CN207920069U - A kind of shear-wall strengthening structure - Google Patents

A kind of shear-wall strengthening structure Download PDF

Info

Publication number
CN207920069U
CN207920069U CN201721812203.6U CN201721812203U CN207920069U CN 207920069 U CN207920069 U CN 207920069U CN 201721812203 U CN201721812203 U CN 201721812203U CN 207920069 U CN207920069 U CN 207920069U
Authority
CN
China
Prior art keywords
shear wall
shear
rod
exterior sheathing
fastener
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721812203.6U
Other languages
Chinese (zh)
Inventor
邱旭程
尹周
张文英
何琪才
李杰文
李洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN201721812203.6U priority Critical patent/CN207920069U/en
Application granted granted Critical
Publication of CN207920069U publication Critical patent/CN207920069U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of shear-wall strengthening structures, belong to building construction technology, including shear wall exterior sheathing, shear wall inner template and fixture;Shear wall exterior sheathing and shear wall inner template are mutually parallel and are arranged on fixture, and to form shear wall to be cast, shear wall exterior sheathing is arranged in the outside of fixture and perpendicular to horizontal plane;Strengthening mechanism and elastic component are equipped between shear wall exterior sheathing and fixture;Strengthening mechanism includes supporting parts and fastener, and fastener is arranged on supporting parts;Supporting parts have mounting portion and supporting part, and mounting portion is for installing supporting parts to the lower part of shear wall exterior sheathing;Supporting part is used for support shear wall exterior sheathing between mounting portion and fastener;Fastener is used in the horizontal direction be fastened on shear wall exterior sheathing the side of fixture;Elastic component is arranged between fastener and shear wall exterior sheathing.It can simplify shear wall hoisting process, increase shear wall structure intensity and adapt to shear wall deformation problems.

