed frame, fixed frame includes the first fixed plate and the second fixed plate, fixing groove is offered in the first fixed plate and the second fixed plate, fixing groove is used cooperatively with wallboard, so that wallboard is inserted into fixing groove, the supporting element being supported for the bottom to wallboard is equipped on fixed frame, supporting element is fixedly connected with fixed frame.Achieve the effect that save manpower and time when wallboard installation.
Description
Technical field
The utility model relates to building field, in particular to the installation fixed structure of a kind of building wall board.
Background technique
Building wall board structure is chiefly used in the building such as house, apartment, office building, school.The load bearing wall of panel structure is available
Brick, building block, prefabricated or cast-in-place concrete are made into.Traditional building wall board during installation, by wallboard and wallboard it
Between smear adhesive so that stable connection between wallboard.But this traditional mounting means not only expends largely during installation
Manpower, while also being taken a substantial amount of time during installation, when demolishing buildings and destructive, after leading to disassembly
Wallboard can not reuse, cause to waste.
Utility model content
In view of the deficienciess of the prior art, the purpose of the utility model is to provide a kind of installation fixed knots of building wall board
Structure achievees the effect that save manpower and time when wallboard installation.
The above-mentioned technical purpose of the utility model has the technical scheme that
A kind of installation fixed structure of building wall board, including multiple wallboards and fixed frame, fixed frame include the first fixed plate
With the second fixed plate, fixing groove is offered in the first fixed plate and the second fixed plate, fixing groove is used cooperatively with wallboard, is made
It obtains wallboard to be inserted into fixing groove, the supporting element being supported for the bottom to wallboard, supporting element is equipped on fixed frame
It is fixedly connected with fixed frame.
By using above-mentioned technical proposal, when wallboard and the first fixed plate and the second fixed plate are used cooperatively, guarantee wallboard
Precision when installation, while the time of scene processing and measurement is also saved, the first fixed plate is inserted into the two sides of single wallboard
In the fixing groove of the second fixed plate, so that the wallboard of bottom is abutted with supporting element, the support to wallboard bottom is realized, then
Remaining is sequentially inserted into fixing groove, and is successively added up, realizes that installation, the setting of the first fixed plate and the second fixed plate rise
To the effect that multiple wallboards are fixed, without smearing adhesive between adjacent wallboard, save manpower when installation and
Time, while in disassembly, the setting of two sides the first fixed plate and the second fixed plate, so that the wallboard after disassembly can also repeat benefit
With reduction waste.
Originally practical to be further arranged to, the supporting element is horizontal support plate, and the section of support plate is concave, and and wall
The thickness of plate is used cooperatively.
By using above-mentioned technical proposal, when the section of support plate is concave, wallboard is caught in support plate, arrives
It up to while being supported to wallboard, is also prevented between wallboard and support plate and misplaces, improve convenience when installation.
This is practical to be further arranged to, the both ends of the support plate with pass through bolt with the first fixed plate, the second fixed plate
Reinforce fixing.
By using above-mentioned technical proposal, the both ends of support plate and the first fixed plate, the second fixed plate are reinforced with bolt
Afterwards, the stability and firmness that support plate uses are improved.
Originally practical to be further arranged to, the top of the wallboard is equipped with horizontal supporting beam, and the section of supporting beam is concave,
And it can be stuck in the first fixed plate and the second fixed plate.
By using above-mentioned technical proposal, after supporting beam is stuck in the first fixed plate and the second fixed plate, both realized to top
The protection of portion's wallboard, while also realizing the limitation to the first fixed plate and the second fixed plate, it effectively prevent the two sides of fixing groove to open
It splits, improves the safety used.
Originally practical to be further arranged to, it is equipped between the supporting beam and the first fixed plate and the second fixed plate for support
The reinforcement assembly that beam is fixed.
By using above-mentioned technical proposal, the setting of reinforcement assembly, to supporting beam and the first fixed plate, the second fixed plate
Further booster action is played in connection, effectively prevent supporting beam and the first fixed plate, the second fixed plate during installation
Separation improves safety when installation.
