CN208870337U - A kind of assembled integrated wall brick system transverse direction integrated support structure - Google Patents
A kind of assembled integrated wall brick system transverse direction integrated support structure Download PDFInfo
- Publication number
- CN208870337U CN208870337U CN201821300425.4U CN201821300425U CN208870337U CN 208870337 U CN208870337 U CN 208870337U CN 201821300425 U CN201821300425 U CN 201821300425U CN 208870337 U CN208870337 U CN 208870337U
- Authority
- CN
- China
- Prior art keywords
- walltile
- cross member
- angle
- hook
- card
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Finishing Walls (AREA)
Abstract
A kind of assembled integrated wall brick system transverse direction integrated support structure, it is related to walltile processing, assembled device and assembly mounting process field.The utility model solves the problems, such as existing walltile wet combining method there are working environments that poor, long construction period, cost of labor be big, worker is susceptible to suffer from pneumoconiosis;And existing walltile dry-hanging method is there are erroneous for installation, artificial and material cost is higher, and walltile back accessory keel occupied space is larger, the problem of reducing interior space utilization rate.The vertical member of the utility model and corner are affixed; a card I is clamped in each pair of longitudinal fish scale punching of vertical member; multiple cross member I are equipped between two neighboring vertical member; the back of walltile is equipped with elastic protective film; walltile is mounted between two neighboring cross member I, and the card slot of walltile upper and lower end face cooperates with the first hook of cross member I and the second hook respectively.The utility model is used for the assembly of assembled integrated wall brick system.
Description
Technical field
The utility model relates to assembled integrated wall brick system and assembly technology fields, are specifically related to a kind of assembled collection
At walltile system transverse direction integrated support structure.
Background technique
Existing walltile mounting means is mainly wet combining method and dry-hanging method.Wet combining method divides common wet combining method, back bolt type again
Wet combining method and walltile glue for tile wet combining method.
Common wet combining method and back bolt type wet combining method are all to need to spread cement mortar at the walltile back side and paste on the wall,
Back of the body bolt is fixed on the basis of common wet combining method in the cementing fixing bolt in the walltile back side, and with screw by back bolt type wet combining method
Wall increases secured intensity.Common wet combining method has the advantages of technical of less demanding, firm pasting with back bolt type wet combining method.
However, wet combining method needs cement mortar to stir, indoor environment is filthy, and worker constructs under dust atmosphere, increases dirt
Tuberculosis dust construction environment.Wet combining method construction period is longer, and skilled worker's profession degree requires height, cost of labor big.Walltile glue formula
Wet combining method spreads dedicated glue for tile at the walltile back side, stickup facilitate it is secured, but since domestic construction quality is also weak, metope
Phenomena such as flatness error is larger is generally existing, and glue for tile construction is in uneven thickness, finally makes cost of labor and material cost
It greatly promotes.It is easy to crack to fall off after the construction of wet combining method to hurt sb.'s feelings, therefore, paving height is severely limited.
Dry-hanging method needs on the wall installation keel in advance, and walltile is processed groove and accessory is inserted into metope frog
In, then hang over accessory on keel.Dry-hanging method, which has, installs firm, the unrestricted advantage of mounting height.However, dry-hanging method is pacified
Fill cumbersome, artificial, material cost is higher, walltile back accessory keel occupied space is larger, tapped after installation be free drum sound and
It collides frangible.
In conclusion existing walltile wet combining method there are working environments poor, long construction period, cost of labor are big, worker
The problem of being susceptible to suffer from pneumoconiosis;And existing walltile dry-hanging method is there are erroneous for installation, artificial and material cost is higher, walltile back
The problem of portion's accessory keel occupied space is larger, reduces interior space utilization rate.
Utility model content
Purpose of the utility model is to solve existing walltile wet combining method there are working environments poor, construction periods
The problem of length, cost of labor are big, worker is susceptible to suffer from pneumoconiosis;And there are erroneous for installation, artificial and materials for existing walltile dry-hanging method
The problem of material higher cost, walltile back accessory keel occupied space is larger, reduces interior space utilization rate, and then provide
A kind of assembled integrated wall brick system transverse direction integrated support structure.
The technical solution of the utility model is:
A kind of assembled integrated wall brick system transverse direction integrated support structure, it includes cross member I, vertical member, card
I, walltile and elastic protective film, vertical member are right angle pole type component, and vertical member is affixed with corner, the two of vertical member
The longitudinal fish scale punching of multipair opening direction upward is symmetrically opened up on side, card I is L-type structure, and each pair of of vertical member indulges
A card I is clamped in fish scale punching, multiple cross members I are equipped between two neighboring vertical member, and cross member I is bullet
Property component, cross member I forms by integrated member body, the first hook and the second hook is made, and member body is placed in the
Between one hook and the second hook, the first hook and second links up with the same side for being located at member body, and member body is U-shaped knot
Structure uniformly opens up multiple first group of strip through-hole in member body in the horizontal direction, and member body passes through multiple first group of bar shaped
Through-hole is anchored on wall, and the both ends of cross member I and card I are mutually clamped, and the back of walltile is equipped with elastic protective film, bullet
Property protective film and walltile back are bonding, and the upper and lower end face of walltile is provided with card slot, and walltile is mounted on two neighboring transverse direction
Between component I, the card slot of walltile upper and lower end face cooperates with the first hook of cross member I and the second hook respectively.