Description

A kind of shear-wall strengthening structure
Technical field
The utility model is related to a kind of building construction technology more particularly to a kind of shear-wall strengthening structures.
Background technology
Shear wall, also known as wind-resistant wall, seismic structural wall, earthquake resistant wall or structural wall.It is primarily subjected to wind load in house or structures or earthquake is made With the wall of caused horizontal loading and vertical load (gravity), prevent structure shear (being cut) from destroying.Also known as seismic structural wall, earthquake resistant wall, generally It is made with armored concrete.
Currently, during shear wall construction, then supporting module, reinforcing bar first pour into a mould concrete, wait for concrete strength Reach form removal after requirement.
But there are problems that two in shear wall exterior sheathing work progress:First, in shear wall exterior sheathing hoisting process In there is no the measure shelved temporarily, second, the reinforcing of shear wall the foot of a wall be construction in weak link.Therefore, shear wall external mold Plate installs difficulty, and difficulty of construction is big, and working efficiency is low, and the shear wall of forming is second-rate.In addition, completing to pour into a mould in shear wall Afterwards, the deformation of shear wall is extremely easily destroyed the structure of fixing device, to destroy shear wall overall structure.
Utility model content
For overcome the deficiencies in the prior art, the purpose of this utility model is to provide a kind of shear-wall strengthening structure, Shear wall exterior sheathing hoisting process can be made more convenient, reduce difficulty of construction, while improving shear wall overall construction intensity.
The purpose of this utility model adopts the following technical scheme that realization:
A kind of shear-wall strengthening structure, including shear wall exterior sheathing, shear wall inner template and fixture;The shear wall Exterior sheathing and the shear wall inner template are mutually parallel and are arranged on the fixture, described to form shear wall to be cast Shear wall exterior sheathing is arranged in the outside of the fixture and perpendicular to horizontal plane;The shear wall exterior sheathing and the fixture Between be equipped with strengthening mechanism and elastic component;The strengthening mechanism includes supporting parts and fastener, the fastener setting On the supporting parts;The supporting parts have mounting portion and supporting part, the mounting portion be used for by the supporting parts install to The lower part of the shear wall exterior sheathing;The supporting part is between the mounting portion and the fastener, for described in support Shear wall exterior sheathing;The fastener is used in the horizontal direction be fastened on the shear wall exterior sheathing side of the fixture Face;The elastic component is arranged between the fastener and the shear wall exterior sheathing.
Further, the supporting parts include first body of rod and second body of rod;First body of rod has the mounting portion; Second body of rod is connected with first body of rod, and the position that first body of rod is connected with second body of rod forms described hold Support portion;The fastener is arranged on second body of rod.
Further, first body of rod and second body of rod are detachably connected.
Further, splicing sleeve is equipped between first body of rod and second body of rod;The both ends of the splicing sleeve respectively with First body of rod and second body of rod are threadedly coupled;The splicing sleeve peripheral surface forms the supporting part.
Further, the fastener includes mountain type card and nut;The mountain type cutting ferrule is located on the supporting parts, described The relatively described mountain type card of nut is far from the supporting part and is threadably engaged on the supporting parts.
Further, the elastic component includes two steel pipes and Buffer Unit relatively arranged side by side;Two steel pipes It is connected between the mountain type card and the shear wall exterior sheathing;Two steel pipes and the mountain type card is arranged in the Buffer Unit Between.
Further, the Buffer Unit includes snap-gauge and elastic layer;The snap-gauge is oppositely arranged with the mountain type card To form the elastic gap for accommodating the elastic layer;The elastic layer is arranged in the elastic gap.
Further, the side that the shear wall inner template and the shear wall exterior sheathing are located remotely from each other is equipped with more mutually The flitch at interval;The fastener is arranged in the outside of the flitch.
Compared with prior art, the beneficial effects of the utility model are:
1, by the way that the utility model mounting portion is arranged in the lower part of shear wall exterior sheathing and is fixed with fixture, Neng Gou Shear wall exterior sheathing is shelved temporarily in shear wall exterior sheathing hoisting process, so that shear wall exterior sheathing installs simply, is reduced Difficulty of construction improves working efficiency, is suitable for large-scale promotion application.
2, when shear wall exterior sheathing is shelved on supporting part, shear wall exterior sheathing is carried out by fastener to compress fixation, Shear wall the foot of a wall can be reinforced so that the shear wall quality of forming is preferable, is suitable for large-scale promotion application.
3, elastic component is set between fastener and shear wall exterior sheathing, for outside shear wall when shear wall being made to deform upon Template provides certain deformational displacement amount, provides certain space for the deformation of shear wall exterior sheathing and plays persistently to support and cut The effect of power wall exterior sheathing avoids shear wall from deforming upon the case where destroying its structure.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model shear-wall strengthening structure;
Fig. 2 is the utility model shear-wall strengthening structure use state diagram.
In figure:10, shear wall exterior sheathing;20, shear wall inner template;30, fixture;40, strengthening mechanism;50, elastic structure Part;60, flitch;41, supporting parts;42, fastener;411, mounting portion;412, supporting part;413, first body of rod;414, the second bar Body;415, splicing sleeve;421, mountain type card;422, nut;51, steel pipe;52, snap-gauge;53, elastic layer.