This is practical to be further arranged to, and the reinforcement assembly includes securing plate and reinforces bolt, and securing plate is in U-shape structure energy
Enough be stuck in supporting beam, it is horizontally disposed to reinforce bolt, pass through the first fixed plate, supporting beam and wallboard and with the first fixed plate, branch
Beam is supportted to be threadedly coupled.
By using above-mentioned technical proposal, securing plate is stuck in the both ends of supporting beam length direction, and screw rod insertion is added
In hole on solid plate, the first fixed plate, supporting beam and wallboard, standing screw is tightened, so that standing screw and securing plate, first
Fixed plate and supporting beam are threadedly coupled, and realize the fixation to securing plate, at the same also effectively prevent supporting beam and the first fixed plate and
The separation of second fixed plate.
Originally practical to be further arranged to, the protective pad of U-shaped, the length and wallboard of protective pad are equipped between each wallboard
Length it is consistent, and can be stuck on wallboard.
By using above-mentioned technical proposal, certain protection is played in the setting of protective pad to the place that wallboard connects with wallboard
Effect, prevents from damaging wallboard during installation, has both improved the use intensity of wallboard, secondary can also make after dismounting
With.
Originally practical to be further arranged to, the protective pad is made of rubber material.
By using above-mentioned technical proposal, the protective pad of rubber material is softer, also reduces when two wallboards are installed
Impact force.
In conclusion the utility model has the following beneficial effects:
1, fixed frame and supporting beam, support plate are used cooperatively, and have both been realized to the fixation of multiple wallboards, have been facilitated staff
Installation, while also wallboard is played a certain protective role, so that secondary can be used after wallboard disassembly;
2, the setting of protective pad, the position to connect to two wallboards play a certain protective role, and reduce during installation two
Impact force between a wallboard plays the role of further protection to wallboard, and it is convenient also to provide to the installation of staff.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is intended to show structural schematic diagram when fixing groove.
In figure, 1, wallboard;2, fixed frame;21, the first fixed plate;22, the second fixed plate;3, fixing groove;4, support plate;5,
Supporting beam;6, reinforcement assembly;61, securing plate;62, bolt is reinforced;7, protective pad.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
A kind of installation fixed structure of building wall board, as shown in Figure 1, including wallboard 1, fixed frame 2, supporting element and supporting beam
5, wallboard 1 is provided with multiple, and connect with fixed frame 2, supporting element is support plate 4, and the bottom of fixed frame 2 is arranged in support plate 4
And be used cooperatively with wallboard 1, the top that fixed frame 2 is arranged in supporting beam 5 is connect with wallboard 1.In use, by multiple wallboards 1 with
Fixed frame 2 connects, and bottom is abutted with support plate 4, and top is abutted with supporting beam 5, realizes the fixation to multiple wallboards 1, facilitates work
Make personnel's installation.
Fixed frame 2 includes vertical the first fixed plate 21 and the second fixed plate 22, the first fixed plate 21, the second fixed plate 22
Height and the height of multiple wallboards 1 and identical, the first fixed plate 21 is identical with the size of the second fixed plate 22, in conjunction with Fig. 2,
First fixed plate 21 and the opposite side of the second fixed plate 22 offer fixing groove 3, and two fixing grooves 3 are opposite, fixing groove 3 and wall
Plate 1 is used cooperatively, so that wallboard 1 is inserted into fixing groove 3.Support plate 4 is horizontally disposed, and the section of support plate 4 is concave,
And wallboard 1 is enabled to be inserted into support plate 4, and the both ends of 4 length direction of support plate and the first fixed plate 21 and second are fixed
22 plug connection of plate, support plate 4 are reinforced fixing after connecting with the first fixed plate 21, the second fixed plate 22 by bolt.
In use, the first fixed plate 21 and the second fixed plate 22 to be stuck in the two sides of wallboard 1, then, will be supported with bolt
Plate 4 and the first fixed plate 21, the second fixed plate 22 are fixed, while wallboard 1 is inserted into support plate 4, the first fixed plate 21, the
Multiple wallboards 1 were both played certain fixed function, while support plate 4 makes by being used cooperatively for two fixed plates 22 and support plate 4
First fixed plate 21 and the second fixed plate 22 connect even closer with wallboard 1, effectively prevent loosening, convenient when improving installation
Property.