A kind of assembled integrated wall brick system transverse direction integrated support structure, it includes cross member II, vertical member, card
II, walltile and elastic protective film, vertical member are right angle pole type component, and vertical member is affixed with corner, vertical member
Symmetrically open up the longitudinal fish scale punching of multipair opening direction upward on two sides, card II is L-type structure, vertical member it is each pair of
A card II is clamped in longitudinal fish scale punching, is equipped with multiple cross members II, cross member between two neighboring vertical member
II is H-type rigid member, and cross member II is formed by the first integrated fixed part, third hook and the 4th hook is made, the
Three hooks and the 4th hook are located at the same side of the first fixed part, and the first fixed part is plate structure, along water on the first fixed part
Square to multiple second group of strip through-hole are uniformly opened up, the first fixed part is anchored at wall by multiple second group of strip through-hole
On, the both ends of cross member II and card II are mutually clamped, and the back of walltile is equipped with elastic protective film, elastic protective film and wall
Face brick back is bonding, and the upper and lower end face of walltile is provided with card slot, and walltile is mounted between two neighboring cross member II, wall
The card slot of face brick upper and lower end face cooperates with the third of cross member II hook and the 4th hook respectively.
The utility model has the effect that compared with prior art
1, the cross member of the utility model, vertical member, card, walltile and fixation kit can pass through factory process
Unified modular design customization, the upright bar of external corner right angle and the upright bar of inner corner trim right angle of the utility model are separately fixed at yin, yang corner,
Successively cross member is overlapped in right angle upright bar, the edge up and down of cross member and the both ends groove of walltile are mutually clamped,
Entirety is formed, it is vertical that the utility model installs right angle at the equipment pipes such as inner corner trim external corner, door and window mouth, flue air duct as needed
Bar, card make it form complete support system with cross member, and fix with wall, on the one hand, can guarantee that walltile assembles
Securely, on the other hand, disassembly is convenient, efficient, is easily changed, high degree shortens the construction period, and improves the service efficiency of fund, subtracts
Lack to refill and has repaired disassembly cost.
2, the cross member of the utility model is easy to process, it can be achieved that batch production, and the cost of material is low, and quality is light
It is full of, is easily portable, freight charges is lower and do not generate transport stockyard expense, and cross member is fabricated for environment-friendly materials, reduces and apply
Work produces the influence to environment.Social resources are saved, it is environmentally protective, the raw material of manufacture ceramic tile have not only been saved, have been subtracted simultaneously
The destruction to environment is lacked, social resources are the common wealths of the mankind.The price material benefit of secondary operation ceramic tile, not using functional effect
Become, change consumption values, meets environmentally friendly virtue according to the quality of recycling ceramic tile and material to carry out classification recycling, Ke Yijie
The wall brick removal cost overhauled is saved, so that it is lower to overhaul cost.
3, the walltile back of the utility model is equipped with elastic protective film, plays protection finished wall face brick during transportation
Effect, when installation do not tear discarding, effectively reduces white garbage pollution, after walltile installation, elastic protective film plays elasticity
Bearing, the effect of enhancing globality;Elastic protective film play simultaneously eliminate hollowing sense, improve anti-seismic performance, avoid structural cracks,
Separate the effect that cold bridge, heat preservation poultry are hot, punch non-friable raising crack resistance;It is straight that wall brick behind bond paper facing can prevent stone material
Connect the accumulation of salt in the surface soil white birch phenomenon occurred with concrete contact surface;Stone material and concrete is absorbed to occur because coefficient of thermal expansion is different
Small Relative Displacement;Prevent not having to fall problem when the fracture of anchorage part stone material crack.
4, the utility model is lower to worker's mounting technique level requirement compared with existing walltile wet combining method, drop
The low training cost of worker, the operation cleaned in situ of the utility model do not use traditional cement mortar, have built a kind of without wet
Operation, without the pneumoconiosis construction environment such as dust, the policy of active response national energy conservation and emission reduction greatly ensure that the health of worker
Situation.
5, for the utility model compared with existing walltile dry-hanging method, the cross member thickness of the utility model is small, at
This is cheap, reduces walltile and installs thickness, increases owner's usable floor area, effectively improves the utilization rate of the interior space and obtains room
Rate.According to measuring and calculating, by taking existing typical unit house type (+85 ㎡ of 115 ㎡) as an example, walltile, this element are fitted up using the assembling method
Every layer of increase usable floor area is 2.13 ㎡.
6, by taking 20 residential quarters Wan ㎡ as an example, walltile usage amount be 14 Wan ㎡ (including toilet, escalator, greatly
Area Tang Gong etc.), by taking (+85 ㎡ of 115 ㎡) standard block as an example, cement mortar 5600m can be saved3, 5000 tons of water is (including applying
Work process water, later period maintenance water etc.), river sand 4200m3, cement 1400m3(2520 tons) greatly save resource.