Specific implementation mode
In the following, in conjunction with attached drawing and specific implementation mode, the utility model is described further, it should be noted that Under the premise of not colliding, it can be formed in any combination between various embodiments described below or between each technical characteristic new Embodiment.
As shown in Fig. 1~2, in order to simplify shear wall hoisting process, while reinforcing shear wall integral strength, the utility model There is provided a kind of shear-wall strengthening structure comprising shear wall exterior sheathing 10, shear wall inner template 20 and fixture 30;Shear wall Exterior sheathing 10 and shear wall inner template 20 are mutually parallel and are arranged on fixture 30, to form shear wall to be cast, shear wall Exterior sheathing 10 is arranged in the outside of fixture 30 and perpendicular to horizontal plane, and fixture 30 is located at the lower part of shear wall to be cast, That is shear wall to be cast will be cast on fixture 30, fixture 30 can be for example last cast shear wall or Matrix.
Strengthening mechanism 40 and elastic component 50 are equipped between shear wall exterior sheathing 10 and fixture 30;Strengthening mechanism 40 wraps Supporting parts 41 and fastener 42 are included, fastener 42 is arranged on supporting parts 41;Supporting parts 41 have mounting portion 411 and supporting part 412, mounting portion 411 is used for the installation of supporting parts 41 to the lower part of shear wall exterior sheathing 10;Supporting part 412 is located at mounting portion 411 Between fastener 42, it to be used for support shear wall exterior sheathing 10;Fastener 42 is used in the horizontal direction by shear wall exterior sheathing 10 It is fastened on the side of fixture 30;Elastic component 50 is arranged between fastener 42 and shear wall exterior sheathing 10.
When shear wall exterior sheathing 10 lifts, first the mounting portion 411 of strengthening mechanism 40 is arranged in the side of fixture 30, To provide the supporting part 412 that can be shelved for shear wall exterior sheathing 10 temporarily, the hoisting difficulty of shear wall exterior sheathing 10 is reduced;Then Shear wall exterior sheathing 10 is pressed on fixture 30 by the fastener 42 on supporting parts 41, to 10 bottom of shear wall exterior sheathing It is reinforced, improves the structural strength of shear wall.Elastic component 50 is set between fastener 42 and shear wall exterior sheathing 10, In shear wall deformation process, shear wall exterior sheathing 10 can be toward closer or far from 42 direction displacement of fastener, and elastic component 50 can be with Certain elastic displacement is provided for shear wall exterior sheathing 10, makes the shear wall exterior sheathing 10 after displacement still can be by fastener 42 It compresses, ensures that the shear wall after deformation can also keep its structural strength.
Specifically, supporting parts 41 include first body of rod 413 and second body of rod 414;First body of rod 413 has mounting portion 411; Second body of rod 414 is connected with first body of rod 413, and the position that first body of rod 413 is connected with second body of rod 414 forms supporting part 412, That is, in use, shear wall exterior sheathing 10 is shelved on the link position of first body of rod 413 and second body of rod 414 temporarily. Fastener 42 is arranged on second body of rod 414.First body of rod 413 and second body of rod 414 are detachably connected.Supporting parts 41 are arranged At modular construction, dismounting and change and the repair of shear-wall strengthening structure can be facilitated.
As preferred embodiment, splicing sleeve 415 is equipped between first body of rod 413 and second body of rod 414;Splicing sleeve 415 both ends are threadedly coupled with first body of rod 413 and second body of rod 414 respectively;415 peripheral surface of splicing sleeve forms supporting part 412. It is spirally connected respectively first body of rod 413 and second body of rod 414 by splicing sleeve 415, can realize first body of rod 413 of Demountable modular With second body of rod, 414 connection structure, it can also increase the supporting force of supporting part 412.
Preferably, fastener 42 includes mountain type card 421 and nut 422;Mountain type card 421 is set on supporting parts 41, nut 422 mountain type cards 421 relatively far from supporting part 412 and are threadably engaged on supporting parts 41.
Elastic component 50 includes two steel pipes 51 and Buffer Unit relatively arranged side by side;Two steel pipes 51 are clamped Yushan Hill type card Between 421 and shear wall exterior sheathing 10;Buffer Unit is arranged between two steel pipes 51 and mountain type card 421.
Buffer Unit includes snap-gauge 52 and elastic layer 53, it is preferred that elastic layer 53 is rubber layer, and rubber has preferable Elastic property, while also there is good compressive property;Snap-gauge 52 is oppositely arranged with mountain type card 421 to be formed for accommodating elasticity The elastic gap of layer 53;Elastic layer 53 is arranged in the elastic gap.When meeting shear wall expansion or shrinkage deformation, pass through rubber The elasticity and compressive property of glue-line make the state that close contact is constantly between fastener 42 and shear wall exterior sheathing 10, And the effect for making fastener 42 persistently press shear wall exterior sheathing 10.
The side that shear wall inner template 20 and shear wall exterior sheathing 10 are located remotely from each other is equipped with more spaced flitches 60; Fastener 42 is arranged in the outside of flitch 60.Here, between more flitches 60 and fastener 42, moreover it is possible to add one piece of metallic plate Material (not shown), sheet metal press on flitch 60 between more flitches 60 and steel pipe 51, by steel pipe 51, can make shearing Wall is more uniformly stressed.
The above embodiment is only preferred embodiments of the present invention, cannot be protected with this to limit the utility model Range, the variation of any unsubstantiality that those skilled in the art is done on the basis of the utility model and replacing belongs to In the utility model range claimed.