As shown in Figure 1, the section of supporting beam 5 is concave and is horizontally disposed with, supporting beam 5 can be stuck in 21 He of the first fixed plate
In second fixed plate 22, the cladding to the first fixed plate 21, the second fixed plate 22 and top panel 1 is realized.It is set in supporting beam 5
Have and reinforce supporting beam 5 and the first fixed plate 21, the second fixed plate 22 fixed reinforcement assembly 6, reinforcement assembly 6 includes securing plate
61 are in U-shape with reinforcing bolt 62, the section of securing plate 61, and there are two the settings of securing plate 61, are located at 5 length side of supporting beam
To both ends, and can be stuck in vertically in supporting beam 5, in securing plate 61, supporting beam 5, the first fixed plate 21, the second fixed plate 22
On offer and reinforce the threaded hole that is used cooperatively of bolt 62.
After reinforcing bolt 62 is threadedly coupled with securing plate 61, supporting beam 5, the first fixed plate 21, consolidating to supporting beam 5 is realized
It is fixed, it prevents from being detached from during installation between supporting beam 5 and the first fixed plate 21, the second fixed plate 22, improves the convenient of operation
The stability of property and installation, while in the process of disassembly, wallboard 1 will not be damaged, be able to carry out secondary use.
The protective pad 7 of rubber material is arranged on each wallboard 1, the section of protective pad 7 is in U-shape (with reference to Fig. 2) and energy
It is stuck on wallboard 1.The setting of protective pad 7 plays a certain protective role the two sides up and down of wallboard 1, effectively prevent to wallboard 1
It damages, thus allows for secondary use.
The implementation principle of the present embodiment are as follows:
It is stitched together by 7 sets of the protective pad two sides in wallboard 1, and by wallboard 1, then by the first fixed plate 21 and second
Fixed plate 22 is stuck on wallboard 1, then the both ends of support plate 4 is plugged in the first fixed plate 21 and the second fixed plate 22, so
It is with bolt that support plate 4 and the first fixed plate 21, the second fixed plate 22 is fixed afterwards, supporting beam 5 is stuck in 21 He of the first fixed plate
In second fixed plate 22, then securing plate 61 is stuck in the both ends of supporting beam 5, in securing plate 61, supporting beam 5, the first fixed plate
21, threaded hole is offered on the second fixed plate 22 and wallboard 1, then will reinforces bolt 62 and securing plate 61, supporting beam 5, first
Fixed plate 21 is fixed, and effectively prevent the loosening of supporting beam 5, improves the stability and convenience of installation.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability
Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but
As long as all by the protection of Patent Law in the scope of the claims of the utility model.
Claims (8)
1. a kind of installation fixed structure of building wall board, it is characterised in that: including multiple wallboards (1) and fixed frame (2), fixed frame
(2) include the first fixed plate (21) and the second fixed plate (22), opened in the first fixed plate (21) and the second fixed plate (22)
Equipped with fixing groove (3), fixing groove (3) is used cooperatively with wallboard (1), so that wallboard (1) is inserted into fixing groove (3), solid
Determine frame (2) and be equipped with the supporting element being supported for the bottom to wallboard (1), supporting element is fixedly connected with fixed frame (2).
2. a kind of installation fixed structure of building wall board according to claim 1, it is characterised in that: the supporting element is water
Flat support plate (4), the section of support plate (4) is concave, and is used cooperatively with the thickness of wallboard (1).
3. a kind of installation fixed structure of building wall board according to claim 2, it is characterised in that: the support plate (4)
Both ends and the first fixed plate (21), the second fixed plate (22) by bolt reinforce fixation.
4. a kind of installation fixed structure of building wall board according to claim 1, it is characterised in that: the wallboard (1)
Top is equipped with horizontal supporting beam (5), and the section of supporting beam (5) is concave, and can be stuck in the first fixed plate (21) and second
In fixed plate (22).