7, the walltile after the utility model disassembly can be unified to recycle.Old wall brick is removed, it is high that integrity degree may be selected
The secondary glazing processing of carry out, secondary use can be carried out so that overhaul cost reduction, while will appear in the market effect height, valence
The wall brick product of lattice material benefit reduces finishing to family and overhauls cost input, while driving the development in wall brick market;It may be selected
It is complete higher as construction material secondary use, such as exterior wall tile can be put into and used, resource is reused,
Save social resources and cost;May be selected integrity degree it is poor carry out pulverization process, use as building material, can such as make
For the raw material of in-filled block brick, the waste of social resources is reduced, while the cost of some construction materials can be reduced;Selection is complete
The poor filler that can be used as construction is spent, as ground is filled.With the development of science and technology and subtract the needs of material, crushes
It adds and uses as the raw material of ceramic tile idiosome afterwards.
8, the utility model versatility with higher is suitable for exterior wall tile, internal wall brick, all kinds of lithotomes, pottery clay plates
The materials for wall of equal various specifications size.
Detailed description of the invention
Fig. 1 is the assembling schematic diagram of cross member I 1;Fig. 2 is the top view of external corner right angle upright bar 2-1;Fig. 3 is that inner corner trim is straight
The top view of angle upright bar 2-2;Fig. 4 is the installation diagram of cross member I 1 Yu external corner right angle upright bar 2-1;Fig. 5 is the side view of Fig. 4;
Fig. 6 is the side view of cross member I 1;Fig. 7 is the main view of Fig. 6;Fig. 8 is the top view of walltile 4;Fig. 9 is fixation kit I
Structural schematic diagram;Figure 10 is the installation diagram of fixation kit I;Figure 11 is structural representation when fixation kit I is mounted at window
Figure;Figure 12 is the structural schematic diagram of fixation kit II;Figure 13 is the side view of Figure 11;Figure 14 is the installation diagram of fixation kit II;
Figure 15 is the side view of end fixed frame 11;Figure 16 is the assembling schematic diagram of cross member II 7;Figure 17 is cross member II 7
Side view;Figure 18 is the main view of Figure 16;Figure 19 is the installation diagram of cross member II 7 Yu angle right angle upright bar 2-1;Figure 20 is figure
18 side view;Figure 21 is the installation diagram of window cross member I 1 Yu card I 3;Figure 22 is window cross member II 7 and card
The installation diagram of piece II 8.
Specific embodiment
Specific embodiment 1: illustrating present embodiment in conjunction with Fig. 1 to Fig. 8, a kind of assembled of present embodiment is integrated
Walltile system transverse direction integrated support structure, it includes cross member I 1, vertical member, card I 3, walltile 4 and elastic protective film
6, vertical member is right angle pole type component, and vertical member is affixed with corner, symmetrically opens up on the two sides of vertical member multipair
The longitudinal fish scale punching 2-3 of opening direction upward, card I 3 are L-type structure, on each pair of longitudinal fish scale punching 2-3 of vertical member
A card I 3 is clamped, multiple cross members I 1 are equipped between two neighboring vertical member, cross member I 1 is elastic component, horizontal
It is formed to component I 1 by integrated member body 1-1, the first hook 1-2 and the second hook 1-3 is made, member body 1-1 is set
Between the first hook 1-2 and the second hook 1-3, the first hook 1-2 and the second hook 1-3 are located at the same of member body 1-1
Side, member body 1-1 are U-shaped structure, uniformly open up multiple first group of strip through-hole 1-1- in the horizontal direction on member body 1-1
1, member body 1-1 are anchored on wall 5 by multiple first group of strip through-hole 1-1-1, the both ends of cross member I 1 and card I
3 mutually clampings, the back of walltile 4 are equipped with elastic protective film 6, and elastic protective film 6 and walltile back are bonding, walltile 4
Upper and lower end face be provided with card slot 4-1, walltile 4 is mounted between two neighboring cross member I 1,4 upper and lower end face of walltile
Card slot 4-1 links up with the hook 1-3 cooperation of 1-2 and second with the first of cross member I 1 respectively.
Specific embodiment 2: illustrating present embodiment in conjunction with Fig. 2 to Fig. 5, the vertical member of present embodiment is external corner
Longitudinal fish scale punching 2-3 of right angle upright bar 2-1 or inner corner trim right angle upright bar 2-2, external corner right angle upright bar 2-1 are inclined outwardly setting, yin
Longitudinal fish scale punching 2-3 of angle right angle upright bar 2-2, which slopes inwardly, to be arranged.So set, upright bar 2-1 in external corner right angle is mounted on wall
At 5 external corners, upright bar 2-2 in inner corner trim right angle is mounted at 5 inner corner trim of wall, and longitudinal fish scale punching 2-3 is used for fixed card I 3.Other groups
At same as the specific embodiment one with connection relationship.