Claims (8)

1. a kind of shear-wall strengthening structure, including shear wall exterior sheathing, shear wall inner template and fixture;Outside the shear wall Template and the shear wall inner template are mutually parallel and are arranged on the fixture, to form shear wall to be cast, feature It is:
The shear wall exterior sheathing is arranged in the outside of the fixture and perpendicular to horizontal plane;The shear wall exterior sheathing and institute It states and is equipped with strengthening mechanism and elastic component between fixture;The strengthening mechanism includes supporting parts and fastener, described tight Firmware is arranged on the supporting parts;There is the supporting parts mounting portion and supporting part, the mounting portion to be used for the support Part is installed to the lower part of the shear wall exterior sheathing;The supporting part is used between the mounting portion and the fastener Shear wall exterior sheathing described in support;The fastener by the shear wall exterior sheathing for being fastened on the fixation in the horizontal direction The side of object;The elastic component is arranged between the fastener and the shear wall exterior sheathing.
2. shear-wall strengthening structure as described in claim 1, it is characterised in that:The supporting parts include first body of rod and second The body of rod;First body of rod has the mounting portion;Second body of rod is connected with first body of rod, first body of rod and The connected position of second body of rod forms the supporting part;The fastener is arranged on second body of rod.
3. shear-wall strengthening structure as claimed in claim 2, it is characterised in that:First body of rod and second body of rod can Dismantling connection.
4. shear-wall strengthening structure as claimed in claim 2 or claim 3, it is characterised in that:First body of rod and second body of rod it Between be equipped with splicing sleeve;The both ends of the splicing sleeve are threadedly coupled with first body of rod and second body of rod respectively;The branch Bearing sleeve peripheral surface forms the supporting part.
5. shear-wall strengthening structure as claimed in claim 4, it is characterised in that:The fastener includes mountain type card and nut; The mountain type cutting ferrule is located on the supporting parts, and the relatively described mountain type card of the nut is far from the supporting part and is threadably engaged in On the supporting parts.
6. shear-wall strengthening structure as claimed in claim 5, it is characterised in that:The elastic component is set side by side relatively including two The steel pipe and Buffer Unit set;Two steel pipes are connected between the mountain type card and the shear wall exterior sheathing;It is described slow Component is rushed to be arranged between two steel pipes and the mountain type card.
7. shear-wall strengthening structure as claimed in claim 6, it is characterised in that:The Buffer Unit includes snap-gauge and elasticity Layer;The snap-gauge is oppositely arranged with the mountain type card to form the elastic gap for accommodating the elastic layer;The elastic layer It is arranged in the elastic gap.
8. shear-wall strengthening structure as described in claim 1, it is characterised in that:The shear wall inner template and the shear wall The side that exterior sheathing is located remotely from each other is equipped with more spaced flitches;The fastener is arranged in the outside of the flitch.
CN201721812203.6U 2017-12-21 2017-12-21 A kind of shear-wall strengthening structure Expired - Fee Related CN207920069U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721812203.6U CN207920069U (en) 2017-12-21 2017-12-21 A kind of shear-wall strengthening structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721812203.6U CN207920069U (en) 2017-12-21 2017-12-21 A kind of shear-wall strengthening structure

Publications (1)

Publication Number Publication Date
CN207920069U true CN207920069U (en) 2018-09-28

Family

ID=63607016

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721812203.6U Expired - Fee Related CN207920069U (en) 2017-12-21 2017-12-21 A kind of shear-wall strengthening structure

Country Status (1)

Country Link
CN (1) CN207920069U (en)

Similar Documents

Publication Publication Date Title
CN106382011A (en) Tensioning-anchoring system and method for prestressed carbon fiber plate of concrete structure
CN105401599A (en) Open trench tunnel main structure tall side wall unilateral vertical mold and construction process thereof
CN205577327U (en) Metal clad sheet system is hung futilely to wall body
CN103234902A (en) Device and method for testing adhesive property between fiber reinforce plastic (FRP) rib and concrete under complicated stress state
CN207920069U (en) A kind of shear-wall strengthening structure
CN205955228U (en) Prestressing force stretch -draw and anchor of carbon cloth
CN203191293U (en) Bonding performance test device for FRP (Fiber Reinforced Plastic) rib and concrete under complex stress state
CN206458118U (en) A kind of pre-stress fibre sheet combination assembled tensioning equipment
CN201981728U (en) Stainless steel composite covered column structure
CN209339377U (en) A kind of installation fixed structure of building wall board
CN204715750U (en) Utilize the Combined formwork of square rod member
CN204401829U (en) RPC compound shear wall is filled out in a kind of encased steel plate
CN203066504U (en) Reinforced concrete floor being reinforced with carbon fiber cloth
CN207846838U (en) A kind of prefabricated panel playing partition
CN112359869A (en) Combined structure pipe gallery of UHPC and steel
CN207499402U (en) All-metal Combined formwork and building template unit for building
CN206570707U (en) A kind of bridge stiffening device
CN206581398U (en) A kind of attachment structure of 3D building modules Z-type keel wall and beam
CN106703433B (en) Prestressed fiber sheet combined assembly type tensioning device and construction method thereof
CN103541559B (en) Reinforced composite board based on concrete bending member
CN215563621U (en) Concrete curtain wall dry-hanging connecting structure
CN109779281A (en) A method of with prestressing force hose clamp reinforced steel concrete structure
CN209608262U (en) A kind of no fixedly connected part and the cable testing bridge of glue bonding
CN204402006U (en) The pre-structure of i iron of reusable edible
CN103866980B (en) The wooden bulkhead construction method of body of wall steel form

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180928