5. a kind of installation fixed structure of building wall board according to claim 4, it is characterised in that: the supporting beam (5)
The reinforcement assembly (6) for supporting beam (5) to be fixed is equipped between the first fixed plate (21) and the second fixed plate (22).
6. a kind of installation fixed structure of building wall board according to claim 5, it is characterised in that: the reinforcement assembly
(6) include securing plate (61) and reinforce bolt (62), securing plate (61) structure that is in U-shape can be stuck on supporting beam (5), reinforce spiral shell
Bolt (62) is horizontally disposed, pass through the first fixed plate (21), supporting beam (5) and wallboard (1) and with the first fixed plate (21), supporting beam
(5) it is threadedly coupled.
7. a kind of installation fixed structure of building wall board according to claim 1, it is characterised in that: each wallboard
(1) protective pad (7) of U-shaped is equipped between, the length of protective pad (7) is consistent with the length of wallboard (1), and can be stuck in wallboard (1)
On.
8. a kind of installation fixed structure of building wall board according to claim 7, it is characterised in that: the protective pad (7)
It is made of rubber material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822168100.1U CN209339377U (en) | 2018-12-24 | 2018-12-24 | A kind of installation fixed structure of building wall board |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822168100.1U CN209339377U (en) | 2018-12-24 | 2018-12-24 | A kind of installation fixed structure of building wall board |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209339377U true CN209339377U (en) | 2019-09-03 |
Family
ID=67758450
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822168100.1U Expired - Fee Related CN209339377U (en) | 2018-12-24 | 2018-12-24 | A kind of installation fixed structure of building wall board |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209339377U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112392176A (en) * | 2020-10-21 | 2021-02-23 | 湖南省建新建材有限公司 | Can dismantle resin partition plate of cycle use |
-
2018
- 2018-12-24 CN CN201822168100.1U patent/CN209339377U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112392176A (en) * | 2020-10-21 | 2021-02-23 | 湖南省建新建材有限公司 | Can dismantle resin partition plate of cycle use |
CN112392176B (en) * | 2020-10-21 | 2022-09-16 | 湖南省建新建材有限公司 | Can dismantle resin partition plate of cycle use |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109610688A (en) | A kind of the installation fixed structure and its installation method of building wall board | |
CN105133830A (en) | Formwork reinforcing system replacing wood with steel and construction technology thereof in external wall construction | |
CN208328979U (en) | Retaining Wall | |
CN209817088U (en) | Prefabricated balcony of assembled | |
CN209339377U (en) | A kind of installation fixed structure of building wall board | |
CN212154127U (en) | Roof post-cast strip quick detach bearing structure | |
CN219773324U (en) | Concrete beam plate structure | |
CN209308409U (en) | It is a kind of for pouring the quick assembling steel form of steel reinforced concrete rectangular column | |
CN204001289U (en) | There is the light steel keel partition that carries the arm of encorbelmenting | |
CN105544743A (en) | Light weight wallboard pre-stress connection method | |
CN213682650U (en) | Prefabricated steel construction building ALC interior partition wall joint construction | |
CN204782178U (en) | System is just before a battle changed to people's air defence basement | |
CN211524170U (en) | Constructional engineering frame roof beam reinforcing apparatus | |
CN210421393U (en) | Wooden joist floor and descending plate joint structure | |
CN204040457U (en) | Wooden frame plastic formwork system | |
CN208685477U (en) | Municipal works soundproof wall | |
CN208870337U (en) | A kind of assembled integrated wall brick system transverse direction integrated support structure | |
CN207728098U (en) | A kind of sound-proof sound-absorbing enclosure wall | |
CN214995286U (en) | Metal roof board rib formula additional strengthening | |
CN219737037U (en) | Building engineering is with floor intensity of strength detection device | |
CN216865961U (en) | Light wallboard non-vertical member combination formula mount | |
CN207920069U (en) | A kind of shear-wall strengthening structure | |
CN217924320U (en) | High-strength bottom film-dismantling-free support-free steel bar truss floor bearing plate | |
CN218541243U (en) | Corridor frame photovoltaic waterproof support | |
CN214220083U (en) | Prefabricated shear wall of assembled |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190903 Termination date: 20201224 |