Specific embodiment 3: illustrating that present embodiment, present embodiment further include window in conjunction with Fig. 9, Figure 10 and Figure 11
Fixed device, the fixed device of window are fixation kit I, and fixation kit I includes the first splice plate 9-1 and the second splice plate 9-2,
It is equipped between the two neighboring locating slot of first splice plate 9-1 for the first bending part 9- with the card slot 4-1 of walltile 4 cooperation
1-1, vertical between the first bending part 9-1-1 and the first splice plate main body to connect, the two neighboring locating slot of the second splice plate 9-2
Between be equipped with for the card slot 4-1 of walltile 4 cooperation the second bending part 9-2-1, the second bending part 9-2-1 and the second spelling
It is vertically connected between fishplate bar main body.So set, fixation kit I is used to fix the walltile of upper window edge and lower edge, fixed group
Part I is clamped with the card slot 4-1 of 4 upper and lower end face of walltile respectively by the first bending part 9-1-1 and the second bending part 9-2-1, tool
There is preferable fastness.Other compositions and connection relationship are the same as one or two specific embodiments.
Specific embodiment 4: illustrating that present embodiment, present embodiment further include that window is fixed in conjunction with Figure 12 to Figure 15
Device, the fixed device of window include fixation kit II and end fixed frame 11, and fixation kit II includes positioning plate 10, positioning plate
10 be V-type positioning plate, and one end of V-type positioning plate is staggeredly equipped with for the third bending part with the card slot 4-1 of walltile 4 cooperation
10-1 and the 4th bending part 10-2, the angle of the first angle α of V-type positioning plate are 135 °, and the 4th bending part 10-2 and V-type are fixed
The angle that position plate is formed by the second angle β is 45 °, and third bending part 10-1 and V-type positioning plate are formed by third angle γ
Angle it is equal with the angle of the second angle β, end fixed frame 11 is hung by integrated the second fixed part 11-1 and the 5th is made
Hook 11-2 composition, the second fixed part 11-1 are plate structure, uniformly open up multiple the on the second fixed part 11-1 in the horizontal direction
Three groups of strip through-holes, the second fixed part 11-1 are anchored on wall 5 by multiple third group strip through-holes.So set, fixed
Component II is used to fix the walltile of upper window edge and lower edge, and fixation kit II passes through third bending part 10-1 and the 4th bending part
10-2 is clamped with the card slot 4-1 of 4 upper and lower end face of walltile respectively, has preferable fastness.It is other composition and connection relationship and
Specific embodiment one, 2 is three identical.
Specific embodiment 5: illustrating present embodiment, a kind of assembled collection of present embodiment in conjunction with Figure 16 to Figure 20
At walltile system transverse direction integrated support structure, it includes that cross member II 7, vertical member, card II 8, walltile 4 and elasticity are protected
Cuticula 6, vertical member are right angle pole type component, and vertical member is affixed with corner, symmetrically opens up on the two sides of vertical member
The longitudinal fish scale punching 2-3 of multipair opening direction upward, card II 8 are L-type structure, each pair of longitudinal fish scale punching of vertical member
A card II 8 is clamped on 2-3, multiple cross members II 7 are equipped between two neighboring vertical member, and cross member II 7 is H-type
Rigid member, cross member II 7 is by being made the first integrated fixed part 7-1, third is linked up with the hook of 7-2 and the 4th 7-3 and formed,
The third hook of hook 7-2 and the 4th 7-3 is located at the same side of the first fixed part 7-1, and the first fixed part 7-1 is plate structure, the
Multiple second group of strip through-hole 7-1-1 are uniformly opened up on one fixed part 7-1 in the horizontal direction, the first fixed part 7-1 passes through multiple
Second group of strip through-hole 7-1-1 is anchored on wall 5, and the both ends of cross member II 7 and card II 8 are mutually clamped, walltile 4
Back is equipped with elastic protective film 6, and elastic protective film 6 and walltile back are bonding, and the upper and lower end face of walltile 4 is provided with card slot 4-
1, walltile 4 is mounted between two neighboring cross member II 7, the card slot 4-1 of 4 upper and lower end face of walltile respectively with cross member
The II 7 third hook 7-3 cooperation of hook 7-2 and the 4th.
Specific embodiment 6: illustrate present embodiment in conjunction with Fig. 2, Fig. 3, Figure 19 and Figure 20, present embodiment it is vertical
Component is external corner right angle upright bar 2-1 or inner corner trim right angle upright bar 2-2, and longitudinal fish scale punching 2-3 of external corner right angle upright bar 2-1 is outside
It is obliquely installed, longitudinal fish scale punching 2-3 of inner corner trim right angle upright bar 2-2, which slopes inwardly, to be arranged.So set, external corner right angle upright bar 2-
1 is mounted at 5 external corner of wall, and upright bar 2-2 in inner corner trim right angle is mounted at 5 inner corner trim of wall, and longitudinal fish scale punching 2-3 is for fixing
Card II 8.Other compositions and connection relationship and specific embodiment one, two, three, four or five are identical.
Specific embodiment 7: illustrating that present embodiment, present embodiment further include window in conjunction with Fig. 9, Figure 10 and Figure 11
Fixed device, the fixed device of window are fixation kit I, and fixation kit I includes the first splice plate 9-1 and the second splice plate 9-2,
It is equipped between the two neighboring locating slot of first splice plate 9-1 for the first bending part 9- with the card slot 4-1 of walltile 4 cooperation
1-1, vertical between the first bending part 9-1-1 and the first splice plate main body to connect, the two neighboring locating slot of the second splice plate 9-2
Between be equipped with for the card slot 4-1 of walltile 4 cooperation the second bending part 9-2-1, the second bending part 9-2-1 and the second spelling
It is vertically connected between fishplate bar main body.So set, fixation kit I is used to fix the walltile of upper window edge and lower edge, fixed group
Part I is clamped with the card slot 4-1 of 4 upper and lower end face of walltile respectively by the first bending part 9-1-1 and the second bending part 9-2-1, tool
There is preferable fastness.Other compositions and connection relationship and specific embodiment one, two, three, four, five or six are identical.
Specific embodiment 8: illustrating that present embodiment, present embodiment further include that window is fixed in conjunction with Figure 12 to Figure 15
Device, the fixed device of window include fixation kit II and end fixed frame 11, and fixation kit II includes positioning plate 10, positioning plate
10 be V-type positioning plate, and one end of V-type positioning plate is staggeredly equipped with for the third bending part with the card slot 4-1 of walltile 4 cooperation
10-1 and the 4th bending part 10-2, the angle of the first angle α of V-type positioning plate are 135 °, and the 4th bending part 10-2 and V-type are fixed
The angle that position plate is formed by the second angle β is 45 °, and third bending part 10-1 and V-type positioning plate are formed by third angle γ
Angle it is equal with the angle of the second angle β, end fixed frame 11 is hung by integrated the second fixed part 11-1 and the 5th is made
Hook 11-2 composition, the second fixed part 11-1 are plate structure, uniformly open up multiple the on the second fixed part 11-1 in the horizontal direction
Three groups of strip through-holes, the second fixed part 11-1 are anchored on wall 5 by multiple third group strip through-holes.So set, fixed
Component II is used to fix the walltile of upper window edge and lower edge, and fixation kit II passes through third bending part 10-1 and the 4th bending part
10-2 is clamped with the card slot 4-1 of 4 upper and lower end face of walltile respectively, has preferable fastness.It is other composition and connection relationship and
Specific embodiment one, two, three, four, five, six or seven are identical.
A kind of assembly method of assembled integrated wall brick system transverse direction integrated support structure, the method includes following steps
Suddenly,
Step 1: first floor walltile assembles:
Firstly, needing to carry out water-proofing treatment to splashproof position in shower area according to waterproof, vertical member is fixed on corner
Place, a card is mounted on longitudinal fish scale punching 2-3 of vertical member, another card is pre-installed in bottom transverse direction
One end of component, the other end and card of bottom cross member are affixed, then the card of bottom cross member one end installation is installed
On longitudinal fish scale punching 2-3 of adjacent vertical member, leveling is carried out to cross member by horizontal ruler, is rushed using aperture
It hits brill bottom cross member is fixed on wall 5;Then, first block of walltile 4 of first floor walltile is caught in bottom transverse direction
At the hook of component, the mounting height of second layer cross member is determined using the height of walltile 4, in two neighboring vertical member
Between install second layer cross member, second layer cross member by card and vertical member it is affixed, finally, by remaining metope of the first floor
Brick 4 is sequentially installed on bottom cross member and second layer cross member and carries out leveling processing, when degree of plainness for wall surface is poor,
Using levelling bayonet lock to flatness adjusting is carried out, second layer cross member is fixed on wall 5 using aperture impact drill;
Step 2: second layer walltile and the assembly of remainder layer walltile:
Firstly, first block of walltile 4 of second layer walltile is caught at the hook of second layer cross member, metope is utilized
The height of brick 4 determines the mounting height of third layer cross member, and third layer transverse direction structure is installed between two neighboring vertical member
Part, third layer cross member is affixed by card and vertical member, then, the second layer remaining walltile 4 is sequentially installed on the
On two layers of cross member and third layer cross member and leveling processing is carried out, when degree of plainness for wall surface is poor, uses levelling bayonet lock
To flatness adjusting is carried out, third layer cross member is fixed on wall 5 using aperture impact drill;Finally, by remainder layer wall
Face brick is assembled according to second layer walltile assembly method;
Step 3: walltile assembles at window:
Assembly is arranged to lower window edge walltile: when the fixed device of window is fixation kit I, firstly, by lateral
Component and the first splice plate 9-1 are sequentially arranged on the vertical metope of lower window edge, and the lower end of walltile 4 is installed on lateral structure
On the hook of part;Then, the second splice plate 9-2 is mounted on the horizontal metope of lower window edge, the of the second splice plate 9-2
The upper end card slot 4-1 of two bending part 9-2-1 and walltile 4 is clamped;Finally, walltile 4 to be mounted on to the horizontal wall of lower window edge
On face, and make the first bending part 9-1-1 clamping of the front end card slot 4-1 and the first splice plate 9-1 of walltile 4;
When the fixed device of window is fixation kit II, firstly, cross member to be mounted on to the vertical metope of lower window edge
On, the lower end of walltile 4 is installed on the hook of cross member;Then, positioning plate 10 and end fixed frame 11 are successively pacified
On the horizontal metope of lower window edge, and make the 4th bending part 10-2 of positioning plate 10 and the upper end card slot 4- of walltile 4
1 clamping;Finally, walltile 4 is mounted on the horizontal metope of lower window edge, and make the front end card slot 4-1 of walltile 4 with
The third bending part 10-1 of positioning plate 10 is clamped, so that the 5th extension of the rear end card slot 4-1 of walltile 4 and end fixed frame 11
Hook 11-2 clamping;
Assembly is arranged to upper window edge walltile: when the fixed device of window is fixation kit I, with lower window edge wall
Face brick carries out assembly method similarly;When the fixed device of window is fixation kit II, firstly, by end fixed frame 11 and walltile
4 are sequentially arranged on the horizontal metope of upper window edge, and make walltile 4 rear end card slot 4-1 and end fixed frame 11 the
Five hook 11-2 clampings;Then, positioning plate 10 is mounted on the vertical metope of upper window edge, and makes the 4th of positioning plate 10 the
The front end card slot 4-1 of bending part 10-2 and walltile 4 is clamped;Walltile 4 is mounted on the vertical metope of upper window edge, and is made
The third bending part 10-1 of the lower end card slot 4-1 and positioning plate 10 that obtain walltile 4 are clamped;Finally, cross member is mounted on window
On mouth on the vertical metope on edge, and the upper end of walltile 4 is installed on the hook of cross member;
Assembly is arranged to window side brick: firstly, the cross member at one end of card and window is clamped, by card
The other end and corresponding metope arranged that cross member is clamped, walltile 4 is sequentially arranged between the cross member at window,
Cross member is fixed on wall 5 using aperture impact drill;
Step 4: walltile assembly at air duct, dirty row's standpipe:
Firstly, to dirt row standpipe outsourcing sound-proof material carry out noise reduction process, sound-proof material with a thickness of 30mm, then, dirt arrange
Standpipe edge installs vertical member, and a card is mounted on longitudinal fish scale punching 2-3 of vertical member, another is blocked
Piece is pre-installed in one end of bottom cross member, and the other end and card of bottom cross member are affixed, then by bottom transverse direction structure
Part one end installation card be mounted on longitudinal fish scale punching 2-3 of adjacent vertical member, by horizontal ruler to cross member into
Bottom cross member is fixed on wall 5 by row leveling using aperture impact drill;Finally, to dirt row standpipe edge into
The assembly of row walltile, assembly method and step 1 and step 2 are similarly;So far, the assembly for completing all walltiles, is filled out
Seam and U.S. seam processing.
Further, step 1 to card described in step 4 is card I 3 or card II 8, and cross member is lateral structure
Part I 1 or cross member II 7;Vertical member described in step 1 is external corner right angle upright bar 2-1 or inner corner trim right angle upright bar 2-2, sun
Upright bar 2-1 in angle right angle is fixedly mounted on Yang Qiangjiaochu, and upright bar 2-2 in inner corner trim right angle is fixedly mounted at negative corner.
Install and design matters explanation:
1, according to the characteristic for the Unit Weight and wall material for installing different walltiles, the load-bearing to ensure cross member is steady
It is qualitative, design the thickness and installation anchoring number of locations of corresponding material.
2, vertical member, cross member and wall mounting means, which remove, uses electronic hand drill, self threading pin, swollen plug mounting means
Outside, can be installed according to the Unit Weight of different walltiles and the characteristic of wall material using nailing gun installation, carpenter's saddle stitching,
Other mounting means such as chemical bolt, expansible anchor of metal.
Claims (8)
1. a kind of assembled integrated wall brick system transverse direction integrated support structure, it is characterised in that: it includes cross member I (1), erects
To component, card I (3), walltile (4) and elastic protective film (6), vertical member is right angle pole type component, vertical member with
Corner is affixed, and the longitudinal fish scale punching (2-3) of multipair opening direction upward, card I are symmetrically opened up on the two sides of vertical member
(3) it is L-type structure, clamps a card I (3), two neighboring vertical structure on each pair of longitudinal fish scale punching (2-3) of vertical member
Multiple cross members I (1) are equipped between part, cross member I (1) is elastic component, and cross member I (1) is integrated by being made
Member body (1-1), the first hook (1-2) and the second hook (1-3) composition, member body (1-1) are placed in the first hook (1-2)
And second between hook (1-3), the first hook (1-2) and second links up with (1-3) and is located at the same side of member body (1-1), structure
Part main body (1-1) is U-shaped structure, uniformly opens up multiple first group of strip through-hole (1-1- in the horizontal direction in member body (1-1)
1), member body (1-1) is anchored on wall (5) by multiple first group of strip through-hole (1-1-1), and the two of cross member I (1)
End is mutually clamped with card I (3), and the back of walltile (4) is equipped with elastic protective film (6), and elastic protective film (6) and walltile are carried on the back
Portion is bonding, and the upper and lower end face of walltile (4) is provided with card slot (4-1), and walltile (4) is mounted on two neighboring cross member I (1)
Between, the card slot (4-1) of walltile (4) upper and lower end face links up with (1-2) and the second hook with the first of cross member I (1) respectively
(1-3) cooperation.
2. a kind of assembled integrated wall brick system transverse direction integrated support structure according to claim 1, it is characterised in that: perpendicular
It is the upright bar of external corner right angle (2-1) or inner corner trim right angle upright bar (2-2), longitudinal fish scale punching of external corner right angle upright bar (2-1) to component
(2-3) is inclined outwardly setting, and longitudinal fish scale punching (2-3) of inner corner trim right angle upright bar (2-2), which slopes inwardly, to be arranged.
3. a kind of assembled integrated wall brick system transverse direction integrated support structure according to claim 1, it is characterised in that: it
It further include the fixed device of window, the fixed device of window is fixation kit I, and fixation kit I includes the first splice plate (9-1) and second
Splice plate (9-2) is equipped with for the card slot (4-1) with walltile (4) between the two neighboring locating slot of the first splice plate (9-1)
The first bending part (9-1-1) of cooperation, vertical between the first bending part (9-1-1) and the first splice plate main body to connect, second spells
It is equipped between the two neighboring locating slot of fishplate bar (9-2) for the second bending part with the cooperation of the card slot (4-1) of walltile (4)
(9-2-1), it is vertical between the second bending part (9-2-1) and the second splice plate main body to connect.
4. a kind of assembled integrated wall brick system transverse direction integrated support structure according to claim 1, it is characterised in that: it
It further include the fixed device of window, the fixed device of window includes fixation kit II and end fixed frame (11), and fixation kit II includes
Positioning plate (10), positioning plate (10) are V-type positioning plate, and one end of V-type positioning plate is staggeredly equipped with for the card slot with walltile (4)
The third bending part (10-1) and the 4th bending part (10-2) of (4-1) cooperation, the angle of the first angle (α) of V-type positioning plate are
135 °, the angle that the 4th bending part (10-2) is formed by the second angle (β) with V-type positioning plate is 45 °, third bending part (10-
1) angle that third angle (γ) is formed by with V-type positioning plate is equal with the angle of the second angle (β), end fixed frame (11)
It is made of the second fixed part (11-1) and the 5th hook (11-2) that are made integrated, the second fixed part (11-1) is plate knot
Structure, multiple third group strip through-holes are uniformly opened up on the second fixed part (11-1) in the horizontal direction, and the second fixed part (11-1) is logical
Multiple third group strip through-holes are crossed to be anchored on wall (5).
5. a kind of assembled integrated wall brick system transverse direction integrated support structure, it is characterised in that: it include cross member II (7),
Vertical member, card II (8), walltile (4) and elastic protective film (6), vertical member are right angle pole type component, vertical member
It is affixed with corner, the longitudinal fish scale punching (2-3) of multipair opening direction upward, card are symmetrically opened up on the two sides of vertical member
II (8) are L-type structure, clamp a card II (8) on each pair of longitudinal fish scale punching (2-3) of vertical member, two neighboring perpendicular
To between component be equipped with multiple cross members II (7), cross member II (7) be H-type rigid member, cross member II (7) be by
Integrated the first fixed part (7-1), third hook (7-2) and the 4th hook (7-3) composition, third hook (7-2) and the is made
Four hooks (7-3) are located at the same side of the first fixed part (7-1), and the first fixed part (7-1) is plate structure, the first fixed part
Uniformly open up multiple second group of strip through-hole (7-1-1) on (7-1) in the horizontal direction, the first fixed part (7-1) passes through multiple the
Two groups of strip through-holes (7-1-1) are anchored on wall (5), and the both ends of cross member II (7) and card II (8) are mutually clamped, wall
The back of face brick (4) be equipped with elastic protective film (6), elastic protective film (6) and walltile back are bonding, walltile (4) it is upper
Lower end surface is provided with card slot (4-1), and walltile (4) is mounted between two neighboring cross member II (7), walltile (4) upper and lower side
The card slot (4-1) in face cooperates with the third of cross member II (7) hook (7-2) and the 4th hook (7-3) respectively.
6. a kind of assembled integrated wall brick system transverse direction integrated support structure according to claim 5, it is characterised in that: perpendicular
It is the upright bar of external corner right angle (2-1) or inner corner trim right angle upright bar (2-2), longitudinal fish scale punching of external corner right angle upright bar (2-1) to component
(2-3) is inclined outwardly setting, and longitudinal fish scale punching (2-3) of inner corner trim right angle upright bar (2-2), which slopes inwardly, to be arranged.
7. a kind of assembled integrated wall brick system transverse direction integrated support structure according to claim 5, it is characterised in that: it
It further include the fixed device of window, the fixed device of window is fixation kit I, and fixation kit I includes the first splice plate (9-1) and second
Splice plate (9-2) is equipped with for the card slot (4-1) with walltile (4) between the two neighboring locating slot of the first splice plate (9-1)
The first bending part (9-1-1) of cooperation, vertical between the first bending part (9-1-1) and the first splice plate main body to connect, second spells
It is equipped between the two neighboring locating slot of fishplate bar (9-2) for the second bending part with the cooperation of the card slot (4-1) of walltile (4)
(9-2-1), it is vertical between the second bending part (9-2-1) and the second splice plate main body to connect.
8. a kind of assembled integrated wall brick system transverse direction integrated support structure according to claim 5, it is characterised in that: it
It further include the fixed device of window, the fixed device of window includes fixation kit II and end fixed frame (11), and fixation kit II includes
Positioning plate (10), positioning plate (10) are V-type positioning plate, and one end of V-type positioning plate is staggeredly equipped with for the card slot with walltile (4)
The third bending part (10-1) and the 4th bending part (10-2) of (4-1) cooperation, the angle of the first angle (α) of V-type positioning plate are
135 °, the angle that the 4th bending part (10-2) is formed by the second angle (β) with V-type positioning plate is 45 °, third bending part (10-
1) angle that third angle (γ) is formed by with V-type positioning plate is equal with the angle of the second angle (β), end fixed frame (11)
It is made of the second fixed part (11-1) and the 5th hook (11-2) that are made integrated, the second fixed part (11-1) is plate knot
Structure, multiple third group strip through-holes are uniformly opened up on the second fixed part (11-1) in the horizontal direction, and the second fixed part (11-1) is logical
Multiple third group strip through-holes are crossed to be anchored on wall (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821300425.4U CN208870337U (en) | 2018-07-30 | 2018-07-30 | A kind of assembled integrated wall brick system transverse direction integrated support structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821300425.4U CN208870337U (en) | 2018-07-30 | 2018-07-30 | A kind of assembled integrated wall brick system transverse direction integrated support structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208870337U true CN208870337U (en) | 2019-05-17 |
Family
ID=66464518
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821300425.4U Expired - Fee Related CN208870337U (en) | 2018-07-30 | 2018-07-30 | A kind of assembled integrated wall brick system transverse direction integrated support structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208870337U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109083356A (en) * | 2018-07-30 | 2018-12-25 | 王圣保 | A kind of assembled integrated wall brick system transverse direction integrated support structure and its assembly method |
-
2018
- 2018-07-30 CN CN201821300425.4U patent/CN208870337U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109083356A (en) * | 2018-07-30 | 2018-12-25 | 王圣保 | A kind of assembled integrated wall brick system transverse direction integrated support structure and its assembly method |
CN109083356B (en) * | 2018-07-30 | 2023-10-03 | 王圣保 | Transverse integral component of assembled integrated wall tile system and assembling method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108756120A (en) | Fixed component and its assembly method are stitched in a kind of assembled integrated wall brick system | |
CN100526577C (en) | Exterior wall heat-preserving decorating curtain wall and construction method thereof | |
CN109339632B (en) | Construction method of light concrete strip plate partition wall door opening | |
KR100935095B1 (en) | The outer wall insulation materials and the structure | |
CN109083356A (en) | A kind of assembled integrated wall brick system transverse direction integrated support structure and its assembly method | |
CN208870337U (en) | A kind of assembled integrated wall brick system transverse direction integrated support structure | |
CN113833154A (en) | Decorative board wall and construction method thereof | |
CN207863391U (en) | A kind of construction and decoration scoop for clearing up ground | |
CN101397835A (en) | External wall constructing structure | |
CN208870336U (en) | Fixed component is stitched in a kind of assembled integrated wall brick system | |
CN207829511U (en) | A kind of existing building external wall reconstruction structure | |
JP4175658B2 (en) | Construction method of composite panel on concrete outer wall of reinforced concrete building | |
CN219081040U (en) | Mounting and positioning structure for PCF (prestressed concrete cylinder pipe) board of assembled building | |
CN217175901U (en) | A reinforced structure for being directed at native brick wall carries out three-dimensional reinforcement | |
CN110878594A (en) | Glass wool composite board and external thermal insulation construction process for glass wool composite board external wall | |
JP2008303547A (en) | Construction method for externally mounting composite panel on exterior concrete wall of reinforced concrete building | |
CN204001289U (en) | There is the light steel keel partition that carries the arm of encorbelmenting | |
CN103835522B (en) | Short wall support energy consumption damping reinforcement structure and construction technology | |
CN210713375U (en) | Light steel keel wall structure | |
CN209339377U (en) | A kind of installation fixed structure of building wall board | |
CN114086677A (en) | Heat-preservation construction process | |
CN113818647A (en) | Composite board integrated wall module and installation method thereof | |
CN216840018U (en) | Decorative board wall | |
CN111206737A (en) | Wall connecting piece of plug-in type low-carbon heat-preservation energy-saving plate | |
CN115434526B (en) | Mounting, positioning and construction method for PCF (prestressed concrete cylinder pipe) plate of assembled building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190517 Termination date: 20210730 |